Page 1: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

KEGOC JSC

KEGOC

Page 2: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

• System Operator of Kazakhstan Unified Power System (UPS)

• Natural Monopolist

• Assets 35-1150 kV OHTLs – 24,380 km

74 substations – 34,493 MVA

• Manpower 4,600 employees

• Sole Shareholder NWF Samruk-Kazyna JSC

• Assets USD 1,295.2 million*

• Equity USD 783.7 million

* as at 1 July 2011

General

Ñâåðíóòü âñå îêíà.scf

Page 3: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Asset Profile

Equity

share Core business

Energoinform JSC 100%

Maintenance of KEGOC’s information

and telecommunication complex,

enhancement of telecommunication

assets efficiency

Batys Transit JSC 20% Electricity transmission across Northern

Kazakhstan – Aktobe interconnector

Page 4: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Strategy

• KEGOC’s Long-Term Development Strategy

extended to 2025

• Comprehensive Action Plan on implementation of

KEGOC’s Long-term Development Strategy

extended to 2025

• KEGOC’s Development Plan for 2011 - 2015

Page 5: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Strategy 2025

secure reliable operation and effective development of Unified Power System of Kazakhstan in accordance with up-to-date technical, economic, environmental requirements, and occupational health and safety standards

By 2025, KEGOC will become a world-class company and the regional centre of power industry expertise

Mission:

Vision:

Strategic goal: create a competitive company in the global

economy

Page 6: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Strategic Goals

• Fulfill the Government requirements for reliability and quality of Kazakhstan UPS operation

• Achieve a level of System Operator functions to rival that of the best companies in the sector

• Ensure stable growth of the Company shareholder value through development of the core business, enhancement of the effective usage of National Power Grid transit potential, and realization of the export potential of Kazakhstan UPS

• Become a leader in corporate development in the sector, Kazakhstan and CIS

Page 7: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

• Electricity transmission across Kazakhstan National

Power Grid (NPG)

• Technical dispatching of supply and consumption in the network

• Balancing of electricity production and consumption

Rendered Services

Page 8: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Financial Indicators

Million USD

2008

actual

2009

actual

2010

actual

2011

estimated

Income 222.2 248.2 334.5 391.2

Expenses 183.6 277.0 273.1 350.6

Net income 49.7 -29.7 38.7 31.3

Dividends 5.0 5.8 4.7

Page 9: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Financial Stability Indicators

2008

actual

2009

actual

2010

actual

2011

estimated

Current ratio

2.08 2.67 2.55 2.15

Debt/equity capital 0.48 0.53 0.47 0.66

Debt/ EBITDA 3.4 4.7 2.9 4.8

Interest coverage 4.1 3.9 8.5 6.4

Page 10: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Credit Ratings

S&P

ВВ+/stable

Fitch Ratings

BBB-/positive

Moody's Investors Service

Ваа3/negative

Page 11: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Investments

USD million

Implementation

period

Alma Electricity Transmission Project 200.0 2009-2014

Kazakhstan Electricity Transmission Rehabilitation

Project, Phase II 346.7 2010-2016

Moinak Electricity Transmission Project 68.7 2010-2012

Ossakarovka Transmission Rehabilitation Project 28.4 2010-2014

Strengthening of Interconnection between Pavlodar

Power Centre and Kazakhstan UPS 26.7 2010-2017

Balkhash Electricity Transmission Project 208.8 2010-2020

Construction of Interstate 500 kV Kemin – Almaty

Transmission Line 150.0 2013-2018

Construction of 500 kV Ekibastuz – ShGES – Ust-

Kamenogorsk OHTL 283.0 2011-2017

Investment Projects of the Company

Page 12: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Investments

USD million

Implementation

period

Construction of 500 kV ShGES – Aktogai –

Taldykorgan – Alma OHTL

400.0 2012-2018

Aktau NPP Electricity Transmission Project /

Construction of 500 kV Aktau – Beineu – Kulsary –

Atyrau OHTL

474.9 2016-2020

Construction of 220 kV Uralsk - Atyrau, Kulsary –

Tengiz OHTL 142.0 2016-2020

Construction of 500 kV Astana SS including 500 kV

Nura - Astana OHTL 157.7 2016-2020

Construction of 500 kV Nura – Zhezkazgan OHTL 179.7 2016-2020

Construction of 500 kV Atyrau – Ulke OHTL 196.3 2021-2025

Torgai TPP Electricity Transmission Project 85.3 2021-2025

National Power Grid Rehabilitation 565.2 2013-2020

Total 16 projects 3 513.4 2009-2025

Investment Projects of the Company

Page 13: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Kazakhstan Electricity Transmission Rehabilitation Project.

Phase II

Project Objective

Improve the technical level, energy efficiency, reliability

and stability of Kazakhstan UPS operation

Location Kazakhstan National Power Grid

Project provides for

Stage I - Upgrading and replacement of high voltage

equipment at 55 substations of Kazakhstan National

Power Grid which have not been included in the scope

of Phase I of the Project.

Stage II - Construction of 220 kV Shu – Zapadnaya

OHTL, 256.6 km, and Burnoye – Tulkubas OHTL, 60

km.

Project value: $ 346.7 million (EBRD - € 255 million plus company's funds)

Implementation period: 2010-2016

Page 14: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Alma Electricity Transmission Project

Objective

•Improve reliability of power supply and cover of power demand of Almaty

city and Almaty region consumers;

•Power delivery from Balkhash TPP (1320 MW)

Location Almaty province

Project provides for:

• Construction of 500/220/110 kV Alma SS including 2 AT, 500 MVA

each

• Rehabilitation and extension of 500 kV Almaty SS and 500 kV

YuKGRES SS

• Construction of 500 kV YuKGRES-Alma OHTL 320.65 km

• Construction of 500 kV Almaty-Alma OHTL 62.71 km

• Construction of 220 kV Alma-Kensai OHTL 54.3 km

•Construction of 220 kV OHTL cross connection lines at Alma SS,

including:

•220 kV ACHPP-3 – Shelek OHTL 2х12.9 km

•220 kV ACHPP-3 – Robot OHTL 2х2.8 km

Project value: $ 200.0 million (IBRD - $ 78 million plus company's funds)

Implementation period: 2009-2014

Page 15: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Moinak Electricity Transmission Project

Objective

Power delivery from Moinak HPP

Location Almaty province

Project provides for

•Construction of 220 kV OHTL Moinak HPP-Shelek SS,

97.73 km

•Construction of 220 kV OHTL Moinak HPP-Robot SS,

227.457 km

•Construction of 220 kV Moinak HPP Outdoor

Switchyard

•Extension of 220 kV Robot SS

•Extension of 220 kV Shelek SS

Project value: $ 68.7 million (IBRD - $ 48 million plus company's funds)

Implementation period: 2010-2012

Page 16: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380

Ossakarovka Transmission Rehabilitation Project

Project value: $ 28.4 million (EBRD – $ 14.2 million plus company's funds)

Implementation period: 2010-2014

Objective

Improve reliability of power supply and

cover power demand of industry and

domestic consumers of Astana power

centre and Astana industrial area.

Location Akmola province

The Project provides for:

- Replacement of two transformers of 125 MVA

with the same of 250 MVA at 220/110 kV TsGPP

SS

- Rehabilitation of 220 kV TsGPP –

Ossakarovka OHTL (118.7 km)

Page 17: KEGOC JSC - Financial magazine for Asia's decision … by...•System Operator of Kazakhstan Unified Power System (UPS) •Natural Monopolist •Assets 35-1150 kV OHTLs – 24,380