Page | 1 Proactive By Design. Our Company Commitment Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting Critical Assets and Infrastructure Presented by: Gary McAllister, P.E. Jennifer Burke, P.E.

Transcript of Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On:...

Page 1: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 1

Proactive By Design.Our Company Commitment

Keeping the Lights On:Energy Facility Flood Mitigation Projects in New England –Takeaways for Protecting Critical Assets and Infrastructure

Presented by:   Gary McAllister, P.E.Jennifer Burke, P.E.

Page 2: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 2

• Background

• Flood Resilience Options

• GZA’s Work• Permanent Flood Control Solutions• Temporary and Mobilized Solutions• Testing

• Conclusions/Takeaways

Topics

Page 3: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 3

• Climate change/sea level rise/larger events

• Super Storm Sandy• 8.1M homes without power in 17 states• 57k utility workers assist in returning power to NYC

• Post-Super Storm Sandy Lessons• Restoring power can be:

Background

Time consuming

Costly A public relations nightmare

Page 4: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 4

Flood Risk Mitigation –Substation Specific Issues

• Security

• Safety

• Accessibility and Space Limitations

• Underground Penetrations

Plus typical issues:• Cost• Maintenance• Schedule• Compatibility with future 

projects• Site constraints• Permitting – comp. storage• Risks/benefits• Adaptability to climate 

change

Page 5: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 5

Protecting Critical Infrastructure

Critical Infrastructure

Commercial

Communications

Manufacturing

Defense Industrial Base

Emergency Services

Energy

Financial

Food / Agriculture

Government

IT

Nuclear

Transportation

Water / Wastewater

USDOHS, 2013 NIPP – Partnering for Critical Infrastructure Security and Resilience

Chemical

Healthcare / Public Health

Dams

Page 6: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 6

Flood Resilience Options

• Physical Options– No Flooding– Controlled Flooding

• What gets protected?

• Longevity of Solution– Long‐term– Interim– Mobilized

Photo Source: fema.gov

Floodwall protects Our Lady of Lourdes Hospital in Binghampton, NY along Susquehanna River

in 2011 during Tropical Storm Lee

Page 7: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 7

Flood Resilience - Option 1No Flooding

Re‐Build above DFERe‐Build above DFE

Permanent BarrierPermanent Barrier

Mobilized BarrierMobilized Barrier

Interim BarrierInterim Barrier

Page 8: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 8

Flood Resilience - Option 2Controlled Flooding

Raise Panels / Equipment

Dry Floodproofing

Page 9: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 9

PermanentFlood Control Barriers

Steel Sheet Pile

Vinyl Sheet Pile

Concrete

Fiberglass Sheet Pile

Page 10: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 10

InterimFlood Control Barriers

Reinforced Barrier (HESCO) Shaped Bag (Trap Bag)

Sand Bag (Big Bag) Timber Wall

www.bigbasusa.com www.hesco.com www.trapbag.com

Page 11: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 11

Mobilized Flood Control Barriers

Aquafence FloodstopInvisible Wall

Sand Bag Bladder Dam

www.aquafence.com | www.floodcontrolam.com www.presray.com | www.hydroresponse.com

Page 12: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 12

Flood Control BarriersControl of Water

Interior Sump & Pump

Exterior Sumps & Pumps

Duck bill

Flap gates

www.duckbillvalve.net www.drainagesolutionsinc.com

Page 13: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 13

• Permanent flood control concepts• 11 substations in New England• Design Flood Elevation (DFE)

• Set based on ASCE-24• Base Flood Elevation (BFE) +2 (or +3)

• Interim flood control concepts• 22 substations in New England• Flood Contingency Plans (FCPs)

• Temporary controls (2-3 years)• Mobilized controls

Project Overview

Page 14: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 14

Permanent Flood Control Concept Plans

FEMA Flood Zone Boundaries

River

Protected Area

Page 15: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 15

Permanent Concepts –Site Specific Realties

Aging seawall

Property constraints

Historical structures,

tunnels/conduits

Page 16: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 16

Flood Control Concept Selection Process

“The Matrix”

Page 17: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 17

Flood Control Concept Selection Process

Engineering/Installation/ Construction

Risk/Opportunity

Operations, Maintenance, & Replacement Cost (thousands)

Capital Cost (thousands)

Critical Path Duration (months)

Weighted RiskWeighted 

OpportunityFlood System Design 

Life= 50 years

Alternative 1 – Floodwall around Existing 23kV Yard and Building Housing 4kV yard, Flood‐proofing north 

wall of building.  

$3,824  40.0 19.0  11.0 $640

Alternative 2 – Construct new raised 23kV yard, decommission existing 23kV yard, Allow building to 

flood 

$3,379  51.5 15.0  9.0 $55

Alternative 3 – Floodwall around 23kV yard ONLY, Allow building 

to flood

$2,503  36.5 10.0 1.0  $565

“The Results”

Page 18: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 18

Flood Contingency Plans/ Mobilized Concepts

Page 19: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 19

Flood Contingency Plans/ Mobilized Concepts Testing

Geotextile between cells Geotextile not folded under

End dumped fill

Mock‐Up #1HESCO Testing

Page 20: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 20

Flood Contingency Plans/ Mobilized Concepts Testing

Excessive Internal Seepage Increasing Flow, Piping

Mock‐Up #1HESCO Testing

Page 21: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 21

Flood Contingency Plans/ Mobilized Concepts Testing

Loss of Strength – Potential Failure of Multiple Cells

Loss of Fill – Imminent Failure of Cell

Mock‐Up #1HESCO Testing

Page 22: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 22

Flood Contingency Plans/ Mobilized Concepts Testing

Mock‐Up #2HESCO Testing

Geotextile folded under this timeGeotextile damage due to

compaction method

Page 23: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 23

1. Need to listen and understand Client needs• Facility – past, present, and future• Operations and capabilities• What needs protection?

2. Thorough design development is key

3. Proper installation, training, and execution are essential

Conclusions/Takeaways

Page 24: Keeping the Lights Onctfloods.org/wp-content/uploads/2015/10/Burke-McCal...Keeping the Lights On: Energy Facility Flood Mitigation Projects in New England – Takeaways for Protecting

Page | 24

Jennifer Burke, P.E.GZA GeoEnvironmental, Inc.1350 Main Street, Suite 1400

Springfield, MA 01103(413) 726-2100

[email protected]

Gary McAllister, P.E.GZA GeoEnvironmental, Inc.477 Congress St., Suite 700

Portland, ME 04101(207) 879-9190

[email protected]

Contact Info