Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

5
Keenan Adamson 2540895 Supervisor: Dr Bill Tucker

Transcript of Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Page 1: Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Keenan Adamson2540895

Supervisor:Dr Bill Tucker

Page 2: Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Sparsely distributed areas Surveys conducted at sites are paper-based Mobile data collection will save time and money. The Emit system (Cell-Life) will be able to meet the needs of the NGO in this area. My project will extend the features of this system.

Source: Image adapted from an image at http://www.cell-life.org/emit and http://www.transcape.org/cms/index.php/Google-Maps.html

Page 3: Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Chairperson of Transcape:◦ Viewing of data as it comes in.◦ A database that is similar in structure to their

existing model.◦ Be able to organise the data in some way so that

it is more informative.

Other extensions:◦ Implement the Emit mobile client on the Android

platform.

Page 4: Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Server-side Need a database that will be able to house

data from sources that are not constant. These sources include files from Access,

Excel or SQL databases. Data could be exported and displayed using

XML or other open format.Patients =2000CanzibePatient 1Patient 2Patient 3Patient 4Patient 5.....LwandilePatient 1Patient 2Patient 3.....

Page 5: Keenan Adamson 2540895 Supervisor: Dr Bill Tucker.

Decide on solution interface and architecture

Model solution structure

Build a prototype

Continue construction of solution based on prototype

Integrate all relevant content into solution

Collect test results

Correct any errors in the source code

Create support material for website

Correspond with end-users to discuss their needs

Document all important points and decisions made

Dep

loy

Receive feedback about prototype from end-user

Term 1

Deploy solution to Transcape

Meet with developers of Emit to discuss the product

Term 2

Term 3

Term 4

Con

stru

ctM

od

el

Pla

nProject Gantt ChartProject Gantt Chart

Finalise requirements

Analyse information and develop use cases

Begin testing on problem areas

Implement prototype at Transcape site

Build a prototype mobile client