Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

414
Kaw River Bike/Pedestrian Trail Connector Bridge Calculations Loading calculations for STAAD.Pro V8i models (Spans 1, 2, and 3)

Transcript of Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Page 1: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Loading calculations for STAAD.Pro V8i models

(Spans 1, 2, and 3)

Page 2: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge repurposedReferences:1LRFD Guide Specifications for the Design of Pedestrian Bridges (Dec 2009 with 2015 Interim Revisions)2 LRFD Bridge Design Specifications, Seventh Edition, 20143 2006 IBC

reinforced concrete weight = 150 pcfPedestrian live load = 90 psf 1 Section 3.1Restaurant live load = 100 psf 3 Table 1607.1

Phase 1 - 10' trail centered on the bridge and wide platform centered on river pier between Spans 1 and 2General assumptions:

• Clear trail width is 10'-0" so total deck width is 12'-0" to account for railings• Trail is a 6" thick reinforced concrete slab supported on steel transverse beams• Transverse support beams will be supported by the running girders in Spans 1 or 2 and stringers in Span 3• Platform is approximately 42' wide and 82'-1", length adjusted to match STAAD beams 83.9' long and will

assume out to out of platform is 43' wide to accounf for railings• Vertical loading will be applied as a distributed load to the running girders or stringers in the STAAD model

At location of 10' trailDead Loads:

Width (ft) Thickness (in) Area (sf) Weight (k/ft) Weight per running girder (k/ft)Concrete deck: 12.00 6.00 6.00 0.90 0.45

2 Railings + Misc: Assume 150.00 lb/ft per rail 0.30 0.15Transverse beams+ Misc.: Assume 75.00 lb/ft per beam

@ 10.00 ft spacing 0.09 0.05Subtotal = 0.645

Apply 10.00% increaseTotal = 0.71

Live Load:Width (ft) Load (psf) Weight (k/ft) Weight per running girder (k/ft)

10.00 90.00 0.90 0.45Total = 0.45

At location of platform STAAD Beams affected by platform loading will be:Span 1: 10031 to 10035 and 20031 to 20035 Span 2: 10000 to 10004 and 20000 to 20004

Dead Loads:Width (ft) Thickness (in) Area (sf) Weight (k/ft) Weight per running girder (k/ft)

Concrete deck: 43.00 6.00 21.50 3.23 1.6125

4 Railings + Misc: Assume 150.00 lb/ft per rail 0.60 0.3

Page 3: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge repurposedTransverse beams+ Misc.: Assume 75.00 lb/ft per beam

@ 5.00 ft spacing 0.65 0.32Subtotal = 2.235

Apply 20.00% increaseTotal = 2.69

Live Load:Width (ft) Load (psf) Weight (k/ft) Weight per running girder (k/ft)

42.00 90.00 3.78 1.89Total = 1.89

Phase 2 - Phase 1 + 200' long platform centered on Span 2General assumptions:

• Clear trail width is 10'-0" so total deck width is 12'-0" to account for railings• Trail is a 6" thick reinforced concrete slab supported on steel transverse beams• Transverse support beams will be supported by the running girders in Spans 1 or 2 and stringers in Span 3• Platform is approximately 200'-4" long and 42' wide, will model as about 201'-4" because of how STAAD beam

are modeled for the running girders (each beam is 8.389' long) and 43' wide to allow railings• Vertical loading will be applied as a distributed load to the running girders or stringers in the STAAD model

At location of 10' trailLoads will be the same as Phase 1 10' trail

DL = 0.71 k/ft LL = 0.45 k/ftSpan 1 STAAD Beams: 10000 to 10030, 20000 to 20030Span 2 STAAD Beams: 10005 to 10008, 10027 to 10035, 20005 to 20008, 20027 to 20035

At location of platformsLoads will be the same as Phase 1 Platform

DL = 2.69 k/ft LL = 1.89 k/ftSpan 1 STAAD Beams: 10031 to 10035, 20031 to 20035Span 2 STAAD Beams: 10000 to 10004, 10009 to 10026, 20000 to 20004, 20009 to 20026

Page 4: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge repurposedPhase 3 - Phase 2 + Amenity Structure in Span 2Same assumptions as Phase 2, plus the following:

• Approximate 132'-10" long by 12' wide building is centered on the platform in Span 2, building length will beadjusted to 134.2' long because of STAAD beam lengths

• Building will also be supported by steel transverse beams

At location of 10' trailLoads will be the same as Phase 1 10' trail

DL = 0.71 k/ft LL = 0.45 k/ftSpan 1 STAAD Beams: same as Phase 2Span 2 STAAD Beams: same as Phase 2

At location of platform without buildingLoads will be the same as Phase 1 Platform

DL = 2.69 k/ft LL = 1.89 k/ftSpan 1 STAAD Beams: same as Phase 2Span 2 STAAD Beams: 10000 to 10004, 10009, 10026, 20000 to 20004, 20009, 20026

At location of platform withbuildingDead Loads:

Span 2 STAAD Beams: 10010 to 10025, 20010 to 20025Width (ft) Thickness (in) Area (sf) Weight (k/ft) Weight per running girder (k/ft)

Concrete deck: 43.00 6.00 21.50 3.23 1.6125

Railings + Misc: Assume 150.00 lb/ft per rail 0.30 0.15

Transverse beams+ Misc.: Assume 75.00 lb/ft per beam@ 5.00 ft spacing 0.65 0.32

Width (ft) Load (psf) Weight (k/ft)Building load: 12.00 50.00 0.60 0.3

Subtotal = 2.385Apply 15.00% increase

Total = 2.75

Live Load: Width (ft) Load (psf) Weight (k/ft) Weight per running girder (k/ft)Trail: 31.00 90.00 2.79 1.395

Building Load: 12.00 100 1.20 0.6Total = 2

Page 5: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge repurposedLoad cases to consider 1 Section 3.7 2 Table 3.4.1-1

• Loads that are applicable are DC, PL and WS, but WS not considered for preliminary planning phase

For each Phase consider:Strength I: 1.25DC + 1.75PL

Page 6: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Spans 1 and 2

As-built section property calculations

Page 7: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/2/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 4.000 inB1 = lh = 4.000 in B2 = lh = 4.000 inC1 = tl = 0.625 in C2 = tl = 0.625 in

Web Plate 1: PL Web Plate 2: PL A3 = b = 24.000 in A4 = b = 0.000 inB3 = t = 0.438 in B4 = t = 0.000 in

B6 = 25.875 in Top Cover Plate: A5 = b = 0.000 inB5 = t = 0.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.000 23.688 118.438 0.163 11.688 682.988 683.151Vertical Leg 4.219 21.688 91.494 4.005 9.688 395.920 399.924Horizontal Leg 5.000 0.313 1.563 0.163 11.688 682.988 683.151Vertical Leg 4.219 2.313 9.756 4.005 9.688 395.920 399.924

3 Inner Web Plate(s) 21.000 12.000 252.000 1008.000 0.000 0.000 1008.0004 Outer Side Plate 0.000 12.000 0.000 0.000 0.000 0.000 0.0005 Top Cover Plate 0.000 24.000 0.000 0.000 12.000 0.000 0.000

Total 39.44 473.25 1016.33 2157.82 3174.15A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 12.0000 in Stop = 264.51 in3 y-bar = 12.0000 in Stop = 264.51 in3

Ix = 3174.15 n4 Sbott. = 264.51 in3 Ix = 3174.15 in4 Sbott. = 264.51 in3

ctop = 12.000 in A = 39.4375 in2 ctop = 12.0000 in A = 39.4375 in2

cbottom = 12.000 in rx = 8.9714 in cbottom = 12.0000 in rx = 8.9714 in

2

P101160439

Lower Chord, PP0-2 & 10-12

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 8: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/2/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310

(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.2551 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310

(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.2552 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310

(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.2552 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310

(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.2553 (Left) 10.500 4.219 44.297 0.167 13.156 1817.413 1817.580

3 (Right) 10.500 30.531 320.578 0.167 13.156 1817.413 1817.5804 (Left) 0.000 4.000 0.000 0.000 13.375 0.000 0.000

4 (Right) 0.000 30.750 0.000 0.000 13.375 0.000 0.0005 Top Cover Plate 0.000 17.375 0.000 0.000 0.000 0.000 0.000

Total 39.44 685.23 13.94 7579.48 7593.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 17.3750 in Sright = 437.03 in3 x-bar = 17.3750 in Sright = 437.03 in3

Iy = 7593.42 n4 Sleft = 437.03 in3 Iy = 7593.42 in4 Sleft = 437.03 in3

cright = 17.3750 in A = 39.4375 in2 cright = 17.3750 in A = 39.4375 in2

cleft = 17.3750 in ry = 13.8760 in cleft = 17.3750 in ry = 13.8760 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 37.4656 in2 Iy = 6853.0618 in2 Ix = 2864.671 in2

ry = 13.5246 in rx = 8.7442 in

Section properties with loss applied

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 9: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.750 in B5 = t = 1.750 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.750 in B6 = t = 1.750 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.750 in C = 2.000 in

Fourth eyebar D = 7.000 inA4 = h = 8.000 in E = 2.000 inB4 = t = 1.750 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6672 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6673 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6674 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6675 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6676 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.667

Total 84.00 336.00 448.00 0.00 448.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 112.00 in3 y-bar = 4.0000 in Stop = 112.00 in3

Ix = 448.00 in4 Sbott. = 112.00 in3 Ix = 448.00 in4 Sbott. = 112.00 in3

ctop = 4.000 in A = 84.0000 in2 ctop = 4.0000 in A = 84.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

P101160439

Lower Chord, L5-L6 & L6-L7

Gross Section (without Losses)

Section Losses

Page 10: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 14.000 0.875 12.250 3.573 14.375 2892.969 2896.5422 eyebar 14.000 4.625 64.750 3.573 10.625 1580.469 1584.0423 eyebar 14.000 13.375 187.250 3.573 1.875 49.219 52.7924 eyebar 14.000 17.125 239.750 3.573 1.875 49.219 52.7925 eyebar 14.000 25.875 362.250 3.573 10.625 1580.469 1584.0426 eyebar 14.000 29.625 414.750 3.573 14.375 2892.969 2896.542

Total 84.00 1281.00 21.44 9045.31 9066.75A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 15.2500 in Sright = 594.54 in3 x-bar = 15.2500 in Sright = 594.54 in3

Iy = 9066.75 n4 Sleft = 594.54 in3 Iy = 9066.75 in4 Sleft = 594.54 in3

cright = 15.2500 in A = 84.0000 in2 cright = 15.2500 in A = 84.0000 in2

cleft = 15.2500 in ry = 10.3893 in cleft = 15.2500 in ry = 10.3893 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 79.8000n2 Iy = 8182.7419n2 Ix = 404.32 in2

ry = 10.1262 in rx = 2.2509 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 11: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.375 in B5 = t = 1.375 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.375 in B6 = t = 1.375 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.375 in C = 16.000 in

Fourth eyebar D = 1.500 inA4 = h = 8.000 in E = 1.500 inB4 = t = 1.375 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6672 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6673 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6674 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6675 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6676 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.667

Total 66.00 264.00 352.00 0.00 352.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 88.00 in3 y-bar = 4.0000 in Stop = 88.00 in3

Ix = 352.00 in4 Sbott. = 88.00 in3 Ix = 352.00 in4 Sbott. = 88.00 in3

ctop = 4.000 in A = 66.0000 in2 ctop = 4.0000 in A = 66.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

P101160439

Lower Chord, L2-L3 & L9-L0

Gross Section (without Losses)

Section Losses

Page 12: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 11.000 0.688 7.563 1.733 14.438 2292.855 2294.5892 eyebar 11.000 3.563 39.188 1.733 11.563 1470.605 1472.3393 eyebar 11.000 6.438 70.813 1.733 8.688 830.199 831.9324 eyebar 11.000 23.813 261.938 1.733 8.688 830.199 831.9325 eyebar 11.000 26.688 293.563 1.733 11.563 1470.605 1472.3396 eyebar 11.000 29.563 325.188 1.733 14.438 2292.855 2294.589

Total 66.00 998.25 10.40 9187.32 9197.72A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 15.1250 in Sright = 608.11 in3 x-bar = 15.1250 in Sright = 608.11 in3

Iy = 9197.72 n4 Sleft = 608.11 in3 Iy = 9197.72 in4 Sleft = 608.11 in3

cright = 15.1250 in A = 66.0000 in2 cright = 15.1250 in A = 66.0000 in2

cleft = 15.1250 in ry = 11.8051 in cleft = 15.1250 in ry = 11.8051 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 62.7000 in2 Iy = 8300.9412 in2 Ix = 317.68 in2

ry = 11.5061 in rx = 2.2509 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 13: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/2/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.375 in B5 = t = 1.375 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.375 in B6 = t = 1.375 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.375 in C = 13.000 in

Fourth eyebar D = 4.500 inA4 = h = 8.000 in E = 1.500 inB4 = t = 1.375 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6672 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6673 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6674 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6675 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6676 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.667

Total 66.00 264.00 352.00 0.00 352.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 88.00 in3 y-bar = 4.0000 in Stop = 88.00 in3

Ix = 352.00 in4 Sbott. = 88.00 in3 Ix = 352.00 in4 Sbott. = 88.00 in3

ctop = 4.000 in A = 66.0000 in2 ctop = 4.0000 in A = 66.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

P101160439

Lower Chord, L3-L4 & L8-L9

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 14: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/2/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 11.000 0.688 7.563 1.733 15.938 2794.043 2795.7762 eyebar 11.000 3.563 39.188 1.733 13.063 1876.918 1878.6513 eyebar 11.000 9.438 103.813 1.733 7.188 568.262 569.9954 eyebar 11.000 23.813 261.938 1.733 7.188 568.262 569.9955 eyebar 11.000 29.688 326.563 1.733 13.063 1876.918 1878.6516 eyebar 11.000 32.563 358.188 1.733 15.938 2794.043 2795.776

Total 66.00 1097.25 10.40 10478.45 10488.84A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 16.6250 in Sright = 630.91 in3 x-bar = 16.6250 in Sright = 630.91 in3

Iy = 10488.84 n4 Sleft = 630.91 in3 Iy = 10488.84 in4 Sleft = 630.91 in3

cright = 16.6250 in A = 66.0000 in2 cright = 16.6250 in A = 66.0000 in2

cleft = 16.6250 in ry = 12.6064 in cleft = 16.6250 in ry = 12.6064 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 62.7000n2 Iy = 9466.1815n2 Ix = 317.68 in2

ry = 12.2872 in rx = 2.2509 in

Section Losses

Section properties with loss applied

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 15: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.750 in B5 = t = 1.750 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.750 in B6 = t = 1.750 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.750 in C = 5.500 in

Fourth eyebar D = 3.500 inA4 = h = 8.000 in E = 2.000 inB4 = t = 1.750 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6672 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6673 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6674 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6675 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.6676 eyebar 14.000 4.000 56.000 74.667 0.000 0.000 74.667

Total 84.00 336.00 448.00 0.00 448.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 112.00 in3 y-bar = 4.0000 in Stop = 112.00 in3

Ix = 448.00 in4 Sbott. = 112.00 in3 Ix = 448.00 in4 Sbott. = 112.00 in3

ctop = 4.000 in A = 84.0000 in2 ctop = 4.0000 in A = 84.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

P101160439

Lower Chord, L4-L5 & L7-L8

Gross Section (without Losses)

Section Losses

Page 16: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 6/15/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 14.000 0.875 12.250 3.573 12.625 2231.469 2235.0422 eyebar 14.000 4.625 64.750 3.573 8.875 1102.719 1106.2923 eyebar 14.000 9.875 138.250 3.573 3.625 183.969 187.5424 eyebar 14.000 17.125 239.750 3.573 3.625 183.969 187.5425 eyebar 14.000 22.375 313.250 3.573 8.875 1102.719 1106.2926 eyebar 14.000 26.125 365.750 3.573 12.625 2231.469 2235.042

Total 84.00 1134.00 21.44 7036.31 7057.75A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 13.5000 in Sright = 522.80 in3 x-bar = 13.5000 in Sright = 522.80 in3

Iy = 7057.75 n4 Sleft = 522.80 in3 Iy = 7057.75 in4 Sleft = 522.80 in3

cright = 13.5000 in A = 84.0000 in2 cright = 13.5000 in A = 84.0000 in2

cleft = 13.5000 in ry = 9.1663 in cleft = 13.5000 in ry = 9.1663 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 79.8000n2 Iy = 6369.6194n2 Ix = 404.32 in2

ry = 8.9342 in rx = 2.2509 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 17: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 6.000 inB1 = lh = 4.000 in B2 = lh = 6.000 inC1 = tl = 0.438 in C2A = tl = 0.625 in

C2B = tl = 0.625 inWeb Plate 1: PL Web Plate 2: PL

A3 = b = 26.500 in A4 = b = 0.000 inB3 = t = 0.625 in B4 = t = 0.000 in

B6 = 20.250 in Top Cover Plate: A5 = b = 30.000 inB5 = t = 0.625 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.500 26.281 91.984 0.056 10.686 399.699 399.755Vertical Leg 3.117 24.281 75.689 3.297 8.686 235.205 238.501Horizontal Leg 7.500 0.313 2.344 0.244 15.282 1751.619 1751.863Vertical Leg 6.719 3.313 22.256 16.176 12.282 1013.559 1029.735

3 Inner Web Plate(s) 33.125 13.250 438.906 1938.503 2.345 182.127 2120.6294 Outer Side Plate 0.000 13.250 0.000 0.000 2.345 0.000 0.0005 Top Cover Plate 18.750 26.813 502.734 0.610 11.218 2359.432 2360.043

Total 72.71 1133.91 1958.89 5941.64 7900.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 15.5948 in Stop = 685.20 in3 y-bar = 15.5948 in Stop = 685.20 in3

Ix = 7900.53 n4 Sbott. = 506.61 in3 Ix = 7900.53 in4 Sbott. = 506.61 in3

ctop = 11.530 in A = 72.7109 in2 ctop = 11.5302 in A = 72.7109 in2

cbottom = 15.595 in rx = 10.4239 in cbottom = 15.5948 in rx = 10.4239 in

2

P101160439

Upper Chord PP 1-2, 10-11 and end posts

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 18: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.750 2.250 3.938 2.333 12.750 284.484 286.818

(Left) Vertical Leg 1.559 4.031 6.283 0.025 10.969 187.520 187.5451 Horizontal Leg 1.750 27.750 48.563 2.333 12.750 284.484 286.818

(Right) Vertical Leg 1.559 25.969 40.475 0.025 10.969 187.520 187.5452 Horizontal Leg 3.750 1.250 4.688 11.250 13.750 708.984 720.234

(Left) Vertical Leg 3.359 3.938 13.228 0.109 11.063 411.117 411.2262 Horizontal Leg 3.750 28.750 107.813 11.250 13.750 708.984 720.234

(Right) Vertical Leg 3.359 26.063 87.554 0.109 11.063 411.117 411.2263 (Left) 16.563 4.563 75.566 0.539 10.438 1804.342 1804.881

3 (Right) 16.563 25.438 421.309 0.539 10.438 1804.342 1804.8814 (Left) 0.000 2.250 0.000 0.000 12.750 0.000 0.000

4 (Right) 0.000 23.750 0.000 0.000 8.750 0.000 0.0005 Top Cover Plate 18.750 15.000 281.250 1406.250 0.000 0.000 1406.250

Total 72.71 1090.66 1434.76 6792.89 8227.66A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 15.0000 in Sright = 548.51 in3 x-bar = 15.0000 in Sright = 548.51 in3

Iy = 8227.66 n4 Sleft = 548.51 in3 Iy = 8227.66 in4 Sleft = 548.51 in3

cright = 15.0000 in A = 72.7109 in2 cright = 15.0000 in A = 72.7109 in2

cleft = 15.0000 in ry = 10.6375 in cleft = 15.0000 in ry = 10.6375 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 69.0754n2 Iy = 7425.4613n2 Ix = 7130.2259 in2

ry = 10.3681 in rx = 10.1599 in

Section properties with loss applied

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 19: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 6.000 inB1 = lh = 4.000 in B2 = lh = 6.000 inC1 = tl = 0.438 in C2A = tl = 0.625 in

C2B = tl = 0.625 inWeb Plate 1: PL Web Plate 2: PL

A3 = b = 26.500 in A4 = b = 16.250 inB3 = t = 0.625 in B4 = t = 0.625 in

B6 = 20.250 in Top Cover Plate: A5 = b = 30.000 inB5 = t = 0.625 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.500 26.281 91.984 0.056 11.198 438.918 438.974Vertical Leg 3.117 24.281 75.689 3.297 9.198 263.750 267.046Horizontal Leg 7.500 0.313 2.344 0.244 14.770 1636.215 1636.459Vertical Leg 6.719 3.313 22.256 16.176 11.770 930.816 946.992

3 Inner Web Plate(s) 33.125 13.250 438.906 1938.503 1.833 111.273 2049.7754 Outer Side Plate 20.313 13.250 269.141 446.981 1.833 68.233 515.2145 Top Cover Plate 18.750 26.813 502.734 0.610 11.730 2579.732 2580.343

Total 93.02 1403.05 2405.87 6028.94 8434.80A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 15.0828 in Stop = 700.44 in3 y-bar = 15.0828 in Stop = 700.44 in3

Ix = 8434.80 n4 Sbott. = 559.23 in3 Ix = 8434.80 in4 Sbott. = 559.23 in3

ctop = 12.042 in A = 93.0234 in2 ctop = 12.0422 in A = 93.0234 in2

cbottom = 15.083 in rx = 9.5223 in cbottom = 15.0828 in rx = 9.5223 in

2

P101160439

Upper Chord PP 2-10

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 20: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.750 2.250 3.938 2.333 12.313 265.330 267.663

(Left) Vertical Leg 1.559 4.031 6.283 0.025 10.532 172.885 172.9101 Horizontal Leg 1.750 27.750 48.563 2.333 13.187 304.307 306.640

(Right) Vertical Leg 1.559 25.969 40.475 0.025 11.405 202.749 202.7742 Horizontal Leg 3.750 1.250 4.688 11.250 13.313 664.663 675.913

(Left) Vertical Leg 3.359 3.938 13.228 0.109 10.626 379.298 379.4072 Horizontal Leg 3.750 28.750 107.813 11.250 14.187 754.736 765.986

(Right) Vertical Leg 3.359 26.063 87.554 0.109 11.499 444.217 444.3263 (Left) 16.563 4.563 75.566 0.539 10.001 1656.509 1657.048

3 (Right) 16.563 25.438 421.309 0.539 10.874 1958.493 1959.0324 (Left) 10.156 1.938 19.678 0.331 12.626 1619.012 1619.342

4 (Right) 10.156 24.063 244.385 0.331 9.499 916.451 916.7815 Top Cover Plate 18.750 15.000 281.250 1406.250 0.437 3.576 1409.826

Total 93.02 1354.73 1435.42 9342.22 10777.65A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 14.5633 in Sright = 698.18 in3 x-bar = 14.5633 in Sright = 698.18 in3

Iy = 10777.65 n4 Sleft = 740.06 in3 Iy = 10777.65 in4 Sleft = 740.06 in3

cright = 15.4367 in A = 93.0234 in2 cright = 15.4367 in A = 93.0234 in2

cleft = 14.5633 in ry = 10.7638 in cleft = 14.5633 in ry = 10.7638 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 88.3723n2 Iy = 9726.8282n2 Ix = 7612.4097 in2

ry = 10.4913 in rx = 9.2812 in

Section properties with loss applied

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 21: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/15/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 0.000 in A5 = h = 8.000 inB1 = t = 0.000 in B5 = t = 1.250 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 0.000 inB2 = t = 1.250 in B6 = t = 0.000 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.250 in C = 5.625 in

Fourth eyebar D = 5.625 inA4 = h = 8.000 in E = 0.000 inB4 = t = 1.250 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 0.000 0.000 0.000 0.000 4.000 0.000 0.0002 eyebar 10.000 4.000 40.000 53.333 0.000 0.000 53.3333 eyebar 10.000 4.000 40.000 53.333 0.000 0.000 53.3334 eyebar 10.000 4.000 40.000 53.333 0.000 0.000 53.3335 eyebar 10.000 4.000 40.000 53.333 0.000 0.000 53.3336 eyebar 0.000 0.000 0.000 0.000 4.000 0.000 0.000

Total 40.00 160.00 213.33 0.00 213.33A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 53.33 in3 y-bar = 4.0000 in Stop = 53.33 in3

Ix = 213.33 in4 Sbott. = 53.33 in3 Ix = 213.33 in4 Sbott. = 53.33 in3

ctop = 4.000 in A = 40.0000 in2 ctop = 4.0000 in A = 40.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

P101160439

Diagonal U1-L2, U11-L10

Gross Section (without Losses)

Section Losses

Page 22: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/15/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 eyebar 0.000 0.000 0.000 0.000 10.938 0.000 0.0002 eyebar 10.000 0.625 6.250 1.302 10.313 1063.477 1064.7793 eyebar 10.000 7.500 75.000 1.302 3.438 118.164 119.4664 eyebar 10.000 14.375 143.750 1.302 3.438 118.164 119.4665 eyebar 10.000 21.250 212.500 1.302 10.313 1063.477 1064.7796 eyebar 0.000 21.875 0.000 0.000 10.938 0.000 0.000

Total 40.00 437.50 5.21 2363.28 2368.49A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 10.9375 in Sright = 216.55 in3 x-bar = 10.9375 in Sright = 216.55 in3

Iy = 2368.49 n4 Sleft = 216.55 in3 Iy = 2368.49 in4 Sleft = 216.55 in3

cright = 10.9375 in A = 40.0000 in2 cright = 10.9375 in A = 40.0000 in2

cleft = 10.9375 in ry = 7.6949 in cleft = 10.9375 in ry = 7.6949 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 38.0000 in2 Iy = 2137.5618 in2 Ix = 192.5333 in2

ry = 7.5001 in rx = 2.2509 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 23: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 4.000 inB1 = lh = 4.000 in B2 = lh = 4.000 inC1 = tl = 0.625 in C2A = tl = 0.625 in

C2B = tl = 0.625 inWeb Plate 1: PL Web Plate 2: PL

A3 = b = 20.250 in A4 = b = 0.000 inB3 = t = 0.500 in B4 = t = 0.000 in

B6 = 17.250 in Top Cover Plate: A5 = b = 26.250 inB5 = t = 0.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.000 19.938 99.688 0.163 9.813 481.426 481.589Vertical Leg 4.219 17.938 75.674 4.005 7.813 257.492 261.497Horizontal Leg 5.000 0.313 1.563 0.163 9.813 481.426 481.589Vertical Leg 4.219 2.313 9.756 4.005 7.813 257.492 261.497

3 Inner Web Plate(s) 20.250 10.125 205.031 691.980 0.000 0.000 691.9804 Outer Side Plate 0.000 10.125 0.000 0.000 0.000 0.000 0.0005 Top Cover Plate 0.000 20.250 0.000 0.000 10.125 0.000 0.000

Total 38.69 391.71 700.32 1477.84 2178.15A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 10.1250 in Stop = 215.13 in3 y-bar = 10.1250 in Stop = 215.13 in3

Ix = 2178.15 n4 Sbott. = 215.13 in3 Ix = 2178.15 in4 Sbott. = 215.13 in3

ctop = 10.125 in A = 38.6875 in2 ctop = 10.1250 in A = 38.6875 in2

cbottom = 10.125 in rx = 7.5034 in cbottom = 10.1250 in rx = 7.5034 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

2

P101160439

Diagonal U2-L4, U4-L6, U8-L6, U10-L8

Gross Section (without Losses)

1

No top cover plate, used only

Page 24: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/1/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.500 2.000 5.000 3.333 11.125 309.414 312.747

(Left) Vertical Leg 2.109 3.688 7.778 0.069 9.438 187.874 187.9431 Horizontal Leg 2.500 24.250 60.625 3.333 11.125 309.414 312.747

(Right) Vertical Leg 2.109 22.563 47.593 0.069 9.438 187.874 187.9432 Horizontal Leg 2.500 2.000 5.000 3.333 11.125 309.414 312.747

(Left) Vertical Leg 2.109 3.688 7.778 0.069 9.438 187.874 187.9432 Horizontal Leg 2.500 24.250 60.625 3.333 11.125 309.414 312.747

(Right) Vertical Leg 2.109 22.563 47.593 0.069 9.438 187.874 187.9433 (Left) 10.125 4.250 43.031 0.211 8.875 797.502 797.713

3 (Right) 10.125 22.000 222.750 0.211 8.875 797.502 797.7134 (Left) 0.000 4.000 0.000 0.000 9.125 0.000 0.000

4 (Right) 0.000 22.250 0.000 0.000 9.125 0.000 0.0005 Top Cover Plate 0.000 13.125 0.000 0.000 0.000 0.000 0.000

Total 38.69 507.77 14.03 3584.16 3598.19A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 13.1250 in Sright = 274.15 in3 x-bar = 13.1250 in Sright = 274.15 in3

Iy = 3598.19 n4 Sleft = 274.15 in3 Iy = 3598.19 in4 Sleft = 274.15 in3

cright = 13.1250 in A = 38.6875 in2 cright = 13.1250 in A = 38.6875 in2

cleft = 13.1250 in ry = 9.6440 in cleft = 13.1250 in ry = 9.6440 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 36.7531 in2 Iy = 3247.3645 in2 Ix = 1965.781 in2

ry = 9.3998 in rx = 7.3134 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 25: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/15/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 12.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500

Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3 y-bar = 7.5000 in Stop = 83.58 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 626.82 in4 Sbott. = 83.58 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 19.8000 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.6265 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

P101160439

Diagonal M3-L2, M5-L4, M7-L8, M9-L10

Gross Section (without Losses)

Page 26: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/15/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 1.7000 3.7570 2.1290 4.3000 40.8629 42.9919

Bottom Leg 2.2100 1.7000 3.7570 2.1290 4.3000 40.8629 42.9919Web 5.4800 0.2000 1.0960 0.0731 5.8000 184.3472 184.4203

2 Top Leg 2.2100 10.3000 22.7630 2.1290 4.3000 40.8629 42.9919Bottom Leg 2.2100 10.3000 22.7630 2.1290 4.3000 40.8629 42.9919Web 5.4800 11.8000 64.6640 0.0731 5.8000 184.3472 184.4203

Total 19.80 118.80 8.66 532.15 540.81A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 6.0000 in Sright = 90.13 in3 x-bar = 6.0000 in Sright = 90.13 in3

Iy = 540.81 n4 Sleft = 90.13 in3 Iy = 540.81 n4 Sleft = 90.13 in3

cright = 6.0000 in A = 19.8000 in2 cright = 6.0000 in A = 19.8000 in2

cleft = 6.0000 in ry = 5.2262 in cleft = 6.0000 in ry = 5.2262 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 488.0792 in2 Ix = 565.7082 in2

ry = 5.0939 in rx = 5.4841 in

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 27: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/3/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500

Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3 y-bar = 7.5000 in Stop = 83.58 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 626.82 in4 Sbott. = 83.58 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 19.8000 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.6265 in

Section Losses

P101160439

Verticals at PP 1, 3-9, 11

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 28: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/3/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439

Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3 x-bar = 8.0000 in Sright = 128.29 in3

Iy = 1026.33 n4 Sleft = 128.29 in3 Iy = 1026.33 in4 Sleft = 128.29 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 19.8000 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.1996 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 in

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 29: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/3/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Angles (Typ):

A1 = lw = 4.000 inB1 = lh = 4.000 inC1 = tl = 0.500 in

Plate (Typ.):A2 = b = 20.000 inB2 = t = 0.500 in

B3 = 15.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 4.000 19.750 79.000 0.083 9.750 380.250 380.333Vertical Leg 3.500 17.750 62.125 3.573 7.750 210.219 213.792Horizontal Leg 4.000 0.250 1.000 0.083 9.750 380.250 380.333Vertical Leg 3.500 2.250 7.875 3.573 7.750 210.219 213.792

2 Left Plate 10.000 10.000 100.000 333.333 0.000 0.000 333.3332 Right Plate 10.000 10.000 100.000 333.333 0.000 0.000 333.333

Total 35.00 350.00 673.98 1180.94 1854.92A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 10.0000 in Stop = 185.49 in3 y-bar = 10.0000 in Stop = 185.49 in3

Ix = 1854.92 n4 Sbott. = 185.49 in3 Ix = 1854.92 in4 Sbott. = 185.49 in3

ctop = 10.000 in A = 35.0000 in2 ctop = 10.0000 in A = 35.0000 in2

cbottom = 10.000 in rx = 7.2799 in cbottom = 10.0000 in rx = 7.2799 in

1 Bottom Angles

P101160439

Verticals at PP 2 & 10

Gross Section (without Losses)

1 Top Angles

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 30: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/3/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 4.000 2.500 10.000 5.333 5.500 121.000 126.333Vertical Leg 3.500 0.750 2.625 0.073 7.250 183.969 184.042Horizontal Leg 4.000 13.500 54.000 5.333 5.500 121.000 126.333Vertical Leg 3.500 15.250 53.375 0.073 7.250 183.969 184.042

2 Left Plate 10.000 0.250 2.500 0.208 7.750 600.625 600.8332 Right Plate 10.000 15.750 157.500 0.208 7.750 600.625 600.833

Total 35.00 280.00 11.23 1811.19 1822.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 8.0000 in Sright = 227.80 in3 x-bar = 8.0000 in Sright = 227.80 in3

Iy = 1822.42 n4 Sleft = 227.80 in3 Iy = 1822.42 in4 Sleft = 227.80 in3

cright = 8.0000 in A = 35.0000 in2 cright = 8.0000 in A = 35.0000 in2

cleft = 8.0000 in ry = 7.2159 in cleft = 8.0000 in ry = 7.2159 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 33.2500 in2 Iy = 1644.731 in2 Ix = 1674.0623 in2

ry = 7.0332 in rx = 7.0956 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

1 Left Angles1 Right Angles

Section properties with loss applied

Page 31: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.0000 in A2 =b = 3.0000 inB1 = t = 0.3750 in B2 = t = 0.3750 in

C1 = b = 3.0000 in C2 = b = 3.0000 inD1 = t = 0.3750 in D2 = t = 0.3750 in

Angle Back-to-Back Dimension:E = 27.0000 in

Angle Back-to-Back Dimension:F = 0.8750 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 2.2500 25.5000 57.3750 1.6875 12.0000 324.0000 325.6875Outstanding Leg 1.9688 26.8125 52.7871 0.0231 13.3125 348.9071 348.9302Connected Leg 2.2500 1.5000 3.3750 1.6875 12.0000 324.0000 325.6875Outstanding Leg 1.9688 0.1875 0.3691 0.0231 13.3125 348.9071 348.9302

Total 8.44 113.91 3.42 1345.81 1349.24

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1 1.1250 2.8125 3.1641 0.0132 0.6250 0.4395 0.4526Connected Leg 2 1.1250 4.0625 4.5703 0.0132 0.6250 0.4395 0.4526Outstanding Leg 1 0.9844 1.3125 1.2920 0.5652 2.1250 4.4451 5.0103Outstanding Leg 2 0.9844 5.5625 5.4756 0.5652 2.1250 4.4451 5.0103Connected Leg 1 1.1250 2.8125 3.1641 0.0132 0.6250 0.4395 0.4526Connected Leg 2 1.1250 4.0625 4.5703 0.0132 0.6250 0.4395 0.4526Outstanding Leg 1 0.9844 1.3125 1.2920 0.5652 2.1250 4.4451 5.0103Outstanding Leg 2 0.9844 5.5625 5.4756 0.5652 2.1250 4.4451 5.0103

Total 8.44 29.00 2.31 19.54 21.85

y-bar = 13.5000 in Stop = 99.94 in3 x-bar = 3.4375 in Sright = 6.36 in3

Ix = 1349.24 in4 Sbott. = 99.94 in3 Iy = 21.85 in4 Sleft = 6.36 in3

ctop = 13.5000 in A = 8.4375 in2 cright = 3.4375 in A = 8.4375 in2

cbottom = 13.5000 in rx = 12.6455 in cleft = 3.4375 in ry = 1.6093 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 32: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.5000 in A2 =b = 3.5000 inB1 = t = 0.3750 in B2 = t = 0.3750 in

C1 = b = 5.0000 in C2 = b = 5.0000 inD1 = t = 0.3750 in D2 = t = 0.3750 in

Angle Back-to-Back Dimension:E = 27.0000 in

Angle Back-to-Back Dimension:F = 0.8750 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 3.7500 24.5000 91.8750 7.8125 11.0000 453.7500 461.5625Outstanding Leg 2.3438 26.8125 62.8418 0.0275 13.3125 415.3656 415.3931Connected Leg 3.7500 2.5000 9.3750 7.8125 11.0000 453.7500 461.5625Outstanding Leg 2.3438 0.1875 0.4395 0.0275 13.3125 415.3656 415.3931

Total 12.19 164.53 15.68 1738.23 1753.91

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1 1.8750 3.3125 6.2109 0.0220 0.6250 0.7324 0.7544Connected Leg 2 1.8750 4.5625 8.5547 0.0220 0.6250 0.7324 0.7544Outstanding Leg 1 1.1719 1.5625 1.8311 0.9537 2.3750 6.6101 7.5638Outstanding Leg 2 1.1719 6.3125 7.3975 0.9537 2.3750 6.6101 7.5638Connected Leg 1 1.8750 3.3125 6.2109 0.0220 0.6250 0.7324 0.7544Connected Leg 2 1.8750 4.5625 8.5547 0.0220 0.6250 0.7324 0.7544Outstanding Leg 1 1.1719 1.5625 1.8311 0.9537 2.3750 6.6101 7.5638Outstanding Leg 2 1.1719 6.3125 7.3975 0.9537 2.3750 6.6101 7.5638

Total 12.19 47.99 3.90 29.37 33.27

y-bar = 13.5000 in Stop = 129.92 in3 x-bar = 3.9375 in Sright = 8.45 in3

Ix = 1753.91 in4 Sbott. = 129.92 in3 Iy = 33.27 in4 Sleft = 8.45 in3

ctop = 13.5000 in A = 12.1875 in2 cright = 3.9375 in A = 12.1875 in2

cbottom = 13.5000 in rx = 11.9963 in cleft = 3.9375 in ry = 1.6523 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 33: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.5000 in A2 =b = 3.5000 inB1 = t = 0.3125 in B2 = t = 0.3125 in

C1 = b = 5.0000 in C2 = b = 5.0000 inD1 = t = 0.3125 in D2 = t = 0.3125 in

Angle Back-to-Back Dimension:E = 14.7500 in

Angle Back-to-Back Dimension:F = 0.8750 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 3.1250 12.2500 38.2813 6.5104 4.8750 74.2676 80.7780Outstanding Leg 1.9922 14.5938 29.0735 0.0162 7.2188 103.8136 103.8298Connected Leg 3.1250 2.5000 7.8125 6.5104 4.8750 74.2676 80.7780Outstanding Leg 1.9922 0.1563 0.3113 0.0162 7.2188 103.8136 103.8298

Total 10.23 75.48 13.05 356.16 369.22

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1 1.5625 3.3438 5.2246 0.0127 0.5938 0.5508 0.5636Connected Leg 2 1.5625 4.5313 7.0801 0.0127 0.5938 0.5508 0.5636Outstanding Leg 1 0.9961 1.5938 1.5875 0.8434 2.3438 5.4717 6.3151Outstanding Leg 2 0.9961 6.2813 6.2567 0.8434 2.3438 5.4717 6.3151Connected Leg 1 1.5625 3.3438 5.2246 0.0127 0.5938 0.5508 0.5636Connected Leg 2 1.5625 4.5313 7.0801 0.0127 0.5938 0.5508 0.5636Outstanding Leg 1 0.9961 1.5938 1.5875 0.8434 2.3438 5.4717 6.3151Outstanding Leg 2 0.9961 6.2813 6.2567 0.8434 2.3438 5.4717 6.3151

Total 10.23 40.30 3.42 24.09 27.51

y-bar = 7.3750 in Stop = 50.06 in3 x-bar = 3.9375 in Sright = 6.99 in3

Ix = 369.22 in4 Sbott. = 50.06 in3 Iy = 27.51 in4 Sleft = 6.99 in3

ctop = 7.3750 in A = 10.2344 in2 cright = 3.9375 in A = 10.2344 in2

cbottom = 7.3750 in rx = 6.0063 in cleft = 3.9375 in ry = 1.6396 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 34: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.0000 in A2 =b = 3.0000 inB1 = t = 0.3750 in B2 = t = 0.3750 in

C1 = b = 3.0000 in C2 = b = 3.0000 inD1 = t = 0.3750 in D2 = t = 0.3750 in

Angle Back-to-Back Dimension:E = 12.3750 in

Angle Back-to-Back Dimension:F = 8.2500 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 2.2500 10.8750 24.4688 1.6875 4.6875 49.4385 51.1260Outstanding Leg 1.9688 12.1875 23.9941 0.0231 6.0000 70.8750 70.8981Connected Leg 2.2500 1.5000 3.3750 1.6875 4.6875 49.4385 51.1260Outstanding Leg 1.9688 0.1875 0.3691 0.0231 6.0000 70.8750 70.8981

Total 8.44 52.21 3.42 240.63 244.05

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1 1.1250 2.8125 3.1641 0.0132 4.3125 20.9224 20.9355Connected Leg 2 1.1250 11.4375 12.8672 0.0132 4.3125 20.9224 20.9355Outstanding Leg 1 0.9844 1.3125 1.2920 0.5652 5.8125 33.2573 33.8225Outstanding Leg 2 0.9844 12.9375 12.7354 0.5652 5.8125 33.2573 33.8225Connected Leg 1 1.1250 2.8125 3.1641 0.0132 4.3125 20.9224 20.9355Connected Leg 2 1.1250 11.4375 12.8672 0.0132 4.3125 20.9224 20.9355Outstanding Leg 1 0.9844 1.3125 1.2920 0.5652 5.8125 33.2573 33.8225Outstanding Leg 2 0.9844 12.9375 12.7354 0.5652 5.8125 33.2573 33.8225

Total 8.44 60.12 2.31 216.72 219.03

y-bar = 6.1875 in Stop = 39.44 in3 x-bar = 7.1250 in Sright = 30.74 in3

Ix = 244.05 in4 Sbott. = 39.44 in3 Iy = 219.03 in4 Sleft = 30.74 in3

ctop = 6.1875 in A = 8.4375 in2 cright = 7.1250 in A = 8.4375 in2

cbottom = 6.1875 in rx = 5.3781 in cleft = 7.1250 in ry = 5.0950 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 35: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 5.0000 in A2 =b = 5.0000 inB1 = t = 0.3750 in B2 = t = 0.3750 in

C1 = b = 3.5000 in C2 = b = 3.5000 inD1 = t = 0.3750 in D2 = t = 0.3750 in

Angle Back-to-Back Dimension:E = 25.7500 in

Angle Back-to-Back Dimension:F = 0.8750 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 2.6250 24.0000 63.0000 2.6797 11.1250 324.8848 327.5645Outstanding Leg 3.4688 25.5625 88.6699 0.0406 12.6875 558.3739 558.4146Connected Leg 2.6250 1.7500 4.5938 2.6797 11.1250 324.8848 327.5645Outstanding Leg 3.4688 0.1875 0.6504 0.0406 12.6875 558.3739 558.4146

Total 12.19 156.91 5.44 1766.52 1771.96

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1 1.3125 4.8125 6.3164 0.0154 0.6250 0.5127 0.5281Connected Leg 2 1.3125 6.0625 7.9570 0.0154 0.6250 0.5127 0.5281Outstanding Leg 1 1.7344 2.3125 4.0107 3.0916 3.1250 16.9373 20.0289Outstanding Leg 2 1.7344 8.5625 14.8506 3.0916 3.1250 16.9373 20.0289Connected Leg 1 1.3125 4.8125 6.3164 0.0154 0.6250 0.5127 0.5281Connected Leg 2 1.3125 6.0625 7.9570 0.0154 0.6250 0.5127 0.5281Outstanding Leg 1 1.7344 2.3125 4.0107 3.0916 3.1250 16.9373 20.0289Outstanding Leg 2 1.7344 8.5625 14.8506 3.0916 3.1250 16.9373 20.0289

Total 12.19 66.27 12.43 69.80 82.23

y-bar = 12.8750 in Stop = 137.63 in3 x-bar = 5.4375 in Sright = 15.12 in3

Ix = 1771.96 in4 Sbott. = 137.63 in3 Iy = 82.23 in4 Sleft = 15.12 in3

ctop = 12.8750 in A = 12.1875 in2 cright = 5.4375 in A = 12.1875 in2

cbottom = 12.8750 in rx = 12.0578 in cleft = 5.4375 in ry = 2.5975 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 36: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 5.0000 in B2 = lh = 5.0000 inC1 = tf = 0.3750 in C2 = tf = 0.3750 inB1 = lv = 3.5000 in A2 = lv = 3.5000 in

Web Plate: C3 = 0.4375 in

*B3 = 25.7500 in

Top Cover Plate: Btm Cover Plate: C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

*using average height of sectionX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.7500 25.5625 95.8594 0.0439 12.6875 603.6475 603.6914Vertical Leg 2.3438 23.8125 55.8105 1.9073 10.9375 280.3802 282.2876Horizontal Leg 3.7500 0.1875 0.7031 0.0439 12.6875 603.6475 603.6914Vertical Leg 2.3438 1.9375 4.5410 1.9073 10.9375 280.3802 282.2876

3 11.2656 12.8750 145.0449 622.4845 0.0000 0.0000 622.4845Cover Plate Top 0.0000 25.7500 0.0000 0.0000 12.8750 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 12.8750 0.0000 0.0000

Total 23.45 301.96 626.39 1768.06 2394.44A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

y-bar = 12.8750 in Stop = 185.98 in3 y-bar = 12.8750 in Stop = 185.98 in3

Ix = 2394.44 n4 Sbott. = 185.98 in3 Ix = 2394.44 in4 Sbott. = 185.98 in3

ctop = 12.8750 in A = 23.4531 in2 ctop = 12.8750 in A = 23.4531 in2

cbottom = 12.8750 in rx = 10.1042 in cbottom = 12.8750 in rx = 10.1042 in

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

2

P101160439

End portal strut

Gross Section (without Losses)

1

Page 37: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.8750 2.5000 4.6875 3.9063 2.7188 13.8593 17.7655

(Left) Vertical Leg 1.1719 4.8125 5.6396 0.0137 0.4063 0.1934 0.20711 Horizontal Leg 1.8750 7.9375 14.8828 3.9063 2.7188 13.8593 17.7655

(Right) Vertical Leg 1.1719 5.6250 6.5918 0.0137 0.4063 0.1934 0.20712 Horizontal Leg 1.8750 2.5000 4.6875 3.9063 2.7188 13.8593 17.7655

(Left) Vertical Leg 1.1719 4.8125 5.6396 0.0137 0.4063 0.1934 0.20712 Horizontal Leg 1.8750 7.9375 14.8828 3.9063 2.7188 13.8593 17.7655

(Right) Vertical Leg 1.1719 5.6250 6.5918 0.0137 0.4063 0.1934 0.20713 Web Plate 11.2656 5.2188 58.7925 0.1797 0.0000 0.0000 0.17974 Top Cover Plate 0.0000 5.2188 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 5.2188 0.0000 0.0000 0.0000 0.0000 0.0000

Total 23.45 122.40 15.86 56.21 72.07A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

x-bar = 5.2188 in Sright = 13.81 in3 x-bar = 5.2188 in Sright = 13.81 in3

Iy = 72.07 n4 Sleft = 13.81 in3 Iy = 72.07 in4 Sleft = 13.81 in3

cright = 5.2188 in A = 23.4531 in2 cright = 5.2188 in A = 23.4531 in2

cleft = 5.2188 in ry = 1.7530 in cleft = 5.2188 in ry = 1.7530 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 38: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.0000 in B2 = lh = 4.0000 inC1 = tf = 0.4375 in C2 = tf = 0.4375 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.5000 in do = N/A in B3 = 27.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.5000 27.0313 94.6094 0.0558 13.4063 629.0464 629.1022Vertical Leg 5.3047 23.7813 126.1521 16.2473 10.1563 547.1754 563.4227Horizontal Leg 3.5000 0.2188 0.7656 0.0558 13.4063 629.0464 629.1022Vertical Leg 5.3047 3.4688 18.4006 16.2473 10.1563 547.1754 563.4227

3 13.6250 13.6250 185.6406 843.1178 0.0000 0.0000 843.1178Cover Plate Top 0.0000 27.2500 0.0000 0.0000 13.6250 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 13.6250 0.0000 0.0000

Total 31.23 425.57 875.72 2352.44 3228.17A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 13.6250 in Stop = 236.93 in3 y-bar = 13.6250 in Stop = 236.93 in3

Ix = 3228.17 n4 Sbott. = 236.93 in3 Ix = 3228.17 in4 Sbott. = 236.93 in3

ctop = 13.6250 in A = 31.2344 in2 ctop = 13.6250 in A = 31.2344 in2

cbottom = 13.6250 in rx = 10.1663 in cbottom = 13.6250 in rx = 10.1663 inJ = 2.2589 Z = 294.4155 in3 Z = 294.4155 in3

Web Plate

4

Section Losses

As-Built Section Properties

2

P101160439

Intermediate floorbeam

Gross Section (without Losses)

1

As-Inspected Section Properties

Page 39: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.7500 2.0000 3.5000 2.3333 2.2500 8.8594 11.1927

(Left) Vertical Leg 2.6523 3.7813 10.0292 0.0423 0.4688 0.5828 0.62511 Horizontal Leg 1.7500 6.5000 11.3750 2.3333 2.2500 8.8594 11.1927

(Right) Vertical Leg 2.6523 4.7188 12.5157 0.0423 0.4688 0.5828 0.62512 Horizontal Leg 1.7500 2.0000 3.5000 2.3333 2.2500 8.8594 11.1927

(Left) Vertical Leg 2.6523 3.7813 10.0292 0.0423 0.4688 0.5828 0.62512 Horizontal Leg 1.7500 6.5000 11.3750 2.3333 2.2500 8.8594 11.1927

(Right) Vertical Leg 2.6523 4.7188 12.5157 0.0423 0.4688 0.5828 0.62513 Web Plate 13.6250 4.2500 57.9063 0.2839 0.0000 0.0000 0.28394 Top Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.0000

Total 31.23 132.75 9.79 37.77 47.56A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 4.2500 in Sright = 11.19 in3 x-bar = 4.2500 in Sright = 11.19 in3

Iy = 47.56 n4 Sleft = 11.19 in3 Iy = 47.56 in4 Sleft = 11.19 in3

cright = 4.2500 in A = 31.2344 in2 cright = 4.2500 in A = 31.2344 in2

cleft = 4.2500 in ry = 1.2339 in cleft = 4.2500 in ry = 1.2339 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 29.6727 in2 Iy = 42.9185 in2 Ix = 2913.4214 in2 Stop = 213.8291 in3

ry = 1.2027 in rx = 9.9088 n Sbot = 213.8291 in3

Z = 279.6948 in3

Fy = 30.00 ksiAB AB** AI

M 592.32 534.57 k-ft 592.32 k-ft AB = As-BuiltV 421.68 400.59 k 421.68 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Gross Section (without Losses)

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 40: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A in B3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.6250 in Stop = 714.74 in3 y-bar = 17.6250 in Stop = 714.74 in3

Ix = 12597.30 n4 Sbott. = 714.74 in3 Ix = 12597.30 in4 Sbott. = 714.74 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 17.6250 in A = 57.0703 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 17.6250 in rx = 14.8571 inJ = 5.8951 Z = 808.9861 in3 Z = 808.9861 in3

2

P101160439

Main floorbeam basic section

Gross Section (without Losses)

1

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 41: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3 x-bar = 7.0000 in Sright = 68.23 in3

Iy = 477.62 n4 Sleft = 68.23 in3 Iy = 477.62 in4 Sleft = 68.23 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 57.0703 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.8929 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 n Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI

M 1786.85 1612.63 k-ft 1786.85 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 42: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.4375 in do = N/A in B3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 31.0625 186.3750 18.0000 13.4375 1083.3984 1101.3984Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 4.1875 25.1250 18.0000 13.4375 1083.3984 1101.3984

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 58.07 1023.49 1454.22 11257.32 12711.54A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.6250 in Stop = 721.22 in3 y-bar = 17.6250 in Stop = 721.22 in3

Ix = 12711.54 n4 Sbott. = 721.22 in3 Ix = 12711.54 in4 Sbott. = 721.22 in3

ctop = 17.6250 in A = 58.0703 in2 ctop = 17.6250 in A = 58.0703 in2

cbottom = 17.6250 in rx = 14.7952 in cbottom = 17.6250 in rx = 14.7952 inJ = 5.9784 Z = 819.6736 in3 Z = 819.6736 in3

2

P101160439

Main end floorbeam basic section

Gross Section (without Losses)

1

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 43: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72171 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72173 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 58.07 406.49 350.90 126.96 477.86A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.27 in3 x-bar = 7.0000 in Sright = 68.27 in3

Iy = 477.86 n4 Sleft = 68.27 in3 Iy = 477.86 in4 Sleft = 68.27 in3

cright = 7.0000 in A = 58.0703 in2 cright = 7.0000 in A = 58.0703 in2

cleft = 7.0000 in ry = 2.8686 in cleft = 7.0000 in ry = 2.8686 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 55.1668 in2 Iy = 431.2723 in2 Ix = 11472.1644 in2 Stop = 650.9029 in3

ry = 2.796 in rx = 14.4206 n Sbot = 650.9029 in3

Z = 778.6899 in3

Fy = 30.00 ksiAB AB** AI

M 1803.06 1627.26 k-ft 1803.06 k-ft AB = As-BuiltV 466.67 443.34 k 466.67 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 44: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.3750 in do = N/A in B3 = 33.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 33.4375 250.7813 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 30.4375 204.5020 16.1757 13.3125 1190.7147 1206.8905Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.3125 1190.7147 1206.8905

3 12.4688 17.1250 213.5273 1148.7485 0.0000 0.0000 1148.7485Cover Plate Top 6.5000 34.0000 221.0000 0.1354 16.8750 1850.9766 1851.1120Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 16.8750 1850.9766 1851.1120

Total 53.91 923.14 1181.86 10074.85 11256.71A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.1250 in Stop = 657.33 in3 y-bar = 17.1250 in Stop = 657.33 in3

Ix = 11256.71 n4 Sbott. = 657.33 in3 Ix = 11256.71 in4 Sbott. = 657.33 in3

ctop = 17.1250 in A = 53.9063 in2 ctop = 17.1250 in A = 53.9063 in2

cbottom = 17.1250 in rx = 14.4506 in cbottom = 17.1250 in rx = 14.4506 inJ = 5.3706 Z = 746.5957 in3 Z = 746.5957 in3

2

P101160439

Running girder with cover plates

Gross Section (without Losses)

1

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 45: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.3125 12.4219 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 6.0000 20.1563 0.1094 0.5000 0.8398 0.94921 Horizontal Leg 3.7500 9.6875 36.3281 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 7.0000 23.5156 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 3.3125 12.4219 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 6.0000 20.1563 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 9.6875 36.3281 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 7.0000 23.5156 0.1094 0.5000 0.8398 0.94923 Web Plate 12.4688 6.5000 81.0469 0.1461 0.0000 0.0000 0.14614 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 53.91 350.39 228.67 155.76 384.43A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.5000 in Sright = 59.14 in3 x-bar = 6.5000 in Sright = 59.14 in3

Iy = 384.43 n4 Sleft = 59.14 in3 Iy = 384.43 in4 Sleft = 59.14 in3

cright = 6.5000 in A = 53.9063 in2 cright = 6.5000 in A = 53.9063 in2

cleft = 6.5000 in ry = 2.6705 in cleft = 6.5000 in ry = 2.6705 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 51.2109 in2 Iy = 346.9468 in2 Ix = 10159.1777 in2 Stop = 593.2367 in3

ry = 2.6029 in rx = 14.0847 n Sbot = 593.2367 in3

Z = 709.2659 in3

Fy = 30.00 ksiAB AB** AI

M 1643.31 1483.09 k-ft 1643.31 k-ft AB = As-BuiltV 450.77 428.23 k 450.77 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 46: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.3750 in do = N/A in B3 = 33.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 32.9375 247.0313 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 29.9375 201.1426 16.1757 13.3125 1190.7147 1206.8905Horizontal Leg 7.5000 0.3125 2.3438 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 3.3125 22.2559 16.1757 13.3125 1190.7147 1206.8905

3 12.4688 16.6250 207.2930 1148.7485 0.0000 0.0000 1148.7485Cover Plate Top 0.0000 33.2500 0.0000 0.0000 16.6250 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 16.6250 0.0000 0.0000

Total 40.91 680.07 1181.59 6372.89 7554.48A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 16.6250 in Stop = 454.40 in3 y-bar = 16.6250 in Stop = 454.40 in3

Ix = 7554.48 n4 Sbott. = 454.40 in3 Ix = 7554.48 in4 Sbott. = 454.40 in3

ctop = 16.6250 in A = 40.9063 in2 ctop = 16.6250 in A = 40.9063 in2

cbottom = 16.6250 in rx = 13.5896 in cbottom = 16.6250 in rx = 13.5896 inJ = 4.2873 Z = 527.2207 in3 Z = 527.2207 in3

2

P101160439

Running girder without cover plates

Gross Section (without Losses)

1

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 47: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/16/2017 Job No.Checked By NRF Date 7/6/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.0000 11.2500 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 5.6875 19.1064 0.1094 0.5000 0.8398 0.94921 Horizontal Leg 3.7500 9.3750 35.1563 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 6.6875 22.4658 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 3.0000 11.2500 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 5.6875 19.1064 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 9.3750 35.1563 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 6.6875 22.4658 0.1094 0.5000 0.8398 0.94923 Web Plate 12.4688 6.1875 77.1504 0.1461 0.0000 0.0000 0.14614 Top Cover Plate 0.0000 6.1875 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 6.1875 0.0000 0.0000 0.0000 0.0000 0.0000

Total 40.91 253.11 45.58 155.76 201.35A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.1875 in Sright = 32.54 in3 x-bar = 6.1875 in Sright = 32.54 in3

Iy = 201.35 n4 Sleft = 32.54 in3 Iy = 201.35 in4 Sleft = 32.54 in3

cright = 6.1875 in A = 40.9063 in2 cright = 6.1875 in A = 40.9063 in2

cleft = 6.1875 in ry = 2.2186 in cleft = 6.1875 in ry = 2.2186 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 38.8609 in2 Iy = 181.7141 in2 Ix = 6817.9205 in2 Stop = 410.1005 in3

ry = 2.1624 in rx = 13.2455 n Sbot = 410.1005 in3

Z = 500.8597 in3

Fy = 30.00 ksiAB AB** AI

M 1136.01 1025.25 k-ft 1136.01 k-ft AB = As-BuiltV 450.77 428.23 k 450.77 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Gross Section (without Losses)

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 48: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/7/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

Element Dimensions (without Section Losses):Historic S20x65 AISC Section Properties

A1 = tw = 0.5000 in A = 19.1 in2

B1 = d = 20.0000 in Ix = 1169.5 in4

A2 = tf = 0.7900 in Sx = 117.0 in3

B2 = bf = 6.2500 in rx = 7.8 inA3 = tf = 0.7900 in Iy = 27.9 in4

B3 = bf = 6.2500 in ry = 1.21 intw = 0.7600 in

do = N/A in d = 20.0000 intf = 0.79 in

bf = 6.2500 inSay OK, simplified rectangular section properties are close to actual properties

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Web 9.2100 10.0000 92.1000 260.4100 0.0000 0.0000 260.41002 Top Flange 4.9375 19.6050 96.7997 0.2568 9.6050 455.514 455.7713 Bottom Flange 4.9375 0.3950 1.9503 0.2568 9.6050 455.514 455.771

Total 19.09 190.85 260.92 911.03 1171.95A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 10.0000 in Stop = 117.20 in3 y-bar = 10.0000 in Stop = 117.20 in3

Ix = 1171.95 in4 Sbott. = 117.20 in3 Ix = 1171.95 in4 Sbott. = 117.20 in3

ctop = 10.0000 in A = 19.0850 in2 ctop = 10.0000 in A = 19.0850 in2

cbottom = 10.0000 in rx = 7.8363 in cbottom = 10.0000 in rx = 7.8363 inJ = 2.8218 in4 Z = 137.26 in3 Z = 137.26 in3

P101160439

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

do = stiffener spacing for shear check for no stiffners use "N/A" Stringer

Page 49: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/7/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Web 9.2100 3.1250 28.7813 0.1919 0.0000 0.0000 0.19192 Top Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.07263 Bottom Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.0726

Total 19.09 59.64 32.34 0.00 32.34A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 3.1250 in Sright = 10.35 in3 x-bar = 3.1250 in Sright = 10.35 in3

Iy = 32.34 n4 Sleft = 10.35 in3 Iy = 32.34 n4 Sleft = 10.35 in3

cright = 3.1250 in A = 19.0850 in2 cright = 3.1250 in A = 19.0850 in2

cleft = 3.1250 in ry = 1.3017 in cleft = 3.1250 in ry = 1.3017 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.1260 in2 Iy = 25.1798 in2 Ix = 1055.4738 in2 Stop = 105.5474 in3

ry = 1.1786 in rx = 7.6308 in Sbot = 105.5474 in3

Z = 130.3984 in3

Fy = 30.00 ksiAB AB** AI

M 292.5 k-ft 263.87 k-ft 293.0 k-ft AB = As-BuiltV 160.25 k 152.24 k 160.25 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Capacities*

Section properties with loss applied

Page 50: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Spans 1 and 2

STAAD.pro V8i model input

Page 51: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 1

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 1 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Job Information Engineer Checked Approved

Name: CTG NRFDate: 26-Apr-17 06-May-17

Structure Type SPACE FRAME

Number of Nodes 331 Highest Node 90011Number of Elements 707 Highest Beam 91107

Number of Basic Load Cases 7Number of Combination Load Cases 3

Included in this printout are data for:All The Whole Structure

NodesNode X

(ft)Y

(ft)Z

(ft)1100 0.000 0.000 0.0001101 25.167 0.000 0.0001102 50.333 0.000 0.0001103 75.500 0.000 0.0001104 100.667 0.000 0.0001105 125.833 0.000 0.0001106 151.000 0.000 0.0001107 176.167 0.000 0.0001108 201.333 0.000 0.0001109 226.500 0.000 0.0001110 251.667 0.000 0.0001111 276.833 0.000 0.0001112 302.000 0.000 0.0001300 14.861 21.284 0.0001303 75.500 20.417 0.0001304 100.667 25.000 0.0001305 125.833 25.000 0.0001306 151.000 25.000 0.0001307 176.167 25.000 0.0001308 201.333 25.000 0.0001309 226.500 20.417 0.0001312 287.138 21.284 0.0001400 20.014 28.663 0.0001402 50.333 27.417 0.0001403 75.500 27.417 0.0001404 100.667 27.417 0.0001405 125.833 27.417 0.000

Page 52: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 2

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 2 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)1406 151.000 27.417 0.0001407 176.167 27.417 0.0001408 201.333 27.417 0.0001409 226.500 27.417 0.0001410 251.667 27.417 0.0001412 281.986 28.663 0.0001501 25.167 36.042 0.0001502 50.333 40.646 0.0001503 75.500 45.417 0.0001504 100.667 50.000 0.0001505 125.833 50.000 0.0001506 151.000 50.000 0.0001507 176.167 50.000 0.0001508 201.333 50.000 0.0001509 226.500 45.417 0.0001510 251.667 40.646 0.0001511 276.833 36.042 0.0002100 0.000 0.000 18.0002101 25.167 0.000 18.0002102 50.333 0.000 18.0002103 75.500 0.000 18.0002104 100.667 0.000 18.0002105 125.833 0.000 18.0002106 151.000 0.000 18.0002107 176.167 0.000 18.0002108 201.333 0.000 18.0002109 226.500 0.000 18.0002110 251.667 0.000 18.0002111 276.833 0.000 18.0002112 302.000 0.000 18.0002300 14.861 21.284 18.0002303 75.500 20.417 18.0002304 100.667 25.000 18.0002305 125.833 25.000 18.0002306 151.000 25.000 18.0002307 176.167 25.000 18.0002308 201.333 25.000 18.0002309 226.500 20.417 18.0002312 287.138 21.284 18.0002400 20.014 28.663 18.0002402 50.333 27.417 18.0002403 75.500 27.417 18.0002404 100.667 27.417 18.0002405 125.833 27.417 18.0002406 151.000 27.417 18.000

Page 53: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 3

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 3 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)2407 176.167 27.417 18.0002408 201.333 27.417 18.0002409 226.500 27.417 18.0002410 251.667 27.417 18.0002412 281.986 28.663 18.0002501 25.167 36.042 18.0002502 50.333 40.646 18.0002503 75.500 45.417 18.0002504 100.667 50.000 18.0002505 125.833 50.000 18.0002506 151.000 50.000 18.0002507 176.167 50.000 18.0002508 201.333 50.000 18.0002509 226.500 45.417 18.0002510 251.667 40.646 18.0002511 276.833 36.042 18.0007001 37.750 38.344 9.0007002 62.917 43.031 9.0007003 88.083 47.708 9.0007004 113.250 50.000 9.0007005 138.417 50.000 9.0007006 163.583 50.000 9.0007007 188.750 50.000 9.0007008 213.917 47.708 9.0007009 239.083 43.031 9.0007010 264.250 38.344 9.0009002 50.333 34.031 9.0009003 75.500 36.417 9.0009004 100.667 38.708 9.0009005 125.833 38.708 9.0009006 151.000 38.708 9.0009007 176.167 38.708 9.0009008 201.333 38.708 9.0009009 226.500 36.417 9.0009010 251.667 34.031 9.0009100 25.167 36.042 9.0009101 22.590 32.352 4.5009102 22.590 32.352 13.5009103 20.014 28.663 3.0009104 20.014 28.663 4.5009105 20.014 28.663 9.0009106 20.014 28.663 13.5009107 20.014 28.663 15.0009200 276.833 36.042 9.0009201 279.410 32.352 4.500

Page 54: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 4

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 4 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)9202 279.410 32.352 13.5009203 281.986 28.663 3.0009204 281.986 28.663 4.5009205 281.986 28.663 9.0009206 281.986 28.663 13.5009207 281.986 28.663 15.000

10000 0.000 0.000 2.50010001 8.389 0.000 2.50010002 16.778 0.000 2.50010100 25.167 0.000 2.50010101 33.556 0.000 2.50010102 41.944 0.000 2.50010200 50.333 0.000 2.50010201 58.722 0.000 2.50010202 67.111 0.000 2.50010300 75.500 0.000 2.50010301 83.889 0.000 2.50010302 92.278 0.000 2.50010400 100.667 0.000 2.50010401 109.056 0.000 2.50010402 117.444 0.000 2.50010500 125.833 0.000 2.50010501 134.222 0.000 2.50010502 142.611 0.000 2.50010600 151.000 0.000 2.50010601 159.389 0.000 2.50010602 167.778 0.000 2.50010700 176.167 0.000 2.50010701 184.556 0.000 2.50010702 192.944 0.000 2.50010800 201.333 0.000 2.50010801 209.722 0.000 2.50010802 218.111 0.000 2.50010900 226.500 0.000 2.50010901 234.889 0.000 2.50010902 243.278 0.000 2.50011000 251.667 0.000 2.50011001 260.056 0.000 2.50011002 268.444 0.000 2.50011100 276.833 0.000 2.50011101 285.222 0.000 2.50011102 293.611 0.000 2.50011200 302.000 0.000 2.50020000 0.000 0.000 15.50020001 8.389 0.000 15.500

Page 55: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 5

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 5 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)20002 16.778 0.000 15.50020100 25.167 0.000 15.50020101 33.556 0.000 15.50020102 41.944 0.000 15.50020200 50.333 0.000 15.50020201 58.722 0.000 15.50020202 67.111 0.000 15.50020300 75.500 0.000 15.50020301 83.889 0.000 15.50020302 92.278 0.000 15.50020400 100.667 0.000 15.50020401 109.056 0.000 15.50020402 117.444 0.000 15.50020500 125.833 0.000 15.50020501 134.222 0.000 15.50020502 142.611 0.000 15.50020600 151.000 0.000 15.50020601 159.389 0.000 15.50020602 167.778 0.000 15.50020700 176.167 0.000 15.50020701 184.556 0.000 15.50020702 192.944 0.000 15.50020800 201.333 0.000 15.50020801 209.722 0.000 15.50020802 218.111 0.000 15.50020900 226.500 0.000 15.50020901 234.889 0.000 15.50020902 243.278 0.000 15.50021000 251.667 0.000 15.50021001 260.056 0.000 15.50021002 268.444 0.000 15.50021100 276.833 0.000 15.50021101 285.222 0.000 15.50021102 293.611 0.000 15.50021200 302.000 0.000 15.50030000 0.000 0.000 5.50030001 8.389 0.000 5.50030002 16.778 0.000 5.50030100 25.167 0.000 5.50030101 33.556 0.000 5.50030102 41.944 0.000 5.50030200 50.333 0.000 5.50030201 58.722 0.000 5.50030202 67.111 0.000 5.50030300 75.500 0.000 5.500

Page 56: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 6

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 6 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)30301 83.889 0.000 5.50030302 92.278 0.000 5.50030400 100.667 0.000 5.50030401 109.056 0.000 5.50030402 117.444 0.000 5.50030500 125.833 0.000 5.50030501 134.222 0.000 5.50030502 142.611 0.000 5.50030600 151.000 0.000 5.50030601 159.389 0.000 5.50030602 167.778 0.000 5.50030700 176.167 0.000 5.50030701 184.556 0.000 5.50030702 192.944 0.000 5.50030800 201.333 0.000 5.50030801 209.722 0.000 5.50030802 218.111 0.000 5.50030900 226.500 0.000 5.50030901 234.889 0.000 5.50030902 243.278 0.000 5.50031000 251.667 0.000 5.50031001 260.056 0.000 5.50031002 268.444 0.000 5.50031100 276.833 0.000 5.50031101 285.222 0.000 5.50031102 293.611 0.000 5.50031200 302.000 0.000 5.50040000 0.000 0.000 12.50040001 8.389 0.000 12.50040002 16.778 0.000 12.50040100 25.167 0.000 12.50040101 33.556 0.000 12.50040102 41.944 0.000 12.50040200 50.333 0.000 12.50040201 58.722 0.000 12.50040202 67.111 0.000 12.50040300 75.500 0.000 12.50040301 83.889 0.000 12.50040302 92.278 0.000 12.50040400 100.667 0.000 12.50040401 109.056 0.000 12.50040402 117.444 0.000 12.50040500 125.833 0.000 12.50040501 134.222 0.000 12.50040502 142.611 0.000 12.500

Page 57: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 7

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 7 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)40600 151.000 0.000 12.50040601 159.389 0.000 12.50040602 167.778 0.000 12.50040700 176.167 0.000 12.50040701 184.556 0.000 12.50040702 192.944 0.000 12.50040800 201.333 0.000 12.50040801 209.722 0.000 12.50040802 218.111 0.000 12.50040900 226.500 0.000 12.50040901 234.889 0.000 12.50040902 243.278 0.000 12.50041000 251.667 0.000 12.50041001 260.056 0.000 12.50041002 268.444 0.000 12.50041100 276.833 0.000 12.50041101 285.222 0.000 12.50041102 293.611 0.000 12.50041200 302.000 0.000 12.50081001 8.389 0.000 6.00081002 16.778 0.000 6.00081011 33.556 0.000 6.00081012 41.944 0.000 6.00081021 58.722 0.000 6.00081022 67.111 0.000 6.00081031 83.889 0.000 6.00081032 92.278 0.000 6.00081041 109.056 0.000 6.00081042 117.444 0.000 6.00081051 134.222 0.000 6.00081052 142.611 0.000 6.00081061 159.389 0.000 6.00081062 167.778 0.000 6.00081071 184.556 0.000 6.00081072 192.944 0.000 6.00081081 209.722 0.000 6.00081082 218.111 0.000 6.00081091 234.889 0.000 6.00081092 243.278 0.000 6.00081101 260.056 0.000 6.00081102 268.444 0.000 6.00081111 285.222 0.000 6.00081112 293.611 0.000 6.00082001 8.389 0.000 12.00082002 16.778 0.000 12.000

Page 58: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 8

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 8 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)82011 33.556 0.000 12.00082012 41.944 0.000 12.00082021 58.722 0.000 12.00082022 67.111 0.000 12.00082031 83.889 0.000 12.00082032 92.278 0.000 12.00082041 109.056 0.000 12.00082042 117.444 0.000 12.00082051 134.222 0.000 12.00082052 142.611 0.000 12.00082061 159.389 0.000 12.00082062 167.778 0.000 12.00082071 184.556 0.000 12.00082072 192.944 0.000 12.00082081 209.722 0.000 12.00082082 218.111 0.000 12.00082091 234.889 0.000 12.00082092 243.278 0.000 12.00082101 260.056 0.000 12.00082102 268.444 0.000 12.00082111 285.222 0.000 12.00082112 293.611 0.000 12.00090000 12.583 0.000 9.00090001 37.750 0.000 9.00090002 62.917 0.000 9.00090003 88.083 0.000 9.00090004 113.250 0.000 9.00090005 138.417 0.000 9.00090006 163.583 0.000 9.00090007 188.750 0.000 9.00090008 213.917 0.000 9.00090009 239.083 0.000 9.00090010 264.250 0.000 9.00090011 289.417 0.000 9.000

Page 59: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 9

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 9 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

BeamsBeam Node A Node B Length

(ft)Property

(degrees)1100 1100 1101 25.167 1 01101 1101 1102 25.167 2 01102 1102 1103 25.167 3 01103 1103 1104 25.167 4 01104 1104 1105 25.166 5 01105 1105 1106 25.167 6 01106 1106 1107 25.167 7 01107 1107 1108 25.166 8 01108 1108 1109 25.167 9 01109 1109 1110 25.167 10 01110 1110 1111 25.166 11 01111 1111 1112 25.167 12 01201 1501 1101 36.042 13 01202 1502 1402 13.229 14 01203 1402 1102 27.417 15 01209 1510 1410 13.229 16 01210 1410 1110 27.417 17 01211 1511 1111 36.042 18 01230 1503 1403 18.000 19 01231 1403 1303 7.000 20 01232 1303 1103 20.417 21 01240 1504 1404 22.583 22 01241 1404 1304 2.417 23 01242 1304 1104 25.000 24 01250 1505 1405 22.583 25 01251 1405 1305 2.417 26 01252 1305 1105 25.000 27 01260 1506 1406 22.583 28 01261 1406 1306 2.417 29 01262 1306 1106 25.000 30 01270 1507 1407 22.583 31 01271 1407 1307 2.417 32 01272 1307 1107 25.000 33 01280 1508 1408 22.583 34 01281 1408 1308 2.417 35 01282 1308 1108 25.000 36 01290 1509 1409 18.000 37 01291 1409 1309 7.000 38 01292 1309 1109 20.417 39 01301 1501 1102 43.959 40 01302 1502 1303 32.289 41 01303 1303 1104 32.407 42 01304 1504 1305 35.473 43 01305 1305 1106 35.474 44 01306 1307 1106 35.474 45 0

Page 60: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 10

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 10 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)1307 1508 1307 35.473 46 01308 1309 1108 32.407 47 01309 1510 1309 32.289 48 01310 1511 1110 43.958 49 01382 1303 1102 32.407 50 01384 1305 1104 35.473 51 01388 1307 1108 35.473 52 01392 1309 1110 32.407 53 01404 1304 1305 25.166 54 01405 1305 1306 25.167 55 01406 1306 1307 25.167 56 01407 1307 1308 25.166 57 01500 1100 1300 25.959 58 01501 1501 1502 25.584 59 01502 1502 1503 25.615 60 01503 1503 1504 25.581 61 01504 1504 1505 25.166 62 01505 1505 1506 25.167 63 01506 1506 1507 25.167 64 01507 1507 1508 25.166 65 01508 1508 1509 25.581 66 01509 1509 1510 25.615 67 01510 1510 1511 25.584 68 01511 1112 1312 25.959 69 01550 1300 1400 9.000 70 01551 1400 1501 9.000 71 01560 1312 1412 9.000 72 01561 1412 1511 9.000 73 02100 2100 2101 25.167 74 02101 2101 2102 25.167 75 02102 2102 2103 25.167 76 02103 2103 2104 25.167 77 02104 2104 2105 25.166 78 02105 2105 2106 25.167 79 02106 2106 2107 25.167 80 02107 2107 2108 25.166 81 02108 2108 2109 25.167 82 02109 2109 2110 25.167 83 02110 2110 2111 25.166 84 02111 2111 2112 25.167 85 02201 2501 2101 36.042 86 02202 2502 2402 13.229 87 02203 2402 2102 27.417 88 02209 2510 2410 13.229 89 02210 2410 2110 27.417 90 0

Page 61: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 11

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 11 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)2211 2511 2111 36.042 91 02230 2503 2403 18.000 92 02231 2403 2303 7.000 93 02232 2303 2103 20.417 94 02240 2504 2404 22.583 95 02241 2404 2304 2.417 96 02242 2304 2104 25.000 97 02250 2505 2405 22.583 98 02251 2405 2305 2.417 99 02252 2305 2105 25.000 100 02260 2506 2406 22.583 101 02261 2406 2306 2.417 102 02262 2306 2106 25.000 103 02270 2507 2407 22.583 104 02271 2407 2307 2.417 105 02272 2307 2107 25.000 106 02280 2508 2408 22.583 107 02281 2408 2308 2.417 108 02282 2308 2108 25.000 109 02290 2509 2409 18.000 110 02291 2409 2309 7.000 111 02292 2309 2109 20.417 112 02301 2501 2102 43.959 113 02302 2502 2303 32.289 114 02303 2303 2104 32.407 115 02304 2504 2305 35.473 116 02305 2305 2106 35.474 117 02306 2307 2106 35.474 118 02307 2508 2307 35.473 119 02308 2309 2108 32.407 120 02309 2510 2309 32.289 121 02310 2511 2110 43.958 122 02382 2303 2102 32.407 123 02384 2305 2104 35.473 124 02388 2307 2108 35.473 125 02392 2309 2110 32.407 126 02404 2304 2305 25.166 127 02405 2305 2306 25.167 128 02406 2306 2307 25.167 129 02407 2307 2308 25.166 130 02500 2100 2300 25.959 131 02501 2501 2502 25.584 132 02502 2502 2503 25.615 133 02503 2503 2504 25.581 134 02504 2504 2505 25.166 135 0

Page 62: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 12

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 12 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)2505 2505 2506 25.167 136 02506 2506 2507 25.167 137 02507 2507 2508 25.166 138 02508 2508 2509 25.581 139 02509 2509 2510 25.615 140 02510 2510 2511 25.584 141 02511 2112 2312 25.959 142 02550 2300 2400 9.000 143 02551 2400 2501 9.000 144 02560 2312 2412 9.000 145 02561 2412 2511 9.000 146 06002 1502 2502 18.000 147 06003 1503 2503 18.000 148 06004 1504 2504 18.000 149 06005 1505 2505 18.000 150 06006 1506 2506 18.000 151 06007 1507 2507 18.000 152 06008 1508 2508 18.000 153 06009 1509 2509 18.000 154 06010 1510 2510 18.000 155 06101 1501 9100 9.000 156 06102 9100 2501 9.000 157 06103 1501 9101 6.364 158 06104 9101 9105 6.364 159 06105 1400 9101 6.364 160 06106 9101 9100 6.364 161 06107 9101 9104 4.500 162 06108 9100 9102 6.364 163 06109 9102 2400 6.364 164 06110 9105 9102 6.364 165 06111 9102 2501 6.364 166 06112 9102 9106 4.500 167 06113 9100 9105 9.000 168 06114 1400 9103 3.000 169 06115 9103 9104 1.500 170 06116 9104 9105 4.500 171 06117 9105 9106 4.500 172 06118 9106 9107 1.500 173 06119 9107 2400 3.000 174 06120 9103 1300 9.487 175 06121 9107 2300 9.487 176 06201 1511 9200 9.000 177 06202 9200 2511 9.000 178 06203 1511 9201 6.364 179 06204 9201 9205 6.364 180 0

Page 63: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 13

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 13 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)6205 1412 9201 6.364 181 06206 9201 9200 6.364 182 06207 9201 9204 4.500 183 06208 9200 9202 6.364 184 06209 9202 2412 6.364 185 06210 9205 9202 6.364 186 06211 9202 2511 6.364 187 06212 9202 9206 4.500 188 06213 9200 9205 9.000 189 06214 1412 9203 3.000 190 06215 9203 9204 1.500 191 06216 9204 9205 4.500 192 06217 9205 9206 4.500 193 06218 9206 9207 1.500 194 06219 9207 2412 3.000 195 06220 9203 1312 9.487 196 06221 9207 2312 9.487 197 07010 1501 7001 15.641 198 07011 7001 2502 15.641 199 07012 2501 7001 15.641 200 07013 7001 1502 15.641 201 07020 1502 7002 15.653 202 07021 7002 2503 15.653 203 07022 2502 7002 15.653 204 07023 7002 1503 15.653 205 07030 1503 7003 15.639 206 07031 7003 2504 15.640 207 07032 2503 7003 15.639 208 07033 7003 1504 15.640 209 07040 1504 7004 15.470 210 07041 7004 2505 15.470 211 07042 2504 7004 15.470 212 07043 7004 1505 15.470 213 07050 1505 7005 15.471 214 07051 7005 2506 15.470 215 07052 2505 7005 15.471 216 07053 7005 1506 15.470 217 07060 1506 7006 15.470 218 07061 7006 2507 15.471 219 07062 2506 7006 15.470 220 07063 7006 1507 15.471 221 07070 1507 7007 15.470 222 07071 7007 2508 15.470 223 07072 2507 7007 15.470 224 07073 7007 1508 15.470 225 0

Page 64: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 14

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 14 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)7080 1508 7008 15.640 226 07081 7008 2509 15.639 227 07082 2508 7008 15.640 228 07083 7008 1509 15.639 229 07090 1509 7009 15.653 230 07091 7009 2510 15.654 231 07092 2509 7009 15.653 232 07093 7009 1510 15.654 233 07100 1510 7010 15.641 234 07101 7010 2511 15.641 235 07102 2510 7010 15.641 236 07103 7010 1511 15.641 237 08002 1402 2402 18.000 238 08003 1403 2403 18.000 239 08004 1404 2404 18.000 240 08005 1405 2405 18.000 241 08006 1406 2406 18.000 242 08007 1407 2407 18.000 243 08008 1408 2408 18.000 244 08009 1409 2409 18.000 245 08010 1410 2410 18.000 246 09020 1502 9002 11.169 247 459021 9002 2402 11.169 247 459022 1402 9002 11.169 247 2259023 9002 2502 11.169 247 2259030 1503 9003 12.728 248 459031 9003 2403 12.728 248 459032 1403 9003 12.728 248 2259033 9003 2503 12.728 248 2259040 1504 9004 14.440 249 459041 9004 2404 14.440 249 459042 1404 9004 14.440 249 2259043 9004 2504 14.440 249 2259050 1505 9005 14.440 250 459051 9005 2405 14.440 250 459052 1405 9005 14.440 250 2259053 9005 2505 14.440 250 2259060 1506 9006 14.440 251 459061 9006 2406 14.440 251 459062 1406 9006 14.440 251 2259063 9006 2506 14.440 251 2259070 1507 9007 14.440 252 459071 9007 2407 14.440 252 459072 1407 9007 14.440 252 2259073 9007 2507 14.440 252 225

Page 65: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 15

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 15 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)9080 1508 9008 14.440 253 459081 9008 2408 14.440 253 459082 1408 9008 14.440 253 2259083 9008 2508 14.440 253 2259090 1509 9009 12.728 254 459091 9009 2409 12.728 254 459092 1409 9009 12.728 254 2259093 9009 2509 12.728 254 2259100 1510 9010 11.169 255 459101 9010 2410 11.169 255 459102 1410 9010 11.169 255 2259103 9010 2510 11.169 255 225

10000 10000 10001 8.389 256 010001 10001 10002 8.389 257 010002 10002 10100 8.389 258 010003 10100 10101 8.389 259 010004 10101 10102 8.389 260 010005 10102 10200 8.389 261 010006 10200 10201 8.389 262 010007 10201 10202 8.389 263 010008 10202 10300 8.389 264 010009 10300 10301 8.389 265 010010 10301 10302 8.389 266 010011 10302 10400 8.389 267 010012 10400 10401 8.389 268 010013 10401 10402 8.388 269 010014 10402 10500 8.389 270 010015 10500 10501 8.389 271 010016 10501 10502 8.389 272 010017 10502 10600 8.389 273 010018 10600 10601 8.389 274 010019 10601 10602 8.389 275 010020 10602 10700 8.389 276 010021 10700 10701 8.389 277 010022 10701 10702 8.388 278 010023 10702 10800 8.389 279 010024 10800 10801 8.389 280 010025 10801 10802 8.389 281 010026 10802 10900 8.389 282 010027 10900 10901 8.389 283 010028 10901 10902 8.389 284 010029 10902 11000 8.389 285 010030 11000 11001 8.389 286 010031 11001 11002 8.388 287 010032 11002 11100 8.389 288 0

Page 66: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 16

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 16 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)10033 11100 11101 8.389 289 010034 11101 11102 8.389 290 010035 11102 11200 8.389 291 020000 20000 20001 8.389 292 020001 20001 20002 8.389 293 020002 20002 20100 8.389 294 020003 20100 20101 8.389 295 020004 20101 20102 8.389 296 020005 20102 20200 8.389 297 020006 20200 20201 8.389 298 020007 20201 20202 8.389 299 020008 20202 20300 8.389 300 020009 20300 20301 8.389 301 020010 20301 20302 8.389 302 020011 20302 20400 8.389 303 020012 20400 20401 8.389 304 020013 20401 20402 8.388 305 020014 20402 20500 8.389 306 020015 20500 20501 8.389 307 020016 20501 20502 8.389 308 020017 20502 20600 8.389 309 020018 20600 20601 8.389 310 020019 20601 20602 8.389 311 020020 20602 20700 8.389 312 020021 20700 20701 8.389 313 020022 20701 20702 8.388 314 020023 20702 20800 8.389 315 020024 20800 20801 8.389 316 020025 20801 20802 8.389 317 020026 20802 20900 8.389 318 020027 20900 20901 8.389 319 020028 20901 20902 8.389 320 020029 20902 21000 8.389 321 020030 21000 21001 8.389 322 020031 21001 21002 8.388 323 020032 21002 21100 8.389 324 020033 21100 21101 8.389 325 020034 21101 21102 8.389 326 020035 21102 21200 8.389 327 030000 30000 30001 8.389 328 030001 30001 30002 8.389 329 030002 30002 30100 8.389 330 030003 30100 30101 8.389 331 030004 30101 30102 8.389 332 030005 30102 30200 8.389 333 0

Page 67: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 17

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 17 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)30006 30200 30201 8.389 334 030007 30201 30202 8.389 335 030008 30202 30300 8.389 336 030009 30300 30301 8.389 337 030010 30301 30302 8.389 338 030011 30302 30400 8.389 339 030012 30400 30401 8.389 340 030013 30401 30402 8.388 341 030014 30402 30500 8.389 342 030015 30500 30501 8.389 343 030016 30501 30502 8.389 344 030017 30502 30600 8.389 345 030018 30600 30601 8.389 346 030019 30601 30602 8.389 347 030020 30602 30700 8.389 348 030021 30700 30701 8.389 349 030022 30701 30702 8.388 350 030023 30702 30800 8.389 351 030024 30800 30801 8.389 352 030025 30801 30802 8.389 353 030026 30802 30900 8.389 354 030027 30900 30901 8.389 355 030028 30901 30902 8.389 356 030029 30902 31000 8.389 357 030030 31000 31001 8.389 358 030031 31001 31002 8.388 359 030032 31002 31100 8.389 360 030033 31100 31101 8.389 361 030034 31101 31102 8.389 362 030035 31102 31200 8.389 363 040000 40000 40001 8.389 364 040001 40001 40002 8.389 365 040002 40002 40100 8.389 366 040003 40100 40101 8.389 367 040004 40101 40102 8.389 368 040005 40102 40200 8.389 369 040006 40200 40201 8.389 370 040007 40201 40202 8.389 371 040008 40202 40300 8.389 372 040009 40300 40301 8.389 373 040010 40301 40302 8.389 374 040011 40302 40400 8.389 375 040012 40400 40401 8.389 376 040013 40401 40402 8.388 377 040014 40402 40500 8.389 378 0

Page 68: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 18

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 18 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)40015 40500 40501 8.389 379 040016 40501 40502 8.389 380 040017 40502 40600 8.389 381 040018 40600 40601 8.389 382 040019 40601 40602 8.389 383 040020 40602 40700 8.389 384 040021 40700 40701 8.389 385 040022 40701 40702 8.388 386 040023 40702 40800 8.389 387 040024 40800 40801 8.389 388 040025 40801 40802 8.389 389 040026 40802 40900 8.389 390 040027 40900 40901 8.389 391 040028 40901 40902 8.389 392 040029 40902 41000 8.389 393 040030 41000 41001 8.389 394 040031 41001 41002 8.388 395 040032 41002 41100 8.389 396 040033 41100 41101 8.389 397 040034 41101 41102 8.389 398 040035 41102 41200 8.389 399 060000 1100 10000 2.500 400 060001 10000 30000 3.000 401 060002 30000 40000 7.000 402 060003 40000 20000 3.000 403 060004 20000 2100 2.500 404 060010 10001 30001 3.000 405 060011 30001 81001 0.500 406 060012 81001 82001 6.000 407 060013 82001 40001 0.500 408 060014 40001 20001 3.000 409 060020 10002 30002 3.000 410 060021 30002 81002 0.500 411 060022 81002 82002 6.000 412 060023 82002 40002 0.500 413 060024 40002 20002 3.000 414 060100 1101 10100 2.500 415 060101 10100 30100 3.000 416 060102 30100 40100 7.000 417 060103 40100 20100 3.000 418 060104 20100 2101 2.500 419 060110 10101 30101 3.000 420 060111 30101 81011 0.500 421 060112 81011 82011 6.000 422 060113 82011 40101 0.500 423 0

Page 69: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 19

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 19 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)60114 40101 20101 3.000 424 060120 10102 30102 3.000 425 060121 30102 81012 0.500 426 060122 81012 82012 6.000 427 060123 82012 40102 0.500 428 060124 40102 20102 3.000 429 060200 1102 10200 2.500 430 060201 10200 30200 3.000 431 060202 30200 40200 7.000 432 060203 40200 20200 3.000 433 060204 20200 2102 2.500 434 060210 10201 30201 3.000 435 060211 30201 81021 0.500 436 060212 81021 82021 6.000 437 060213 82021 40201 0.500 438 060214 40201 20201 3.000 439 060220 10202 30202 3.000 440 060221 30202 81022 0.500 441 060222 81022 82022 6.000 442 060223 82022 40202 0.500 443 060224 40202 20202 3.000 444 060300 1103 10300 2.500 445 060301 10300 30300 3.000 446 060302 30300 40300 7.000 447 060303 40300 20300 3.000 448 060304 20300 2103 2.500 449 060310 10301 30301 3.000 450 060311 30301 81031 0.500 451 060312 81031 82031 6.000 452 060313 82031 40301 0.500 453 060314 40301 20301 3.000 454 060320 10302 30302 3.000 455 060321 30302 81032 0.500 456 060322 81032 82032 6.000 457 060323 82032 40302 0.500 458 060324 40302 20302 3.000 459 060400 1104 10400 2.500 460 060401 10400 30400 3.000 461 060402 30400 40400 7.000 462 060403 40400 20400 3.000 463 060404 20400 2104 2.500 464 060410 10401 30401 3.000 465 060411 30401 81041 0.500 466 060412 81041 82041 6.000 467 060413 82041 40401 0.500 468 0

Page 70: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 20

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 20 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)60414 40401 20401 3.000 469 060420 10402 30402 3.000 470 060421 30402 81042 0.500 471 060422 81042 82042 6.000 472 060423 82042 40402 0.500 473 060424 40402 20402 3.000 474 060500 1105 10500 2.500 475 060501 10500 30500 3.000 476 060502 30500 40500 7.000 477 060503 40500 20500 3.000 478 060504 20500 2105 2.500 479 060510 10501 30501 3.000 480 060511 30501 81051 0.500 481 060512 81051 82051 6.000 482 060513 82051 40501 0.500 483 060514 40501 20501 3.000 484 060520 10502 30502 3.000 485 060521 30502 81052 0.500 486 060522 81052 82052 6.000 487 060523 82052 40502 0.500 488 060524 40502 20502 3.000 489 060600 1106 10600 2.500 490 060601 10600 30600 3.000 491 060602 30600 40600 7.000 492 060603 40600 20600 3.000 493 060604 20600 2106 2.500 494 060610 10601 30601 3.000 495 060611 30601 81061 0.500 496 060612 81061 82061 6.000 497 060613 82061 40601 0.500 498 060614 40601 20601 3.000 499 060620 10602 30602 3.000 500 060621 30602 81062 0.500 501 060622 81062 82062 6.000 502 060623 82062 40602 0.500 503 060624 40602 20602 3.000 504 060700 1107 10700 2.500 505 060701 10700 30700 3.000 506 060702 30700 40700 7.000 507 060703 40700 20700 3.000 508 060704 20700 2107 2.500 509 060710 10701 30701 3.000 510 060711 30701 81071 0.500 511 060712 81071 82071 6.000 512 060713 82071 40701 0.500 513 0

Page 71: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 21

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 21 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)60714 40701 20701 3.000 514 060720 10702 30702 3.000 515 060721 30702 81072 0.500 516 060722 81072 82072 6.000 517 060723 82072 40702 0.500 518 060724 40702 20702 3.000 519 060800 1108 10800 2.500 520 060801 10800 30800 3.000 521 060802 30800 40800 7.000 522 060803 40800 20800 3.000 523 060804 20800 2108 2.500 524 060810 10801 30801 3.000 525 060811 30801 81081 0.500 526 060812 81081 82081 6.000 527 060813 82081 40801 0.500 528 060814 40801 20801 3.000 529 060820 10802 30802 3.000 530 060821 30802 81082 0.500 531 060822 81082 82082 6.000 532 060823 82082 40802 0.500 533 060824 40802 20802 3.000 534 060900 1109 10900 2.500 535 060901 10900 30900 3.000 536 060902 30900 40900 7.000 537 060903 40900 20900 3.000 538 060904 20900 2109 2.500 539 060910 10901 30901 3.000 540 060911 30901 81091 0.500 541 060912 81091 82091 6.000 542 060913 82091 40901 0.500 543 060914 40901 20901 3.000 544 060920 10902 30902 3.000 545 060921 30902 81092 0.500 546 060922 81092 82092 6.000 547 060923 82092 40902 0.500 548 060924 40902 20902 3.000 549 061000 1110 11000 2.500 550 061001 11000 31000 3.000 551 061002 31000 41000 7.000 552 061003 41000 21000 3.000 553 061004 21000 2110 2.500 554 061010 11001 31001 3.000 555 061011 31001 81101 0.500 556 061012 81101 82101 6.000 557 061013 82101 41001 0.500 558 0

Page 72: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 22

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 22 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)61014 41001 21001 3.000 559 061020 11002 31002 3.000 560 061021 31002 81102 0.500 561 061022 81102 82102 6.000 562 061023 82102 41002 0.500 563 061024 41002 21002 3.000 564 061100 1111 11100 2.500 565 061101 11100 31100 3.000 566 061102 31100 41100 7.000 567 061103 41100 21100 3.000 568 061104 21100 2111 2.500 569 061110 11101 31101 3.000 570 061111 31101 81111 0.500 571 061112 81111 82111 6.000 572 061113 82111 41101 0.500 573 061114 41101 21101 3.000 574 061120 11102 31102 3.000 575 061121 31102 81112 0.500 576 061122 81112 82112 6.000 577 061123 82112 41102 0.500 578 061124 41102 21102 3.000 579 061200 1112 11200 2.500 580 061201 11200 31200 3.000 581 061202 31200 41200 7.000 582 061203 41200 21200 3.000 583 061204 21200 2112 2.500 584 090000 1100 81001 10.314 585 090001 81001 90000 5.157 585 090002 90000 82002 5.157 585 090003 82002 2101 10.314 585 090004 2100 82001 10.314 585 090005 82001 90000 5.157 585 090006 90000 81002 5.157 585 090007 81002 1101 10.314 585 090100 1101 81011 10.314 586 090101 81011 90001 5.157 586 090102 90001 82012 5.157 586 090103 82012 2102 10.314 586 090104 2101 82011 10.314 586 090105 82011 90001 5.157 586 090106 90001 81012 5.157 586 090107 81012 1102 10.314 586 090200 1102 81021 10.314 587 4590201 81021 90002 5.157 587 4590202 90002 82022 5.157 587 45

Page 73: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 23

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 23 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)90203 82022 2103 10.314 587 4590204 2102 82021 10.314 587 4590205 82021 90002 5.157 587 4590206 90002 81022 5.157 587 4590207 81022 1103 10.314 587 4590300 1103 81031 10.314 588 4590301 81031 90003 5.157 588 4590302 90003 82032 5.157 588 4590303 82032 2104 10.314 588 4590304 2103 82031 10.314 588 4590305 82031 90003 5.157 588 4590306 90003 81032 5.157 588 4590307 81032 1104 10.314 588 4590400 1104 81041 10.314 589 4590401 81041 90004 5.157 589 4590402 90004 82042 5.157 589 4590403 82042 2105 10.314 589 4590404 2104 82041 10.314 589 4590405 82041 90004 5.157 589 4590406 90004 81042 5.157 589 4590407 81042 1105 10.314 589 4590500 1105 81051 10.314 590 4590501 81051 90005 5.157 590 4590502 90005 82052 5.156 590 4590503 82052 2106 10.314 590 4590504 2105 82051 10.314 590 4590505 82051 90005 5.157 590 4590506 90005 81052 5.156 590 4590507 81052 1106 10.314 590 4590600 1106 81061 10.314 591 4590601 81061 90006 5.156 591 4590602 90006 82062 5.157 591 4590603 82062 2107 10.314 591 4590604 2106 82061 10.314 591 4590605 82061 90006 5.156 591 4590606 90006 81062 5.157 591 4590607 81062 1107 10.314 591 4590700 1107 81071 10.314 592 4590701 81071 90007 5.157 592 4590702 90007 82072 5.157 592 4590703 82072 2108 10.314 592 4590704 2107 82071 10.314 592 4590705 82071 90007 5.157 592 4590706 90007 81072 5.157 592 4590707 81072 1108 10.314 592 45

Page 74: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 24

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 24 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)90800 1108 81081 10.314 593 4590801 81081 90008 5.157 593 4590802 90008 82082 5.157 593 4590803 82082 2109 10.314 593 4590804 2108 82081 10.314 593 4590805 82081 90008 5.157 593 4590806 90008 81082 5.157 593 4590807 81082 1109 10.314 593 4590900 1109 81091 10.314 594 4590901 81091 90009 5.157 594 4590902 90009 82092 5.157 594 4590903 82092 2110 10.314 594 4590904 2109 82091 10.314 594 4590905 82091 90009 5.157 594 4590906 90009 81092 5.157 594 4590907 81092 1110 10.314 594 4591000 1110 81101 10.314 595 091001 81101 90010 5.157 595 091002 90010 82102 5.157 595 091003 82102 2111 10.314 595 091004 2110 82101 10.314 595 091005 82101 90010 5.157 595 091006 90010 81102 5.157 595 091007 81102 1111 10.314 595 091100 1111 81111 10.314 596 091101 81111 90011 5.157 596 091102 90011 82112 5.157 596 091103 82112 2112 10.314 596 091104 2111 82111 10.314 596 091105 82111 90011 5.157 596 091106 90011 81112 5.157 596 091107 81112 1112 10.314 596 0

Page 75: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 25

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 25 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section PropertiesProp Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

1 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL2 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL3 Prismatic General 66.000 9.2 E +3 352.000 1.000 STEEL4 Prismatic General 66.000 10.5 E +3 352.000 1.000 STEEL5 Prismatic General 84.000 7.06 E +3 448.000 1.000 STEEL6 Prismatic General 84.000 9.07 E +3 448.000 1.000 STEEL7 Prismatic General 84.000 9.07 E +3 448.000 1.000 STEEL8 Prismatic General 84.000 7.06 E +3 448.000 1.000 STEEL9 Prismatic General 66.000 10.5 E +3 352.000 1.000 STEEL

10 Prismatic General 66.000 9.2 E +3 352.000 1.000 STEEL11 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL12 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL13 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL14 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL15 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL16 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL17 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL18 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL19 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL20 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL21 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL22 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL23 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL24 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL25 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL26 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL27 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL28 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL29 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL30 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL31 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL32 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL33 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL34 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL35 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL36 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL37 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL38 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL39 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL40 Prismatic General 40.000 2.37 E +3 213.330 1.000 STEEL41 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL42 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL43 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL44 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL45 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL

Page 76: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 26

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 26 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

46 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL47 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL48 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL49 Prismatic General 40.000 2.37 E +3 213.330 1.000 STEEL50 Prismatic General 19.800 540.810 626.820 1.000 STEEL51 Prismatic General 19.800 540.810 626.820 1.000 STEEL52 Prismatic General 19.800 540.810 626.820 1.000 STEEL53 Prismatic General 19.800 540.810 626.820 1.000 STEEL54 Prismatic General 8.438 219.030 244.050 1.000 STEEL55 Prismatic General 8.438 219.030 244.050 1.000 STEEL56 Prismatic General 8.438 219.030 244.050 1.000 STEEL57 Prismatic General 8.438 219.030 244.050 1.000 STEEL58 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL59 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL60 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL61 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL62 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL63 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL64 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL65 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL66 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL67 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL68 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL69 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL70 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL71 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL72 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL73 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL74 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL75 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL76 Prismatic General 66.000 9.2 E +3 352.000 1.000 STEEL77 Prismatic General 66.000 10.5 E +3 352.000 1.000 STEEL78 Prismatic General 84.000 7.06 E +3 448.000 1.000 STEEL79 Prismatic General 84.000 9.07 E +3 448.000 1.000 STEEL80 Prismatic General 84.000 9.07 E +3 448.000 1.000 STEEL81 Prismatic General 84.000 7.06 E +3 448.000 1.000 STEEL82 Prismatic General 66.000 10.5 E +3 352.000 1.000 STEEL83 Prismatic General 66.000 9.2 E +3 352.000 1.000 STEEL84 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL85 Prismatic General 39.438 7.59 E +3 3.17 E +3 1.000 STEEL86 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL87 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL88 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL89 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL90 Prismatic General 35.000 1.82 E +3 1.85 E +3 1.000 STEEL

Page 77: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 27

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 27 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

91 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL92 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL93 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL94 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL95 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL96 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL97 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL98 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL99 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL

100 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL101 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL102 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL103 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL104 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL105 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL106 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL107 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL108 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL109 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL110 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL111 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL112 Prismatic General 19.800 1.03 E +3 626.820 1.000 STEEL113 Prismatic General 40.000 2.37 E +3 213.330 1.000 STEEL114 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL115 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL116 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL117 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL118 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL119 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL120 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL121 Prismatic General 38.688 3.6 E +3 2.18 E +3 1.000 STEEL122 Prismatic General 40.000 2.37 E +3 213.330 1.000 STEEL123 Prismatic General 19.800 540.810 626.820 1.000 STEEL124 Prismatic General 19.800 540.810 626.820 1.000 STEEL125 Prismatic General 19.800 540.810 626.820 1.000 STEEL126 Prismatic General 19.800 540.810 626.820 1.000 STEEL127 Prismatic General 8.438 219.030 244.050 1.000 STEEL128 Prismatic General 8.438 219.030 244.050 1.000 STEEL129 Prismatic General 8.438 219.030 244.050 1.000 STEEL130 Prismatic General 8.438 219.030 244.050 1.000 STEEL131 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL132 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL133 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL134 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL135 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL

Page 78: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 28

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 28 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

136 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL137 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL138 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL139 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL140 Prismatic General 93.023 10.8 E +3 8.43 E +3 1.000 STEEL141 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL142 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL143 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL144 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL145 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL146 Prismatic General 72.711 8.23 E +3 7.9 E +3 1.000 STEEL147 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL148 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL149 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL150 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL151 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL152 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL153 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL154 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL155 Prismatic General 12.188 33.270 1.75 E +3 1.000 STEEL156 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL157 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL158 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL159 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL160 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL161 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL162 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL163 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL164 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL165 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL166 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL167 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL168 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL169 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL170 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL171 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL172 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL173 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL174 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL175 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL176 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL177 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL178 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL179 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL180 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL

Page 79: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 29

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 29 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

181 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL182 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL183 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL184 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL185 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL186 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL187 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL188 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL189 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL190 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL191 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL192 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL193 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL194 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL195 Prismatic General 23.453 72.070 2.39 E +3 1.000 STEEL196 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL197 Prismatic General 12.188 82.230 1.77 E +3 1.000 STEEL198 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL199 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL200 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL201 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL202 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL203 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL204 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL205 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL206 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL207 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL208 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL209 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL210 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL211 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL212 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL213 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL214 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL215 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL216 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL217 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL218 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL219 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL220 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL221 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL222 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL223 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL224 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL225 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL

Page 80: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 30

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 30 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

226 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL227 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL228 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL229 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL230 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL231 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL232 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL233 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL234 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL235 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL236 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL237 Prismatic General 8.438 21.850 1.35 E +3 1.000 STEEL238 Prismatic General 10.234 27.510 369.220 1.000 STEEL239 Prismatic General 10.234 27.510 369.220 1.000 STEEL240 Prismatic General 10.234 27.510 369.220 1.000 STEEL241 Prismatic General 10.234 27.510 369.220 1.000 STEEL242 Prismatic General 10.234 27.510 369.220 1.000 STEEL243 Prismatic General 10.234 27.510 369.220 1.000 STEEL244 Prismatic General 10.234 27.510 369.220 1.000 STEEL245 Prismatic General 10.234 27.510 369.220 1.000 STEEL246 Prismatic General 10.234 27.510 369.220 1.000 STEEL247 L50355 2.563 7.835 1.502 0.085 STEEL248 L50355 2.563 7.835 1.502 0.085 STEEL249 L50355 2.563 7.835 1.502 0.085 STEEL250 L50355 2.563 7.835 1.502 0.085 STEEL251 L50355 2.563 7.835 1.502 0.085 STEEL252 L50355 2.563 7.835 1.502 0.085 STEEL253 L50355 2.563 7.835 1.502 0.085 STEEL254 L50355 2.563 7.835 1.502 0.085 STEEL255 L50355 2.563 7.835 1.502 0.085 STEEL256 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL257 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL258 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL259 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL260 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL261 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL262 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL263 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL264 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL265 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL266 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL267 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL268 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL269 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL270 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL

Page 81: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 31

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 31 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

271 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL272 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL273 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL274 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL275 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL276 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL277 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL278 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL279 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL280 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL281 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL282 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL283 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL284 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL285 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL286 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL287 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL288 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL289 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL290 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL291 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL292 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL293 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL294 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL295 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL296 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL297 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL298 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL299 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL300 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL301 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL302 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL303 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL304 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL305 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL306 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL307 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL308 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL309 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL310 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL311 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL312 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL313 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL314 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL315 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL

Page 82: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 32

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 32 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

316 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL317 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL318 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL319 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL320 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL321 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL322 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL323 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL324 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL325 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL326 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL327 Prismatic General 53.906 384.430 11.3 E +3 1.000 STEEL328 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL329 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL330 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL331 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL332 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL333 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL334 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL335 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL336 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL337 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL338 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL339 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL340 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL341 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL342 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL343 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL344 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL345 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL346 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL347 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL348 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL349 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL350 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL351 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL352 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL353 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL354 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL355 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL356 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL357 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL358 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL359 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL360 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL

Page 83: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 33

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 33 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

361 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL362 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL363 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL364 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL365 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL366 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL367 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL368 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL369 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL370 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL371 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL372 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL373 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL374 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL375 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL376 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL377 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL378 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL379 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL380 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL381 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL382 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL383 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL384 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL385 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL386 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL387 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL388 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL389 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL390 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL391 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL392 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL393 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL394 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL395 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL396 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL397 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL398 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL399 Prismatic General 25.000 34.200 1.39 E +3 1.000 STEEL400 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL401 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL402 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL403 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL404 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL405 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL

Page 84: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 34

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 34 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

406 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL407 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL408 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL409 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL410 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL411 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL412 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL413 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL414 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL415 Prismatic General 57.070 477.620 12.6 E +3 1.000 STEEL416 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL417 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL418 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL419 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL420 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL421 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL422 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL423 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL424 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL425 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL426 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL427 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL428 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL429 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL430 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL431 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL432 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL433 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL434 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL435 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL436 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL437 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL438 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL439 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL440 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL441 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL442 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL443 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL444 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL445 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL446 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL447 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL448 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL449 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL450 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL

Page 85: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 35

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 35 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

451 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL452 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL453 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL454 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL455 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL456 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL457 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL458 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL459 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL460 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL461 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL462 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL463 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL464 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL465 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL466 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL467 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL468 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL469 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL470 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL471 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL472 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL473 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL474 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL475 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL476 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL477 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL478 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL479 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL480 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL481 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL482 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL483 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL484 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL485 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL486 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL487 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL488 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL489 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL490 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL491 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL492 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL493 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL494 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL495 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL

Page 86: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 36

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 36 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

496 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL497 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL498 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL499 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL500 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL501 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL502 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL503 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL504 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL505 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL506 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL507 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL508 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL509 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL510 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL511 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL512 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL513 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL514 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL515 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL516 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL517 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL518 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL519 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL520 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL521 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL522 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL523 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL524 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL525 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL526 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL527 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL528 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL529 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL530 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL531 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL532 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL533 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL534 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL535 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL536 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL537 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL538 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL539 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL540 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL

Page 87: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 37

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 37 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

541 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL542 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL543 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL544 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL545 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL546 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL547 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL548 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL549 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL550 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL551 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL552 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL553 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL554 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL555 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL556 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL557 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL558 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL559 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL560 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL561 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL562 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL563 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL564 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL565 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL566 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL567 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL568 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL569 Prismatic General 57.070 477.623 12.6 E +3 1.000 STEEL570 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL571 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL572 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL573 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL574 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL575 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL576 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL577 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL578 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL579 Prismatic General 31.234 47.560 3.23 E +3 1.000 STEEL580 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL581 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL582 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL583 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL584 Prismatic General 58.070 477.860 12.7 E +3 1.000 STEEL585 L60608 LD 11.500 72.458 39.816 0.979 STEEL

Page 88: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 38

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 38 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

586 L60608 LD 11.500 72.458 39.816 0.979 STEEL587 L60608 5.750 31.745 8.071 0.490 STEEL588 L60608 5.750 31.745 8.071 0.490 STEEL589 L60608 5.750 31.745 8.071 0.490 STEEL590 L60608 5.750 31.745 8.071 0.490 STEEL591 L60608 5.750 31.745 8.071 0.490 STEEL592 L60608 5.750 31.745 8.071 0.490 STEEL593 L60608 5.750 31.745 8.071 0.490 STEEL594 L60608 5.750 31.745 8.071 0.490 STEEL595 L60608 LD 11.500 72.458 39.816 0.979 STEEL596 L60608 LD 11.500 72.458 39.816 0.979 STEEL

MaterialsMat Name E

(kip/in2) Density

(kip/in3)

(/°F)1 STEEL 29 E +3 0.300 0.000 6 E -62 STAINLESSSTEEL 28 E +3 0.300 0.000 9.9 E -63 ALUMINUM 10 E +3 0.330 0.000 12.8 E -64 CONCRETE 3.15 E +3 0.170 0.000 5.5 E -6

SupportsThere is no data of this type.

ReleasesBeam ends not shown in this table are fixed in all directions.Beam Node x y z rx ry rz

1100 1100 Fixed Fixed Fixed Fixed Pin Pin1100 1101 Fixed Fixed Fixed Fixed Pin Pin1101 1101 Fixed Fixed Fixed Fixed Pin Pin1101 1102 Fixed Fixed Fixed Fixed Pin Pin1102 1102 Fixed Fixed Fixed Fixed Pin Pin1102 1103 Fixed Fixed Fixed Fixed Pin Pin1103 1103 Fixed Fixed Fixed Fixed Pin Pin1103 1104 Fixed Fixed Fixed Fixed Pin Pin1104 1104 Fixed Fixed Fixed Fixed Pin Pin1104 1105 Fixed Fixed Fixed Fixed Pin Pin1105 1105 Fixed Fixed Fixed Fixed Pin Pin1105 1106 Fixed Fixed Fixed Fixed Pin Pin1106 1106 Fixed Fixed Fixed Fixed Pin Pin1106 1107 Fixed Fixed Fixed Fixed Pin Pin

Page 89: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 39

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 39 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

1107 1107 Fixed Fixed Fixed Fixed Pin Pin1107 1108 Fixed Fixed Fixed Fixed Pin Pin1108 1108 Fixed Fixed Fixed Fixed Pin Pin1108 1109 Fixed Fixed Fixed Fixed Pin Pin1109 1109 Fixed Fixed Fixed Fixed Pin Pin1109 1110 Fixed Fixed Fixed Fixed Pin Pin1110 1110 Fixed Fixed Fixed Fixed Pin Pin1110 1111 Fixed Fixed Fixed Fixed Pin Pin1111 1111 Fixed Fixed Fixed Fixed Pin Pin1111 1112 Fixed Fixed Fixed Fixed Pin Pin1201 1501 Fixed Fixed Fixed Fixed Pin Pin1201 1101 Fixed Fixed Fixed Fixed Pin Pin1202 1502 Fixed Fixed Fixed Fixed Pin Pin1203 1102 Fixed Fixed Fixed Fixed Pin Pin1209 1510 Fixed Fixed Fixed Fixed Pin Pin1210 1110 Fixed Fixed Fixed Fixed Pin Pin1211 1511 Fixed Fixed Fixed Fixed Pin Pin1211 1111 Fixed Fixed Fixed Fixed Pin Pin1230 1503 Fixed Fixed Fixed Fixed Pin Pin1232 1103 Fixed Fixed Fixed Fixed Pin Pin1240 1504 Fixed Fixed Fixed Fixed Pin Pin1242 1104 Fixed Fixed Fixed Fixed Pin Pin1250 1505 Fixed Fixed Fixed Fixed Pin Pin1252 1105 Fixed Fixed Fixed Fixed Pin Pin1260 1506 Fixed Fixed Fixed Fixed Pin Pin1262 1106 Fixed Fixed Fixed Fixed Pin Pin1270 1507 Fixed Fixed Fixed Fixed Pin Pin1272 1107 Fixed Fixed Fixed Fixed Pin Pin1280 1508 Fixed Fixed Fixed Fixed Pin Pin1282 1108 Fixed Fixed Fixed Fixed Pin Pin1290 1509 Fixed Fixed Fixed Fixed Pin Pin1292 1109 Fixed Fixed Fixed Fixed Pin Pin1301 1501 Fixed Fixed Fixed Fixed Pin Pin1301 1102 Fixed Fixed Fixed Fixed Pin Pin1302 1502 Fixed Fixed Fixed Fixed Pin Pin1303 1104 Fixed Fixed Fixed Fixed Pin Pin1304 1504 Fixed Fixed Fixed Fixed Pin Pin1305 1106 Fixed Fixed Fixed Fixed Pin Pin1306 1106 Fixed Fixed Fixed Fixed Pin Pin1307 1508 Fixed Fixed Fixed Fixed Pin Pin1308 1108 Fixed Fixed Fixed Fixed Pin Pin1309 1510 Fixed Fixed Fixed Fixed Pin Pin1310 1511 Fixed Fixed Fixed Fixed Pin Pin1310 1110 Fixed Fixed Fixed Fixed Pin Pin1382 1303 Fixed Fixed Fixed Fixed Pin Pin

Page 90: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 40

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 40 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

1382 1102 Fixed Fixed Fixed Fixed Pin Pin1384 1305 Fixed Fixed Fixed Fixed Pin Pin1384 1104 Fixed Fixed Fixed Fixed Pin Pin1388 1307 Fixed Fixed Fixed Fixed Pin Pin1388 1108 Fixed Fixed Fixed Fixed Pin Pin1392 1309 Fixed Fixed Fixed Fixed Pin Pin1392 1110 Fixed Fixed Fixed Fixed Pin Pin1404 1304 Fixed Fixed Fixed Fixed Pin Pin1404 1305 Fixed Fixed Fixed Fixed Pin Pin1405 1305 Fixed Fixed Fixed Fixed Pin Pin1405 1306 Fixed Fixed Fixed Fixed Pin Pin1406 1306 Fixed Fixed Fixed Fixed Pin Pin1406 1307 Fixed Fixed Fixed Fixed Pin Pin1407 1307 Fixed Fixed Fixed Fixed Pin Pin1407 1308 Fixed Fixed Fixed Fixed Pin Pin1500 1100 Fixed Fixed Fixed Fixed Pin Pin1501 1501 Fixed Fixed Fixed Fixed Pin Pin1501 1502 Fixed Fixed Fixed Fixed Pin Pin1502 1502 Fixed Fixed Fixed Fixed Pin Pin1502 1503 Fixed Fixed Fixed Fixed Pin Pin1503 1503 Fixed Fixed Fixed Fixed Pin Pin1503 1504 Fixed Fixed Fixed Fixed Pin Pin1504 1504 Fixed Fixed Fixed Fixed Pin Pin1504 1505 Fixed Fixed Fixed Fixed Pin Pin1505 1505 Fixed Fixed Fixed Fixed Pin Pin1505 1506 Fixed Fixed Fixed Fixed Pin Pin1506 1506 Fixed Fixed Fixed Fixed Pin Pin1506 1507 Fixed Fixed Fixed Fixed Pin Pin1507 1507 Fixed Fixed Fixed Fixed Pin Pin1507 1508 Fixed Fixed Fixed Fixed Pin Pin1508 1508 Fixed Fixed Fixed Fixed Pin Pin1508 1509 Fixed Fixed Fixed Fixed Pin Pin1509 1509 Fixed Fixed Fixed Fixed Pin Pin1509 1510 Fixed Fixed Fixed Fixed Pin Pin1510 1510 Fixed Fixed Fixed Fixed Pin Pin1510 1511 Fixed Fixed Fixed Fixed Pin Pin1511 1112 Fixed Fixed Fixed Fixed Pin Pin1551 1501 Fixed Fixed Fixed Fixed Pin Pin1561 1511 Fixed Fixed Fixed Fixed Pin Pin2100 2100 Fixed Fixed Fixed Fixed Pin Pin2100 2101 Fixed Fixed Fixed Fixed Pin Pin2101 2101 Fixed Fixed Fixed Fixed Pin Pin2101 2102 Fixed Fixed Fixed Fixed Pin Pin2102 2102 Fixed Fixed Fixed Fixed Pin Pin2102 2103 Fixed Fixed Fixed Fixed Pin Pin

Page 91: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 41

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 41 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

2103 2103 Fixed Fixed Fixed Fixed Pin Pin2103 2104 Fixed Fixed Fixed Fixed Pin Pin2104 2104 Fixed Fixed Fixed Fixed Pin Pin2104 2105 Fixed Fixed Fixed Fixed Pin Pin2105 2105 Fixed Fixed Fixed Fixed Pin Pin2105 2106 Fixed Fixed Fixed Fixed Pin Pin2106 2106 Fixed Fixed Fixed Fixed Pin Pin2106 2107 Fixed Fixed Fixed Fixed Pin Pin2107 2107 Fixed Fixed Fixed Fixed Pin Pin2107 2108 Fixed Fixed Fixed Fixed Pin Pin2108 2108 Fixed Fixed Fixed Fixed Pin Pin2108 2109 Fixed Fixed Fixed Fixed Pin Pin2109 2109 Fixed Fixed Fixed Fixed Pin Pin2109 2110 Fixed Fixed Fixed Fixed Pin Pin2110 2110 Fixed Fixed Fixed Fixed Pin Pin2110 2111 Fixed Fixed Fixed Fixed Pin Pin2111 2111 Fixed Fixed Fixed Fixed Pin Pin2111 2112 Fixed Fixed Fixed Fixed Pin Pin2201 2501 Fixed Fixed Fixed Fixed Pin Pin2201 2101 Fixed Fixed Fixed Fixed Pin Pin2202 2502 Fixed Fixed Fixed Fixed Pin Pin2203 2102 Fixed Fixed Fixed Fixed Pin Pin2209 2510 Fixed Fixed Fixed Fixed Pin Pin2210 2110 Fixed Fixed Fixed Fixed Pin Pin2211 2511 Fixed Fixed Fixed Fixed Pin Pin2211 2111 Fixed Fixed Fixed Fixed Pin Pin2230 2503 Fixed Fixed Fixed Fixed Pin Pin2232 2103 Fixed Fixed Fixed Fixed Pin Pin2240 2504 Fixed Fixed Fixed Fixed Pin Pin2242 2104 Fixed Fixed Fixed Fixed Pin Pin2250 2505 Fixed Fixed Fixed Fixed Pin Pin2252 2105 Fixed Fixed Fixed Fixed Pin Pin2260 2506 Fixed Fixed Fixed Fixed Pin Pin2262 2106 Fixed Fixed Fixed Fixed Pin Pin2270 2507 Fixed Fixed Fixed Fixed Pin Pin2272 2107 Fixed Fixed Fixed Fixed Pin Pin2280 2508 Fixed Fixed Fixed Fixed Pin Pin2282 2108 Fixed Fixed Fixed Fixed Pin Pin2290 2509 Fixed Fixed Fixed Fixed Pin Pin2292 2109 Fixed Fixed Fixed Fixed Pin Pin2301 2501 Fixed Fixed Fixed Fixed Pin Pin2301 2102 Fixed Fixed Fixed Fixed Pin Pin2302 2502 Fixed Fixed Fixed Fixed Pin Pin2303 2104 Fixed Fixed Fixed Fixed Pin Pin2304 2504 Fixed Fixed Fixed Fixed Pin Pin

Page 92: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 42

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 42 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

2305 2106 Fixed Fixed Fixed Fixed Pin Pin2306 2106 Fixed Fixed Fixed Fixed Pin Pin2307 2508 Fixed Fixed Fixed Fixed Pin Pin2308 2108 Fixed Fixed Fixed Fixed Pin Pin2309 2510 Fixed Fixed Fixed Fixed Pin Pin2310 2511 Fixed Fixed Fixed Fixed Pin Pin2310 2110 Fixed Fixed Fixed Fixed Pin Pin2382 2303 Fixed Fixed Fixed Fixed Pin Pin2382 2102 Fixed Fixed Fixed Fixed Pin Pin2384 2305 Fixed Fixed Fixed Fixed Pin Pin2384 2104 Fixed Fixed Fixed Fixed Pin Pin2388 2307 Fixed Fixed Fixed Fixed Pin Pin2388 2108 Fixed Fixed Fixed Fixed Pin Pin2392 2309 Fixed Fixed Fixed Fixed Pin Pin2392 2110 Fixed Fixed Fixed Fixed Pin Pin2404 2304 Fixed Fixed Fixed Fixed Pin Pin2404 2305 Fixed Fixed Fixed Fixed Pin Pin2405 2305 Fixed Fixed Fixed Fixed Pin Pin2405 2306 Fixed Fixed Fixed Fixed Pin Pin2406 2306 Fixed Fixed Fixed Fixed Pin Pin2406 2307 Fixed Fixed Fixed Fixed Pin Pin2407 2307 Fixed Fixed Fixed Fixed Pin Pin2407 2308 Fixed Fixed Fixed Fixed Pin Pin2500 2100 Fixed Fixed Fixed Fixed Pin Pin2501 2501 Fixed Fixed Fixed Fixed Pin Pin2501 2502 Fixed Fixed Fixed Fixed Pin Pin2502 2502 Fixed Fixed Fixed Fixed Pin Pin2502 2503 Fixed Fixed Fixed Fixed Pin Pin2503 2503 Fixed Fixed Fixed Fixed Pin Pin2503 2504 Fixed Fixed Fixed Fixed Pin Pin2504 2504 Fixed Fixed Fixed Fixed Pin Pin2504 2505 Fixed Fixed Fixed Fixed Pin Pin2505 2505 Fixed Fixed Fixed Fixed Pin Pin2505 2506 Fixed Fixed Fixed Fixed Pin Pin2506 2506 Fixed Fixed Fixed Fixed Pin Pin2506 2507 Fixed Fixed Fixed Fixed Pin Pin2507 2507 Fixed Fixed Fixed Fixed Pin Pin2507 2508 Fixed Fixed Fixed Fixed Pin Pin2508 2508 Fixed Fixed Fixed Fixed Pin Pin2508 2509 Fixed Fixed Fixed Fixed Pin Pin2509 2509 Fixed Fixed Fixed Fixed Pin Pin2509 2510 Fixed Fixed Fixed Fixed Pin Pin2510 2510 Fixed Fixed Fixed Fixed Pin Pin2510 2511 Fixed Fixed Fixed Fixed Pin Pin2511 2112 Fixed Fixed Fixed Fixed Pin Pin

Page 93: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 43

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 43 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

2551 2501 Fixed Fixed Fixed Fixed Pin Pin2561 2511 Fixed Fixed Fixed Fixed Pin Pin6002 1502 Fixed Fixed Fixed Fixed Pin Pin6002 2502 Fixed Fixed Fixed Fixed Pin Pin6003 1503 Fixed Fixed Fixed Fixed Pin Pin6003 2503 Fixed Fixed Fixed Fixed Pin Pin6004 1504 Fixed Fixed Fixed Fixed Pin Pin6004 2504 Fixed Fixed Fixed Fixed Pin Pin6005 1505 Fixed Fixed Fixed Fixed Pin Pin6005 2505 Fixed Fixed Fixed Fixed Pin Pin6006 1506 Fixed Fixed Fixed Fixed Pin Pin6006 2506 Fixed Fixed Fixed Fixed Pin Pin6007 1507 Fixed Fixed Fixed Fixed Pin Pin6007 2507 Fixed Fixed Fixed Fixed Pin Pin6008 1508 Fixed Fixed Fixed Fixed Pin Pin6008 2508 Fixed Fixed Fixed Fixed Pin Pin6009 1509 Fixed Fixed Fixed Fixed Pin Pin6009 2509 Fixed Fixed Fixed Fixed Pin Pin6010 1510 Fixed Fixed Fixed Fixed Pin Pin6010 2510 Fixed Fixed Fixed Fixed Pin Pin6101 1501 Fixed Fixed Fixed Fixed Pin Pin6102 2501 Fixed Fixed Fixed Fixed Pin Pin6103 1501 Fixed Fixed Fixed Fixed Pin Pin6104 9105 Fixed Fixed Fixed Fixed Pin Pin6105 1400 Fixed Fixed Fixed Fixed Pin Pin6106 9100 Fixed Fixed Fixed Fixed Pin Pin6107 9101 Fixed Fixed Fixed Fixed Pin Pin6107 9104 Fixed Fixed Fixed Fixed Pin Pin6108 9100 Fixed Fixed Fixed Fixed Pin Pin6109 2400 Fixed Fixed Fixed Fixed Pin Pin6110 9105 Fixed Fixed Fixed Fixed Pin Pin6111 2501 Fixed Fixed Fixed Fixed Pin Pin6112 9102 Fixed Fixed Fixed Fixed Pin Pin6112 9106 Fixed Fixed Fixed Fixed Pin Pin6113 9100 Fixed Fixed Fixed Fixed Pin Pin6113 9105 Fixed Fixed Fixed Fixed Pin Pin6114 1400 Fixed Fixed Fixed Fixed Pin Pin6119 2400 Fixed Fixed Fixed Fixed Pin Pin6120 9103 Fixed Fixed Fixed Fixed Pin Pin6120 1300 Fixed Fixed Fixed Fixed Pin Pin6121 9107 Fixed Fixed Fixed Fixed Pin Pin6121 2300 Fixed Fixed Fixed Fixed Pin Pin6201 1511 Fixed Fixed Fixed Fixed Pin Pin6202 2511 Fixed Fixed Fixed Fixed Pin Pin6203 1511 Fixed Fixed Fixed Fixed Pin Pin

Page 94: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 44

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 44 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

6204 9205 Fixed Fixed Fixed Fixed Pin Pin6205 1412 Fixed Fixed Fixed Fixed Pin Pin6206 9200 Fixed Fixed Fixed Fixed Pin Pin6207 9201 Fixed Fixed Fixed Fixed Pin Pin6207 9204 Fixed Fixed Fixed Fixed Pin Pin6208 9200 Fixed Fixed Fixed Fixed Pin Pin6209 2412 Fixed Fixed Fixed Fixed Pin Pin6210 9205 Fixed Fixed Fixed Fixed Pin Pin6211 2511 Fixed Fixed Fixed Fixed Pin Pin6212 9202 Fixed Fixed Fixed Fixed Pin Pin6212 9206 Fixed Fixed Fixed Fixed Pin Pin6213 9200 Fixed Fixed Fixed Fixed Pin Pin6213 9205 Fixed Fixed Fixed Fixed Pin Pin6214 1412 Fixed Fixed Fixed Fixed Pin Pin6219 2412 Fixed Fixed Fixed Fixed Pin Pin6220 9203 Fixed Fixed Fixed Fixed Pin Pin6220 1312 Fixed Fixed Fixed Fixed Pin Pin6221 9207 Fixed Fixed Fixed Fixed Pin Pin6221 2312 Fixed Fixed Fixed Fixed Pin Pin7010 1501 Fixed Fixed Fixed Fixed Pin Pin7010 7001 Fixed Fixed Fixed Fixed Pin Pin7011 7001 Fixed Fixed Fixed Fixed Pin Pin7011 2502 Fixed Fixed Fixed Fixed Pin Pin7012 2501 Fixed Fixed Fixed Fixed Pin Pin7013 1502 Fixed Fixed Fixed Fixed Pin Pin7020 1502 Fixed Fixed Fixed Fixed Pin Pin7020 7002 Fixed Fixed Fixed Fixed Pin Pin7021 7002 Fixed Fixed Fixed Fixed Pin Pin7021 2503 Fixed Fixed Fixed Fixed Pin Pin7022 2502 Fixed Fixed Fixed Fixed Pin Pin7023 1503 Fixed Fixed Fixed Fixed Pin Pin7030 1503 Fixed Fixed Fixed Fixed Pin Pin7030 7003 Fixed Fixed Fixed Fixed Pin Pin7031 7003 Fixed Fixed Fixed Fixed Pin Pin7031 2504 Fixed Fixed Fixed Fixed Pin Pin7032 2503 Fixed Fixed Fixed Fixed Pin Pin7033 1504 Fixed Fixed Fixed Fixed Pin Pin7040 1504 Fixed Fixed Fixed Fixed Pin Pin7040 7004 Fixed Fixed Fixed Fixed Pin Pin7041 7004 Fixed Fixed Fixed Fixed Pin Pin7041 2505 Fixed Fixed Fixed Fixed Pin Pin7042 2504 Fixed Fixed Fixed Fixed Pin Pin7043 1505 Fixed Fixed Fixed Fixed Pin Pin7050 1505 Fixed Fixed Fixed Fixed Pin Pin7050 7005 Fixed Fixed Fixed Fixed Pin Pin

Page 95: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 45

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 45 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

7051 7005 Fixed Fixed Fixed Fixed Pin Pin7051 2506 Fixed Fixed Fixed Fixed Pin Pin7052 2505 Fixed Fixed Fixed Fixed Pin Pin7053 1506 Fixed Fixed Fixed Fixed Pin Pin7060 1506 Fixed Fixed Fixed Fixed Pin Pin7060 7006 Fixed Fixed Fixed Fixed Pin Pin7061 7006 Fixed Fixed Fixed Fixed Pin Pin7061 2507 Fixed Fixed Fixed Fixed Pin Pin7062 2506 Fixed Fixed Fixed Fixed Pin Pin7063 1507 Fixed Fixed Fixed Fixed Pin Pin7070 1507 Fixed Fixed Fixed Fixed Pin Pin7070 7007 Fixed Fixed Fixed Fixed Pin Pin7071 7007 Fixed Fixed Fixed Fixed Pin Pin7071 2508 Fixed Fixed Fixed Fixed Pin Pin7072 2507 Fixed Fixed Fixed Fixed Pin Pin7073 1508 Fixed Fixed Fixed Fixed Pin Pin7080 1508 Fixed Fixed Fixed Fixed Pin Pin7080 7008 Fixed Fixed Fixed Fixed Pin Pin7081 7008 Fixed Fixed Fixed Fixed Pin Pin7081 2509 Fixed Fixed Fixed Fixed Pin Pin7082 2508 Fixed Fixed Fixed Fixed Pin Pin7083 1509 Fixed Fixed Fixed Fixed Pin Pin7090 1509 Fixed Fixed Fixed Fixed Pin Pin7090 7009 Fixed Fixed Fixed Fixed Pin Pin7091 7009 Fixed Fixed Fixed Fixed Pin Pin7091 2510 Fixed Fixed Fixed Fixed Pin Pin7092 2509 Fixed Fixed Fixed Fixed Pin Pin7093 1510 Fixed Fixed Fixed Fixed Pin Pin7100 1510 Fixed Fixed Fixed Fixed Pin Pin7100 7010 Fixed Fixed Fixed Fixed Pin Pin7101 7010 Fixed Fixed Fixed Fixed Pin Pin7101 2511 Fixed Fixed Fixed Fixed Pin Pin7102 2510 Fixed Fixed Fixed Fixed Pin Pin7103 1511 Fixed Fixed Fixed Fixed Pin Pin8002 1402 Fixed Fixed Fixed Fixed Pin Pin8002 2402 Fixed Fixed Fixed Fixed Pin Pin8003 1403 Fixed Fixed Fixed Fixed Pin Pin8003 2403 Fixed Fixed Fixed Fixed Pin Pin8004 1404 Fixed Fixed Fixed Fixed Pin Pin8004 2404 Fixed Fixed Fixed Fixed Pin Pin8005 1405 Fixed Fixed Fixed Fixed Pin Pin8005 2405 Fixed Fixed Fixed Fixed Pin Pin8006 1406 Fixed Fixed Fixed Fixed Pin Pin8006 2406 Fixed Fixed Fixed Fixed Pin Pin8007 1407 Fixed Fixed Fixed Fixed Pin Pin

Page 96: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 46

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 46 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

8007 2407 Fixed Fixed Fixed Fixed Pin Pin8008 1408 Fixed Fixed Fixed Fixed Pin Pin8008 2408 Fixed Fixed Fixed Fixed Pin Pin8009 1409 Fixed Fixed Fixed Fixed Pin Pin8009 2409 Fixed Fixed Fixed Fixed Pin Pin8010 1410 Fixed Fixed Fixed Fixed Pin Pin8010 2410 Fixed Fixed Fixed Fixed Pin Pin9020 1502 Fixed Fixed Fixed Fixed Pin Pin9020 9002 Fixed Fixed Fixed Fixed Pin Pin9021 9002 Fixed Fixed Fixed Fixed Pin Pin9021 2402 Fixed Fixed Fixed Fixed Pin Pin9022 1402 Fixed Fixed Fixed Fixed Pin Pin9022 9002 Fixed Fixed Fixed Fixed Pin Pin9023 9002 Fixed Fixed Fixed Fixed Pin Pin9023 2502 Fixed Fixed Fixed Fixed Pin Pin9030 1503 Fixed Fixed Fixed Fixed Pin Pin9030 9003 Fixed Fixed Fixed Fixed Pin Pin9031 9003 Fixed Fixed Fixed Fixed Pin Pin9031 2403 Fixed Fixed Fixed Fixed Pin Pin9032 1403 Fixed Fixed Fixed Fixed Pin Pin9032 9003 Fixed Fixed Fixed Fixed Pin Pin9033 9003 Fixed Fixed Fixed Fixed Pin Pin9033 2503 Fixed Fixed Fixed Fixed Pin Pin9040 1504 Fixed Fixed Fixed Fixed Pin Pin9040 9004 Fixed Fixed Fixed Fixed Pin Pin9041 9004 Fixed Fixed Fixed Fixed Pin Pin9041 2404 Fixed Fixed Fixed Fixed Pin Pin9042 1404 Fixed Fixed Fixed Fixed Pin Pin9042 9004 Fixed Fixed Fixed Fixed Pin Pin9043 9004 Fixed Fixed Fixed Fixed Pin Pin9043 2504 Fixed Fixed Fixed Fixed Pin Pin9050 1505 Fixed Fixed Fixed Fixed Pin Pin9050 9005 Fixed Fixed Fixed Fixed Pin Pin9051 9005 Fixed Fixed Fixed Fixed Pin Pin9051 2405 Fixed Fixed Fixed Fixed Pin Pin9052 1405 Fixed Fixed Fixed Fixed Pin Pin9052 9005 Fixed Fixed Fixed Fixed Pin Pin9053 9005 Fixed Fixed Fixed Fixed Pin Pin9053 2505 Fixed Fixed Fixed Fixed Pin Pin9060 1506 Fixed Fixed Fixed Fixed Pin Pin9060 9006 Fixed Fixed Fixed Fixed Pin Pin9061 9006 Fixed Fixed Fixed Fixed Pin Pin9061 2406 Fixed Fixed Fixed Fixed Pin Pin9062 1406 Fixed Fixed Fixed Fixed Pin Pin9062 9006 Fixed Fixed Fixed Fixed Pin Pin

Page 97: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 47

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 47 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

9063 9006 Fixed Fixed Fixed Fixed Pin Pin9063 2506 Fixed Fixed Fixed Fixed Pin Pin9070 1507 Fixed Fixed Fixed Fixed Pin Pin9070 9007 Fixed Fixed Fixed Fixed Pin Pin9071 9007 Fixed Fixed Fixed Fixed Pin Pin9071 2407 Fixed Fixed Fixed Fixed Pin Pin9072 1407 Fixed Fixed Fixed Fixed Pin Pin9072 9007 Fixed Fixed Fixed Fixed Pin Pin9073 9007 Fixed Fixed Fixed Fixed Pin Pin9073 2507 Fixed Fixed Fixed Fixed Pin Pin9080 1508 Fixed Fixed Fixed Fixed Pin Pin9080 9008 Fixed Fixed Fixed Fixed Pin Pin9081 9008 Fixed Fixed Fixed Fixed Pin Pin9081 2408 Fixed Fixed Fixed Fixed Pin Pin9082 1408 Fixed Fixed Fixed Fixed Pin Pin9082 9008 Fixed Fixed Fixed Fixed Pin Pin9083 9008 Fixed Fixed Fixed Fixed Pin Pin9083 2508 Fixed Fixed Fixed Fixed Pin Pin9090 1509 Fixed Fixed Fixed Fixed Pin Pin9090 9009 Fixed Fixed Fixed Fixed Pin Pin9091 9009 Fixed Fixed Fixed Fixed Pin Pin9091 2409 Fixed Fixed Fixed Fixed Pin Pin9092 1409 Fixed Fixed Fixed Fixed Pin Pin9092 9009 Fixed Fixed Fixed Fixed Pin Pin9093 9009 Fixed Fixed Fixed Fixed Pin Pin9093 2509 Fixed Fixed Fixed Fixed Pin Pin9100 1510 Fixed Fixed Fixed Fixed Pin Pin9100 9010 Fixed Fixed Fixed Fixed Pin Pin9101 9010 Fixed Fixed Fixed Fixed Pin Pin9101 2410 Fixed Fixed Fixed Fixed Pin Pin9102 1410 Fixed Fixed Fixed Fixed Pin Pin9102 9010 Fixed Fixed Fixed Fixed Pin Pin9103 9010 Fixed Fixed Fixed Fixed Pin Pin9103 2510 Fixed Fixed Fixed Fixed Pin Pin

10000 10000 Fixed Fixed Fixed Fixed Pin Pin10002 10100 Fixed Fixed Fixed Fixed Pin Pin10003 10100 Fixed Fixed Fixed Fixed Pin Pin10005 10200 Fixed Fixed Fixed Fixed Pin Pin10006 10200 Fixed Fixed Fixed Fixed Pin Pin10008 10300 Fixed Fixed Fixed Fixed Pin Pin10009 10300 Fixed Fixed Fixed Fixed Pin Pin10011 10400 Fixed Fixed Fixed Fixed Pin Pin10012 10400 Fixed Fixed Fixed Fixed Pin Pin10014 10500 Fixed Fixed Fixed Fixed Pin Pin10015 10500 Fixed Fixed Fixed Fixed Pin Pin

Page 98: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 48

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 48 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

10017 10600 Fixed Fixed Fixed Fixed Pin Pin10018 10600 Fixed Fixed Fixed Fixed Pin Pin10020 10700 Fixed Fixed Fixed Fixed Pin Pin10021 10700 Fixed Fixed Fixed Fixed Pin Pin10023 10800 Fixed Fixed Fixed Fixed Pin Pin10024 10800 Fixed Fixed Fixed Fixed Pin Pin10026 10900 Fixed Fixed Fixed Fixed Pin Pin10027 10900 Fixed Fixed Fixed Fixed Pin Pin10029 11000 Fixed Fixed Fixed Fixed Pin Pin10030 11000 Fixed Fixed Fixed Fixed Pin Pin10032 11100 Fixed Fixed Fixed Fixed Pin Pin10033 11100 Fixed Fixed Fixed Fixed Pin Pin10035 11200 Fixed Fixed Fixed Fixed Pin Pin20000 20000 Fixed Fixed Fixed Fixed Pin Pin20002 20100 Fixed Fixed Fixed Fixed Pin Pin20003 20100 Fixed Fixed Fixed Fixed Pin Pin20005 20200 Fixed Fixed Fixed Fixed Pin Pin20006 20200 Fixed Fixed Fixed Fixed Pin Pin20008 20300 Fixed Fixed Fixed Fixed Pin Pin20009 20300 Fixed Fixed Fixed Fixed Pin Pin20011 20400 Fixed Fixed Fixed Fixed Pin Pin20012 20400 Fixed Fixed Fixed Fixed Pin Pin20014 20500 Fixed Fixed Fixed Fixed Pin Pin20015 20500 Fixed Fixed Fixed Fixed Pin Pin20017 20600 Fixed Fixed Fixed Fixed Pin Pin20018 20600 Fixed Fixed Fixed Fixed Pin Pin20020 20700 Fixed Fixed Fixed Fixed Pin Pin20021 20700 Fixed Fixed Fixed Fixed Pin Pin20023 20800 Fixed Fixed Fixed Fixed Pin Pin20024 20800 Fixed Fixed Fixed Fixed Pin Pin20026 20900 Fixed Fixed Fixed Fixed Pin Pin20027 20900 Fixed Fixed Fixed Fixed Pin Pin20029 21000 Fixed Fixed Fixed Fixed Pin Pin20030 21000 Fixed Fixed Fixed Fixed Pin Pin20032 21100 Fixed Fixed Fixed Fixed Pin Pin20033 21100 Fixed Fixed Fixed Fixed Pin Pin20035 21200 Fixed Fixed Fixed Fixed Pin Pin30000 30000 Slide Fixed Fixed Fixed Fixed Fixed30000 30001 Fixed Fixed Fixed Fixed Pin Pin30001 30001 Slide Fixed Fixed Fixed Fixed Fixed30001 30002 Fixed Fixed Fixed Fixed Pin Pin30002 30002 Slide Fixed Fixed Fixed Fixed Fixed30002 30100 Fixed Fixed Fixed Fixed Pin Pin30003 30100 Slide Fixed Fixed Fixed Fixed Fixed30003 30101 Fixed Fixed Fixed Fixed Pin Pin

Page 99: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 49

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 49 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

30004 30101 Slide Fixed Fixed Fixed Fixed Fixed30004 30102 Fixed Fixed Fixed Fixed Pin Pin30005 30102 Slide Fixed Fixed Fixed Fixed Fixed30005 30200 Fixed Fixed Fixed Fixed Pin Pin30006 30200 Slide Fixed Fixed Fixed Fixed Fixed30006 30201 Fixed Fixed Fixed Fixed Pin Pin30007 30201 Slide Fixed Fixed Fixed Fixed Fixed30007 30202 Fixed Fixed Fixed Fixed Pin Pin30008 30202 Slide Fixed Fixed Fixed Fixed Fixed30008 30300 Fixed Fixed Fixed Fixed Pin Pin30009 30300 Slide Fixed Fixed Fixed Fixed Fixed30009 30301 Fixed Fixed Fixed Fixed Pin Pin30010 30301 Slide Fixed Fixed Fixed Fixed Fixed30010 30302 Fixed Fixed Fixed Fixed Pin Pin30011 30302 Slide Fixed Fixed Fixed Fixed Fixed30011 30400 Fixed Fixed Fixed Fixed Pin Pin30012 30400 Slide Fixed Fixed Fixed Fixed Fixed30012 30401 Fixed Fixed Fixed Fixed Pin Pin30013 30401 Slide Fixed Fixed Fixed Fixed Fixed30013 30402 Fixed Fixed Fixed Fixed Pin Pin30014 30402 Slide Fixed Fixed Fixed Fixed Fixed30014 30500 Fixed Fixed Fixed Fixed Pin Pin30015 30500 Slide Fixed Fixed Fixed Fixed Fixed30015 30501 Fixed Fixed Fixed Fixed Pin Pin30016 30501 Slide Fixed Fixed Fixed Fixed Fixed30016 30502 Fixed Fixed Fixed Fixed Pin Pin30017 30502 Slide Fixed Fixed Fixed Fixed Fixed30017 30600 Fixed Fixed Fixed Fixed Pin Pin30018 30600 Slide Fixed Fixed Fixed Fixed Fixed30018 30601 Fixed Fixed Fixed Fixed Pin Pin30019 30601 Slide Fixed Fixed Fixed Fixed Fixed30019 30602 Fixed Fixed Fixed Fixed Pin Pin30020 30602 Slide Fixed Fixed Fixed Fixed Fixed30020 30700 Fixed Fixed Fixed Fixed Pin Pin30021 30700 Slide Fixed Fixed Fixed Fixed Fixed30021 30701 Fixed Fixed Fixed Fixed Pin Pin30022 30701 Slide Fixed Fixed Fixed Fixed Fixed30022 30702 Fixed Fixed Fixed Fixed Pin Pin30023 30702 Slide Fixed Fixed Fixed Fixed Fixed30023 30800 Fixed Fixed Fixed Fixed Pin Pin30024 30800 Slide Fixed Fixed Fixed Fixed Fixed30024 30801 Fixed Fixed Fixed Fixed Pin Pin30025 30801 Slide Fixed Fixed Fixed Fixed Fixed30025 30802 Fixed Fixed Fixed Fixed Pin Pin30026 30802 Slide Fixed Fixed Fixed Fixed Fixed

Page 100: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 50

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 50 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

30026 30900 Fixed Fixed Fixed Fixed Pin Pin30027 30900 Slide Fixed Fixed Fixed Fixed Fixed30027 30901 Fixed Fixed Fixed Fixed Pin Pin30028 30901 Slide Fixed Fixed Fixed Fixed Fixed30028 30902 Fixed Fixed Fixed Fixed Pin Pin30029 30902 Slide Fixed Fixed Fixed Fixed Fixed30029 31000 Fixed Fixed Fixed Fixed Pin Pin30030 31000 Slide Fixed Fixed Fixed Fixed Fixed30030 31001 Fixed Fixed Fixed Fixed Pin Pin30031 31001 Slide Fixed Fixed Fixed Fixed Fixed30031 31002 Fixed Fixed Fixed Fixed Pin Pin30032 31002 Slide Fixed Fixed Fixed Fixed Fixed30032 31100 Fixed Fixed Fixed Fixed Pin Pin30033 31100 Slide Fixed Fixed Fixed Fixed Fixed30033 31101 Fixed Fixed Fixed Fixed Pin Pin30034 31101 Slide Fixed Fixed Fixed Fixed Fixed30034 31102 Fixed Fixed Fixed Fixed Pin Pin30035 31102 Slide Fixed Fixed Fixed Fixed Fixed30035 31200 Fixed Fixed Fixed Fixed Pin Pin40000 40000 Slide Fixed Fixed Fixed Fixed Fixed40000 40001 Fixed Fixed Fixed Fixed Pin Pin40001 40001 Slide Fixed Fixed Fixed Fixed Fixed40001 40002 Fixed Fixed Fixed Fixed Pin Pin40002 40002 Slide Fixed Fixed Fixed Fixed Fixed40002 40100 Fixed Fixed Fixed Fixed Pin Pin40003 40100 Slide Fixed Fixed Fixed Fixed Fixed40003 40101 Fixed Fixed Fixed Fixed Pin Pin40004 40101 Slide Fixed Fixed Fixed Fixed Fixed40004 40102 Fixed Fixed Fixed Fixed Pin Pin40005 40102 Slide Fixed Fixed Fixed Fixed Fixed40005 40200 Fixed Fixed Fixed Fixed Pin Pin40006 40200 Slide Fixed Fixed Fixed Fixed Fixed40006 40201 Fixed Fixed Fixed Fixed Pin Pin40007 40201 Slide Fixed Fixed Fixed Fixed Fixed40007 40202 Fixed Fixed Fixed Fixed Pin Pin40008 40202 Slide Fixed Fixed Fixed Fixed Fixed40008 40300 Fixed Fixed Fixed Fixed Pin Pin40009 40300 Slide Fixed Fixed Fixed Fixed Fixed40009 40301 Fixed Fixed Fixed Fixed Pin Pin40010 40301 Slide Fixed Fixed Fixed Fixed Fixed40010 40302 Fixed Fixed Fixed Fixed Pin Pin40011 40302 Slide Fixed Fixed Fixed Fixed Fixed40011 40400 Fixed Fixed Fixed Fixed Pin Pin40012 40400 Slide Fixed Fixed Fixed Fixed Fixed40012 40401 Fixed Fixed Fixed Fixed Pin Pin

Page 101: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 51

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 51 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

40013 40401 Slide Fixed Fixed Fixed Fixed Fixed40013 40402 Fixed Fixed Fixed Fixed Pin Pin40014 40402 Slide Fixed Fixed Fixed Fixed Fixed40014 40500 Fixed Fixed Fixed Fixed Pin Pin40015 40500 Slide Fixed Fixed Fixed Fixed Fixed40015 40501 Fixed Fixed Fixed Fixed Pin Pin40016 40501 Slide Fixed Fixed Fixed Fixed Fixed40016 40502 Fixed Fixed Fixed Fixed Pin Pin40017 40502 Slide Fixed Fixed Fixed Fixed Fixed40017 40600 Fixed Fixed Fixed Fixed Pin Pin40018 40600 Slide Fixed Fixed Fixed Fixed Fixed40018 40601 Fixed Fixed Fixed Fixed Pin Pin40019 40601 Slide Fixed Fixed Fixed Fixed Fixed40019 40602 Fixed Fixed Fixed Fixed Pin Pin40020 40602 Slide Fixed Fixed Fixed Fixed Fixed40020 40700 Fixed Fixed Fixed Fixed Pin Pin40021 40700 Slide Fixed Fixed Fixed Fixed Fixed40021 40701 Fixed Fixed Fixed Fixed Pin Pin40022 40701 Slide Fixed Fixed Fixed Fixed Fixed40022 40702 Fixed Fixed Fixed Fixed Pin Pin40023 40702 Slide Fixed Fixed Fixed Fixed Fixed40023 40800 Fixed Fixed Fixed Fixed Pin Pin40024 40800 Slide Fixed Fixed Fixed Fixed Fixed40024 40801 Fixed Fixed Fixed Fixed Pin Pin40025 40801 Slide Fixed Fixed Fixed Fixed Fixed40025 40802 Fixed Fixed Fixed Fixed Pin Pin40026 40802 Slide Fixed Fixed Fixed Fixed Fixed40026 40900 Fixed Fixed Fixed Fixed Pin Pin40027 40900 Slide Fixed Fixed Fixed Fixed Fixed40027 40901 Fixed Fixed Fixed Fixed Pin Pin40028 40901 Slide Fixed Fixed Fixed Fixed Fixed40028 40902 Fixed Fixed Fixed Fixed Pin Pin40029 40902 Slide Fixed Fixed Fixed Fixed Fixed40029 41000 Fixed Fixed Fixed Fixed Pin Pin40030 41000 Slide Fixed Fixed Fixed Fixed Fixed40030 41001 Fixed Fixed Fixed Fixed Pin Pin40031 41001 Slide Fixed Fixed Fixed Fixed Fixed40031 41002 Fixed Fixed Fixed Fixed Pin Pin40032 41002 Slide Fixed Fixed Fixed Fixed Fixed40032 41100 Fixed Fixed Fixed Fixed Pin Pin40033 41100 Slide Fixed Fixed Fixed Fixed Fixed40033 41101 Fixed Fixed Fixed Fixed Pin Pin40034 41101 Slide Fixed Fixed Fixed Fixed Fixed40034 41102 Fixed Fixed Fixed Fixed Pin Pin40035 41102 Slide Fixed Fixed Fixed Fixed Fixed

Page 102: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 52

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 52 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

40035 41200 Fixed Fixed Fixed Fixed Pin Pin60000 1100 Fixed Fixed Fixed Fixed Pin Pin60004 2100 Fixed Fixed Fixed Fixed Pin Pin60010 10001 Fixed Fixed Fixed Fixed Pin Pin60014 40001 Fixed Fixed Fixed Fixed Pin Pin60020 10002 Fixed Fixed Fixed Fixed Pin Pin60024 40002 Fixed Fixed Fixed Fixed Pin Pin60100 1101 Fixed Fixed Fixed Fixed Pin Pin60104 2101 Fixed Fixed Fixed Fixed Pin Pin60110 10101 Fixed Fixed Fixed Fixed Pin Pin60114 40101 Fixed Fixed Fixed Fixed Pin Pin60120 10102 Fixed Fixed Fixed Fixed Pin Pin60124 40102 Fixed Fixed Fixed Fixed Pin Pin60200 1102 Fixed Fixed Fixed Fixed Pin Pin60204 2102 Fixed Fixed Fixed Fixed Pin Pin60210 10201 Fixed Fixed Fixed Fixed Pin Pin60214 40201 Fixed Fixed Fixed Fixed Pin Pin60220 10202 Fixed Fixed Fixed Fixed Pin Pin60224 40202 Fixed Fixed Fixed Fixed Pin Pin60300 1103 Fixed Fixed Fixed Fixed Pin Pin60304 2103 Fixed Fixed Fixed Fixed Pin Pin60310 10301 Fixed Fixed Fixed Fixed Pin Pin60314 40301 Fixed Fixed Fixed Fixed Pin Pin60320 10302 Fixed Fixed Fixed Fixed Pin Pin60324 40302 Fixed Fixed Fixed Fixed Pin Pin60400 1104 Fixed Fixed Fixed Fixed Pin Pin60404 2104 Fixed Fixed Fixed Fixed Pin Pin60410 10401 Fixed Fixed Fixed Fixed Pin Pin60414 40401 Fixed Fixed Fixed Fixed Pin Pin60420 10402 Fixed Fixed Fixed Fixed Pin Pin60424 40402 Fixed Fixed Fixed Fixed Pin Pin60500 1105 Fixed Fixed Fixed Fixed Pin Pin60504 2105 Fixed Fixed Fixed Fixed Pin Pin60510 10501 Fixed Fixed Fixed Fixed Pin Pin60514 40501 Fixed Fixed Fixed Fixed Pin Pin60520 10502 Fixed Fixed Fixed Fixed Pin Pin60524 40502 Fixed Fixed Fixed Fixed Pin Pin60600 1106 Fixed Fixed Fixed Fixed Pin Pin60604 2106 Fixed Fixed Fixed Fixed Pin Pin60610 10601 Fixed Fixed Fixed Fixed Pin Pin60614 40601 Fixed Fixed Fixed Fixed Pin Pin60620 10602 Fixed Fixed Fixed Fixed Pin Pin60624 40602 Fixed Fixed Fixed Fixed Pin Pin60700 1107 Fixed Fixed Fixed Fixed Pin Pin60704 2107 Fixed Fixed Fixed Fixed Pin Pin

Page 103: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 53

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 53 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

60710 10701 Fixed Fixed Fixed Fixed Pin Pin60714 40701 Fixed Fixed Fixed Fixed Pin Pin60720 10702 Fixed Fixed Fixed Fixed Pin Pin60724 40702 Fixed Fixed Fixed Fixed Pin Pin60800 1108 Fixed Fixed Fixed Fixed Pin Pin60804 2108 Fixed Fixed Fixed Fixed Pin Pin60810 10801 Fixed Fixed Fixed Fixed Pin Pin60814 40801 Fixed Fixed Fixed Fixed Pin Pin60820 10802 Fixed Fixed Fixed Fixed Pin Pin60824 40802 Fixed Fixed Fixed Fixed Pin Pin60900 1109 Fixed Fixed Fixed Fixed Pin Pin60904 2109 Fixed Fixed Fixed Fixed Pin Pin60910 10901 Fixed Fixed Fixed Fixed Pin Pin60914 40901 Fixed Fixed Fixed Fixed Pin Pin60920 10902 Fixed Fixed Fixed Fixed Pin Pin60924 40902 Fixed Fixed Fixed Fixed Pin Pin61000 1110 Fixed Fixed Fixed Fixed Pin Pin61004 2110 Fixed Fixed Fixed Fixed Pin Pin61010 11001 Fixed Fixed Fixed Fixed Pin Pin61014 41001 Fixed Fixed Fixed Fixed Pin Pin61020 11002 Fixed Fixed Fixed Fixed Pin Pin61024 41002 Fixed Fixed Fixed Fixed Pin Pin61100 1111 Fixed Fixed Fixed Fixed Pin Pin61104 2111 Fixed Fixed Fixed Fixed Pin Pin61110 11101 Fixed Fixed Fixed Fixed Pin Pin61114 41101 Fixed Fixed Fixed Fixed Pin Pin61120 11102 Fixed Fixed Fixed Fixed Pin Pin61124 41102 Fixed Fixed Fixed Fixed Pin Pin61200 1112 Fixed Fixed Fixed Fixed Pin Pin61204 2112 Fixed Fixed Fixed Fixed Pin Pin90000 1100 Fixed Fixed Fixed Fixed Pin Pin90000 81001 Fixed Fixed Fixed Fixed Pin Pin90001 81001 Fixed Fixed Fixed Fixed Pin Pin90001 90000 Fixed Fixed Fixed Fixed Pin Pin90002 90000 Fixed Fixed Fixed Fixed Pin Pin90002 82002 Fixed Fixed Fixed Fixed Pin Pin90003 82002 Fixed Fixed Fixed Fixed Pin Pin90003 2101 Fixed Fixed Fixed Fixed Pin Pin90004 2100 Fixed Fixed Fixed Fixed Pin Pin90004 82001 Fixed Fixed Fixed Fixed Pin Pin90005 82001 Fixed Fixed Fixed Fixed Pin Pin90006 81002 Fixed Fixed Fixed Fixed Pin Pin90007 81002 Fixed Fixed Fixed Fixed Pin Pin90007 1101 Fixed Fixed Fixed Fixed Pin Pin90100 1101 Fixed Fixed Fixed Fixed Pin Pin

Page 104: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 54

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 54 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

90100 81011 Fixed Fixed Fixed Fixed Pin Pin90101 81011 Fixed Fixed Fixed Fixed Pin Pin90101 90001 Fixed Fixed Fixed Fixed Pin Pin90102 90001 Fixed Fixed Fixed Fixed Pin Pin90102 82012 Fixed Fixed Fixed Fixed Pin Pin90103 82012 Fixed Fixed Fixed Fixed Pin Pin90103 2102 Fixed Fixed Fixed Fixed Pin Pin90104 2101 Fixed Fixed Fixed Fixed Pin Pin90104 82011 Fixed Fixed Fixed Fixed Pin Pin90105 82011 Fixed Fixed Fixed Fixed Pin Pin90106 81012 Fixed Fixed Fixed Fixed Pin Pin90107 81012 Fixed Fixed Fixed Fixed Pin Pin90107 1102 Fixed Fixed Fixed Fixed Pin Pin90200 1102 Fixed Fixed Fixed Fixed Pin Pin90200 81021 Fixed Fixed Fixed Fixed Pin Pin90201 81021 Fixed Fixed Fixed Fixed Pin Pin90201 90002 Fixed Fixed Fixed Fixed Pin Pin90202 90002 Fixed Fixed Fixed Fixed Pin Pin90202 82022 Fixed Fixed Fixed Fixed Pin Pin90203 82022 Fixed Fixed Fixed Fixed Pin Pin90203 2103 Fixed Fixed Fixed Fixed Pin Pin90204 2102 Fixed Fixed Fixed Fixed Pin Pin90204 82021 Fixed Fixed Fixed Fixed Pin Pin90205 82021 Fixed Fixed Fixed Fixed Pin Pin90206 81022 Fixed Fixed Fixed Fixed Pin Pin90207 81022 Fixed Fixed Fixed Fixed Pin Pin90207 1103 Fixed Fixed Fixed Fixed Pin Pin90300 1103 Fixed Fixed Fixed Fixed Pin Pin90300 81031 Fixed Fixed Fixed Fixed Pin Pin90301 81031 Fixed Fixed Fixed Fixed Pin Pin90301 90003 Fixed Fixed Fixed Fixed Pin Pin90302 90003 Fixed Fixed Fixed Fixed Pin Pin90302 82032 Fixed Fixed Fixed Fixed Pin Pin90303 82032 Fixed Fixed Fixed Fixed Pin Pin90303 2104 Fixed Fixed Fixed Fixed Pin Pin90304 2103 Fixed Fixed Fixed Fixed Pin Pin90304 82031 Fixed Fixed Fixed Fixed Pin Pin90305 82031 Fixed Fixed Fixed Fixed Pin Pin90306 81032 Fixed Fixed Fixed Fixed Pin Pin90307 81032 Fixed Fixed Fixed Fixed Pin Pin90307 1104 Fixed Fixed Fixed Fixed Pin Pin90400 1104 Fixed Fixed Fixed Fixed Pin Pin90400 81041 Fixed Fixed Fixed Fixed Pin Pin90401 81041 Fixed Fixed Fixed Fixed Pin Pin90401 90004 Fixed Fixed Fixed Fixed Pin Pin

Page 105: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 55

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 55 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

90402 90004 Fixed Fixed Fixed Fixed Pin Pin90402 82042 Fixed Fixed Fixed Fixed Pin Pin90403 82042 Fixed Fixed Fixed Fixed Pin Pin90403 2105 Fixed Fixed Fixed Fixed Pin Pin90404 2104 Fixed Fixed Fixed Fixed Pin Pin90404 82041 Fixed Fixed Fixed Fixed Pin Pin90405 82041 Fixed Fixed Fixed Fixed Pin Pin90406 81042 Fixed Fixed Fixed Fixed Pin Pin90407 81042 Fixed Fixed Fixed Fixed Pin Pin90407 1105 Fixed Fixed Fixed Fixed Pin Pin90500 1105 Fixed Fixed Fixed Fixed Pin Pin90500 81051 Fixed Fixed Fixed Fixed Pin Pin90501 81051 Fixed Fixed Fixed Fixed Pin Pin90501 90005 Fixed Fixed Fixed Fixed Pin Pin90502 90005 Fixed Fixed Fixed Fixed Pin Pin90502 82052 Fixed Fixed Fixed Fixed Pin Pin90503 82052 Fixed Fixed Fixed Fixed Pin Pin90503 2106 Fixed Fixed Fixed Fixed Pin Pin90504 2105 Fixed Fixed Fixed Fixed Pin Pin90504 82051 Fixed Fixed Fixed Fixed Pin Pin90505 82051 Fixed Fixed Fixed Fixed Pin Pin90506 81052 Fixed Fixed Fixed Fixed Pin Pin90507 81052 Fixed Fixed Fixed Fixed Pin Pin90507 1106 Fixed Fixed Fixed Fixed Pin Pin90600 1106 Fixed Fixed Fixed Fixed Pin Pin90600 81061 Fixed Fixed Fixed Fixed Pin Pin90601 81061 Fixed Fixed Fixed Fixed Pin Pin90601 90006 Fixed Fixed Fixed Fixed Pin Pin90602 90006 Fixed Fixed Fixed Fixed Pin Pin90602 82062 Fixed Fixed Fixed Fixed Pin Pin90603 82062 Fixed Fixed Fixed Fixed Pin Pin90603 2107 Fixed Fixed Fixed Fixed Pin Pin90604 2106 Fixed Fixed Fixed Fixed Pin Pin90604 82061 Fixed Fixed Fixed Fixed Pin Pin90605 82061 Fixed Fixed Fixed Fixed Pin Pin90606 81062 Fixed Fixed Fixed Fixed Pin Pin90607 81062 Fixed Fixed Fixed Fixed Pin Pin90607 1107 Fixed Fixed Fixed Fixed Pin Pin90700 1107 Fixed Fixed Fixed Fixed Pin Pin90700 81071 Fixed Fixed Fixed Fixed Pin Pin90701 81071 Fixed Fixed Fixed Fixed Pin Pin90701 90007 Fixed Fixed Fixed Fixed Pin Pin90702 90007 Fixed Fixed Fixed Fixed Pin Pin90702 82072 Fixed Fixed Fixed Fixed Pin Pin90703 82072 Fixed Fixed Fixed Fixed Pin Pin

Page 106: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 56

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 56 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

90703 2108 Fixed Fixed Fixed Fixed Pin Pin90704 2107 Fixed Fixed Fixed Fixed Pin Pin90704 82071 Fixed Fixed Fixed Fixed Pin Pin90705 82071 Fixed Fixed Fixed Fixed Pin Pin90706 81072 Fixed Fixed Fixed Fixed Pin Pin90707 81072 Fixed Fixed Fixed Fixed Pin Pin90707 1108 Fixed Fixed Fixed Fixed Pin Pin90800 1108 Fixed Fixed Fixed Fixed Pin Pin90800 81081 Fixed Fixed Fixed Fixed Pin Pin90801 81081 Fixed Fixed Fixed Fixed Pin Pin90801 90008 Fixed Fixed Fixed Fixed Pin Pin90802 90008 Fixed Fixed Fixed Fixed Pin Pin90802 82082 Fixed Fixed Fixed Fixed Pin Pin90803 82082 Fixed Fixed Fixed Fixed Pin Pin90803 2109 Fixed Fixed Fixed Fixed Pin Pin90804 2108 Fixed Fixed Fixed Fixed Pin Pin90804 82081 Fixed Fixed Fixed Fixed Pin Pin90805 82081 Fixed Fixed Fixed Fixed Pin Pin90806 81082 Fixed Fixed Fixed Fixed Pin Pin90807 81082 Fixed Fixed Fixed Fixed Pin Pin90807 1109 Fixed Fixed Fixed Fixed Pin Pin90900 1109 Fixed Fixed Fixed Fixed Pin Pin90900 81091 Fixed Fixed Fixed Fixed Pin Pin90901 81091 Fixed Fixed Fixed Fixed Pin Pin90901 90009 Fixed Fixed Fixed Fixed Pin Pin90902 90009 Fixed Fixed Fixed Fixed Pin Pin90902 82092 Fixed Fixed Fixed Fixed Pin Pin90903 82092 Fixed Fixed Fixed Fixed Pin Pin90903 2110 Fixed Fixed Fixed Fixed Pin Pin90904 2109 Fixed Fixed Fixed Fixed Pin Pin90904 82091 Fixed Fixed Fixed Fixed Pin Pin90905 82091 Fixed Fixed Fixed Fixed Pin Pin90906 81092 Fixed Fixed Fixed Fixed Pin Pin90907 81092 Fixed Fixed Fixed Fixed Pin Pin90907 1110 Fixed Fixed Fixed Fixed Pin Pin91000 1110 Fixed Fixed Fixed Fixed Pin Pin91000 81101 Fixed Fixed Fixed Fixed Pin Pin91001 81101 Fixed Fixed Fixed Fixed Pin Pin91001 90010 Fixed Fixed Fixed Fixed Pin Pin91002 90010 Fixed Fixed Fixed Fixed Pin Pin91002 82102 Fixed Fixed Fixed Fixed Pin Pin91003 82102 Fixed Fixed Fixed Fixed Pin Pin91003 2111 Fixed Fixed Fixed Fixed Pin Pin91004 2110 Fixed Fixed Fixed Fixed Pin Pin91004 82101 Fixed Fixed Fixed Fixed Pin Pin

Page 107: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 57

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 57 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

91005 82101 Fixed Fixed Fixed Fixed Pin Pin91006 81102 Fixed Fixed Fixed Fixed Pin Pin91007 81102 Fixed Fixed Fixed Fixed Pin Pin91007 1111 Fixed Fixed Fixed Fixed Pin Pin91100 1111 Fixed Fixed Fixed Fixed Pin Pin91100 81111 Fixed Fixed Fixed Fixed Pin Pin91101 81111 Fixed Fixed Fixed Fixed Pin Pin91101 90011 Fixed Fixed Fixed Fixed Pin Pin91102 90011 Fixed Fixed Fixed Fixed Pin Pin91102 82112 Fixed Fixed Fixed Fixed Pin Pin91103 82112 Fixed Fixed Fixed Fixed Pin Pin91103 2112 Fixed Fixed Fixed Fixed Pin Pin91104 2111 Fixed Fixed Fixed Fixed Pin Pin91104 82111 Fixed Fixed Fixed Fixed Pin Pin91105 82111 Fixed Fixed Fixed Fixed Pin Pin91106 81112 Fixed Fixed Fixed Fixed Pin Pin91107 81112 Fixed Fixed Fixed Fixed Pin Pin91107 1112 Fixed Fixed Fixed Fixed Pin Pin

Basic Load CasesNumber Name

1 SELFWEIGHT OF STRUCTURE3 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVA4 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVA5 SPAN 2 PHASE 2 DL6 SPAN 2 PHASE 2 LL7 SPAN 2 PHASE 3 DL8 SPAN 2 PHASE 3 LL

Combination Load CasesComb. Combination L/C Name Primary Primary L/C Name Factor

11 STRENGTH I FOR PHASE 1 1 SELFWEIGHT OF STRUCTURE 1.253 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVA 1.254 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVA 1.75

12 STRENGTH I FOR PHASE 2 1 SELFWEIGHT OF STRUCTURE 1.255 SPAN 2 PHASE 2 DL 1.256 SPAN 2 PHASE 2 LL 1.75

13 STRENGTH I FOR PHASE 3 1 SELFWEIGHT OF STRUCTURE 1.257 SPAN 2 PHASE 3 DL 1.258 SPAN 2 PHASE 3 LL 1.75

Page 108: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 58

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 58 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Load GeneratorsThere is no data of this type.

Selfweight : 1 SELFWEIGHT OF STRUCTUREDirection Factor

Y -121.400

Beam Loads : 3 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVATION DLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -2.69 E +3 - - - -10001 UNI lbf/ft GY -2.69 E +3 - - - -10002 UNI lbf/ft GY -2.69 E +3 - - - -10003 UNI lbf/ft GY -2.69 E +3 - - - -10004 UNI lbf/ft GY -2.69 E +3 - - - -10005 UNI lbf/ft GY -710.000 - - - -10006 UNI lbf/ft GY -710.000 - - - -10007 UNI lbf/ft GY -710.000 - - - -10008 UNI lbf/ft GY -710.000 - - - -10009 UNI lbf/ft GY -710.000 - - - -10010 UNI lbf/ft GY -710.000 - - - -10011 UNI lbf/ft GY -710.000 - - - -10012 UNI lbf/ft GY -710.000 - - - -10013 UNI lbf/ft GY -710.000 - - - -10014 UNI lbf/ft GY -710.000 - - - -10015 UNI lbf/ft GY -710.000 - - - -10016 UNI lbf/ft GY -710.000 - - - -10017 UNI lbf/ft GY -710.000 - - - -10018 UNI lbf/ft GY -710.000 - - - -10019 UNI lbf/ft GY -710.000 - - - -10020 UNI lbf/ft GY -710.000 - - - -10021 UNI lbf/ft GY -710.000 - - - -10022 UNI lbf/ft GY -710.000 - - - -10023 UNI lbf/ft GY -710.000 - - - -10024 UNI lbf/ft GY -710.000 - - - -10025 UNI lbf/ft GY -710.000 - - - -10026 UNI lbf/ft GY -710.000 - - - -10027 UNI lbf/ft GY -710.000 - - - -10028 UNI lbf/ft GY -710.000 - - - -10029 UNI lbf/ft GY -710.000 - - - -10030 UNI lbf/ft GY -710.000 - - - -10031 UNI lbf/ft GY -710.000 - - - -10032 UNI lbf/ft GY -710.000 - - - -10033 UNI lbf/ft GY -710.000 - - - -

Page 109: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 59

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 59 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 3 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVATION DL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10034 UNI lbf/ft GY -710.000 - - - -10035 UNI lbf/ft GY -710.000 - - - -20000 UNI lbf/ft GY -2.69 E +3 - - - -20001 UNI lbf/ft GY -2.69 E +3 - - - -20002 UNI lbf/ft GY -2.69 E +3 - - - -20003 UNI lbf/ft GY -2.69 E +3 - - - -20004 UNI lbf/ft GY -2.69 E +3 - - - -20005 UNI lbf/ft GY -710.000 - - - -20006 UNI lbf/ft GY -710.000 - - - -20007 UNI lbf/ft GY -710.000 - - - -20008 UNI lbf/ft GY -710.000 - - - -20009 UNI lbf/ft GY -710.000 - - - -20010 UNI lbf/ft GY -710.000 - - - -20011 UNI lbf/ft GY -710.000 - - - -20012 UNI lbf/ft GY -710.000 - - - -20013 UNI lbf/ft GY -710.000 - - - -20014 UNI lbf/ft GY -710.000 - - - -20015 UNI lbf/ft GY -710.000 - - - -20016 UNI lbf/ft GY -710.000 - - - -20017 UNI lbf/ft GY -710.000 - - - -20018 UNI lbf/ft GY -710.000 - - - -20019 UNI lbf/ft GY -710.000 - - - -20020 UNI lbf/ft GY -710.000 - - - -20021 UNI lbf/ft GY -710.000 - - - -20022 UNI lbf/ft GY -710.000 - - - -20023 UNI lbf/ft GY -710.000 - - - -20024 UNI lbf/ft GY -710.000 - - - -20025 UNI lbf/ft GY -710.000 - - - -20026 UNI lbf/ft GY -710.000 - - - -20027 UNI lbf/ft GY -710.000 - - - -20028 UNI lbf/ft GY -710.000 - - - -20029 UNI lbf/ft GY -710.000 - - - -20030 UNI lbf/ft GY -710.000 - - - -20031 UNI lbf/ft GY -710.000 - - - -20032 UNI lbf/ft GY -710.000 - - - -20033 UNI lbf/ft GY -710.000 - - - -20034 UNI lbf/ft GY -710.000 - - - -20035 UNI lbf/ft GY -710.000 - - - -

Page 110: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 60

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 60 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 4 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVATION LLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -1.89 E +3 - - - -10001 UNI lbf/ft GY -1.89 E +3 - - - -10002 UNI lbf/ft GY -1.89 E +3 - - - -10003 UNI lbf/ft GY -1.89 E +3 - - - -10004 UNI lbf/ft GY -1.89 E +3 - - - -10005 UNI lbf/ft GY -450.000 - - - -10006 UNI lbf/ft GY -450.000 - - - -10007 UNI lbf/ft GY -450.000 - - - -10008 UNI lbf/ft GY -450.000 - - - -10009 UNI lbf/ft GY -450.000 - - - -10010 UNI lbf/ft GY -450.000 - - - -10011 UNI lbf/ft GY -450.000 - - - -10012 UNI lbf/ft GY -450.000 - - - -10013 UNI lbf/ft GY -450.000 - - - -10014 UNI lbf/ft GY -450.000 - - - -10015 UNI lbf/ft GY -450.000 - - - -10016 UNI lbf/ft GY -450.000 - - - -10017 UNI lbf/ft GY -450.000 - - - -10018 UNI lbf/ft GY -450.000 - - - -10019 UNI lbf/ft GY -450.000 - - - -10020 UNI lbf/ft GY -450.000 - - - -10021 UNI lbf/ft GY -450.000 - - - -10022 UNI lbf/ft GY -450.000 - - - -10023 UNI lbf/ft GY -450.000 - - - -10024 UNI lbf/ft GY -450.000 - - - -10025 UNI lbf/ft GY -450.000 - - - -10026 UNI lbf/ft GY -450.000 - - - -10027 UNI lbf/ft GY -450.000 - - - -10028 UNI lbf/ft GY -450.000 - - - -10029 UNI lbf/ft GY -450.000 - - - -10030 UNI lbf/ft GY -450.000 - - - -10031 UNI lbf/ft GY -450.000 - - - -10032 UNI lbf/ft GY -450.000 - - - -10033 UNI lbf/ft GY -450.000 - - - -10034 UNI lbf/ft GY -450.000 - - - -10035 UNI lbf/ft GY -450.000 - - - -20000 UNI lbf/ft GY -1.89 E +3 - - - -20001 UNI lbf/ft GY -1.89 E +3 - - - -20002 UNI lbf/ft GY -1.89 E +3 - - - -20003 UNI lbf/ft GY -1.89 E +3 - - - -20004 UNI lbf/ft GY -1.89 E +3 - - - -20005 UNI lbf/ft GY -450.000 - - - -20006 UNI lbf/ft GY -450.000 - - - -20007 UNI lbf/ft GY -450.000 - - - -20008 UNI lbf/ft GY -450.000 - - - -

Page 111: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 61

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 61 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 4 SPAN 2 PHASE 1 - 10' TRAIL & OBSERVATION LL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20009 UNI lbf/ft GY -450.000 - - - -20010 UNI lbf/ft GY -450.000 - - - -20011 UNI lbf/ft GY -450.000 - - - -20012 UNI lbf/ft GY -450.000 - - - -20013 UNI lbf/ft GY -450.000 - - - -20014 UNI lbf/ft GY -450.000 - - - -20015 UNI lbf/ft GY -450.000 - - - -20016 UNI lbf/ft GY -450.000 - - - -20017 UNI lbf/ft GY -450.000 - - - -20018 UNI lbf/ft GY -450.000 - - - -20019 UNI lbf/ft GY -450.000 - - - -20020 UNI lbf/ft GY -450.000 - - - -20021 UNI lbf/ft GY -450.000 - - - -20022 UNI lbf/ft GY -450.000 - - - -20023 UNI lbf/ft GY -450.000 - - - -20024 UNI lbf/ft GY -450.000 - - - -20025 UNI lbf/ft GY -450.000 - - - -20026 UNI lbf/ft GY -450.000 - - - -20027 UNI lbf/ft GY -450.000 - - - -20028 UNI lbf/ft GY -450.000 - - - -20029 UNI lbf/ft GY -450.000 - - - -20030 UNI lbf/ft GY -450.000 - - - -20031 UNI lbf/ft GY -450.000 - - - -20032 UNI lbf/ft GY -450.000 - - - -20033 UNI lbf/ft GY -450.000 - - - -20034 UNI lbf/ft GY -450.000 - - - -20035 UNI lbf/ft GY -450.000 - - - -

Beam Loads : 5 SPAN 2 PHASE 2 DLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -2.69 E +3 - - - -10001 UNI lbf/ft GY -2.69 E +3 - - - -10002 UNI lbf/ft GY -2.69 E +3 - - - -10003 UNI lbf/ft GY -2.69 E +3 - - - -10004 UNI lbf/ft GY -2.69 E +3 - - - -10005 UNI lbf/ft GY -710.000 - - - -10006 UNI lbf/ft GY -710.000 - - - -10007 UNI lbf/ft GY -710.000 - - - -10008 UNI lbf/ft GY -710.000 - - - -10009 UNI lbf/ft GY -2.69 E +3 - - - -10010 UNI lbf/ft GY -2.69 E +3 - - - -10011 UNI lbf/ft GY -2.69 E +3 - - - -

Page 112: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 62

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 62 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 5 SPAN 2 PHASE 2 DL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10012 UNI lbf/ft GY -2.69 E +3 - - - -10013 UNI lbf/ft GY -2.69 E +3 - - - -10014 UNI lbf/ft GY -2.69 E +3 - - - -10015 UNI lbf/ft GY -2.69 E +3 - - - -10016 UNI lbf/ft GY -2.69 E +3 - - - -10017 UNI lbf/ft GY -2.69 E +3 - - - -10018 UNI lbf/ft GY -2.69 E +3 - - - -10019 UNI lbf/ft GY -2.69 E +3 - - - -10020 UNI lbf/ft GY -2.69 E +3 - - - -10021 UNI lbf/ft GY -2.69 E +3 - - - -10022 UNI lbf/ft GY -2.69 E +3 - - - -10023 UNI lbf/ft GY -2.69 E +3 - - - -10024 UNI lbf/ft GY -2.69 E +3 - - - -10025 UNI lbf/ft GY -2.69 E +3 - - - -10026 UNI lbf/ft GY -2.69 E +3 - - - -10027 UNI lbf/ft GY -710.000 - - - -10028 UNI lbf/ft GY -710.000 - - - -10029 UNI lbf/ft GY -710.000 - - - -10030 UNI lbf/ft GY -710.000 - - - -10031 UNI lbf/ft GY -710.000 - - - -10032 UNI lbf/ft GY -710.000 - - - -10033 UNI lbf/ft GY -710.000 - - - -10034 UNI lbf/ft GY -710.000 - - - -10035 UNI lbf/ft GY -710.000 - - - -20000 UNI lbf/ft GY -2.69 E +3 - - - -20001 UNI lbf/ft GY -2.69 E +3 - - - -20002 UNI lbf/ft GY -2.69 E +3 - - - -20003 UNI lbf/ft GY -2.69 E +3 - - - -20004 UNI lbf/ft GY -2.69 E +3 - - - -20005 UNI lbf/ft GY -710.000 - - - -20006 UNI lbf/ft GY -710.000 - - - -20007 UNI lbf/ft GY -710.000 - - - -20008 UNI lbf/ft GY -710.000 - - - -20009 UNI lbf/ft GY -2.69 E +3 - - - -20010 UNI lbf/ft GY -2.69 E +3 - - - -20011 UNI lbf/ft GY -2.69 E +3 - - - -20012 UNI lbf/ft GY -2.69 E +3 - - - -20013 UNI lbf/ft GY -2.69 E +3 - - - -20014 UNI lbf/ft GY -2.69 E +3 - - - -20015 UNI lbf/ft GY -2.69 E +3 - - - -20016 UNI lbf/ft GY -2.69 E +3 - - - -20017 UNI lbf/ft GY -2.69 E +3 - - - -20018 UNI lbf/ft GY -2.69 E +3 - - - -20019 UNI lbf/ft GY -2.69 E +3 - - - -20020 UNI lbf/ft GY -2.69 E +3 - - - -

Page 113: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 63

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 63 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 5 SPAN 2 PHASE 2 DL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20021 UNI lbf/ft GY -2.69 E +3 - - - -20022 UNI lbf/ft GY -2.69 E +3 - - - -20023 UNI lbf/ft GY -2.69 E +3 - - - -20024 UNI lbf/ft GY -2.69 E +3 - - - -20025 UNI lbf/ft GY -2.69 E +3 - - - -20026 UNI lbf/ft GY -2.69 E +3 - - - -20027 UNI lbf/ft GY -710.000 - - - -20028 UNI lbf/ft GY -710.000 - - - -20029 UNI lbf/ft GY -710.000 - - - -20030 UNI lbf/ft GY -710.000 - - - -20031 UNI lbf/ft GY -710.000 - - - -20032 UNI lbf/ft GY -710.000 - - - -20033 UNI lbf/ft GY -710.000 - - - -20034 UNI lbf/ft GY -710.000 - - - -20035 UNI lbf/ft GY -710.000 - - - -

Beam Loads : 6 SPAN 2 PHASE 2 LLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -1.89 E +3 - - - -10001 UNI lbf/ft GY -1.89 E +3 - - - -10002 UNI lbf/ft GY -1.89 E +3 - - - -10003 UNI lbf/ft GY -1.89 E +3 - - - -10004 UNI lbf/ft GY -1.89 E +3 - - - -10005 UNI lbf/ft GY -450.000 - - - -10006 UNI lbf/ft GY -450.000 - - - -10007 UNI lbf/ft GY -450.000 - - - -10008 UNI lbf/ft GY -450.000 - - - -10009 UNI lbf/ft GY -1.89 E +3 - - - -10010 UNI lbf/ft GY -1.89 E +3 - - - -10011 UNI lbf/ft GY -1.89 E +3 - - - -10012 UNI lbf/ft GY -1.89 E +3 - - - -10013 UNI lbf/ft GY -1.89 E +3 - - - -10014 UNI lbf/ft GY -1.89 E +3 - - - -10015 UNI lbf/ft GY -1.89 E +3 - - - -10016 UNI lbf/ft GY -1.89 E +3 - - - -10017 UNI lbf/ft GY -1.89 E +3 - - - -10018 UNI lbf/ft GY -1.89 E +3 - - - -10019 UNI lbf/ft GY -1.89 E +3 - - - -10020 UNI lbf/ft GY -1.89 E +3 - - - -10021 UNI lbf/ft GY -1.89 E +3 - - - -10022 UNI lbf/ft GY -1.89 E +3 - - - -10023 UNI lbf/ft GY -1.89 E +3 - - - -

Page 114: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 64

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 64 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 6 SPAN 2 PHASE 2 LL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10024 UNI lbf/ft GY -1.89 E +3 - - - -10025 UNI lbf/ft GY -1.89 E +3 - - - -10026 UNI lbf/ft GY -1.89 E +3 - - - -10027 UNI lbf/ft GY -450.000 - - - -10028 UNI lbf/ft GY -450.000 - - - -10029 UNI lbf/ft GY -450.000 - - - -10030 UNI lbf/ft GY -450.000 - - - -10031 UNI lbf/ft GY -450.000 - - - -10032 UNI lbf/ft GY -450.000 - - - -10033 UNI lbf/ft GY -450.000 - - - -10034 UNI lbf/ft GY -450.000 - - - -10035 UNI lbf/ft GY -450.000 - - - -20000 UNI lbf/ft GY -1.89 E +3 - - - -20001 UNI lbf/ft GY -1.89 E +3 - - - -20002 UNI lbf/ft GY -1.89 E +3 - - - -20003 UNI lbf/ft GY -1.89 E +3 - - - -20004 UNI lbf/ft GY -1.89 E +3 - - - -20005 UNI lbf/ft GY -450.000 - - - -20006 UNI lbf/ft GY -450.000 - - - -20007 UNI lbf/ft GY -450.000 - - - -20008 UNI lbf/ft GY -450.000 - - - -20009 UNI lbf/ft GY -1.89 E +3 - - - -20010 UNI lbf/ft GY -1.89 E +3 - - - -20011 UNI lbf/ft GY -1.89 E +3 - - - -20012 UNI lbf/ft GY -1.89 E +3 - - - -20013 UNI lbf/ft GY -1.89 E +3 - - - -20014 UNI lbf/ft GY -1.89 E +3 - - - -20015 UNI lbf/ft GY -1.89 E +3 - - - -20016 UNI lbf/ft GY -1.89 E +3 - - - -20017 UNI lbf/ft GY -1.89 E +3 - - - -20018 UNI lbf/ft GY -1.89 E +3 - - - -20019 UNI lbf/ft GY -1.89 E +3 - - - -20020 UNI lbf/ft GY -1.89 E +3 - - - -20021 UNI lbf/ft GY -1.89 E +3 - - - -20022 UNI lbf/ft GY -1.89 E +3 - - - -20023 UNI lbf/ft GY -1.89 E +3 - - - -20024 UNI lbf/ft GY -1.89 E +3 - - - -20025 UNI lbf/ft GY -1.89 E +3 - - - -20026 UNI lbf/ft GY -1.89 E +3 - - - -20027 UNI lbf/ft GY -450.000 - - - -20028 UNI lbf/ft GY -450.000 - - - -20029 UNI lbf/ft GY -450.000 - - - -20030 UNI lbf/ft GY -450.000 - - - -20031 UNI lbf/ft GY -450.000 - - - -20032 UNI lbf/ft GY -450.000 - - - -

Page 115: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 65

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 65 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 6 SPAN 2 PHASE 2 LL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20033 UNI lbf/ft GY -450.000 - - - -20034 UNI lbf/ft GY -450.000 - - - -20035 UNI lbf/ft GY -450.000 - - - -

Beam Loads : 7 SPAN 2 PHASE 3 DLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -2.69 E +3 - - - -10001 UNI lbf/ft GY -2.69 E +3 - - - -10002 UNI lbf/ft GY -2.69 E +3 - - - -10003 UNI lbf/ft GY -2.69 E +3 - - - -10004 UNI lbf/ft GY -2.69 E +3 - - - -10005 UNI lbf/ft GY -710.000 - - - -10006 UNI lbf/ft GY -710.000 - - - -10007 UNI lbf/ft GY -710.000 - - - -10008 UNI lbf/ft GY -710.000 - - - -10009 UNI lbf/ft GY -2.69 E +3 - - - -10010 UNI lbf/ft GY -2.75 E +3 - - - -10011 UNI lbf/ft GY -2.75 E +3 - - - -10012 UNI lbf/ft GY -2.75 E +3 - - - -10013 UNI lbf/ft GY -2.75 E +3 - - - -10014 UNI lbf/ft GY -2.75 E +3 - - - -10015 UNI lbf/ft GY -2.75 E +3 - - - -10016 UNI lbf/ft GY -2.75 E +3 - - - -10017 UNI lbf/ft GY -2.75 E +3 - - - -10018 UNI lbf/ft GY -2.75 E +3 - - - -10019 UNI lbf/ft GY -2.75 E +3 - - - -10020 UNI lbf/ft GY -2.75 E +3 - - - -10021 UNI lbf/ft GY -2.75 E +3 - - - -10022 UNI lbf/ft GY -2.75 E +3 - - - -10023 UNI lbf/ft GY -2.75 E +3 - - - -10024 UNI lbf/ft GY -2.75 E +3 - - - -10025 UNI lbf/ft GY -2.75 E +3 - - - -10026 UNI lbf/ft GY -2.69 E +3 - - - -10027 UNI lbf/ft GY -710.000 - - - -10028 UNI lbf/ft GY -710.000 - - - -10029 UNI lbf/ft GY -710.000 - - - -10030 UNI lbf/ft GY -710.000 - - - -10031 UNI lbf/ft GY -710.000 - - - -10032 UNI lbf/ft GY -710.000 - - - -10033 UNI lbf/ft GY -710.000 - - - -10034 UNI lbf/ft GY -710.000 - - - -10035 UNI lbf/ft GY -710.000 - - - -

Page 116: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 66

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 66 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 7 SPAN 2 PHASE 3 DL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20000 UNI lbf/ft GY -2.69 E +3 - - - -20001 UNI lbf/ft GY -2.69 E +3 - - - -20002 UNI lbf/ft GY -2.69 E +3 - - - -20003 UNI lbf/ft GY -2.69 E +3 - - - -20004 UNI lbf/ft GY -2.69 E +3 - - - -20005 UNI lbf/ft GY -710.000 - - - -20006 UNI lbf/ft GY -710.000 - - - -20007 UNI lbf/ft GY -710.000 - - - -20008 UNI lbf/ft GY -710.000 - - - -20009 UNI lbf/ft GY -2.69 E +3 - - - -20010 UNI lbf/ft GY -2.75 E +3 - - - -20011 UNI lbf/ft GY -2.75 E +3 - - - -20012 UNI lbf/ft GY -2.75 E +3 - - - -20013 UNI lbf/ft GY -2.75 E +3 - - - -20014 UNI lbf/ft GY -2.75 E +3 - - - -20015 UNI lbf/ft GY -2.75 E +3 - - - -20016 UNI lbf/ft GY -2.75 E +3 - - - -20017 UNI lbf/ft GY -2.75 E +3 - - - -20018 UNI lbf/ft GY -2.75 E +3 - - - -20019 UNI lbf/ft GY -2.75 E +3 - - - -20020 UNI lbf/ft GY -2.75 E +3 - - - -20021 UNI lbf/ft GY -2.75 E +3 - - - -20022 UNI lbf/ft GY -2.75 E +3 - - - -20023 UNI lbf/ft GY -2.75 E +3 - - - -20024 UNI lbf/ft GY -2.75 E +3 - - - -20025 UNI lbf/ft GY -2.75 E +3 - - - -20026 UNI lbf/ft GY -2.69 E +3 - - - -20027 UNI lbf/ft GY -710.000 - - - -20028 UNI lbf/ft GY -710.000 - - - -20029 UNI lbf/ft GY -710.000 - - - -20030 UNI lbf/ft GY -710.000 - - - -20031 UNI lbf/ft GY -710.000 - - - -20032 UNI lbf/ft GY -710.000 - - - -20033 UNI lbf/ft GY -710.000 - - - -20034 UNI lbf/ft GY -710.000 - - - -20035 UNI lbf/ft GY -710.000 - - - -

Page 117: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 67

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 67 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 8 SPAN 2 PHASE 3 LLBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -1.89 E +3 - - - -10001 UNI lbf/ft GY -1.89 E +3 - - - -10002 UNI lbf/ft GY -1.89 E +3 - - - -10003 UNI lbf/ft GY -1.89 E +3 - - - -10004 UNI lbf/ft GY -1.89 E +3 - - - -10005 UNI lbf/ft GY -450.000 - - - -10006 UNI lbf/ft GY -450.000 - - - -10007 UNI lbf/ft GY -450.000 - - - -10008 UNI lbf/ft GY -450.000 - - - -10009 UNI lbf/ft GY -1.89 E +3 - - - -10010 UNI lbf/ft GY -2 E +3 - - - -10011 UNI lbf/ft GY -2 E +3 - - - -10012 UNI lbf/ft GY -2 E +3 - - - -10013 UNI lbf/ft GY -2 E +3 - - - -10014 UNI lbf/ft GY -2 E +3 - - - -10015 UNI lbf/ft GY -2 E +3 - - - -10016 UNI lbf/ft GY -2 E +3 - - - -10017 UNI lbf/ft GY -2 E +3 - - - -10018 UNI lbf/ft GY -2 E +3 - - - -10019 UNI lbf/ft GY -2 E +3 - - - -10020 UNI lbf/ft GY -2 E +3 - - - -10021 UNI lbf/ft GY -2 E +3 - - - -10022 UNI lbf/ft GY -2 E +3 - - - -10023 UNI lbf/ft GY -2 E +3 - - - -10024 UNI lbf/ft GY -2 E +3 - - - -10025 UNI lbf/ft GY -2 E +3 - - - -10026 UNI lbf/ft GY -1.89 E +3 - - - -10027 UNI lbf/ft GY -450.000 - - - -10028 UNI lbf/ft GY -450.000 - - - -10029 UNI lbf/ft GY -450.000 - - - -10030 UNI lbf/ft GY -450.000 - - - -10031 UNI lbf/ft GY -450.000 - - - -10032 UNI lbf/ft GY -450.000 - - - -10033 UNI lbf/ft GY -450.000 - - - -10034 UNI lbf/ft GY -450.000 - - - -10035 UNI lbf/ft GY -450.000 - - - -20000 UNI lbf/ft GY -1.89 E +3 - - - -20001 UNI lbf/ft GY -1.89 E +3 - - - -20002 UNI lbf/ft GY -1.89 E +3 - - - -20003 UNI lbf/ft GY -1.89 E +3 - - - -20004 UNI lbf/ft GY -1.89 E +3 - - - -20005 UNI lbf/ft GY -450.000 - - - -20006 UNI lbf/ft GY -450.000 - - - -20007 UNI lbf/ft GY -450.000 - - - -20008 UNI lbf/ft GY -450.000 - - - -

Page 118: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 68

Kaw River Bridge

CTG 26-Apr-17 NRF

11-Sep-2017 12:15Span 1 or 2 As-Built.std

Print Time/Date: 11/09/2017 12:16 Print Run 68 of 68STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 8 SPAN 2 PHASE 3 LL Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20009 UNI lbf/ft GY -1.89 E +3 - - - -20010 UNI lbf/ft GY -2 E +3 - - - -20011 UNI lbf/ft GY -2 E +3 - - - -20012 UNI lbf/ft GY -2 E +3 - - - -20013 UNI lbf/ft GY -2 E +3 - - - -20014 UNI lbf/ft GY -2 E +3 - - - -20015 UNI lbf/ft GY -2 E +3 - - - -20016 UNI lbf/ft GY -2 E +3 - - - -20017 UNI lbf/ft GY -2 E +3 - - - -20018 UNI lbf/ft GY -2 E +3 - - - -20019 UNI lbf/ft GY -2 E +3 - - - -20020 UNI lbf/ft GY -2 E +3 - - - -20021 UNI lbf/ft GY -2 E +3 - - - -20022 UNI lbf/ft GY -2 E +3 - - - -20023 UNI lbf/ft GY -2 E +3 - - - -20024 UNI lbf/ft GY -2 E +3 - - - -20025 UNI lbf/ft GY -2 E +3 - - - -20026 UNI lbf/ft GY -1.89 E +3 - - - -20027 UNI lbf/ft GY -450.000 - - - -20028 UNI lbf/ft GY -450.000 - - - -20029 UNI lbf/ft GY -450.000 - - - -20030 UNI lbf/ft GY -450.000 - - - -20031 UNI lbf/ft GY -450.000 - - - -20032 UNI lbf/ft GY -450.000 - - - -20033 UNI lbf/ft GY -450.000 - - - -20034 UNI lbf/ft GY -450.000 - - - -20035 UNI lbf/ft GY -450.000 - - - -

Page 119: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

As-inspected section property calculations

Page 120: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 4.000 inB1 = lh = 4.000 in B2 = lh = 4.000 inC1 = tl = 0.625 in C2 = tl = 0.625 in

Web Plate 1: PL Web Plate 2: PL A3 = b = 24.000 in A4 = b = 0.000 inB3 = t = 0.438 in B4 = t = 0.000 in

B6 = 25.875 in Top Cover Plate: A5 = b = 0.000 inB5 = t = 0.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

Horizontal Leg 5.000 23.688 118.438 0.163 11.688 682.988 683.151Vertical Leg 4.219 21.688 91.494 4.005 9.688 395.920 399.924Horizontal Leg 5.000 0.313 1.563 0.163 11.688 682.988 683.151Vertical Leg 4.219 2.313 9.756 4.005 9.688 395.920 399.924

3 Inner Web Plate(s) 21.000 12.000 252.000 1008.000 0.000 0.000 1008.0004 Outer Side Plate 0.000 12.000 0.000 0.000 0.000 0.000 0.0005 Top Cover Plate 0.000 24.000 0.000 0.000 12.000 0.000 0.000

Total 39.44 473.25 1016.33 2157.82 3174.15A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 3.0000 0.0625 -0.1875 23.9688 -4.4941 -0.0001 11.9688 -26.8596 -26.85962 3.0000 0.0625 -0.1875 23.9688 -4.4941 -0.0001 11.9688 -26.8596 -26.85963 3.0000 0.0625 -0.1875 0.0313 -0.0059 -0.0001 11.9688 -26.8596 -26.85964 3.0000 0.0625 -0.1875 0.0313 -0.0059 -0.0001 11.9688 -26.8596 -26.85965 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.75 -9.00 0.00 -107.44 -107.44Contribution from shifting centroid: Ad2 = 0.00

y-bar = 12.0000 in Stop = 264.51 in3y-bar = 12.0000 in Stop = 255.56 in3

Ix = 3174.15 in4 Sbott. = 264.51 in3 Ix = 3066.71 in4 Sbott. = 255.56 in3

ctop = 12.000 in A = 39.4375 in2 ctop = 12.0000 in A = 38.6875 in2

cbottom = 12.000 in rx = 8.9714 in cbottom = 12.0000 in rx = 8.9033 in

Built up lower chord with typical lacing bar pack rust with loss

Section Losses

As-Built Section Properties As-Inspected Section Properties

p101160439

Gross Section (without Losses)

1

2

Page 121: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 or 2 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.255

1 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.255

2 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.255

2 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.2553 (Left) 10.500 4.219 44.297 0.167 13.156 1817.413 1817.580

3 (Right) 10.500 30.531 320.578 0.167 13.156 1817.413 1817.5804 (Left) 0.000 4.000 0.000 0.000 13.375 0.000 0.000

4 (Right) 0.000 30.750 0.000 0.000 13.375 0.000 0.0005 Top Cover Plate 0.000 17.375 0.000 0.000 0.000 0.000 0.000

Total 39.44 685.23 13.94 7579.48 7593.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 3.0000 -0.1875 2.9375 -0.5508 -0.1406 14.4375 -39.0828 -39.22342 0.0625 3.0000 -0.1875 31.8125 -5.9648 -0.1406 14.4375 -39.0828 -39.22343 0.0625 3.0000 -0.1875 2.9375 -0.5508 -0.1406 14.4375 -39.0828 -39.22344 0.0625 3.0000 -0.1875 31.8125 -5.9648 -0.1406 14.4375 -39.0828 -39.22345 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.75 -13.03 -0.56 -156.33 -156.89Contribution from shifting centroid: Ad2 = 0.00

x-bar = 17.3750 in Sright = 437.03 in3x-bar = 17.3750 in Sright = 428.00 in3

Iy = 7593.42 in4 Sleft = 437.03 in3 Iy = 7436.53 in4 Sleft = 428.00 in3

cright = 17.3750 in A = 39.4375 in2 cright = 17.3750 in A = 38.6875 in2

cleft = 17.3750 in ry = 13.8760 in cleft = 17.3750 in ry = 13.8644 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 37.4656 in2 Iy = 6853.0618 in2 Ix = 2864.671 in2

ry = 13.5246 in rx = 8.7442 inTherefore, as-built section properties with 5% loss applied govern

Section Losses

As-Built Section Properties As-Inspected Section Properties

As-built section properties with loss applied

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 122: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.375 in B5 = t = 1.375 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.375 in B6 = t = 1.375 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.375 in C = 13.000 in

Fourth eyebar D = 4.500 inA4 = h = 8.000 in E = 1.500 inB4 = t = 1.375 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6672 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6673 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6674 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6675 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6676 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.667

Total 66.00 264.00 352.00 0.00 352.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 8.0000 -1.0000 4.0000 -4.0000 -5.3333 0.0000 0.0000 -5.33332 0.3125 8.0000 -2.5000 4.0000 -10.0000 -13.3333 0.0000 0.0000 -13.33333 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -14.00 -18.67 0.00 -18.67Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 88.00 in3y-bar = 4.0000 in Stop = 83.33 in3

Ix = 352.00 in4 Sbott. = 88.00 in3 Ix = 333.33 in4 Sbott. = 83.33 in3

ctop = 4.000 in A = 66.0000 in2 ctop = 4.0000 in A = 62.5000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

p101160439

Span 1 North Truss L8-L9

Gross Section (without Losses)

Section Losses

Page 123: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 0.688 7.563 1.733 15.938 2794.043 2795.7762 eyebar 11.000 3.563 39.188 1.733 13.063 1876.918 1878.6513 eyebar 11.000 9.438 103.813 1.733 7.188 568.262 569.9954 eyebar 11.000 23.813 261.938 1.733 7.188 568.262 569.9955 eyebar 11.000 29.688 326.563 1.733 13.063 1876.918 1878.6516 eyebar 11.000 32.563 358.188 1.733 15.938 2794.043 2795.776

Total 66.00 1097.25 10.40 10478.45 10488.84A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 8.0000 0.1250 -1.0000 4.1875 -4.1875 -0.0013 12.1353 -147.2643 -147.26562 8.0000 0.3125 -2.5000 29.1563 -72.8906 -0.0203 12.8335 -411.7468 -411.76723 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -77.08 -0.02 -559.01 -559.03Contribution from shifting centroid: Ad2 = 6.03

x-bar = 16.6250 in Sright = 630.91 in3x-bar = 16.3228 in Sright = 586.97 in3

Iy = 10488.84 in4 Sleft = 630.91 in3 Iy = 9935.84 in4 Sleft = 608.71 in3

cright = 16.6250 in A = 66.0000 in2 cright = 16.9273 in A = 62.5000 in2

cleft = 16.6250 in ry = 12.6064 in cleft = 16.3228 in ry = 12.6085 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 62.7000 in2 Iy = 9466.1815 in2 Ix = 317.68 in2

ry = 12.2872 in rx = 2.2509 inTherefore, as-inspected section properties govern

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 124: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57812 0.1250 15.0000 -1.8750 7.5000 -14.0625 -35.1563 0.0000 0.0000 -35.15633 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.81 -21.09 -52.73 0.00 -52.73Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 76.55 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 574.09 in4 Sbott. = 76.55 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 16.9875 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.8133 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

p101160439

Span 1 North Truss U7-L7

Gross Section (without Losses)

Page 125: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.5324 -53.1913 -53.19162 15.0000 0.1250 -1.8750 15.9375 -29.8828 -0.0024 8.3738 -131.4768 -131.47933 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.81 -29.91 0.00 -184.67 -184.67Contribution from shifting centroid: Ad2 = 3.769553307

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 7.5637 in Sright = 100.21 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 845.43 in4 Sleft = 111.77 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.4363 in A = 16.9875 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 7.5637 in ry = 7.0546 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 126: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 8.3543 -97.5378 -97.58702 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 8.3543 -97.5378 -97.58703 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.80 -0.91 -0.10 -195.08 -195.17Contribution from shifting centroid: Ad2 = 27.54

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 8.6793 in Stop = 72.65 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 459.19 in4 Sbott. = 52.91 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 6.3207 in A = 17.0050 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 8.6793 in rx = 5.1964 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

p101160439

Span 1 North Truss U8-L8

Gross Section (without Losses)

Page 127: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54572 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54573 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.80 -22.36 -1.08 -90.01 -91.09Contribution from shifting centroid: Ad2 = 6.24778E-29

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 116.90 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 935.24 in4 Sleft = 116.90 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 17.0050 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.4160 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 128: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0431 -0.0032 -26.78812 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0431 -0.0032 -26.78813 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8069 -64.7510 -64.80024 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8069 -64.7510 -64.80025 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2181 -72.8118 -72.86106 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2181 -72.8118 -72.86107 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -9.02 -66.70 -53.77 -275.13 -328.90Contribution from shifting centroid: Ad2 = 0.06

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 7.5431 in Stop = 61.51 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 458.69 in4 Sbott. = 60.81 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 7.4569 in A = 21.0600 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 7.5431 in rx = 4.6669 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

p101160439

Span 1 North Truss U9-L9

Gross Section (without Losses)

Page 129: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.1250 -1.7125 0.7125 -1.2202 -0.0022 7.2875 -90.9469 -90.94912 13.7000 0.1250 -1.7125 15.2875 -26.1798 -0.0022 7.2875 -90.9469 -90.94913 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -9.02 -72.12 -2.16 -361.92 -364.08Contribution from shifting centroid: Ad2 = 9.49E-29

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.0000 in Sright = 153.37 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 1226.93 in4 Sleft = 153.37 in3

cright = 8.0000 in A = 30.0750 in2 cright = 8.0000 in A = 21.0600 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.0000 in ry = 7.6327 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 130: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Angles (Typ):

A1 = lw = 4.000 inB1 = lh = 4.000 inC1 = tl = 0.500 in

Plate (Typ.):A2 = b = 20.000 inB2 = t = 0.500 in

B3 = 15.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

Horizontal Leg 4.000 19.750 79.000 0.083 9.750 380.250 380.333Vertical Leg 3.500 17.750 62.125 3.573 7.750 210.219 213.792Horizontal Leg 4.000 0.250 1.000 0.083 9.750 380.250 380.333Vertical Leg 3.500 2.250 7.875 3.573 7.750 210.219 213.792

2 Left Plate 10.000 10.000 100.000 333.333 0.000 0.000 333.3332 Right Plate 10.000 10.000 100.000 333.333 0.000 0.000 333.333

Total 35.00 350.00 673.98 1180.94 1854.92A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 2.7500 0.5000 -1.3750 19.7500 -27.1563 -0.0286 10.2218 -143.6664 -143.69512 2.7500 0.5000 -1.3750 19.7500 -27.1563 -0.0286 10.2218 -143.6664 -143.69513 1.2500 0.5000 -0.6250 0.2500 -0.1563 -0.0130 9.2782 -53.8034 -53.81644 1.2500 0.5000 -0.6250 0.2500 -0.1563 -0.0130 9.2782 -53.8034 -53.81645 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.00 -54.63 -0.08 -394.94 -395.02Contribution from shifting centroid: Ad2 = 7.79

y-bar = 10.0000 in Stop = 185.49 in3y-bar = 9.5282 in Stop = 140.16 in3

Ix = 1854.92 in4 Sbott. = 185.49 in3 Ix = 1467.68 in4 Sbott. = 154.04 in3

ctop = 10.000 in A = 35.0000 in2 ctop = 10.4718 in A = 31.0000 in2

cbottom = 10.000 in rx = 7.2799 in cbottom = 9.5282 in rx = 6.8807 in

p101160439

Span 1 North Truss U10-L10

Gross Section (without Losses)

1 Top Angles

1 Bottom Angles

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 131: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

Horizontal Leg 4.000 2.500 10.000 5.333 5.500 121.000 126.333Vertical Leg 3.500 0.750 2.625 0.073 7.250 183.969 184.042Horizontal Leg 4.000 13.500 54.000 5.333 5.500 121.000 126.333Vertical Leg 3.500 15.250 53.375 0.073 7.250 183.969 184.042

2 Left Plate 10.000 0.250 2.500 0.208 7.750 600.625 600.8332 Right Plate 10.000 15.750 157.500 0.208 7.750 600.625 600.833

Total 35.00 280.00 11.23 1811.19 1822.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.5000 2.7500 -1.3750 3.1250 -4.2969 -0.8665 4.8750 -32.6777 -33.54432 0.5000 2.7500 -1.3750 12.8750 -17.7031 -0.8665 4.8750 -32.6777 -33.54433 0.5000 1.2500 -0.6250 3.1250 -1.9531 -0.0814 4.8750 -14.8535 -14.93494 0.5000 1.2500 -0.6250 12.8750 -8.0469 -0.0814 4.8750 -14.8535 -14.93495 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.00 -32.00 -1.90 -95.06 -96.96Contribution from shifting centroid: Ad2 = 0.00

x-bar = 8.0000 in Sright = 227.80 in3x-bar = 8.0000 in Sright = 215.68 in3

Iy = 1822.42 in4 Sleft = 227.80 in3 Iy = 1725.46 in4 Sleft = 215.68 in3

cright = 8.0000 in A = 35.0000 in2 cright = 8.0000 in A = 31.0000 in2

cleft = 8.0000 in ry = 7.2159 in cleft = 8.0000 in ry = 7.4606 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 33.2500 in2 Iy = 1644.731 in2 Ix = 1674.0623 in2

ry = 7.0332 in rx = 7.0956 inTherefore, as-inspected section properties govern

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

1 Right Angles

Gross Section (without Losses)

1 Left Angles

Page 132: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.8375 in *A2 = tw = 0.8375 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 7/16" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 11.4738 7.5000 86.0531 179.4590 0.0000 0.0000 179.4590

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 11.4738 7.5000 86.0531 179.4590 0.0000 0.0000 179.4590

Total 31.79 238.41 359.23 455.09 814.32A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2188 13.7000 -2.9969 7.5000 -22.4766 -46.8736 0.0450 -0.0061 -46.87972 0.2188 13.7000 -2.9969 7.5000 -22.4766 -46.8736 0.0450 -0.0061 -46.87973 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8050 -64.7162 -64.76544 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8050 -64.7162 -64.76545 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2200 -72.8486 -72.89786 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2200 -72.8486 -72.89787 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -11.58 -85.97 -93.94 -275.14 -369.09Contribution from shifting centroid: Ad2 = 0.06

y-bar = 7.5000 in Stop = 108.58 in3y-bar = 7.5450 in Stop = 59.73 in3

Ix = 814.32 in4 Sbott. = 108.58 in3 Ix = 445.30 in4 Sbott. = 59.02 in3

ctop = 7.5000 in A = 31.7875 in2 ctop = 7.4550 in A = 20.2038 in2

cbottom = 7.5000 in rx = 5.0614 in cbottom = 7.5450 in rx = 4.6947 in

Section Losses

p101160439

Span 1 North Truss M7-L8

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 133: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 11.4738 0.4188 4.8046 0.6706 7.5813 659.4578 660.1285

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 11.4738 15.5813 178.7754 0.6706 7.5813 659.4578 660.1285

Total 31.79 254.30 9.86 1669.78 1679.63A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.2188 -2.9969 0.7281 -2.1821 -0.0120 7.2719 -158.4752 -158.48722 13.7000 0.2188 -2.9969 15.2719 -45.7679 -0.0120 7.2719 -158.4752 -158.48723 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -11.58 -92.67 -2.18 -496.98 -499.16Contribution from shifting centroid: Ad2 = 1.00304E-28

x-bar = 8.0000 in Sright = 209.95 in3x-bar = 8.0000 in Sright = 147.56 in3

Iy = 1679.63 in4 Sleft = 209.95 in3 Iy = 1180.48 in4 Sleft = 147.56 in3

cright = 8.0000 in A = 31.7875 in2 cright = 8.0000 in A = 20.2038 in2

cleft = 8.0000 in ry = 7.2691 in cleft = 8.0000 in ry = 7.6439 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 30.1981 in2 Iy = 1515.8682 in2 Ix = 734.922 in2

ry = 7.085 in rx = 4.9332 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 134: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.8711 -1.2993 -28.08432 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.8711 -1.2993 -28.08433 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 7.7211 -83.3115 -83.36074 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 7.7211 -83.3115 -83.36075 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.8711 -0.7113 -18.28946 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.8711 -0.7113 -18.28947 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -8.10 -79.86 -88.82 -170.64 -259.47Contribution from shifting centroid: Ad2 = 22.82

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 6.6289 in Stop = 65.81 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 550.88 in4 Sbott. = 83.10 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 8.3711 in A = 21.9800 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 6.6289 in rx = 5.0063 in

Section Losses

p101160439

Span 1 North Truss M9-L10

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 135: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.1250 -1.7125 0.7125 -1.2202 -0.0022 7.2875 -90.9469 -90.94912 13.7000 0.1250 -1.7125 15.2875 -26.1798 -0.0022 7.2875 -90.9469 -90.94913 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.9688 -59.5322 -59.53256 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.9688 -59.5322 -59.53257 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -8.10 -64.76 -1.08 -390.97 -392.05Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.0000 in Sright = 149.87 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 1198.96 in4 Sleft = 149.87 in3

cright = 8.0000 in A = 30.0750 in2 cright = 8.0000 in A = 21.9800 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.0000 in ry = 7.3856 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 136: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 4.000 inB1 = lh = 4.000 in B2 = lh = 4.000 inC1 = tl = 0.625 in C2 = tl = 0.625 in

Web Plate 1: PL Web Plate 2: PL A3 = b = 24.000 in A4 = b = 0.000 inB3 = t = 0.438 in B4 = t = 0.000 in

B6 = 25.875 in Top Cover Plate: A5 = b = 0.000 inB5 = t = 0.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

Horizontal Leg 5.000 23.688 118.438 0.163 11.688 682.988 683.151Vertical Leg 4.219 21.688 91.494 4.005 9.688 395.920 399.924Horizontal Leg 5.000 0.313 1.563 0.163 11.688 682.988 683.151Vertical Leg 4.219 2.313 9.756 4.005 9.688 395.920 399.924

3 Inner Web Plate(s) 21.000 12.000 252.000 1008.000 0.000 0.000 1008.0004 Outer Side Plate 0.000 12.000 0.000 0.000 0.000 0.000 0.0005 Top Cover Plate 0.000 24.000 0.000 0.000 12.000 0.000 0.000

Total 39.44 473.25 1016.33 2157.82 3174.15A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1875 13.0000 -2.4375 17.5000 -42.6563 -34.3281 5.3651 -70.1624 -104.49052 0.3125 15.0000 -4.6875 16.5000 -77.3438 -87.8906 4.3651 -89.3171 -177.20773 0.1250 3.0000 -0.3750 7.5000 -2.8125 -0.2813 4.6349 -8.0558 -8.33704 0.2500 6.0000 -1.5000 3.0000 -4.5000 -4.5000 9.1349 -125.1689 -129.66895 0.1250 1.0000 -0.1250 4.5000 -0.5625 -0.0104 7.6349 -7.2864 -7.29686 0.2500 3.3750 -0.8438 2.3125 -1.9512 -0.8009 9.8224 -81.4042 -82.20517 2.8750 0.3125 -0.8984 0.4688 -0.4211 -0.0073 11.6661 -122.2760 -122.28338 0.5000 0.6250 -0.3125 0.3125 -0.0977 -0.0102 11.8224 -43.6777 -43.6878

Total -11.18 -130.34 -127.83 -547.35 -675.18Contribution from shifting centroid: Ad2 = 0.72

y-bar = 12.0000 in Stop = 264.51 in3y-bar = 12.1349 in Stop = 210.68 in3

Ix = 3174.15 in4 Sbott. = 264.51 in3 Ix = 2499.69 in4 Sbott. = 205.99 in3

ctop = 12.000 in A = 39.4375 in2 ctop = 11.8651 in A = 28.2578 in2

cbottom = 12.000 in rx = 8.9714 in cbottom = 12.1349 in rx = 9.4053 in

Span 1 South Truss L0-L1

Section Losses

As-Built Section Properties As-Inspected Section Properties

p101160439

Gross Section (without Losses)

1

2

Page 137: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.255

1 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.255

2 Horizontal Leg 2.500 2.000 5.000 3.333 15.375 590.977 594.310(Left) Vertical Leg 2.109 3.688 7.778 0.069 13.688 395.186 395.255

2 Horizontal Leg 2.500 32.750 81.875 3.333 15.375 590.977 594.310(Right) Vertical Leg 2.109 31.063 65.522 0.069 13.688 395.186 395.2553 (Left) 10.500 4.219 44.297 0.167 13.156 1817.413 1817.580

3 (Right) 10.500 30.531 320.578 0.167 13.156 1817.413 1817.5804 (Left) 0.000 4.000 0.000 0.000 13.375 0.000 0.000

4 (Right) 0.000 30.750 0.000 0.000 13.375 0.000 0.0005 Top Cover Plate 0.000 17.375 0.000 0.000 0.000 0.000 0.000

Total 39.44 685.23 13.94 7579.48 7593.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.0000 0.1875 -2.4375 4.3438 -10.5879 -0.0071 10.2532 -256.2518 -256.25892 15.0000 0.3125 -4.6875 30.4688 -142.8223 -0.0381 15.8718 -1180.8411 -1180.87923 3.0000 0.1250 -0.3750 30.3750 -11.3906 -0.0005 15.7780 -93.3546 -93.35514 6.0000 0.2500 -1.5000 30.4375 -45.6563 -0.0078 15.8405 -376.3826 -376.39055 1.0000 0.1250 -0.1250 30.6875 -3.8359 -0.0002 16.0905 -32.3631 -32.36326 3.3750 0.2500 -0.8438 31.2500 -26.3672 -0.0044 16.6530 -233.9911 -233.99557 0.3125 2.8750 -0.8984 26.0625 -23.4155 -0.6188 11.4655 -118.1067 -118.72568 0.6250 0.5000 -0.3125 27.7500 -8.6719 -0.0065 13.1530 -54.0630 -54.0695

Total -11.18 -272.75 -0.68 -2345.35 -2346.04Contribution from shifting centroid: Ad2 = 304.35

x-bar = 17.3750 in Sright = 437.03 in3x-bar = 14.5970 in Sright = 275.48 in3

Iy = 7593.42 in4 Sleft = 437.03 in3 Iy = 5551.74 in4 Sleft = 380.33 in3

cright = 17.3750 in A = 39.4375 in2 cright = 20.1530 in A = 28.2578 in2

cleft = 17.3750 in ry = 13.8760 in cleft = 14.5970 in ry = 14.0167 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 37.4656 in2 Iy = 6853.0618 in2 Ix = 2864.671 in2

ry = 13.5246 in rx = 8.7442 inTherefore, as-inspected section properties govern

Section Losses

As-Built Section Properties As-Inspected Section Properties

As-built section properties with loss applied

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 138: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.375 in B5 = t = 1.375 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.375 in B6 = t = 1.375 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.375 in C = 13.000 in

Fourth eyebar D = 4.500 inA4 = h = 8.000 in E = 1.500 inB4 = t = 1.375 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6672 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6673 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6674 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6675 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6676 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.667

Total 66.00 264.00 352.00 0.00 352.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 8.0000 -2.0000 4.0000 -8.0000 -10.6667 0.0000 0.0000 -10.66672 0.2500 8.0000 -2.0000 4.0000 -8.0000 -10.6667 0.0000 0.0000 -10.66673 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.00 -16.00 -21.33 0.00 -21.33Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 88.00 in3y-bar = 4.0000 in Stop = 82.67 in3

Ix = 352.00 in4 Sbott. = 88.00 in3 Ix = 330.67 in4 Sbott. = 82.67 in3

ctop = 4.000 in A = 66.0000 in2 ctop = 4.0000 in A = 62.0000 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 4.0000 in rx = 2.3094 in

As-Built Section Properties As-Inspected Section Properties

p101160439

Span 1 South Truss L8-L9

Gross Section (without Losses)

Section Losses

Page 139: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 0.688 7.563 1.733 15.938 2794.043 2795.7762 eyebar 11.000 3.563 39.188 1.733 13.063 1876.918 1878.6513 eyebar 11.000 9.438 103.813 1.733 7.188 568.262 569.9954 eyebar 11.000 23.813 261.938 1.733 7.188 568.262 569.9955 eyebar 11.000 29.688 326.563 1.733 13.063 1876.918 1878.6516 eyebar 11.000 32.563 358.188 1.733 15.938 2794.043 2795.776

Total 66.00 1097.25 10.40 10478.45 10488.84A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 8.0000 0.2500 -2.0000 4.1250 -8.2500 -0.0104 12.5000 -312.5000 -312.51042 8.0000 0.2500 -2.0000 29.1250 -58.2500 -0.0104 12.5000 -312.5000 -312.51043 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.00 -66.50 -0.02 -625.00 -625.02Contribution from shifting centroid: Ad2 = 0.00

x-bar = 16.6250 in Sright = 630.91 in3x-bar = 16.6250 in Sright = 593.31 in3

Iy = 10488.84 in4 Sleft = 630.91 in3 Iy = 9863.82 in4 Sleft = 593.31 in3

cright = 16.6250 in A = 66.0000 in2 cright = 16.6250 in A = 62.0000 in2

cleft = 16.6250 in ry = 12.6064 in cleft = 16.6250 in ry = 12.6132 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 62.7000 in2 Iy = 9466.1815 in2 Ix = 317.68 in2

ry = 12.2872 in rx = 2.2509 inTherefore, as-inspected section properties govern

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 140: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):First eyebar Fifth eyebar

A1 = h = 8.000 in A5 = h = 8.000 inB1 = t = 1.375 in B5 = t = 1.375 in

Second eyebar Sixth eyebarA2 = h = 8.000 in A6 = h = 8.000 inB2 = t = 1.375 in B6 = t = 1.375 in

Third eyebarA3 = h = 8.000 in SpacingB3 = t = 1.375 in C = 16.000 in

Fourth eyebar D = 1.500 inA4 = h = 8.000 in E = 1.500 inB4 = t = 1.375 in

Max Height = 8.0000 inX-Axis Section Properties:

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6672 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6673 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6674 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6675 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.6676 eyebar 11.000 4.000 44.000 58.667 0.000 0.000 58.667

Total 66.00 264.00 352.00 0.00 352.00A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 8.0000 -0.5000 4.0000 -2.0000 -2.6667 0.0056 0.0000 -2.66672 0.2500 8.0000 -2.0000 4.0000 -8.0000 -10.6667 0.0056 -0.0001 -10.66673 1.3750 0.0625 -0.0859 7.9688 -0.6848 0.0000 3.9743 -1.3574 -1.35744 0.1875 8.0000 -1.5000 4.0000 -6.0000 -8.0000 0.0056 0.0000 -8.00005 0.0625 8.0000 -0.5000 4.0000 -2.0000 -2.6667 0.0056 0.0000 -2.66676 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.59 -18.68 -24.00 -1.36 -25.36Contribution from shifting centroid: Ad2 = 0.00

y-bar = 4.0000 in Stop = 88.00 in3y-bar = 3.9944 in Stop = 81.55 in3

Ix = 352.00 in4 Sbott. = 88.00 in3 Ix = 326.64 in4 Sbott. = 81.77 in3

ctop = 4.000 in A = 66.0000 in2 ctop = 4.0056 in A = 61.4141 in2

cbottom = 4.000 in rx = 2.3094 in cbottom = 3.9944 in rx = 2.3062 in

As-Built Section Properties As-Inspected Section Properties

p101160439

Span 1 South Truss L9-L10

Gross Section (without Losses)

Section Losses

Page 141: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/18/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 eyebar 11.000 0.688 7.563 1.733 14.438 2292.855 2294.5892 eyebar 11.000 3.563 39.188 1.733 11.563 1470.605 1472.3393 eyebar 11.000 6.438 70.813 1.733 8.688 830.199 831.9324 eyebar 11.000 23.813 261.938 1.733 8.688 830.199 831.9325 eyebar 11.000 26.688 293.563 1.733 11.563 1470.605 1472.3396 eyebar 11.000 29.563 325.188 1.733 14.438 2292.855 2294.589

Total 66.00 998.25 10.40 9187.32 9197.72A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 8.0000 0.0625 -0.5000 1.3438 -0.6719 -0.0002 13.8931 -96.5090 -96.50922 8.0000 0.2500 -2.0000 3.0000 -6.0000 -0.0104 12.2368 -299.4806 -299.49103 0.0625 1.3750 -0.0859 3.5625 -0.3062 -0.0135 11.6743 -11.7124 -11.72604 8.0000 0.1875 -1.5000 27.3750 -41.0625 -0.0044 12.1382 -221.0023 -221.00675 8.0000 0.0625 -0.5000 28.9063 -14.4531 -0.0002 13.6694 -93.4264 -93.42656 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.59 -62.49 -0.03 -722.13 -722.16Contribution from shifting centroid: Ad2 = 0.83

x-bar = 15.1250 in Sright = 608.11 in3x-bar = 15.2368 in Sright = 564.60 in3

Iy = 9197.72 in4 Sleft = 608.11 in3 Iy = 8476.38 in4 Sleft = 556.31 in3

cright = 15.1250 in A = 66.0000 in2 cright = 15.0132 in A = 61.4141 in2

cleft = 15.1250 in ry = 11.8051 in cleft = 15.2368 in ry = 11.7482 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 62.7000 in2 Iy = 8300.9412 in2 Ix = 317.68 in2

ry = 11.5061 in rx = 2.2509 inTherefore, as-inspected section properties govern

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 142: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

section at pin with loss

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20002 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20003 0.0625 0.5000 -0.0313 4.2500 -0.1328 -0.0007 3.2500 -0.3301 -0.33074 0.0625 0.5000 -0.0313 10.7500 -0.3359 -0.0007 3.2500 -0.3301 -0.33075 0.0625 0.5000 -0.0313 4.2500 -0.1328 -0.0007 3.2500 -0.3301 -0.33076 0.0625 0.5000 -0.0313 10.7500 -0.3359 -0.0007 3.2500 -0.3301 -0.33077 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.93 -36.94 -14.40 -1.32 -15.72Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 81.48 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 611.10 in4 Sbott. = 81.48 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 14.8750 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 6.4096 in

Section Losses

p101160439

Span 1 South Truss U1-L1

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 143: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 6.0000 0.4000 -2.4000 0.2000 -0.4800 -0.0320 7.8000 -146.0160 -146.04802 6.0000 0.4000 -2.4000 15.8000 -37.9200 -0.0320 7.8000 -146.0160 -146.04803 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9688 -1.9844 -1.98444 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9688 -1.9844 -1.98445 0.5000 0.0625 -0.0313 15.9688 -0.4990 0.0000 7.9688 -1.9844 -1.98446 0.5000 0.0625 -0.0313 15.9688 -0.4990 0.0000 7.9688 -1.9844 -1.98447 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.93 -39.40 -0.06 -299.97 -300.03Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 90.79 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 726.29 in4 Sleft = 90.79 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 14.8750 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 6.9876 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 144: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 2.0000 -0.1250 12.5000 -1.5625 -0.0417 4.9232 -3.0298 -3.07152 0.0625 2.0000 -0.1250 2.5000 -0.3125 -0.0417 5.0768 -3.2217 -3.26333 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7732 -64.1129 -64.16214 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7732 -64.1129 -64.16215 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2518 -73.4916 -73.54086 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2518 -73.4916 -73.54087 0.7750 8.0000 -6.2000 7.5000 -46.5000 -33.0667 0.0768 -0.0365 -33.10328 0.7750 8.0000 -6.2000 7.5000 -46.5000 -33.0667 0.0768 -0.0365 -33.1032

Total -18.24 -135.89 -66.41 -281.53 -347.95Contribution from shifting centroid: Ad2 = 0.18

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 7.5768 in Stop = 59.24 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 439.76 in4 Sbott. = 58.04 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 7.4232 in A = 11.8350 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 7.5768 in rx = 6.0957 in

Section Losses

p101160439

Span 1 South Truss U3-L3 at lower chord

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 145: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 2.0000 0.0625 -0.1250 0.0313 -0.0039 0.0000 8.1371 -8.2765 -8.27652 2.0000 0.0625 -0.1250 0.0313 -0.0039 0.0000 8.1371 -8.2765 -8.27653 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.8433 -47.7169 -48.25534 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.5067 -42.3770 -42.91535 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.8433 -47.7169 -48.25536 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.5067 -42.3770 -42.91537 8.0000 0.7750 -6.2000 0.3875 -2.4025 -0.3103 7.7808 -375.3562 -375.66658 8.0000 0.7750 -6.2000 15.6125 -96.7975 -0.3103 7.4442 -343.5771 -343.8874

Total -18.24 -143.93 -2.77 -915.67 -918.45Contribution from shifting centroid: Ad2 = 0.852176459

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.1683 in Sright = 85.99 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 673.41 in4 Sleft = 82.44 in3

cright = 8.0000 in A = 30.0750 in2 cright = 7.8317 in A = 11.8350 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.1683 in ry = 7.5432 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 146: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57812 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57813 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -14.06 -35.16 0.00 -35.16Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 78.89 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 591.67 in4 Sbott. = 78.89 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 17.9250 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.7453 in

Section Losses

p101160439

Span 1 South Truss U3-L3 at midheight

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 147: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.9688 -59.5322 -59.53252 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.9688 -59.5322 -59.53253 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -15.00 0.00 -119.06 -119.06Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 113.41 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 907.26 in4 Sleft = 113.41 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 17.9250 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.1144 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 148: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 8.3543 -97.5378 -97.58702 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 8.3543 -97.5378 -97.58703 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.80 -0.91 -0.10 -195.08 -195.17Contribution from shifting centroid: Ad2 = 27.54

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 8.6793 in Stop = 72.65 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 459.19 in4 Sbott. = 52.91 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 6.3207 in A = 17.0050 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 8.6793 in rx = 5.1964 in

Section Losses

p101160439

Span 1 South Truss U4-L4 & U8-L8

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 149: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54572 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54573 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.80 -22.36 -1.08 -90.01 -91.09Contribution from shifting centroid: Ad2 = 6.24778E-29

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 116.90 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 935.24 in4 Sleft = 116.90 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 17.0050 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.4160 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 150: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 15.0000 -1.8750 7.5000 -14.0625 -35.1563 0.0000 0.0000 -35.15632 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57813 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.81 -21.09 -52.73 0.00 -52.73Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 76.55 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 574.09 in4 Sbott. = 76.55 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 16.9875 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.8133 in

Section Losses

p101160439

Span 1 South Truss U5-L5

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 151: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.1250 -1.8750 0.0625 -0.1172 -0.0024 8.3738 -131.4768 -131.47932 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.5324 -53.1913 -53.19163 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.81 -15.09 0.00 -184.67 -184.67Contribution from shifting centroid: Ad2 = 3.769553307

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.4363 in Sright = 111.77 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 845.43 in4 Sleft = 100.21 in3

cright = 8.0000 in A = 19.8000 in2 cright = 7.5637 in A = 16.9875 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.4363 in ry = 7.0546 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 152: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57812 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57813 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -14.06 -35.16 0.00 -35.16Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 78.89 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 591.67 in4 Sbott. = 78.89 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 17.9250 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.7453 in

Section Losses

p101160439

Span 1 South Truss U7-L7

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 153: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.9688 -59.5322 -59.53252 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.9688 -59.5322 -59.53253 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -15.00 0.00 -119.06 -119.06Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 113.41 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 907.26 in4 Sleft = 113.41 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 17.9250 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.1144 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 154: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.7750 8.0000 -6.2000 7.5000 -46.5000 -33.0667 0.1163 -0.0839 -33.15052 0.7750 8.0000 -6.2000 7.5000 -46.5000 -33.0667 0.1163 -0.0839 -33.15053 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7337 -63.3663 -63.41554 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7337 -63.3663 -63.41555 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2913 -74.2956 -74.34486 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2913 -74.2956 -74.34487 0.1875 5.7000 -1.0688 3.5000 -3.7406 -2.8936 4.1163 -18.1089 -21.00258 0.1875 5.7000 -1.0688 11.5000 -12.2906 -2.8936 3.8837 -16.1200 -19.01379 0.1875 5.7000 -1.0688 3.5000 -3.7406 -2.8936 4.1163 -18.1089 -21.002510 0.1875 5.7000 -1.0688 11.5000 -12.2906 -2.8936 3.8837 -16.1200 -19.0137

Total -22.27 -166.08 -77.90 -343.95 -421.85Contribution from shifting centroid: Ad2 = 0.41

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 7.6163 in Stop = 49.58 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 366.09 in4 Sbott. = 48.07 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 7.3837 in A = 7.8100 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 7.6163 in rx = 6.8465 in

Section Losses

p101160439

Span 1 South Truss U9-L9

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 155: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 8.0000 0.7750 -6.2000 0.3875 -2.4025 -0.3103 7.6125 -359.2910 -359.60132 8.0000 0.7750 -6.2000 15.6125 -96.7975 -0.3103 7.6125 -359.2910 -359.60133 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 5.7000 0.1875 -1.0688 0.6813 -0.7281 -0.0031 7.3188 -57.2466 -57.24988 5.7000 0.1875 -1.0688 0.6813 -0.7281 -0.0031 7.3188 -57.2466 -57.24989 5.7000 0.1875 -1.0688 15.3188 -16.3719 -0.0031 7.3187 -57.2466 -57.249810 5.7000 0.1875 -1.0688 15.3188 -16.3719 -0.0031 7.3187 -57.2466 -57.2498

Total -22.27 -178.12 -2.79 -1127.60 -1130.38Contribution from shifting centroid: Ad2 = 1.5184E-27

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.0000 in Sright = 57.58 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 460.63 in4 Sleft = 57.58 in3

cright = 8.0000 in A = 30.0750 in2 cright = 8.0000 in A = 7.8100 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.0000 in ry = 7.6798 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 156: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

section at pin with loss

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20002 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20003 0.0625 0.5000 -0.0313 4.2500 -0.1328 -0.0007 3.2500 -0.3301 -0.33074 0.0625 0.5000 -0.0313 10.7500 -0.3359 -0.0007 3.2500 -0.3301 -0.33075 0.1250 0.5000 -0.0625 4.2500 -0.2656 -0.0013 3.2500 -0.6602 -0.66156 0.1250 0.5000 -0.0625 10.7500 -0.6719 -0.0013 3.2500 -0.6602 -0.66157 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.99 -37.41 -14.40 -1.98 -16.38Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 81.39 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 610.44 in4 Sbott. = 81.39 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 14.8125 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 6.4196 in

Section Losses

p101160439

Span 1 South Truss U11-L11

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 157: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 6.0000 0.4000 -2.4000 0.2000 -0.4800 -0.0320 7.7666 -144.7697 -144.80172 6.0000 0.4000 -2.4000 15.8000 -37.9200 -0.0320 7.8334 -147.2677 -147.29973 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9354 -1.9678 -1.96784 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9354 -1.9678 -1.96785 0.5000 0.1250 -0.0625 15.9375 -0.9961 -0.0001 7.9709 -3.9709 -3.97106 0.5000 0.1250 -0.0625 15.9375 -0.9961 -0.0001 7.9709 -3.9709 -3.97107 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.99 -40.39 -0.06 -303.91 -303.98Contribution from shifting centroid: Ad2 = 0.022034824

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 7.9666 in Sright = 89.92 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 722.37 in4 Sleft = 90.67 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0334 in A = 14.8125 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 7.9666 in ry = 6.9834 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 158: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.000 in A2 = lw = 4.000 inB1 = lh = 4.000 in B2 = lh = 4.000 inC1 = tl = 0.625 in C2A = tl = 0.625 in

C2B = tl = 0.625 inWeb Plate 1: PL Web Plate 2: PL

A3 = b = 20.250 in A4 = b = 0.000 inB3 = t = 0.500 in B4 = t = 0.000 in

B6 = 17.250 in Top Cover Plate: A5 = b = 26.250 inB5 = t = 0.000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

Horizontal Leg 5.000 19.938 99.688 0.163 9.813 481.426 481.589Vertical Leg 4.219 17.938 75.674 4.005 7.813 257.492 261.497Horizontal Leg 5.000 0.313 1.563 0.163 9.813 481.426 481.589Vertical Leg 4.219 2.313 9.756 4.005 7.813 257.492 261.497

3 Inner Web Plate(s) 20.250 10.125 205.031 691.980 0.000 0.000 691.9804 Outer Side Plate 0.000 10.125 0.000 0.000 0.000 0.000 0.0005 Top Cover Plate 0.000 20.250 0.000 0.000 10.125 0.000 0.000

Total 38.69 391.71 700.32 1477.84 2178.15A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 12.0000 -1.5000 6.0000 -9.0000 -18.0000 4.3797 -28.7729 -46.77292 0.0625 12.0000 -0.7500 6.0000 -4.5000 -9.0000 4.3797 -14.3864 -23.38643 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.25 -13.50 -27.00 -43.16 -70.16Contribution from shifting centroid: Ad2 = 2.51

y-bar = 10.1250 in Stop = 215.13 in3y-bar = 10.3797 in Stop = 213.82 in3

Ix = 2178.15 in4 Sbott. = 215.13 in3 Ix = 2110.50 in4 Sbott. = 203.33 in3

ctop = 10.125 in A = 38.6875 in2 ctop = 9.8703 in A = 36.4375 in2

cbottom = 10.125 in rx = 7.5034 in cbottom = 10.3797 in rx = 7.6106 in

2

p101160439

Span 1 South Truss U8-L6

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

No top cover plate, used only for

Page 159: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Horizontal Leg 2.500 2.000 5.000 3.333 11.125 309.414 312.747(Left) Vertical Leg 2.109 3.688 7.778 0.069 9.438 187.874 187.943

1 Horizontal Leg 2.500 24.250 60.625 3.333 11.125 309.414 312.747(Right) Vertical Leg 2.109 22.563 47.593 0.069 9.438 187.874 187.943

2 Horizontal Leg 2.500 2.000 5.000 3.333 11.125 309.414 312.747(Left) Vertical Leg 2.109 3.688 7.778 0.069 9.438 187.874 187.943

2 Horizontal Leg 2.500 24.250 60.625 3.333 11.125 309.414 312.747(Right) Vertical Leg 2.109 22.563 47.593 0.069 9.438 187.874 187.9433 (Left) 10.125 4.250 43.031 0.211 8.875 797.502 797.713

3 (Right) 10.125 22.000 222.750 0.211 8.875 797.502 797.7134 (Left) 0.000 4.000 0.000 0.000 9.125 0.000 0.000

4 (Right) 0.000 22.250 0.000 0.000 9.125 0.000 0.0005 Top Cover Plate 0.000 13.125 0.000 0.000 0.000 0.000 0.000

Total 38.69 507.77 14.03 3584.16 3598.19A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 12.0000 0.1250 -1.5000 4.4375 -6.6563 -0.0020 8.8670 -117.9345 -117.93642 12.0000 0.0625 -0.7500 21.7813 -16.3359 -0.0002 8.4768 -53.8920 -53.89223 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.25 -22.99 0.00 -171.83 -171.83Contribution from shifting centroid: Ad2 = 1.25

x-bar = 13.1250 in Sright = 274.15 in3x-bar = 13.3045 in Sright = 264.77 in3

Iy = 3598.19 in4 Sleft = 274.15 in3 Iy = 3427.61 in4 Sleft = 257.63 in3

cright = 13.1250 in A = 38.6875 in2 cright = 12.9455 in A = 36.4375 in2

cleft = 13.1250 in ry = 9.6440 in cleft = 13.3045 in ry = 9.6989 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 36.7531 in2 Iy = 3247.3645 in2 Ix = 1965.781 in2

ry = 9.3998 in rx = 7.3134 inTherefore, as-inspected section properties govern

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

Inner Web Plate(s)

Outer Web Plate

Page 160: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.6500 in *A2 = tw = 0.6500 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 1/2" web plate with 50% loss on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 8.9050 7.5000 66.7875 139.2816 0.0000 0.0000 139.2816

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 8.9050 7.5000 66.7875 139.2816 0.0000 0.0000 139.2816

Total 26.65 199.88 278.87 455.09 733.96A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.6500 8.0000 -5.2000 7.5000 -39.0000 -27.7333 0.0852 -0.0378 -27.77112 0.6500 8.0000 -5.2000 7.5000 -39.0000 -27.7333 0.0852 -0.0378 -27.77113 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7648 -63.9529 -64.00214 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.7648 -63.9529 -64.00215 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2602 -73.6632 -73.71246 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2602 -73.6632 -73.71247 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -15.99 -119.02 -55.66 -275.31 -330.97Contribution from shifting centroid: Ad2 = 0.19

y-bar = 7.5000 in Stop = 97.86 in3y-bar = 7.5852 in Stop = 54.38 in3

Ix = 733.96 in4 Sbott. = 97.86 in3 Ix = 403.19 in4 Sbott. = 53.15 in3

ctop = 7.5000 in A = 26.6500 in2 ctop = 7.4148 in A = 10.6600 in2

cbottom = 7.5000 in rx = 5.2479 in cbottom = 7.5852 in rx = 6.1500 in

Section Losses

p101160439

Span 1 South Truss M5-L4 & M7-L8

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 161: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

p101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 8.9050 0.3250 2.8941 0.3135 7.6750 524.5546 524.8681

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 8.9050 15.6750 139.5859 0.3135 7.6750 524.5546 524.8681

Total 26.65 213.20 9.14 1399.97 1409.11A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 8.0000 0.6500 -5.2000 0.3250 -1.6900 -0.1831 7.6750 -306.3093 -306.49232 8.0000 0.6500 -5.2000 15.6750 -81.5100 -0.1831 7.6750 -306.3093 -306.49233 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -15.99 -127.92 -2.52 -792.65 -795.17Contribution from shifting centroid: Ad2 = 8.40926E-29

x-bar = 8.0000 in Sright = 176.14 in3x-bar = 8.0000 in Sright = 76.74 in3

Iy = 1409.11 in4 Sleft = 176.14 in3 Iy = 613.94 in4 Sleft = 76.74 in3

cright = 8.0000 in A = 26.6500 in2 cright = 8.0000 in A = 10.6600 in2

cleft = 8.0000 in ry = 7.2715 in cleft = 8.0000 in ry = 7.5890 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 25.3175 in2 Iy = 1271.7233 in2 Ix = 662.4018 in2

ry = 7.0874 in rx = 5.1151 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 162: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.3750 in do = N/A inB3 = 33.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties: STAAD Beams: 10000, 10001, 20000, 20001, 20003A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 33.4375 250.7813 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 30.4375 204.5020 16.1757 13.3125 1190.7147 1206.8905Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.3125 1995.7324 1995.9766Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.3125 1190.7147 1206.8905

3 12.4688 17.1250 213.5273 1148.7485 0.0000 0.0000 1148.7485Cover Plate Top 6.5000 34.0000 221.0000 0.1354 16.8750 1850.9766 1851.1120Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 16.8750 1850.9766 1851.1120

Total 53.91 923.14 1181.86 10074.85 11256.71A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 4.0000 0.3750 -1.5000 0.9375 -1.4063 -0.0176 16.9568 -431.2996 -431.31722 0.3750 2.0000 -0.7500 2.1250 -1.5938 -0.2500 15.7693 -186.5031 -186.75313 2.0000 0.1250 -0.2500 1.0625 -0.2656 -0.0003 16.8318 -70.8274 -70.82774 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -3.27 -0.27 -688.63 -688.90Contribution from shifting centroid: Ad2 = 31.90

y-bar = 17.1250 in Stop = 657.33 in3y-bar = 17.8943 in Stop = 648.07 in3

Ix = 11256.71 in4 Sbott. = 657.33 in3 Ix = 10599.71 in4 Sbott. = 592.35 in3

ctop = 17.1250 in A = 53.9063 in2 ctop = 16.3557 in A = 51.4063 in2

cbottom = 17.1250 in rx = 14.4506 in cbottom = 17.8943 in rx = 14.3595 inJ = 5.3706 Z = 746.5957 in3

Z = 746.5957 in3

P101160439

Span 1 Running Girder Bay 1 and Bay 2

Gross Section (without Losses)

1

2

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 163: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.3125 12.4219 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 6.0000 20.1563 0.1094 0.5000 0.8398 0.94921 Horizontal Leg 3.7500 9.6875 36.3281 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 7.0000 23.5156 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 3.3125 12.4219 11.2500 3.1875 38.1006 49.3506

(Left) Vertical Leg 3.3594 6.0000 20.1563 0.1094 0.5000 0.8398 0.94922 Horizontal Leg 3.7500 9.6875 36.3281 11.2500 3.1875 38.1006 49.3506

(Right) Vertical Leg 3.3594 7.0000 23.5156 0.1094 0.5000 0.8398 0.94923 Web Plate 12.4688 6.5000 81.0469 0.1461 0.0000 0.0000 0.14614 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 53.91 350.39 228.67 155.76 384.43A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.3750 4.0000 -1.5000 3.6875 -5.5313 -2.0000 2.8903 -12.5309 -14.53092 2.0000 0.3750 -0.7500 6.1875 -4.6406 -0.0088 0.3903 -0.1143 -0.12303 0.1250 2.0000 -0.2500 8.3125 -2.0781 -0.0833 1.7347 -0.7523 -0.83564 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -12.25 -2.09 -13.40 -15.49Contribution from shifting centroid: Ad2 = 0.33

x-bar = 6.5000 in Sright = 59.14 in3x-bar = 6.5778 in Sright = 57.50 in3

Iy = 384.43 in4 Sleft = 59.14 in3 Iy = 369.27 in4 Sleft = 56.14 in3

cright = 6.5000 in A = 53.9063 in2 cright = 6.4222 in A = 51.4063 in2

cleft = 6.5000 in ry = 2.6705 in cleft = 6.5778 in ry = 2.6802 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 51.2109 in2 Iy = 346.9468 in2 Ix = 10159.1777 in2 Stop = 593.2367 in3

ry = 2.6029 in rx = 14.0847 in Sbot = 593.2367 in3

Z = 709.2659 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1643.31 1483.09 k-ft 1480.88 k-ft 1480.88 k-ft AB = As-BuiltV 450.77 428.23 k 437.72 k 428.23 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Page 164: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Historic S20x65 AISC Section Properties

A1 = tw = 0.5000 in A = 19.1 in2

B1 = d = 20.0000 in Ix = 1169.5 in4

A2 = tf = 0.7900 in Sx = 117.0 in3

B2 = bf = 6.2500 in rx = 7.8 inA3 = tf = 0.7900 in Iy = 27.9 in4

B3 = bf = 6.2500 in ry = 1.21 intw = 0.7600 in

do = N/A in d = 20.0000 intf = 0.79 in

bf = 6.2500 inSay OK, simplified rectangular section properties are close to actual properties

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Web 9.2100 10.0000 92.1000 260.4100 0.0000 0.0000 260.41002 Top Flange 4.9375 19.6050 96.7997 0.2568 9.6050 455.514 455.7713 Bottom Flange 4.9375 0.3950 1.9503 0.2568 9.6050 455.514 455.771

Total 19.09 190.85 260.92 911.03 1171.95A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 6.2500 0.3750 -2.3438 19.8125 -46.4355 -0.0275 11.1862 -293.2778 -293.30532 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.34 -46.44 -0.03 -293.28 -293.31Contribution from shifting centroid: Ad2 = 36.02

y-bar = 10.0000 in Stop = 117.20 in3y-bar = 8.6263 in Stop = 80.42 in3

Ix = 1171.95 in4 Sbott. = 117.20 in3 Ix = 914.66 in4 Sbott. = 106.03 in3

ctop = 10.0000 in A = 19.0850 in2 ctop = 11.3737 in A = 16.7413 in2

cbottom = 10.0000 in rx = 7.8363 in cbottom = 8.6263 in rx = 7.3916 inJ = 2.8218 in4 Z = 137.26 in3

Z = 137.26 in3

Section Losses

P101160439

do = stiffener spacing for shear check for no stiffners use "N/A" Stringer

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 165: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Web 9.2100 3.1250 28.7813 0.1919 0.0000 0.0000 0.19192 Top Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.07263 Bottom Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.0726

Total 19.09 59.64 32.34 0.00 32.34A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.3750 6.2500 -2.3438 3.1250 -7.3242 -7.6294 0.0000 0.0000 -7.62942 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.34 -7.32 -7.63 0.00 -7.63Contribution from shifting centroid: Ad2 = 0.00

x-bar = 3.1250 in Sright = 10.35 in3x-bar = 3.1250 in Sright = 7.91 in3

Iy = 32.34 in4 Sleft = 10.35 in3 Iy = 24.71 in4 Sleft = 7.91 in3

cright = 3.1250 in A = 19.0850 in2 cright = 3.1250 in A = 16.7413 in2

cleft = 3.1250 in ry = 1.3017 in cleft = 3.1250 in ry = 1.2148 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.1260 in2 Iy = 25.1798 in2 Ix = 1055.4738 in2 Stop = 105.5474 in3

ry = 1.1786 in rx = 7.6308n Sbot = 105.5474 in3

Z = 130.3984 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 292.5 k-ft 263.87 k-ft 201.1 k-ft 201.05 k-ft AB = As-BuiltV 160.25 k 152.24 k 160.25 k 152.24 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 166: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 31.0625 186.3750 18.0000 13.4375 1083.3984 1101.3984Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 4.1875 25.1250 18.0000 13.4375 1083.3984 1101.3984

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 58.07 1023.49 1454.22 11257.32 12711.54A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 17.5052 -1072.5154 -1072.53362 5.5000 0.2500 -1.3750 1.0625 -1.4609 -0.0072 16.5573 -376.9470 -376.95423 5.5000 0.2500 -1.3750 1.0625 -1.4609 -0.0072 16.5573 -376.9470 -376.95424 0.2500 2.0000 -0.5000 2.1875 -1.0938 -0.1667 15.4323 -119.0775 -119.24425 0.2500 2.0000 -0.5000 2.1875 -1.0938 -0.1667 15.4323 -119.0775 -119.24426 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.25 -128.05 -0.37 -2064.56 -2064.93Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.6250 in Stop = 721.22 in3y-bar = 17.6198 in Stop = 603.88 in3

Ix = 12711.54 in4 Sbott. = 721.22 in3 Ix = 10646.61 in4 Sbott. = 604.24 in3

ctop = 17.6250 in A = 58.0703 in2 ctop = 17.6302 in A = 50.8203 in2

cbottom = 17.6250 in rx = 14.7952 in cbottom = 17.6198 in rx = 14.4739 inJ = 5.9784 Z = 819.6736 in3

Z = 819.6736 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 1 Floorbeam 0 by North Stringer

Gross Section (without Losses)

1

Page 167: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72171 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72173 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 58.07 406.49 350.90 126.96 477.86A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0000 0.0000 -57.16672 0.2500 5.5000 -1.3750 3.5313 -4.8555 -3.4661 3.4688 -16.5443 -20.01053 0.2500 5.5000 -1.3750 10.4688 -14.3945 -3.4661 3.4688 -16.5443 -20.01054 2.0000 0.2500 -0.5000 6.4063 -3.2031 -0.0026 0.5938 -0.1763 -0.17895 2.0000 0.2500 -0.5000 7.5938 -3.7969 -0.0026 0.5938 -0.1763 -0.17896 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.25 -50.75 -64.10 -33.44 -97.55Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.27 in3x-bar = 7.0000 in Sright = 54.33 in3

Iy = 477.86 in4 Sleft = 68.27 in3 Iy = 380.32 in4 Sleft = 54.33 in3

cright = 7.0000 in A = 58.0703 in2 cright = 7.0000 in A = 50.8203 in2

cleft = 7.0000 in ry = 2.8686 in cleft = 7.0000 in ry = 2.7356 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 55.1668 in2 Iy = 431.2723 in2 Ix = 11472.1644 in2 Stop = 650.9029 in3

ry = 2.796 in rx = 14.4206 in Sbot = 650.9029 in3

Z = 778.6899 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1803.06 1627.26 k-ft 1509.71 k-ft 1509.71 k-ft AB = As-BuiltV 466.67 443.34 k 449.27 k 443.34 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 168: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 31.0625 186.3750 18.0000 13.4375 1083.3984 1101.3984Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 4.1875 25.1250 18.0000 13.4375 1083.3984 1101.3984

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 58.07 1023.49 1454.22 11257.32 12711.54A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 18.6224 -1213.7789 -1213.79712 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -122.94 -0.02 -1213.78 -1213.80Contribution from shifting centroid: Ad2 = 73.16

y-bar = 17.6250 in Stop = 721.22 in3y-bar = 16.5026 in Stop = 617.20 in3

Ix = 12711.54 in4 Sbott. = 721.22 in3 Ix = 11570.90 in4 Sbott. = 701.16 in3

ctop = 17.6250 in A = 58.0703 in2 ctop = 18.7474 in A = 54.5703 in2

cbottom = 17.6250 in rx = 14.7952 in cbottom = 16.5026 in rx = 14.5615 inJ = 5.9784 Z = 819.6736 in3

Z = 819.6736 in3

P101160439

Span 1 Floorbeam 0 by South Stringer

Gross Section (without Losses)

1

2

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 169: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72171 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72173 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 58.07 406.49 350.90 126.96 477.86A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0000 0.0000 -57.16672 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -24.50 -57.17 0.00 -57.17Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.27 in3x-bar = 7.0000 in Sright = 60.10 in3

Iy = 477.86 in4 Sleft = 68.27 in3 Iy = 420.70 in4 Sleft = 60.10 in3

cright = 7.0000 in A = 58.0703 in2 cright = 7.0000 in A = 54.5703 in2

cleft = 7.0000 in ry = 2.8686 in cleft = 7.0000 in ry = 2.7766 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 55.1668 in2 Iy = 431.2723 in2 Ix = 11472.1644 in2 Stop = 650.9029 in3

ry = 2.796 in rx = 14.4206 in Sbot = 650.9029 in3

Z = 778.6899 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1803.06 1627.26 k-ft 1543.00 k-ft 1543.00 k-ft AB = As-BuiltV 466.67 443.34 k 466.67 k 443.34 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Page 170: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 17.5850 -1082.3084 -1082.32672 5.5000 0.1250 -0.6875 1.0625 -0.7305 -0.0009 16.4775 -186.6626 -186.66343 0.1250 2.0000 -0.2500 2.1875 -0.5469 -0.0833 15.3525 -58.9251 -59.00844 5.5000 0.2500 -1.3750 0.9375 -1.2891 -0.0072 16.6025 -379.0107 -379.01795 0.2500 5.5000 -1.3750 3.9375 -5.4141 -3.4661 13.6025 -254.4148 -257.88106 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.19 -130.92 -3.58 -1961.32 -1964.90Contribution from shifting centroid: Ad2 = 0.41

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 17.5400 in Stop = 600.39 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 10632.81 in4 Sbott. = 606.20 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 17.7100 in A = 49.8828 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 17.5400 in rx = 14.5999 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 1 Floorbeam 1 by stringers

Gross Section (without Losses)

1

Page 171: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0621 -0.0135 -57.18022 0.1250 5.5000 -0.6875 3.5313 -2.4277 -1.7331 3.4066 -7.9784 -9.71153 2.0000 0.1250 -0.2500 6.5938 -1.6484 -0.0003 0.3441 -0.0296 -0.02994 0.2500 5.5000 -1.3750 10.4688 -14.3945 -3.4661 3.5309 -17.1424 -20.60855 5.5000 0.2500 -1.3750 7.5938 -10.4414 -0.0072 0.6559 -0.5915 -0.59876 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.19 -53.41 -62.37 -25.76 -88.13Contribution from shifting centroid: Ad2 = 0.22

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 6.9379 in Sright = 55.18 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 389.71 in4 Sleft = 56.17 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0621 in A = 49.8828 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 6.9379 in ry = 2.7951 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1500.96 k-ft 1500.96 k-ft AB = As-BuiltV 449.27 426.81 k 421.00 k 421.00 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 172: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/1/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.1250 -1.7500 35.1875 -61.5781 -0.0023 17.7117 -548.9805 -548.98282 5.5000 0.1250 -0.6875 1.1250 -0.7734 -0.0009 16.3508 -183.8029 -183.80383 5.5000 0.1250 -0.6875 1.1250 -0.7734 -0.0009 16.3508 -183.8029 -183.80384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.13 -63.13 0.00 -916.59 -916.59Contribution from shifting centroid: Ad2 = 1.27

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 17.4758 in Stop = 657.24 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 11681.98 in4 Sbott. = 668.46 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 17.7742 in A = 53.9453 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 17.4758 in rx = 14.7157 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

2

P101160439

Span 1 Floorbeam 3, 7, 8, 9 by North Stringer

Gross Section (without Losses)

1

4

Section Losses

As-Built Section Properties

Web Plate

As-Inspected Section Properties

Page 173: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/1/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 14.0000 -1.7500 7.0000 -12.2500 -28.5833 0.0000 0.0000 -28.58332 0.1250 5.5000 -0.6875 3.5313 -2.4277 -1.7331 3.4688 -8.2722 -10.00523 0.1250 5.5000 -0.6875 10.4688 -7.1973 -1.7331 3.4688 -8.2722 -10.00524 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.13 -21.88 -32.05 -16.54 -48.59Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0000 in Sright = 61.29 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 429.03 in4 Sleft = 61.29 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 53.9453 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.8201 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1643.11 k-ft 1612.63 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties

Gross Section (without Losses)

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Page 174: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/1/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 18.2388 -1164.2899 -1164.30812 5.5000 0.1250 -0.6875 1.1250 -0.7734 -0.0009 15.7612 -170.7854 -170.78623 5.5000 0.1250 -0.6875 1.1250 -0.7734 -0.0009 15.7612 -170.7854 -170.78624 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.88 -124.48 -0.02 -1505.86 -1505.88Contribution from shifting centroid: Ad2 = 31.15

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 16.8862 in Stop = 605.68 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 11122.57 in4 Sbott. = 658.68 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 18.3638 in A = 52.1953 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 16.8862 in rx = 14.5978 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

2

P101160439

Span 1 Floorbeam 3, 7, 8, 9 by South Stringer

Gross Section (without Losses)

1

4

Section Losses

As-Built Section Properties

Web Plate

As-Inspected Section Properties

Page 175: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/1/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0000 0.0000 -57.16672 0.1250 5.5000 -0.6875 3.5313 -2.4277 -1.7331 3.4688 -8.2722 -10.00523 0.1250 5.5000 -0.6875 10.4688 -7.1973 -1.7331 3.4688 -8.2722 -10.00524 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.88 -34.13 -60.63 -16.54 -77.18Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0000 in Sright = 57.21 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 400.45 in4 Sleft = 57.21 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 52.1953 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.7699 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1514.20 k-ft 1514.20 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties

Gross Section (without Losses)

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Page 176: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss member section properties summary

Page 177: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

1 L0-L1 1100 37.47 28.10 25.20 8.74 13.522 L1-L2 1101 37.47 28.10 25.20 8.74 13.523 L2-L3 1102 62.70 47.03 25.20 2.25 11.514 L3-L4 1103 62.70 47.03 25.20 2.25 12.295 L4-L5 1104 79.80 59.85 25.20 2.25 8.936 L5-L6 1105 79.80 59.85 25.20 2.25 10.137 L6-L7 1106 79.80 59.85 25.20 2.25 10.138 L7-L8 1107 79.80 59.85 25.20 2.25 8.939 L8-L9 1108 62.50 46.88 25.20 2.31 12.61

10 L9-L10 1109 62.70 47.03 25.20 2.25 11.5111 L10-L11 1110 37.47 28.10 25.20 8.74 13.5212 L11-L12 1111 37.47 28.10 25.20 8.74 13.5213 U1-L1 1201 18.81 14.11 36.00 5.48 7.0214 U2-L2 1202 33.25 24.94 13.20 7.10 7.0315 U2-L2 1203 33.25 24.94 27.40 7.10 7.0316 U10-L10 1209 33.25 24.94 13.20 7.10 7.0317 U10-L10 1210 31.00 23.25 27.40 6.88 7.4618 U11-L11 1211 18.81 14.11 36.00 5.48 7.0219 U3-L3 1230 18.81 14.11 18.00 5.48 7.0220 U3-L3 1231 18.81 14.11 7.00 5.48 7.0221 U3-L3 1232 18.81 14.11 20.40 5.48 7.0222 U4-L4 1240 18.81 14.11 22.60 5.48 7.0223 U4-L4 1241 18.81 14.11 2.42 5.48 7.0224 U4-L4 1242 18.81 14.11 25.00 5.48 7.0225 U5-L5 1250 18.81 14.11 22.60 5.48 7.0226 U5-L5 1251 18.81 14.11 2.42 5.48 7.0227 U5-L5 1252 18.81 14.11 25.00 5.48 7.0228 U6-L6 1260 18.81 14.11 22.60 5.48 7.0229 U6-L6 1261 18.81 14.11 2.42 5.48 7.0230 U6-L6 1262 18.81 14.11 25.00 5.48 7.0231 U7-L7 1270 18.81 14.11 22.60 5.48 7.0232 U7-L7 1271 18.81 14.11 2.42 5.48 7.0233 U7-L7 1272 16.99 12.74 25.00 5.81 7.0534 U8-L8 1280 18.81 14.11 22.60 5.48 7.0235 U8-L8 1281 18.81 14.11 2.42 5.48 7.0236 U8-L8 1282 17.01 12.75 25.00 5.20 7.4237 U9-L9 1290 18.81 14.11 18.00 5.48 7.0238 U9-L9 1291 18.81 14.11 7.00 5.48 7.0239 U9-L9 1292 21.06 15.80 20.40 4.67 7.6340 U1-L2 1301 38.00 28.50 44.00 2.25 7.5041 U2-L4 1302 36.75 27.56 32.30 7.31 9.4042 U2-L4 1303 36.75 27.56 32.40 7.31 9.40

Reference ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)

Page 178: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Reference ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)43 U4-L6 1304 36.75 27.56 35.50 7.31 9.4044 U4-L6 1305 36.75 27.56 35.50 7.31 9.4045 U8-L6 1306 36.75 27.56 35.50 7.31 9.4046 U8-L6 1307 36.75 27.56 35.50 7.31 9.4047 U10-L8 1308 36.75 27.56 32.40 7.31 9.4048 U10-L8 1309 36.75 27.56 32.30 7.31 9.4049 U11-L10 1310 38.00 28.50 44.00 2.25 7.5050 M3-L2 1382 18.81 14.11 32.40 5.48 5.0951 M5-L4 1384 18.81 14.11 35.50 5.48 5.0952 M7-L8 1388 20.20 15.15 35.50 4.69 7.6453 M9-L10 1392 21.98 16.49 32.40 5.01 7.3958 U1-L0 1500 69.08 51.81 26.00 10.16 10.3759 U1-U2 1501 69.08 51.81 25.60 10.16 10.3760 U2-U3 1502 88.37 66.28 25.60 9.28 10.4961 U3-U4 1503 88.37 66.28 25.60 9.28 10.4962 U4-U5 1504 88.37 66.28 25.20 9.28 10.4963 U5-U6 1505 88.37 66.28 25.20 9.28 10.4964 U6-U7 1506 88.37 66.28 25.20 9.28 10.4965 U7-U8 1507 88.37 66.28 25.20 9.28 10.4966 U8-U9 1508 88.37 66.28 25.60 9.28 10.4967 U9-U10 1509 88.37 66.28 25.60 9.28 10.4968 U10-U11 1510 69.08 51.81 25.60 10.16 10.3769 U11-L12 1511 69.08 51.81 26.00 10.16 10.3770 U1-L0 1550 69.08 51.81 9.00 10.16 10.3771 U1-L0 1551 69.08 51.81 9.00 10.16 10.3772 U11-L12 1560 69.08 51.81 9.00 10.16 10.3773 U11-L12 1561 69.08 51.81 9.00 10.16 10.3774 L0-L1 2100 28.26 21.19 25.20 9.41 14.0275 L1-L2 2101 37.47 28.10 25.20 8.74 13.5276 L2-L3 2102 62.70 47.03 25.20 2.25 11.5177 L3-L4 2103 62.70 47.03 25.20 2.25 12.2978 L4-L5 2104 79.80 59.85 25.20 2.25 8.9379 L5-L6 2105 79.80 59.85 25.20 2.25 10.1380 L6-L7 2106 79.80 59.85 25.20 2.25 10.1381 L7-L8 2107 79.80 59.85 25.20 2.25 8.9382 L8-L9 2108 62.00 46.50 25.20 2.31 12.6183 L9-L10 2109 61.41 46.06 25.20 2.31 11.7584 L10-L11 2110 37.47 28.10 25.20 8.74 13.5285 L11-L12 2111 37.47 28.10 25.20 8.74 13.5286 U1-L1 2201 14.88 11.16 36.00 6.41 6.9987 U2-L2 2202 33.25 24.94 13.20 7.10 7.0388 U2-L2 2203 33.25 24.94 27.40 7.10 7.03

Page 179: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Reference ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)89 U10-L10 2209 33.25 24.94 13.20 7.10 7.0390 U10-L10 2210 33.25 24.94 27.40 7.10 7.0391 U11-L11 2211 14.81 11.11 36.00 6.42 6.9892 U3-L3 2230 18.81 14.11 18.00 5.48 7.0293 U3-L3 2231 17.93 13.44 7.00 5.75 7.1194 U3-L3 2232 11.84 8.88 20.40 6.10 7.5495 U4-L4 2240 18.81 14.11 22.60 5.48 7.0296 U4-L4 2241 18.81 14.11 2.42 5.48 7.0297 U4-L4 2242 17.01 12.75 25.00 5.20 7.4298 U5-L5 2250 18.81 14.11 22.60 5.48 7.0299 U5-L5 2251 18.81 14.11 2.42 5.48 7.02

100 U5-L5 2252 16.99 12.74 25.00 5.81 7.05101 U6-L6 2260 18.81 14.11 22.60 5.48 7.02102 U6-L6 2261 18.81 14.11 2.42 5.48 7.02103 U6-L6 2262 18.81 14.11 25.00 5.48 7.02104 U7-L7 2270 18.81 14.11 22.60 5.48 7.02105 U7-L7 2271 18.81 14.11 2.42 5.48 7.02106 U7-L7 2272 18.81 14.11 25.00 5.48 7.02107 U8-L8 2280 18.81 14.11 22.60 5.48 7.02108 U8-L8 2281 18.81 14.11 2.42 5.48 7.02109 U8-L8 2282 17.01 12.75 25.00 5.20 7.42110 U9-L9 2290 18.81 14.11 18.00 5.48 7.02111 U9-L9 2291 18.81 14.11 7.00 5.48 7.02112 U9-L9 2292 7.81 5.86 20.40 6.85 7.68113 U1-L2 2301 38.00 28.50 44.00 2.25 7.50114 U2-L4 2302 36.75 27.56 32.30 7.31 9.40115 U2-L4 2303 36.75 27.56 32.40 7.31 9.40116 U4-L6 2304 36.75 27.56 35.50 7.31 9.40117 U4-L6 2305 36.75 27.56 35.50 7.31 9.40118 U8-L6 2306 36.44 27.33 35.50 7.61 9.70119 U8-L6 2307 36.75 27.56 35.50 7.31 9.40120 U10-L8 2308 36.75 27.56 32.40 7.31 9.40121 U10-L8 2309 36.75 27.56 32.30 7.31 9.40122 U11-L10 2310 38.00 28.50 44.00 2.25 7.50123 M3-L2 2382 18.81 14.11 32.40 5.48 5.09124 M5-L4 2384 10.66 8.00 35.50 6.15 7.59125 M7-L8 2388 10.66 8.00 35.50 6.15 7.59126 M9-L10 2392 18.81 14.11 32.40 5.48 5.09131 U1-L0 2500 69.08 51.81 26.00 10.16 10.37132 U1-U2 2501 69.08 51.81 25.60 10.16 10.37133 U2-U3 2502 88.37 66.28 25.60 9.28 10.49134 U3-U4 2503 88.37 66.28 25.60 9.28 10.49

Page 180: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Reference ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)135 U4-U5 2504 88.37 66.28 25.20 9.28 10.49136 U5-U6 2505 88.37 66.28 25.20 9.28 10.49137 U6-U7 2506 88.37 66.28 25.20 9.28 10.49138 U7-U8 2507 88.37 66.28 25.20 9.28 10.49139 U8-U9 2508 88.37 66.28 25.60 9.28 10.49140 U9-U10 2509 88.37 66.28 25.60 9.28 10.49141 U10-U11 2510 69.08 51.81 25.60 10.16 10.37142 U11-L12 2511 69.08 51.81 26.00 10.16 10.37143 U1-L0 2550 69.08 51.81 9.00 10.16 10.37144 U1-L0 2551 69.08 51.81 9.00 10.16 10.37145 U11-L12 2560 69.08 51.81 9.00 10.16 10.37146 U11-L12 2561 69.08 51.81 9.00 10.16 10.37

Page 181: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss member capacity calculation

Page 182: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

North L0-L1 1100 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L1-L2 1101 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L2-L3 1102 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L3-L4 1103 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L4-L5 1104 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L5-L6 1105 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L6-L7 1106 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L7-L8 1107 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L8-L9 1108 62.50 46.88 25.20 2.31 0.750 98.21 1936 22.42 1190.97 1875.00 4218.75 1875.00North L9-L10 1109 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L10-L11 1110 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L11-L12 1111 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North U1-L1 1201 18.81 14.11 36.00 5.48 0.750 59.08 1936 27.26 435.78 564.30 1269.68 564.30North U2-L2 1202 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50North U2-L2 1203 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50North U10-L10 1209 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50North U10-L10 1210 31.00 23.25 27.40 6.88 0.750 35.84 1936 28.99 763.89 930.00 2092.50 930.00North U11-L11 1211 18.81 14.11 36.00 5.48 0.750 59.08 1936 27.26 435.78 564.30 1269.68 564.30North U3-L3 1230 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30North U3-L3 1231 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30North U3-L3 1232 18.81 14.11 20.40 5.48 0.750 33.48 1936 29.12 465.57 564.30 1269.68 564.30North U4-L4 1240 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U4-L4 1241 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U4-L4 1242 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U5-L5 1250 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U5-L5 1251 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U5-L5 1252 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U6-L6 1260 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U6-L6 1261 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U6-L6 1262 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U7-L7 1270 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U7-L7 1271 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U7-L7 1272 16.99 12.74 25.00 5.81 0.750 38.70 1936 28.82 416.18 509.63 1146.66 509.63North U8-L8 1280 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U8-L8 1281 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U8-L8 1282 17.01 12.75 25.00 5.20 0.750 43.30 1936 28.53 412.32 510.15 1147.84 510.15North U9-L9 1290 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30North U9-L9 1291 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30North U9-L9 1292 21.06 15.80 20.40 4.67 0.750 39.34 1936 28.78 515.25 631.80 1421.55 631.80North U1-L2 1301 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00North U2-L4 1302 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59North U2-L4 1303 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59North U4-L6 1304 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U4-L6 1305 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U8-L6 1306 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U8-L6 1307 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U10-L8 1308 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59North U10-L8 1309 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59North U11-L10 1310 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00North M3-L2 1382 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30North M5-L4 1384 18.81 14.11 35.50 5.09 0.750 62.72 1936 26.91 430.21 564.30 1269.68 564.30North M7-L8 1388 20.20 15.15 35.50 4.69 0.750 68.06 1936 26.36 452.67 606.11 1363.75 606.11North M9-L10 1392 21.98 16.49 32.40 5.01 0.750 58.25 1936 27.33 510.66 659.40 1483.65 659.40

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

Page 183: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

North U1-L0 1500 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26North U1-U2 1501 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26North U2-U3 1502 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U3-U4 1503 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U4-U5 1504 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U5-U6 1505 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U6-U7 1506 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U7-U8 1507 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U8-U9 1508 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U9-U10 1509 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U10-U11 1510 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26North U11-L12 1511 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26North U1-L0 1550 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U1-L0 1551 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U11-L12 1560 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U11-L12 1561 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South L0-L1 2100 28.26 21.19 25.20 9.41 0.750 24.11 1936 29.54 709.59 847.73 1907.40 847.73South L1-L2 2101 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South L2-L3 2102 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L3-L4 2103 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L4-L5 2104 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L5-L6 2105 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L6-L7 2106 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L7-L8 2107 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L8-L9 2108 62.00 46.50 25.20 2.31 0.750 98.21 1936 22.42 1181.44 1860.00 4185.00 1860.00South L9-L10 2109 61.41 46.06 25.20 2.31 0.750 98.34 1936 22.40 1169.19 1842.42 4145.45 1842.42South L10-L11 2110 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South L11-L12 2111 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South U1-L1 2201 14.88 11.16 36.00 6.41 0.750 50.55 1936 27.99 353.91 446.25 1004.06 446.25South U2-L2 2202 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50South U2-L2 2203 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50South U10-L10 2209 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50South U10-L10 2210 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50South U11-L11 2211 14.81 11.11 36.00 6.42 0.750 50.47 1936 28.00 352.51 444.38 999.84 444.38South U3-L3 2230 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30South U3-L3 2231 17.93 13.44 7.00 5.75 0.750 10.97 1936 29.91 455.65 537.75 1209.94 537.75South U3-L3 2232 11.84 8.88 20.40 6.10 0.750 30.12 1936 29.29 294.62 355.05 798.86 355.05South U4-L4 2240 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U4-L4 2241 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U4-L4 2242 17.01 12.75 25.00 5.20 0.750 43.30 1936 28.53 412.32 510.15 1147.84 510.15South U5-L5 2250 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U5-L5 2251 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U5-L5 2252 16.99 12.74 25.00 5.81 0.750 38.70 1936 28.82 416.18 509.63 1146.66 509.63South U6-L6 2260 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U6-L6 2261 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U6-L6 2262 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U7-L7 2270 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U7-L7 2271 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U7-L7 2272 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U8-L8 2280 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30

Page 184: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

South U8-L8 2281 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U8-L8 2282 17.01 12.75 25.00 5.20 0.750 43.30 1936 28.53 412.32 510.15 1147.84 510.15South U9-L9 2290 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30South U9-L9 2291 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30South U9-L9 2292 7.81 5.86 20.40 6.85 0.750 26.82 1936 29.43 195.40 234.30 527.17 234.30South U1-L2 2301 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00South U2-L4 2302 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59South U2-L4 2303 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59South U4-L6 2304 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U4-L6 2305 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U8-L6 2306 36.44 27.33 35.50 7.61 0.750 41.98 1936 28.61 886.25 1093.13 2459.53 1093.13South U8-L6 2307 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U10-L8 2308 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59South U10-L8 2309 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59South U11-L10 2310 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00South M3-L2 2382 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30South M5-L4 2384 10.66 8.00 35.50 6.15 0.750 51.95 1936 27.88 252.61 319.80 719.55 319.80South M7-L8 2388 10.66 8.00 35.50 6.15 0.750 51.95 1936 27.88 252.61 319.80 719.55 319.80South M9-L10 2392 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30South U1-L0 2500 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26South U1-U2 2501 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26South U2-U3 2502 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U3-U4 2503 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U4-U5 2504 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U5-U6 2505 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U6-U7 2506 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U7-U8 2507 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U8-U9 2508 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U9-U10 2509 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U10-U11 2510 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26South U11-L12 2511 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26South U1-L0 2550 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U1-L0 2551 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U11-L12 2560 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U11-L12 2561 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26

Page 185: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss member forces output from STAAD.pro V8i model

Page 186: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No.Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1Output copied from STAAD Max Axial Forces

Reference ID Member Rating ID Compression

(k) Tension (k)

1 L0-L1 1100 0.00 259.172 L1-L2 1101 0.00 218.573 L2-L3 1102 0.00 465.614 L3-L4 1103 0.00 438.495 L4-L5 1104 0.00 595.686 L5-L6 1105 0.00 585.807 L6-L7 1106 0.00 609.638 L7-L8 1107 0.00 616.459 L8-L9 1108 0.00 493.52

10 L9-L10 1109 0.00 519.6711 L10-L11 1110 0.00 277.2912 L11-L12 1111 0.00 321.0413 U1-L1 1201 0.00 65.5814 U2-L2 1202 199.86 0.0015 U2-L2 1203 206.17 0.0016 U10-L10 1209 162.27 0.0017 U10-L10 1210 167.91 0.0018 U11-L11 1211 0.00 173.1319 U3-L3 1230 9.87 0.0020 U3-L3 1231 10.10 0.0021 U3-L3 1232 0.00 65.8322 U4-L4 1240 0.00 15.7923 U4-L4 1241 0.00 15.1824 U4-L4 1242 0.00 14.2525 U5-L5 1250 15.23 0.0026 U5-L5 1251 15.47 0.0027 U5-L5 1252 0.00 68.3028 U6-L6 1260 15.27 0.0029 U6-L6 1261 15.55 0.0030 U6-L6 1262 19.37 0.0031 U7-L7 1270 15.22 0.0032 U7-L7 1271 15.44 0.0033 U7-L7 1272 0.00 68.3034 U8-L8 1280 0.00 45.1635 U8-L8 1281 0.00 46.3036 U8-L8 1282 0.00 45.3737 U9-L9 1290 9.66 0.0038 U9-L9 1291 9.79 0.0039 U9-L9 1292 0.00 65.8340 U1-L2 1301 0.00 390.7141 U2-L4 1302 0.00 235.4242 U2-L4 1303 0.00 169.0443 U4-L6 1304 0.00 150.5344 U4-L6 1305 0.00 85.8045 U8-L6 1306 0.00 48.2646 U8-L6 1307 0.00 113.14

P101160439

Strength I

Page 187: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No.Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1Output copied from STAAD Max Axial Forces

Reference ID Member Rating ID Compression

(k) Tension (k)

P101160439

Strength I

47 U10-L8 1308 0.00 119.3748 U10-L8 1309 0.00 185.4649 U11-L10 1310 0.00 374.2650 M3-L2 1382 69.35 0.0051 M5-L4 1384 69.41 0.0052 M7-L8 1388 68.99 0.0053 M9-L10 1392 68.52 0.0058 U1-L0 1500 626.80 0.0059 U1-U2 1501 557.47 0.0060 U2-U3 1502 744.06 0.0061 U3-U4 1503 742.95 0.0062 U4-U5 1504 831.51 0.0063 U5-U6 1505 831.70 0.0064 U6-U7 1506 831.62 0.0065 U7-U8 1507 831.25 0.0066 U8-U9 1508 768.44 0.0067 U9-U10 1509 769.76 0.0068 U10-U11 1510 620.19 0.0069 U11-L12 1511 756.81 0.0070 U1-L0 1550 580.86 0.0071 U1-L0 1551 590.04 0.0072 U11-L12 1560 702.87 0.0073 U11-L12 1561 714.72 0.0074 L0-L1 2100 0.00 264.2875 L1-L2 2101 0.00 219.4376 L2-L3 2102 0.00 464.2277 L3-L4 2103 0.00 436.0478 L4-L5 2104 0.00 592.8979 L5-L6 2105 0.00 582.6880 L6-L7 2106 0.00 605.8581 L7-L8 2107 0.00 612.3982 L8-L9 2108 0.00 488.6183 L9-L10 2109 0.00 515.2184 L10-L11 2110 0.00 273.7585 L11-L12 2111 0.00 321.3486 U1-L1 2201 0.00 65.5587 U2-L2 2202 199.85 0.0088 U2-L2 2203 206.15 0.0089 U10-L10 2209 163.01 0.0090 U10-L10 2210 168.73 0.0091 U11-L11 2211 0.00 173.1092 U3-L3 2230 9.94 0.0093 U3-L3 2231 10.25 0.0094 U3-L3 2232 0.00 65.8195 U4-L4 2240 0.00 16.2096 U4-L4 2241 0.00 15.53

Page 188: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No.Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1Output copied from STAAD Max Axial Forces

Reference ID Member Rating ID Compression

(k) Tension (k)

P101160439

Strength I

97 U4-L4 2242 0.00 14.5998 U5-L5 2250 15.41 0.0099 U5-L5 2251 15.82 0.00

100 U5-L5 2252 0.00 68.26101 U6-L6 2260 15.36 0.00102 U6-L6 2261 15.74 0.00103 U6-L6 2262 19.55 0.00104 U7-L7 2270 15.43 0.00105 U7-L7 2271 15.86 0.00106 U7-L7 2272 0.00 68.26107 U8-L8 2280 0.00 45.21108 U8-L8 2281 0.00 46.25109 U8-L8 2282 0.00 45.32110 U9-L9 2290 9.83 0.00111 U9-L9 2291 10.15 0.00112 U9-L9 2292 0.00 65.81113 U1-L2 2301 0.00 390.71114 U2-L4 2302 0.00 235.41115 U2-L4 2303 0.00 168.93116 U4-L6 2304 0.00 150.37117 U4-L6 2305 0.00 85.65118 U8-L6 2306 0.00 48.61119 U8-L6 2307 0.00 113.54120 U10-L8 2308 0.00 119.95121 U10-L8 2309 0.00 186.30122 U11-L10 2310 0.00 375.45123 M3-L2 2382 69.45 0.00124 M5-L4 2384 69.85 0.00125 M7-L8 2388 69.50 0.00126 M9-L10 2392 68.80 0.00131 U1-L0 2500 626.93 0.00132 U1-U2 2501 558.26 0.00133 U2-U3 2502 745.37 0.00134 U3-U4 2503 744.79 0.00135 U4-U5 2504 833.68 0.00136 U5-U6 2505 834.25 0.00137 U6-U7 2506 834.39 0.00138 U7-U8 2507 834.03 0.00139 U8-U9 2508 770.86 0.00140 U9-U10 2509 771.94 0.00141 U10-U11 2510 621.32 0.00142 U11-L12 2511 756.70 0.00143 U1-L0 2550 581.76 0.00144 U1-L0 2551 590.82 0.00145 U11-L12 2560 703.31 0.00146 U11-L12 2561 715.11 0.00

Page 189: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss floor system member forces output from

STAAD.pro V8i model

Page 190: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

North 10000 0.00 -1831.97 26.232 N/A 152.6641667 26.232RG 10001 N/A -2036.425 8.079 -7.988 169.7020833 8.079

10002 0.00 -1836.4 N/A -26.276 153.0333333 26.27610003 0.00 -1832.965 26.242 N/A 152.7470833 26.24210004 N/A -2037.773 8.085 -7.982 169.8144167 8.08510005 0.00 -1837.603 N/A -26.288 153.1335833 26.28810006 0.00 -1809.411 26.008 N/A 150.78425 26.00810007 N/A -2012.844 8.056 -8.011 167.737 8.05610008 0.00 -1811.627 N/A -26.03 150.9689167 26.0310009 0.00 -1809.959 26.013 N/A 150.8299167 26.01310010 N/A -2013.647 8.061 -8.006 167.8039167 8.06110011 0.00 -1812.413 N/A -26.037 151.0344167 26.03710012 0.00 -1810.247 26.016 N/A 150.8539167 26.01610013 N/A -2013.746 8.052 -8.013 167.8121667 8.05210014 0.00 -1812.316 N/A -26.037 151.0263333 26.03710015 0.00 -1810.186 26.015 N/A 150.8488333 26.01510016 N/A -2013.862 8.059 -8.008 167.8218333 8.05910017 0.00 -1812.528 N/A -26.039 151.044 26.03910018 0.00 -1810.317 26.017 N/A 150.85975 26.01710019 N/A -2013.862 8.053 -8.014 167.8218333 8.05310020 0.00 -1812.393 N/A -26.037 151.03275 26.03710021 0.00 -1810.108 26.015 N/A 150.8423333 26.01510022 N/A -2013.745 8.058 -8.007 167.8120833 8.05810023 0.00 -1812.46 N/A -26.038 151.0383333 26.03810024 0.00 -1810.173 26.015 N/A 150.84775 26.01510025 N/A -2013.636 8.051 -8.016 167.803 8.05110026 0.00 -1812.173 N/A -26.035 151.0144167 26.03510027 0.00 -1809.442 26.008 N/A 150.7868333 26.00810028 N/A -2012.865 8.056 -8.011 167.73875 8.05610029 0.00 -1811.665 N/A -26.03 150.9720833 26.0310030 0.00 -4645.198 54.177 N/A 387.0998333 54.17710031 N/A -5766.954 36.004 -21.96 480.5795 36.00410032 0.00 -5352.275 N/A -82.153 446.0229167 82.15310033 0.00 -6050.459 89.088 N/A 504.2049167 89.08810034 N/A -6782.109 29.028 -28.943 565.17575 29.02810035 0.00 -6054.746 N/A -89.131 504.5621667 89.131

South 20000 0.00 -1879.704 26.706 N/A 156.642 26.706RG 20001 N/A -2079.578 7.993 -8.074 173.2981667 8.074

20002 0.00 -1875.264 N/A -26.662 156.272 26.66220003 0.00 -1878.684 26.696 N/A 156.557 26.696

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

Page 191: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

20004 N/A -2078.207 7.989 -8.078 173.1839167 8.07820005 0.00 -1874.043 N/A -26.65 156.17025 26.6520006 0.00 -1849.036 26.401 N/A 154.0863333 26.40120007 N/A -2049.961 8.013 -8.054 170.8300833 8.05420008 0.00 -1846.827 N/A -26.379 153.90225 26.37920009 0.00 -1848.552 26.397 N/A 154.046 26.39720010 N/A -2049.244 8.009 -8.058 170.7703333 8.05820011 0.00 -1846.171 N/A -26.373 153.8475833 26.37320012 0.00 -1848.083 26.392 N/A 154.0069167 26.39220013 N/A -2048.835 8.015 -8.05 170.73625 8.0520014 0.00 -1846.009 N/A -26.371 153.8340833 26.37120015 0.00 -1848.346 26.394 N/A 154.0288333 26.39420016 N/A -2049.023 8.01 -8.057 170.7519167 8.05720017 0.00 -1846.01 N/A -26.371 153.8341667 26.37120018 0.00 -1848.219 26.393 N/A 154.01825 26.39320019 N/A -2049.02 8.016 -8.051 170.7516667 8.05120020 0.00 -1846.134 N/A -26.372 153.8445 26.37220021 0.00 -1848.224 26.393 N/A 154.0186667 26.39320022 N/A -2048.841 8.009 -8.056 170.73675 8.05620023 0.00 -1845.88 N/A -26.37 153.8233333 26.3720024 0.00 -1848.362 26.395 N/A 154.0301667 26.39520025 N/A -2049.242 8.018 -8.05 170.7701667 8.0520026 0.00 -1846.358 N/A -26.375 153.8631667 26.37520027 0.00 -1849.08 26.402 N/A 154.09 26.40220028 N/A -2050 8.013 -8.054 170.8333333 8.05420029 0.00 -1846.879 N/A -26.38 153.9065833 26.3820030 0.00 -4690.321 54.626 N/A 390.8600833 54.62620031 N/A -5806.73 35.933 -22.03 483.8941667 35.93320032 0.00 -5389.214 N/A -82.52 449.1011667 82.5220033 0.00 -6097.884 89.559 N/A 508.157 89.55920034 N/A -6825.072 28.948 -29.023 568.756 29.02320035 0.00 -6093.594 N/A -89.517 507.7995 89.517

North 30000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 30001 0.00 -11.763 0.467 -0.467 0.98025 0.467

30002 0.00 -11.763 0.467 -0.467 0.98025 0.46730003 0.00 -11.763 0.467 -0.467 0.98025 0.46730004 0.00 -11.762 0.467 -0.467 0.980166667 0.46730005 0.00 -11.763 0.467 -0.467 0.98025 0.46730006 0.00 -11.763 0.467 -0.467 0.98025 0.46730007 0.00 -11.763 0.467 -0.467 0.98025 0.467

Page 192: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

30008 0.00 -11.763 0.467 -0.467 0.98025 0.46730009 0.00 -11.763 0.467 -0.467 0.98025 0.46730010 0.00 -11.763 0.467 -0.467 0.98025 0.46730011 0.00 -11.764 0.467 -0.467 0.980333333 0.46730012 0.00 -11.763 0.467 -0.467 0.98025 0.46730013 0.00 -11.76 0.467 -0.467 0.98 0.46730014 0.00 -11.763 0.467 -0.467 0.98025 0.46730015 0.00 -11.763 0.467 -0.467 0.98025 0.46730016 0.00 -11.763 0.467 -0.467 0.98025 0.46730017 0.00 -11.763 0.467 -0.467 0.98025 0.46730018 0.00 -11.763 0.467 -0.467 0.98025 0.46730019 0.00 -11.763 0.467 -0.467 0.98025 0.46730020 0.00 -11.763 0.467 -0.467 0.98025 0.46730021 0.00 -11.763 0.467 -0.467 0.98025 0.46730022 0.00 -11.76 0.467 -0.467 0.98 0.46730023 0.00 -11.763 0.467 -0.467 0.98025 0.46730024 0.00 -11.763 0.467 -0.467 0.98025 0.46730025 0.00 -11.763 0.467 -0.467 0.98025 0.46730026 0.00 -11.763 0.467 -0.467 0.98025 0.46730027 0.00 -11.763 0.467 -0.467 0.98025 0.46730028 0.00 -11.763 0.467 -0.467 0.98025 0.46730029 0.00 -11.763 0.467 -0.467 0.98025 0.46730030 0.00 -11.763 0.467 -0.467 0.98025 0.46730031 0.00 -11.76 0.467 -0.467 0.98 0.46730032 0.00 -11.763 0.467 -0.467 0.98025 0.46730033 0.00 -11.763 0.467 -0.467 0.98025 0.46730034 0.00 -11.763 0.467 -0.467 0.98025 0.46730035 0.00 -11.763 0.467 -0.467 0.98025 0.467

South 40000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 40001 0.00 -11.763 0.467 -0.467 0.98025 0.467

40002 0.00 -11.763 0.467 -0.467 0.98025 0.46740003 0.00 -11.763 0.467 -0.467 0.98025 0.46740004 0.00 -11.762 0.467 -0.467 0.980166667 0.46740005 0.00 -11.763 0.467 -0.467 0.98025 0.46740006 0.00 -11.763 0.467 -0.467 0.98025 0.46740007 0.00 -11.763 0.467 -0.467 0.98025 0.46740008 0.00 -11.763 0.467 -0.467 0.98025 0.46740009 0.00 -11.763 0.467 -0.467 0.98025 0.46740010 0.00 -11.763 0.467 -0.467 0.98025 0.46740011 0.00 -11.764 0.467 -0.467 0.980333333 0.467

Page 193: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

40012 0.00 -11.763 0.467 -0.467 0.98025 0.46740013 0.00 -11.76 0.467 -0.467 0.98 0.46740014 0.00 -11.763 0.467 -0.467 0.98025 0.46740015 0.00 -11.763 0.467 -0.467 0.98025 0.46740016 0.00 -11.763 0.467 -0.467 0.98025 0.46740017 0.00 -11.763 0.467 -0.467 0.98025 0.46740018 0.00 -11.763 0.467 -0.467 0.98025 0.46740019 0.00 -11.763 0.467 -0.467 0.98025 0.46740020 0.00 -11.763 0.467 -0.467 0.98025 0.46740021 0.00 -11.763 0.467 -0.467 0.98025 0.46740022 0.00 -11.76 0.467 -0.467 0.98 0.46740023 0.00 -11.763 0.467 -0.467 0.98025 0.46740024 0.00 -11.763 0.467 -0.467 0.98025 0.46740025 0.00 -11.763 0.467 -0.467 0.98025 0.46740026 0.00 -11.763 0.467 -0.467 0.98025 0.46740027 0.00 -11.763 0.467 -0.467 0.98025 0.46740028 0.00 -11.763 0.467 -0.467 0.98025 0.46740029 0.00 -11.763 0.467 -0.467 0.98025 0.46740030 0.00 -11.763 0.467 -0.467 0.98025 0.46740031 0.00 -11.76 0.467 -0.467 0.98 0.46740032 0.00 -11.763 0.467 -0.467 0.98025 0.46740033 0.00 -11.763 0.467 -0.467 0.98025 0.46740034 0.00 -11.763 0.467 -0.467 0.98025 0.46740035 0.00 -11.763 0.467 -0.467 0.98025 0.467

Floorbeam60000 0.00 -882.249 29.809 N/A 73.52075 29.80960001 N/A -964.882 2.776 N/A 80.40683333 2.77660002 N/A -1024.7 1.347 -0.896 85.39166667 1.34760003 N/A -1035.584 N/A -2.325 86.29866667 2.32560004 0.00 -882.947 N/A -29.832 73.57891667 29.83260010 0.00 -67.559 2.085 N/A 5.629916667 2.08560011 N/A -45.429 0.733 N/A 3.78575 0.73360012 N/A -48.353 0.267 -0.568 4.029416667 0.56860013 N/A -33.895 N/A -1.294 2.824583333 1.29460014 87.74 0 N/A -2.646 7.312 2.64660020 0.00 -72.444 2.221 N/A 6.037 2.22160021 N/A -52.487 0.869 N/A 4.373916667 0.86960022 N/A -52.979 0.133 -0.702 4.414916667 0.70260023 N/A -31.804 N/A -1.168 2.650333333 1.16860024 83.23 0 N/A -2.521 6.935666667 2.52160100 0.00 -1689.771 56.719 N/A 140.81425 56.719

Page 194: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60101 N/A -1795.674 3.414 N/A 149.6395 3.41460102 N/A -1891.641 1.535 -0.67 157.63675 1.53560103 N/A -1934.434 N/A -2.549 161.2028333 2.54960104 0.00 -1689.03 N/A -56.695 140.7525 56.69560110 0.00 -67.725 2.09 N/A 5.64375 2.0960111 N/A -45.69 0.738 N/A 3.8075 0.73860112 N/A -48.421 0.272 -0.564 4.035083333 0.56460113 N/A -33.815 N/A -1.288 2.817916667 1.28860114 87.54 0 N/A -2.64 7.294583333 2.6460120 0.00 -73.071 2.239 N/A 6.08925 2.23960121 N/A -53.394 0.886 N/A 4.4495 0.88660122 N/A -52.862 0.149 -0.686 4.405166667 0.68660123 N/A -31.531 N/A -1.152 2.627583333 1.15260124 82.64 0 N/A -2.504 6.886916667 2.50460200 0.00 -1682.142 56.465 N/A 140.1785 56.46560201 N/A -1786.891 3.382 N/A 148.9075833 3.38260202 N/A -1877.733 1.502 -0.702 156.47775 1.50260203 N/A -1916.305 N/A -2.582 159.6920833 2.58260204 0.00 -1680.798 N/A -56.42 140.0665 56.4260210 0.00 -60.34 1.885 N/A 5.028333333 1.88560211 N/A -40.517 0.532 N/A 3.376416667 0.53260212 N/A -43.06 0.265 -0.571 3.588333333 0.57160213 N/A -28.459 N/A -0.969 2.371583333 0.96960214 76.06 0 N/A -2.322 6.338166667 2.32260220 0.00 -62.736 1.952 N/A 5.228 1.95260221 N/A -43.997 0.599 N/A 3.666416667 0.59960222 N/A -45.245 0.197 -0.638 3.770416667 0.63860223 N/A -27.394 N/A -0.906 2.282833333 0.90660224 73.78 0 N/A -2.258 6.148083333 2.25860300 0.00 -1673.92 56.191 N/A 139.4933333 56.19160301 N/A -1777.897 3.361 N/A 148.1580833 3.36160302 N/A -1864.571 1.481 -0.724 155.3809167 1.48160303 N/A -1899.574 N/A -2.603 158.2978333 2.60360304 0.00 -1673.187 N/A -56.167 139.43225 56.16760310 0.00 -60.347 1.885 N/A 5.028916667 1.88560311 N/A -40.532 0.533 N/A 3.377666667 0.53360312 N/A -43.081 0.265 -0.57 3.590083333 0.5760313 N/A -28.448 N/A -0.968 2.370666667 0.96860314 76.04 0 N/A -2.321 6.33625 2.32160320 0.00 -63.173 1.964 N/A 5.264416667 1.96460321 N/A -44.632 0.611 N/A 3.719333333 0.611

Page 195: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60322 N/A -45.248 0.209 -0.626 3.770666667 0.62660323 N/A -27.198 N/A -0.894 2.2665 0.89460324 73.36 0 N/A -2.247 6.113166667 2.24760400 0.00 -1674.109 56.197 N/A 139.5090833 56.19760401 N/A -1777.946 3.357 N/A 148.1621667 3.35760402 N/A -1864.257 1.477 -0.727 155.35475 1.47760403 N/A -1899.007 N/A -2.607 158.2505833 2.60760404 0.00 -1672.955 N/A -56.159 139.4129167 56.15960410 0.00 -60.771 1.897 N/A 5.06425 1.89760411 N/A -41.152 0.545 N/A 3.429333333 0.54560412 N/A -43.15 0.277 -0.559 3.595833333 0.55960413 N/A -28.254 N/A -0.957 2.3545 0.95760414 75.62 0 N/A -2.309 6.301583333 2.30960420 0.00 -62.891 1.956 N/A 5.240916667 1.95660421 N/A -44.223 0.603 N/A 3.68525 0.60360422 N/A -45.246 0.202 -0.634 3.7705 0.63460423 N/A -27.322 N/A -0.902 2.276833333 0.90260424 73.62 0 N/A -2.254 6.13525 2.25460500 0.00 -1674.088 56.197 N/A 139.5073333 56.19760501 N/A -1777.946 3.357 N/A 148.1621667 3.35760502 N/A -1864.333 1.478 -0.727 155.3610833 1.47860503 N/A -1899.142 N/A -2.606 158.2618333 2.60660504 0.00 -1672.974 N/A -56.159 139.4145 56.15960510 0.00 -60.49 1.889 N/A 5.040833333 1.88960511 N/A -40.741 0.537 N/A 3.395083333 0.53760512 N/A -43.109 0.269 -0.567 3.592416667 0.56760513 N/A -28.382 N/A -0.965 2.365166667 0.96560514 75.89 0 N/A -2.317 6.3245 2.31760520 0.00 -63.157 1.963 N/A 5.263083333 1.96360521 N/A -44.609 0.611 N/A 3.717416667 0.61160522 N/A -45.25 0.209 -0.627 3.770833333 0.62760523 N/A -27.205 N/A -0.895 2.267083333 0.89560524 73.37 0 N/A -2.247 6.114416667 2.24760600 0.00 -1674.162 56.199 N/A 139.5135 56.19960601 N/A -1777.986 3.356 N/A 148.1655 3.35660602 N/A -1864.273 1.477 -0.728 155.3560833 1.47760603 N/A -1899.007 N/A -2.607 158.2505833 2.60760604 0.00 -1672.965 N/A -56.159 139.41375 56.15960610 0.00 -60.754 1.896 N/A 5.062833333 1.89660611 N/A -41.125 0.544 N/A 3.427083333 0.54460612 N/A -43.15 0.276 -0.559 3.595833333 0.559

Page 196: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60613 N/A -28.264 N/A -0.958 2.355333333 0.95860614 75.64 0 N/A -2.31 6.303416667 2.3160620 0.00 -62.892 1.956 N/A 5.241 1.95660621 N/A -44.224 0.603 N/A 3.685333333 0.60360622 N/A -45.247 0.202 -0.634 3.770583333 0.63460623 N/A -27.323 N/A -0.902 2.276916667 0.90260624 73.63 0 N/A -2.254 6.1355 2.25460700 0.00 -1674.087 56.197 N/A 139.50725 56.19760701 N/A -1777.946 3.357 N/A 148.1621667 3.35760702 N/A -1864.333 1.478 -0.727 155.3610833 1.47860703 N/A -1899.143 N/A -2.606 158.2619167 2.60660704 0.00 -1672.974 N/A -56.159 139.4145 56.15960710 0.00 -60.488 1.889 N/A 5.040666667 1.88960711 N/A -40.74 0.537 N/A 3.395 0.53760712 N/A -43.109 0.269 -0.567 3.592416667 0.56760713 N/A -28.38 N/A -0.964 2.365 0.96460714 75.89 0 N/A -2.317 6.324166667 2.31760720 0.00 -63.173 1.964 N/A 5.264416667 1.96460721 N/A -44.634 0.611 N/A 3.7195 0.61160722 N/A -45.249 0.209 -0.626 3.77075 0.62660723 N/A -27.196 N/A -0.894 2.266333333 0.89460724 73.35 0 N/A -2.246 6.112666667 2.24660800 0.00 -1674.109 56.197 N/A 139.5090833 56.19760801 N/A -1777.946 3.357 N/A 148.1621667 3.35760802 N/A -1864.26 1.477 -0.727 155.355 1.47760803 N/A -1899.012 N/A -2.607 158.251 2.60760804 0.00 -1672.957 N/A -56.159 139.4130833 56.15960810 0.00 -60.771 1.897 N/A 5.06425 1.89760811 N/A -41.149 0.544 N/A 3.429083333 0.54460812 N/A -43.149 0.277 -0.559 3.59575 0.55960813 N/A -28.258 N/A -0.957 2.354833333 0.95760814 75.63 0 N/A -2.31 6.302416667 2.3160820 0.00 -62.745 1.952 N/A 5.22875 1.95260821 N/A -44.009 0.599 N/A 3.667416667 0.59960822 N/A -45.253 0.198 -0.638 3.771083333 0.63860823 N/A -27.39 N/A -0.905 2.2825 0.90560824 73.77 0 N/A -2.258 6.147333333 2.25860900 0.00 -1673.923 56.191 N/A 139.4935833 56.19160901 N/A -1777.909 3.361 N/A 148.1590833 3.36160902 N/A -1864.589 1.481 -0.724 155.3824167 1.48160903 N/A -1899.598 N/A -2.603 158.2998333 2.603

Page 197: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60904 0.00 -1673.197 N/A -56.167 139.4330833 56.16760910 0.00 -60.34 1.885 N/A 5.028333333 1.88560911 N/A -40.517 0.532 N/A 3.376416667 0.53260912 N/A -43.073 0.265 -0.571 3.589416667 0.57160913 N/A -28.459 N/A -0.969 2.371583333 0.96960914 76.06 0 N/A -2.322 6.33825 2.32260920 0.00 -62.732 1.951 N/A 5.227666667 1.95160921 N/A -43.995 0.599 N/A 3.66625 0.59960922 N/A -45.286 0.197 -0.638 3.773833333 0.63860923 N/A -27.413 N/A -0.906 2.284416667 0.90660924 73.78 0 N/A -2.258 6.1485 2.25861000 0.00 -2519.704 84.384 N/A 209.9753333 84.38461001 N/A -2624.721 3.389 N/A 218.72675 3.38961002 N/A -2716.157 1.51 -0.695 226.3464167 1.5161003 N/A -2755.167 N/A -2.575 229.59725 2.57561004 0.00 -2519.213 N/A -84.367 209.9344167 84.36761010 0.00 -68.309 2.106 N/A 5.692416667 2.10661011 N/A -46.539 0.754 N/A 3.87825 0.75461012 N/A -48.554 0.288 -0.548 4.046166667 0.54861013 N/A -33.578 N/A -1.273 2.798166667 1.27361014 86.99 0 N/A -2.625 7.249416667 2.62561020 0.00 -72.501 2.223 N/A 6.04175 2.22361021 N/A -52.593 0.87 N/A 4.38275 0.8761022 N/A -53.062 0.135 -0.7 4.421833333 0.761023 N/A -31.845 N/A -1.167 2.65375 1.16761024 83.16 0 N/A -2.519 6.930333333 2.51961100 0.00 -5251.448 175.442 N/A 437.6206667 175.44261101 N/A -5357.291 3.414 N/A 446.4409167 3.41461102 N/A -5453.156 1.534 -0.671 454.4296667 1.53461103 N/A -5496.048 N/A -2.55 458.004 2.5561104 0.00 -5250.686 N/A -175.417 437.5571667 175.41761110 0.00 -67.733 2.09 N/A 5.644416667 2.0961111 N/A -45.706 0.738 N/A 3.808833333 0.73861112 N/A -48.484 0.272 -0.564 4.040333333 0.56461113 N/A -33.905 N/A -1.289 2.825416667 1.28961114 87.58 0 N/A -2.642 7.298083333 2.64261120 0.00 -72.33 2.218 N/A 6.0275 2.21861121 N/A -52.327 0.866 N/A 4.360583333 0.86661122 N/A -53.07 0.13 -0.705 4.4225 0.70561123 N/A -31.875 N/A -1.171 2.65625 1.17161124 83.34 0 N/A -2.524 6.94475 2.524

Page 198: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

LOAD COMB 11 Strength I

Controlling moment (k-ft)

Controlling shear (k)Rating ID

Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

61200 0.00 -2768.763 92.693 N/A 230.73025 92.69361201 N/A -2850.863 2.761 N/A 237.5719167 2.76161202 N/A -2909.485 1.332 -0.911 242.4570833 1.33261203 N/A -2919.432 N/A -2.34 243.286 2.3461204 0.00 -2767.722 N/A -92.658 230.6435 92.658

Page 199: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss floor system member capacity summary

Page 200: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

0 60000 443.34 1627.26 14.87 22.130 60001 443.34 1509.71 159.70 18.780 60002 443.34 1627.26 329.13 19.060 60003 443.34 1543.00 190.68 17.880 60004 443.34 1627.26 14.86 22.12

0A 60010 400.59 534.57 192.13 94.950A 60011 400.59 534.57 546.51 141.210A 60012 400.59 534.57 705.26 132.670A 60013 400.59 534.57 309.57 189.260A 60014 400.59 534.57 151.39 73.110B 60020 400.59 534.57 180.36 88.550B 60021 400.59 534.57 460.98 122.220B 60022 400.59 534.57 570.64 121.080B 60023 400.59 534.57 342.97 201.700B 60024 400.59 534.57 158.90 77.081 60100 426.81 1612.63 7.52 11.451 60101 421.00 1500.96 123.32 10.031 60102 426.81 1612.63 278.05 10.231 60103 421.00 1500.96 165.16 9.311 60104 426.81 1612.63 7.53 11.46

1A 60110 400.59 534.57 191.67 94.721A 60111 400.59 534.57 542.80 140.401A 60112 400.59 534.57 710.27 132.481A 60113 400.59 534.57 311.02 189.701A 60114 400.59 534.57 151.74 73.281B 60120 400.59 534.57 178.91 87.791B 60121 400.59 534.57 452.13 120.141B 60122 400.59 534.57 583.95 121.351B 60123 400.59 534.57 347.73 203.451B 60124 400.59 534.57 159.98 77.622 60200 426.81 1612.63 7.56 11.502 60201 426.81 1612.63 126.20 10.832 60202 426.81 1612.63 284.16 10.312 60203 426.81 1612.63 165.30 10.102 60204 426.81 1612.63 7.56 11.51

2A 60210 400.59 534.57 212.51 106.312A 60211 400.59 534.57 752.99 158.322A 60212 400.59 534.57 701.56 148.972A 60213 400.59 534.57 413.41 225.412A 60214 400.59 534.57 172.52 84.342B 60220 400.59 534.57 205.22 102.252B 60221 400.59 534.57 668.76 145.80

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

Page 201: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

2B 60222 400.59 534.57 627.88 141.782B 60223 400.59 534.57 442.15 234.172B 60224 400.59 534.57 177.41 86.953 60300 426.81 1612.63 7.60 11.563 60301 426.81 1612.63 126.99 10.883 60302 426.81 1612.63 288.19 10.383 60303 426.81 1514.20 163.97 9.573 60304 426.81 1612.63 7.60 11.57

3A 60310 400.59 534.57 212.51 106.303A 60311 400.59 534.57 751.58 158.273A 60312 400.59 534.57 702.79 148.903A 60313 400.59 534.57 413.83 225.493A 60314 400.59 534.57 172.59 84.373B 60320 400.59 534.57 203.97 101.543B 60321 400.59 534.57 655.63 143.733B 60322 400.59 534.57 639.92 141.773B 60323 400.59 534.57 448.09 235.863B 60324 400.59 534.57 178.28 87.454 60400 426.81 1612.63 7.59 11.564 60401 426.81 1612.63 127.14 10.884 60402 426.81 1612.63 288.97 10.384 60403 426.81 1612.63 163.72 10.194 60404 426.81 1612.63 7.60 11.57

4A 60410 400.59 534.57 211.17 105.564A 60411 400.59 534.57 735.03 155.884A 60412 400.59 534.57 716.62 148.664A 60413 400.59 534.57 418.59 227.044A 60414 400.59 534.57 173.49 84.834B 60420 400.59 534.57 204.80 102.004B 60421 400.59 534.57 664.33 145.064B 60422 400.59 534.57 631.85 141.784B 60423 400.59 534.57 444.11 234.794B 60424 400.59 534.57 177.72 87.135 60500 426.81 1612.63 7.59 11.565 60501 426.81 1612.63 127.14 10.885 60502 426.81 1612.63 288.78 10.385 60503 426.81 1612.63 163.78 10.195 60504 426.81 1612.63 7.60 11.57

5A 60510 400.59 534.57 212.06 106.055A 60511 400.59 534.57 745.98 157.455A 60512 400.59 534.57 706.51 148.815A 60513 400.59 534.57 415.12 226.02

Page 202: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

5A 60514 400.59 534.57 172.89 84.525B 60520 400.59 534.57 204.07 101.575B 60521 400.59 534.57 655.63 143.805B 60522 400.59 534.57 638.90 141.765B 60523 400.59 534.57 447.59 235.805B 60524 400.59 534.57 178.28 87.436 60600 426.81 1612.63 7.59 11.566 60601 426.81 1612.63 127.18 10.886 60602 426.81 1612.63 288.97 10.386 60603 426.81 1612.63 163.72 10.196 60604 426.81 1612.63 7.60 11.57

6A 60610 400.59 534.57 211.28 105.596A 60611 400.59 534.57 736.38 155.986A 60612 400.59 534.57 716.62 148.666A 60613 400.59 534.57 418.15 226.966A 60614 400.59 534.57 173.42 84.816B 60620 400.59 534.57 204.80 102.006B 60621 400.59 534.57 664.33 145.056B 60622 400.59 534.57 631.85 141.776B 60623 400.59 534.57 444.11 234.786B 60624 400.59 534.57 177.72 87.137 60700 426.81 1612.63 7.59 11.567 60701 426.81 1612.63 127.14 10.887 60702 426.81 1612.63 288.78 10.387 60703 426.81 1514.20 163.78 9.577 60704 426.81 1612.63 7.60 11.57

7A 60710 400.59 534.57 212.06 106.057A 60711 400.59 534.57 745.98 157.467A 60712 400.59 534.57 706.51 148.817A 60713 400.59 534.57 415.55 226.037A 60714 400.59 534.57 172.89 84.537B 60720 400.59 534.57 203.97 101.547B 60721 400.59 534.57 655.63 143.727B 60722 400.59 534.57 639.92 141.777B 60723 400.59 534.57 448.09 235.877B 60724 400.59 534.57 178.36 87.458 60800 426.81 1612.63 7.59 11.568 60801 426.81 1612.63 127.14 10.888 60802 426.81 1612.63 288.97 10.388 60803 426.81 1514.20 163.72 9.578 60804 426.81 1612.63 7.60 11.57

8A 60810 400.59 534.57 211.17 105.56

Page 203: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

8A 60811 400.59 534.57 736.38 155.898A 60812 400.59 534.57 716.62 148.678A 60813 400.59 534.57 418.59 227.018A 60814 400.59 534.57 173.42 84.828B 60820 400.59 534.57 205.22 102.248B 60821 400.59 534.57 668.76 145.768B 60822 400.59 534.57 627.88 141.768B 60823 400.59 534.57 442.64 234.208B 60824 400.59 534.57 177.41 86.969 60900 426.81 1612.63 7.60 11.569 60901 426.81 1612.63 126.99 10.889 60902 426.81 1612.63 288.19 10.389 60903 426.81 1514.20 163.97 9.579 60904 426.81 1612.63 7.60 11.57

9A 60910 400.59 534.57 212.51 106.319A 60911 400.59 534.57 752.99 158.329A 60912 400.59 534.57 701.56 148.939A 60913 400.59 534.57 413.41 225.419A 60914 400.59 534.57 172.52 84.349B 60920 400.59 534.57 205.33 102.269B 60921 400.59 534.57 668.76 145.819B 60922 400.59 534.57 627.88 141.659B 60923 400.59 534.57 442.15 234.019B 60924 400.59 534.57 177.41 86.9410 61000 426.81 1612.63 5.06 7.6810 61001 426.81 1612.63 125.94 7.3710 61002 426.81 1612.63 282.66 7.1210 61003 426.81 1612.63 165.75 7.0210 61004 426.81 1612.63 5.06 7.68

10A 61010 400.59 534.57 190.21 93.9110A 61011 400.59 534.57 531.29 137.8410A 61012 400.59 534.57 731.00 132.1210A 61013 400.59 534.57 314.68 191.0410A 61014 400.59 534.57 152.61 73.7410B 61020 400.59 534.57 180.20 88.4810B 61021 400.59 534.57 460.45 121.9710B 61022 400.59 534.57 572.27 120.8910B 61023 400.59 534.57 343.26 201.4410B 61024 400.59 534.57 159.03 77.1311 61100 426.81 1612.63 2.43 3.6811 61101 426.81 1612.63 125.02 3.6111 61102 426.81 1612.63 278.23 3.55

Page 204: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

11 61103 426.81 1612.63 167.38 3.5211 61104 426.81 1612.63 2.43 3.69

11A 61110 400.59 534.57 191.67 94.7111A 61111 400.59 534.57 542.80 140.3511A 61112 400.59 534.57 710.27 132.3111A 61113 400.59 534.57 310.78 189.2011A 61114 400.59 534.57 151.62 73.2511B 61120 400.59 534.57 180.61 88.6911B 61121 400.59 534.57 462.58 122.5911B 61122 400.59 534.57 568.21 120.8811B 61123 400.59 534.57 342.09 201.2511B 61124 400.59 534.57 158.71 76.9712 61200 443.34 1627.26 4.78 7.0512 61201 443.34 1627.26 160.57 6.8512 61202 443.34 1627.26 332.84 6.7112 61203 443.34 1627.26 189.46 6.6912 61204 443.34 1627.26 4.78 7.06

Page 205: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

North 10000 428.23 1480.88 16.32 9.70North 10001 428.23 1480.88 53.01 8.73North 10002 428.23 1483.09 16.30 9.69North 10003 428.23 1483.09 16.32 9.71North 10004 428.23 1483.09 52.97 8.73North 10005 428.23 1483.09 16.29 9.68North 10006 428.23 1483.09 16.47 9.84North 10007 428.23 1483.09 53.16 8.84North 10008 428.23 1483.09 16.45 9.82North 10009 428.23 1483.09 16.46 9.83North 10010 428.23 1483.09 53.12 8.84North 10011 428.23 1483.09 16.45 9.82North 10012 428.23 1483.09 16.46 9.83North 10013 428.23 1483.09 53.18 8.84North 10014 428.23 1483.09 16.45 9.82North 10015 428.23 1483.09 16.46 9.83North 10016 428.23 1483.09 53.14 8.84North 10017 428.23 1483.09 16.45 9.82North 10018 428.23 1483.09 16.46 9.83North 10019 428.23 1483.09 53.18 8.84North 10020 428.23 1483.09 16.45 9.82North 10021 428.23 1483.09 16.46 9.83North 10022 428.23 1483.09 53.14 8.84North 10023 428.23 1483.09 16.45 9.82North 10024 428.23 1483.09 16.46 9.83North 10025 428.23 1483.09 53.19 8.84North 10026 428.23 1483.09 16.45 9.82North 10027 428.23 1483.09 16.47 9.84North 10028 428.23 1483.09 53.16 8.84North 10029 428.23 1483.09 16.45 9.82North 10030 428.23 1483.09 7.90 3.83North 10031 428.23 1483.09 11.89 3.09North 10032 428.23 1483.09 5.21 3.33North 10033 428.23 1483.09 4.81 2.94North 10034 428.23 1483.09 14.75 2.62North 10035 428.23 1483.09 4.80 2.94South 20000 428.23 1480.88 16.03 9.45South 20001 428.23 1480.88 53.04 8.55South 20002 428.23 1483.09 16.06 9.49South 20003 428.23 1480.88 16.04 9.46South 20004 428.23 1483.09 53.01 8.56

Running Girder Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedMoment

C/D

Page 206: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Running Girder Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedMoment

C/D

South 20005 428.23 1483.09 16.07 9.50South 20006 428.23 1483.09 16.22 9.63South 20007 428.23 1483.09 53.17 8.68South 20008 428.23 1483.09 16.23 9.64South 20009 428.23 1483.09 16.22 9.63South 20010 428.23 1483.09 53.14 8.68South 20011 428.23 1483.09 16.24 9.64South 20012 428.23 1483.09 16.23 9.63South 20013 428.23 1483.09 53.20 8.69South 20014 428.23 1483.09 16.24 9.64South 20015 428.23 1483.09 16.22 9.63South 20016 428.23 1483.09 53.15 8.69South 20017 428.23 1483.09 16.24 9.64South 20018 428.23 1483.09 16.23 9.63South 20019 428.23 1483.09 53.19 8.69South 20020 428.23 1483.09 16.24 9.64South 20021 428.23 1483.09 16.23 9.63South 20022 428.23 1483.09 53.16 8.69South 20023 428.23 1483.09 16.24 9.64South 20024 428.23 1483.09 16.22 9.63South 20025 428.23 1483.09 53.20 8.68South 20026 428.23 1483.09 16.24 9.64South 20027 428.23 1483.09 16.22 9.62South 20028 428.23 1483.09 53.17 8.68South 20029 428.23 1483.09 16.23 9.64South 20030 428.23 1483.09 7.84 3.79South 20031 428.23 1483.09 11.92 3.06South 20032 428.23 1483.09 5.19 3.30South 20033 428.23 1483.09 4.78 2.92South 20034 428.23 1483.09 14.75 2.61South 20035 428.23 1483.09 4.78 2.92

Page 207: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

North 30000 152.24 201.05 325.99 205.10North 30001 152.24 201.05 325.99 205.10North 30002 152.24 201.05 325.99 205.10North 30003 152.24 201.05 325.99 205.10North 30004 152.24 201.05 325.99 205.12North 30005 152.24 201.05 325.99 205.10North 30006 152.24 201.05 325.99 205.10North 30007 152.24 201.05 325.99 205.10North 30008 152.24 201.05 325.99 205.10North 30009 152.24 201.05 325.99 205.10North 30010 152.24 201.05 325.99 205.10North 30011 152.24 201.05 325.99 205.08North 30012 152.24 201.05 325.99 205.10North 30013 152.24 201.05 325.99 205.15North 30014 152.24 201.05 325.99 205.10North 30015 152.24 201.05 325.99 205.10North 30016 152.24 201.05 325.99 205.10North 30017 152.24 201.05 325.99 205.10North 30018 152.24 201.05 325.99 205.10North 30019 152.24 201.05 325.99 205.10North 30020 152.24 201.05 325.99 205.10North 30021 152.24 201.05 325.99 205.10North 30022 152.24 201.05 325.99 205.15North 30023 152.24 201.05 325.99 205.10North 30024 152.24 201.05 325.99 205.10North 30025 152.24 201.05 325.99 205.10North 30026 152.24 201.05 325.99 205.10North 30027 152.24 201.05 325.99 205.10North 30028 152.24 201.05 325.99 205.10North 30029 152.24 201.05 325.99 205.10North 30030 152.24 201.05 325.99 205.10North 30031 152.24 201.05 325.99 205.15North 30032 152.24 201.05 325.99 205.10North 30033 152.24 201.05 325.99 205.10North 30034 152.24 201.05 325.99 205.10North 30035 152.24 201.05 325.99 205.10South 40000 152.24 201.05 325.99 205.10South 40001 152.24 201.05 325.99 205.10South 40002 152.24 201.05 325.99 205.10South 40003 152.24 201.05 325.99 205.10South 40004 152.24 201.05 325.99 205.12

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedStringer Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

Page 208: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedStringer Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

South 40005 152.24 201.05 325.99 205.10South 40006 152.24 201.05 325.99 205.10South 40007 152.24 201.05 325.99 205.10South 40008 152.24 201.05 325.99 205.10South 40009 152.24 201.05 325.99 205.10South 40010 152.24 201.05 325.99 205.10South 40011 152.24 201.05 325.99 205.08South 40012 152.24 201.05 325.99 205.10South 40013 152.24 201.05 325.99 205.15South 40014 152.24 201.05 325.99 205.10South 40015 152.24 201.05 325.99 205.10South 40016 152.24 201.05 325.99 205.10South 40017 152.24 201.05 325.99 205.10South 40018 152.24 201.05 325.99 205.10South 40019 152.24 201.05 325.99 205.10South 40020 152.24 201.05 325.99 205.10South 40021 152.24 201.05 325.99 205.10South 40022 152.24 201.05 325.99 205.15South 40023 152.24 201.05 325.99 205.10South 40024 152.24 201.05 325.99 205.10South 40025 152.24 201.05 325.99 205.10South 40026 152.24 201.05 325.99 205.10South 40027 152.24 201.05 325.99 205.10South 40028 152.24 201.05 325.99 205.10South 40029 152.24 201.05 325.99 205.10South 40030 152.24 201.05 325.99 205.10South 40031 152.24 201.05 325.99 205.15South 40032 152.24 201.05 325.99 205.10South 40033 152.24 201.05 325.99 205.10South 40034 152.24 201.05 325.99 205.10South 40035 152.24 201.05 325.99 205.10

Page 209: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss member capacity to demand ratios

Page 210: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1All phases will have the same force results for Span 1Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

North L0-L1 1100 N/A 4.34North L1-L2 1101 N/A 5.14North L2-L3 1102 N/A 4.04North L3-L4 1103 N/A 4.29North L4-L5 1104 N/A 4.02North L5-L6 1105 N/A 4.09North L6-L7 1106 N/A 3.93North L7-L8 1107 N/A 3.88North L8-L9 1108 N/A 3.80North L9-L10 1109 N/A 3.62North L10-L11 1110 N/A 4.05North L11-L12 1111 N/A 3.50North U1-L1 1201 N/A 8.61North U2-L2 1202 4.21 N/ANorth U2-L2 1203 3.98 N/ANorth U10-L10 1209 5.19 N/ANorth U10-L10 1210 4.55 N/ANorth U11-L11 1211 N/A 3.26North U3-L3 1230 47.50 N/ANorth U3-L3 1231 47.31 N/ANorth U3-L3 1232 N/A 8.57North U4-L4 1240 N/A 35.74North U4-L4 1241 N/A 37.17North U4-L4 1242 N/A 39.60North U5-L5 1250 30.35 N/ANorth U5-L5 1251 30.99 N/ANorth U5-L5 1252 N/A 8.26North U6-L6 1260 30.29 N/ANorth U6-L6 1261 30.83 N/ANorth U6-L6 1262 23.67 N/ANorth U7-L7 1270 30.39 N/ANorth U7-L7 1271 31.06 N/ANorth U7-L7 1272 N/A 7.46North U8-L8 1280 N/A 12.50North U8-L8 1281 N/A 12.19

Span 1 Truss Capacity/Demand

ratios**

Dead Load + Live LoadMember CapacityCapacity/Demand =

Compression** Tension**

Truss Member Rating IDAll PhasesStrength I

Compression Tension Compression** Tension**

Page 211: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1All phases will have the same force results for Span 1Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load casesSpan 1 Truss

Capacity/Demand ratios**

Dead Load + Live LoadMember CapacityCapacity/Demand =

Compression** Tension**

Truss Member Rating IDAll PhasesStrength I

Compression Tension Compression** Tension**

North U8-L8 1282 N/A 11.24North U9-L9 1290 48.50 N/ANorth U9-L9 1291 48.83 N/ANorth U9-L9 1292 N/A 9.60North U1-L2 1301 N/A 2.92North U2-L4 1302 N/A 4.68North U2-L4 1303 N/A 6.52North U4-L6 1304 N/A 7.32North U4-L6 1305 N/A 12.85North U8-L6 1306 N/A 22.85North U8-L6 1307 N/A 9.75North U10-L8 1308 N/A 9.24North U10-L8 1309 N/A 5.95North U11-L10 1310 N/A 3.05North M3-L2 1382 6.32 N/ANorth M5-L4 1384 6.20 N/ANorth M7-L8 1388 6.56 N/ANorth M9-L10 1392 7.45 N/ANorth U1-L0 1500 2.77 N/ANorth U1-U2 1501 3.12 N/ANorth U2-U3 1502 2.98 N/ANorth U3-U4 1503 2.98 N/ANorth U4-U5 1504 2.67 N/ANorth U5-U6 1505 2.67 N/ANorth U6-U7 1506 2.67 N/ANorth U7-U8 1507 2.67 N/ANorth U8-U9 1508 2.89 N/ANorth U9-U10 1509 2.88 N/ANorth U10-U11 1510 2.80 N/ANorth U11-L12 1511 2.30 N/ANorth U1-L0 1550 3.03 N/ANorth U1-L0 1551 2.98 N/ANorth U11-L12 1560 2.50 N/ANorth U11-L12 1561 2.46 N/A

Page 212: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1All phases will have the same force results for Span 1Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load casesSpan 1 Truss

Capacity/Demand ratios**

Dead Load + Live LoadMember CapacityCapacity/Demand =

Compression** Tension**

Truss Member Rating IDAll PhasesStrength I

Compression Tension Compression** Tension**

South L0-L1 2100 N/A 3.21South L1-L2 2101 N/A 5.12South L2-L3 2102 N/A 4.05South L3-L4 2103 N/A 4.31South L4-L5 2104 N/A 4.04South L5-L6 2105 N/A 4.11South L6-L7 2106 N/A 3.95South L7-L8 2107 N/A 3.91South L8-L9 2108 N/A 3.81South L9-L10 2109 N/A 3.58South L10-L11 2110 N/A 4.11South L11-L12 2111 N/A 3.50South U1-L1 2201 N/A 6.81South U2-L2 2202 4.21 N/ASouth U2-L2 2203 3.98 N/ASouth U10-L10 2209 5.16 N/ASouth U10-L10 2210 4.86 N/ASouth U11-L11 2211 N/A 2.57South U3-L3 2230 47.17 N/ASouth U3-L3 2231 44.44 N/ASouth U3-L3 2232 N/A 5.40South U4-L4 2240 N/A 34.82South U4-L4 2241 N/A 36.34South U4-L4 2242 N/A 34.96South U5-L5 2250 30.01 N/ASouth U5-L5 2251 30.31 N/ASouth U5-L5 2252 N/A 7.47South U6-L6 2260 30.11 N/ASouth U6-L6 2261 30.46 N/ASouth U6-L6 2262 23.45 N/ASouth U7-L7 2270 29.97 N/ASouth U7-L7 2271 30.24 N/ASouth U7-L7 2272 N/A 8.27South U8-L8 2280 N/A 12.48South U8-L8 2281 N/A 12.20

Page 213: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1All phases will have the same force results for Span 1Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load casesSpan 1 Truss

Capacity/Demand ratios**

Dead Load + Live LoadMember CapacityCapacity/Demand =

Compression** Tension**

Truss Member Rating IDAll PhasesStrength I

Compression Tension Compression** Tension**

South U8-L8 2282 N/A 11.26South U9-L9 2290 47.66 N/ASouth U9-L9 2291 47.12 N/ASouth U9-L9 2292 N/A 3.56South U1-L2 2301 N/A 2.92South U2-L4 2302 N/A 4.68South U2-L4 2303 N/A 6.53South U4-L6 2304 N/A 7.33South U4-L6 2305 N/A 12.87South U8-L6 2306 N/A 22.49South U8-L6 2307 N/A 9.71South U10-L8 2308 N/A 9.19South U10-L8 2309 N/A 5.92South U11-L10 2310 N/A 3.04South M3-L2 2382 6.31 N/ASouth M5-L4 2384 3.62 N/ASouth M7-L8 2388 3.63 N/ASouth M9-L10 2392 6.37 N/ASouth U1-L0 2500 2.77 N/ASouth U1-U2 2501 3.11 N/ASouth U2-U3 2502 2.97 N/ASouth U3-U4 2503 2.98 N/ASouth U4-U5 2504 2.66 N/ASouth U5-U6 2505 2.66 N/ASouth U6-U7 2506 2.66 N/ASouth U7-U8 2507 2.66 N/ASouth U8-U9 2508 2.88 N/ASouth U9-U10 2509 2.87 N/ASouth U10-U11 2510 2.80 N/ASouth U11-L12 2511 2.30 N/ASouth U1-L0 2550 3.02 N/ASouth U1-L0 2551 2.98 N/ASouth U11-L12 2560 2.50 N/ASouth U11-L12 2561 2.46 N/A

Page 214: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 1

Truss floor system member capacity to demand ratios

Page 215: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 1All phases will have the same force results for Span 1Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

Main Floorbeam 0 100 17.88 14.86Main Floorbeam 1 110 9.31 7.52Main Floorbeam 2 120 10.10 7.56Main Floorbeam 3 130 9.57 7.60Main Floorbeam 4 140 10.19 7.59Main Floorbeam 5 150 10.19 7.59Main Floorbeam 6 160 10.19 7.59Main Floorbeam 7 170 9.57 7.59Main Floorbeam 8 180 9.57 7.59Main Floorbeam 9 190 9.57 7.60

Main Floorbeam 10 200 7.02 5.06Main Floorbeam 11 210 3.52 2.43Main Floorbeam 12 220 6.69 4.78

Intermediate Floorbeam 0A 101 73.11 151.39Intermediate Floorbeam 0B 102 77.08 158.90Intermediate Floorbeam 1A 111 73.28 151.74Intermediate Floorbeam 1B 112 77.62 159.98Intermediate Floorbeam 2A 121 84.34 172.52Intermediate Floorbeam 2B 122 86.95 177.41Intermediate Floorbeam 3A 131 84.37 172.59Intermediate Floorbeam 3B 132 87.45 178.28Intermediate Floorbeam 4A 141 84.83 173.49Intermediate Floorbeam 4B 142 87.13 177.72Intermediate Floorbeam 5A 151 84.52 172.89Intermediate Floorbeam 5B 152 87.43 178.28Intermediate Floorbeam 6A 161 84.81 173.42Intermediate Floorbeam 6B 162 87.13 177.72Intermediate Floorbeam 7A 171 84.53 172.89Intermediate Floorbeam 7B 172 87.45 178.36Intermediate Floorbeam 8A 181 84.82 173.42Intermediate Floorbeam 8B 182 86.96 177.41Intermediate Floorbeam 9A 191 84.34 172.52Intermediate Floorbeam 9B 192 86.94 177.41

Intermediate Floorbeam 10A 201 73.74 152.61Intermediate Floorbeam 10B 202 77.13 159.03Intermediate Floorbeam 11A 211 73.25 151.62Intermediate Floorbeam 11B 212 76.97 158.71

North Running Girder - 2.62 4.80South Running Girder - 2.61 4.78

North Stringer - 205.08 325.99South Stringer - 205.08 325.99

Capacity/Demand =

Span 1 Truss Capacity/Demand

ratios

Member CapacityDead Load + Live Load

Member Ref ID

All PhasesStrength I

Moment Shear

Page 216: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

As-inspected section property calculations

Page 217: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57812 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.0000 0.0000 -17.57813 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -14.06 -35.16 0.00 -35.16Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 78.89 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 591.67 in4 Sbott. = 78.89 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 17.9250 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.7453 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

P101160439

Span 2 North Truss U7-L7

Gross Section (without Losses)

Page 218: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.9688 -59.5322 -59.53252 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.9688 -59.5322 -59.53253 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.88 -15.00 0.00 -119.06 -119.06Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 113.41 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 907.26 in4 Sleft = 113.41 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 17.9250 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.1144 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 219: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0473 -0.0038 -26.78882 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0473 -0.0038 -26.78883 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8027 -64.6708 -64.72004 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8027 -64.6708 -64.72005 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2223 -72.8968 -72.94606 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2223 -72.8968 -72.94607 0.1250 15.0000 -1.8750 7.5000 -14.0625 -35.1563 0.0473 -0.0042 -35.16058 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -10.89 -80.77 -88.92 -275.15 -364.07Contribution from shifting centroid: Ad2 = 0.07

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 7.5473 in Stop = 56.83 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 423.53 in4 Sbott. = 56.12 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 7.4527 in A = 19.1850 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 7.5473 in rx = 4.6985 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

P101160439

Span 2 North Truss U9-L9

Gross Section (without Losses)

Page 220: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.1250 -1.7125 0.7125 -1.2202 -0.0022 8.0633 -111.3400 -111.34222 13.7000 0.1250 -1.7125 15.2875 -26.1798 -0.0022 6.5117 -72.6149 -72.61713 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 6.4508 -58.1531 -58.69144 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 4.8992 -33.5437 -34.08205 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 6.4508 -58.1531 -58.69146 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 4.8992 -33.5437 -34.08207 15.0000 0.1250 -1.8750 0.0625 -0.1172 -0.0024 8.7133 -142.3514 -142.35398 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -10.89 -72.24 -2.16 -509.70 -511.86Contribution from shifting centroid: Ad2 = 18.09889455

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.7758 in Sright = 151.88 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 1097.25 in4 Sleft = 125.03 in3

cright = 8.0000 in A = 30.0750 in2 cright = 7.2242 in A = 19.1850 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.7758 in ry = 7.5626 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 221: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.8375 in *A2 = tw = 0.8375 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 7/16" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 11.4738 7.5000 86.0531 179.4590 0.0000 0.0000 179.4590

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 11.4738 7.5000 86.0531 179.4590 0.0000 0.0000 179.4590

Total 31.79 238.41 359.23 455.09 814.32A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0399 -0.0027 -26.78772 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.0399 -0.0027 -26.78773 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8101 -64.8127 -64.86194 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8101 -64.8127 -64.86195 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2149 -72.7463 -72.79556 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2149 -72.7463 -72.79557 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -9.02 -66.70 -53.77 -275.12 -328.89Contribution from shifting centroid: Ad2 = 0.05

y-bar = 7.5000 in Stop = 108.58 in3y-bar = 7.5399 in Stop = 65.08 in3

Ix = 814.32 in4 Sbott. = 108.58 in3 Ix = 485.48 in4 Sbott. = 64.39 in3

ctop = 7.5000 in A = 31.7875 in2 ctop = 7.4601 in A = 22.7725 in2

cbottom = 7.5000 in rx = 5.0614 in cbottom = 7.5399 in rx = 4.6172 in

Section Losses

P101160439

Span 2 North Truss M7-L8

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 222: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/30/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 11.4738 0.4188 4.8046 0.6706 7.5813 659.4578 660.1285

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 11.4738 15.5813 178.7754 0.6706 7.5813 659.4578 660.1285

Total 31.79 254.30 9.86 1669.78 1679.63A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.1250 -1.7125 0.7750 -1.3272 -0.0022 7.2250 -89.3936 -89.39582 13.7000 0.1250 -1.7125 15.2250 -26.0728 -0.0022 7.2250 -89.3936 -89.39583 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -9.02 -72.12 -2.16 -358.82 -360.97Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 209.95 in3x-bar = 8.0000 in Sright = 164.83 in3

Iy = 1679.63 in4 Sleft = 209.95 in3 Iy = 1318.66 in4 Sleft = 164.83 in3

cright = 8.0000 in A = 31.7875 in2 cright = 8.0000 in A = 22.7725 in2

cleft = 8.0000 in ry = 7.2691 in cleft = 8.0000 in ry = 7.6096 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 30.1981 in2 Iy = 1515.8682 in2 Ix = 734.922 in2

ry = 7.085 in rx = 4.9332 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 223: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.8711 -1.2993 -28.08432 0.1250 13.7000 -1.7125 7.5000 -12.8438 -26.7849 0.8711 -1.2993 -28.08433 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 7.7211 -83.3115 -83.36074 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 7.7211 -83.3115 -83.36075 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.8711 -0.7113 -18.28946 0.0625 15.0000 -0.9375 7.5000 -7.0313 -17.5781 0.8711 -0.7113 -18.28947 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -8.10 -79.86 -88.82 -170.64 -259.47Contribution from shifting centroid: Ad2 = 22.82

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 6.6289 in Stop = 65.81 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 550.88 in4 Sbott. = 83.10 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 8.3711 in A = 21.9800 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 6.6289 in rx = 5.0063 in

Section Losses

P101160439

Span 2 North Truss M9-L10

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 224: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 1 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.1250 -1.7125 0.7125 -1.2202 -0.0022 7.2875 -90.9469 -90.94912 13.7000 0.1250 -1.7125 15.2875 -26.1798 -0.0022 7.2875 -90.9469 -90.94913 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 15.0000 0.0625 -0.9375 0.0313 -0.0293 -0.0003 7.9688 -59.5322 -59.53256 15.0000 0.0625 -0.9375 15.9688 -14.9707 -0.0003 7.9688 -59.5322 -59.53257 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -8.10 -64.76 -1.08 -390.97 -392.05Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.0000 in Sright = 149.87 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 1198.96 in4 Sleft = 149.87 in3

cright = 8.0000 in A = 30.0750 in2 cright = 8.0000 in A = 21.9800 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.0000 in ry = 7.3856 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 225: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

section at pin with loss

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20002 0.4000 6.0000 -2.4000 7.5000 -18.0000 -7.2000 0.0000 0.0000 -7.20003 0.0625 0.5000 -0.0313 4.2500 -0.1328 -0.0007 3.2500 -0.3301 -0.33074 0.0625 0.5000 -0.0313 10.7500 -0.3359 -0.0007 3.2500 -0.3301 -0.33075 0.1250 0.5000 -0.0625 4.2500 -0.2656 -0.0013 3.2500 -0.6602 -0.66156 0.1250 0.5000 -0.0625 10.7500 -0.6719 -0.0013 3.2500 -0.6602 -0.66157 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.99 -37.41 -14.40 -1.98 -16.38Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 81.39 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 610.44 in4 Sbott. = 81.39 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 14.8125 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 6.4196 in

Section Losses

P101160439

Span 2 South Truss U11-L11

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 226: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 6.0000 0.4000 -2.4000 0.2000 -0.4800 -0.0320 7.7666 -144.7697 -144.80172 6.0000 0.4000 -2.4000 15.8000 -37.9200 -0.0320 7.8334 -147.2677 -147.29973 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9354 -1.9678 -1.96784 0.5000 0.0625 -0.0313 0.0313 -0.0010 0.0000 7.9354 -1.9678 -1.96785 0.5000 0.1250 -0.0625 15.9375 -0.9961 -0.0001 7.9709 -3.9709 -3.97106 0.5000 0.1250 -0.0625 15.9375 -0.9961 -0.0001 7.9709 -3.9709 -3.97107 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -4.99 -40.39 -0.06 -303.91 -303.98Contribution from shifting centroid: Ad2 = 0.022034824

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 7.9666 in Sright = 89.92 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 722.37 in4 Sleft = 90.67 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0334 in A = 14.8125 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 7.9666 in ry = 6.9834 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 227: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

Total 19.80 148.50 171.73 455.09 626.82A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 15.0000 -1.8750 7.5000 -14.0625 -35.1563 0.0000 0.0000 -35.15632 0.1250 15.0000 -1.8750 7.5000 -14.0625 -35.1563 0.0000 0.0000 -35.15633 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.75 -28.13 -70.31 0.00 -70.31Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.5000 in Stop = 74.20 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 556.51 in4 Sbott. = 74.20 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 16.0500 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.8884 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

P101160439

Span 2 South Truss U7-L7

Gross Section (without Losses)

Page 228: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 5.4800 0.2000 1.0960 0.0731 7.8000 333.4032 333.4763

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 5.4800 15.8000 86.5840 0.0731 7.8000 333.4032 333.4763

Total 19.80 158.40 8.66 1017.67 1026.33A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 15.0000 0.1250 -1.8750 0.0625 -0.1172 -0.0024 7.9375 -118.1323 -118.13482 15.0000 0.1250 -1.8750 15.9375 -29.8828 -0.0024 7.9375 -118.1323 -118.13483 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.75 -30.00 0.00 -236.26 -236.27Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 128.29 in3x-bar = 8.0000 in Sright = 98.76 in3

Iy = 1026.33 in4 Sleft = 128.29 in3 Iy = 790.06 in4 Sleft = 98.76 in3

cright = 8.0000 in A = 19.8000 in2 cright = 8.0000 in A = 16.0500 in2

cleft = 8.0000 in ry = 7.1996 in cleft = 8.0000 in ry = 7.0160 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 926.261 in2 Ix = 565.7082 in2

ry = 7.0173 in rx = 5.4841 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 229: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

*A1 = tw = 0.7750 in *A2 = tw = 0.7750 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Channel Back-to-Back DistanceG = 16.0000 in

*This has an additional 3/8" web plate on inside face of each

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 10.6175 7.5000 79.6313 166.0665 0.0000 0.0000 166.0665

Total 30.08 225.56 332.44 455.09 787.53A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 13.7000 -0.8563 7.5000 -6.4219 -13.3925 0.0399 -0.0014 -13.39382 0.0625 13.7000 -0.8563 7.5000 -6.4219 -13.3925 0.0399 -0.0014 -13.39383 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8101 -64.8127 -64.86194 2.1500 0.6500 -1.3975 14.3500 -20.0541 -0.0492 6.8101 -64.8127 -64.86195 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2149 -72.7463 -72.79556 2.1500 0.6500 -1.3975 0.3250 -0.4542 -0.0492 7.2149 -72.7463 -72.79557 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.30 -53.86 -26.98 -275.12 -302.10Contribution from shifting centroid: Ad2 = 0.05

y-bar = 7.5000 in Stop = 105.00 in3y-bar = 7.5399 in Stop = 65.08 in3

Ix = 787.53 in4 Sbott. = 105.00 in3 Ix = 485.48 in4 Sbott. = 64.39 in3

ctop = 7.5000 in A = 30.0750 in2 ctop = 7.4601 in A = 22.7725 in2

cbottom = 7.5000 in rx = 5.1172 in cbottom = 7.5399 in rx = 4.6172 in

As-Built Section Properties As-Inspected Section Properties

Section Losses

P101160439

Span 2 South Truss U9-L9

Gross Section (without Losses)

Page 230: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 1.7000 3.7570 2.1290 6.3000 87.7149 89.8439Web 10.6175 0.3875 4.1143 0.5314 7.6125 615.2858 615.8172

2 Top Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Bottom Leg 2.2100 14.3000 31.6030 2.1290 6.3000 87.7149 89.8439Web 10.6175 15.6125 165.7657 0.5314 7.6125 615.2858 615.8172

Total 30.08 240.60 9.58 1581.43 1591.01A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 13.7000 0.0625 -0.8563 0.7438 -0.6368 -0.0003 7.2563 -45.0843 -45.08462 13.7000 0.0625 -0.8563 15.2563 -13.0632 -0.0003 7.2563 -45.0843 -45.08463 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54574 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54575 0.6500 2.1500 -1.3975 2.3250 -3.2492 -0.5383 5.6750 -45.0074 -45.54576 0.6500 2.1500 -1.3975 13.6750 -19.1108 -0.5383 5.6750 -45.0074 -45.54577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -7.30 -58.42 -2.15 -270.20 -272.35Contribution from shifting centroid: Ad2 = 0

x-bar = 8.0000 in Sright = 198.88 in3x-bar = 8.0000 in Sright = 164.83 in3

Iy = 1591.01 in4 Sleft = 198.88 in3 Iy = 1318.66 in4 Sleft = 164.83 in3

cright = 8.0000 in A = 30.0750 in2 cright = 8.0000 in A = 22.7725 in2

cleft = 8.0000 in ry = 7.2733 in cleft = 8.0000 in ry = 7.6096 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 28.5713 in2 Iy = 1435.8864 in2 Ix = 710.7486 in2

ry = 7.0892 in rx = 4.9876 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 231: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Historic S20x65 AISC Section Properties

A1 = tw = 0.5000 in A = 19.1 in2

B1 = d = 20.0000 in Ix = 1169.5 in4

A2 = tf = 0.7900 in Sx = 117.0 in3

B2 = bf = 6.2500 in rx = 7.8 inA3 = tf = 0.7900 in Iy = 27.9 in4

B3 = bf = 6.2500 in ry = 1.21 intw = 0.7600 in

do = N/A in d = 20.0000 intf = 0.79 in

bf = 6.2500 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Web 9.2100 10.0000 92.1000 260.4100 0.0000 0.0000 260.41002 Top Flange 4.9375 19.6050 96.7997 0.2568 9.6050 455.514 455.7713 Bottom Flange 4.9375 0.3950 1.9503 0.2568 9.6050 455.514 455.771

Total 19.09 190.85 260.92 911.03 1171.95A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 5.5000 0.4775 -2.6263 19.7613 -51.8980 -0.0499 11.7357 -361.7020 -361.75192 0.7500 0.7900 -0.5925 19.6050 -11.6160 -0.0308 11.5794 -79.4440 -79.47483 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.22 -63.51 -0.08 -441.15 -441.23Contribution from shifting centroid: Ad2 = 74.40

y-bar = 10.0000 in Stop = 117.20 in3y-bar = 8.0256 in Stop = 67.24 in3

Ix = 1171.95 in4 Sbott. = 117.20 in3 Ix = 805.12 in4 Sbott. = 100.32 in3

ctop = 10.0000 in A = 19.0850 in2 ctop = 11.9744 in A = 15.8663 in2

cbottom = 10.0000 in rx = 7.8363 in cbottom = 8.0256 in rx = 7.1235 inJ = 2.8218 in4 Z = 137.26 in3

Z = 137.26 in3

Section Losses

P101160439

do = stiffener spacing for shear check for no stiffners use "N/A" Span 2 Typical Stringer

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 232: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Web 9.2100 3.1250 28.7813 0.1919 0.0000 0.0000 0.19192 Top Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.07263 Bottom Flange 4.9375 3.1250 15.4297 16.0726 0.0000 0.0000 16.0726

Total 19.09 59.64 32.34 0.00 32.34A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.4775 5.5000 -2.6263 3.5400 -9.2969 -6.6203 0.3810 -0.3812 -7.00162 0.7900 0.7500 -0.5925 0.3750 -0.2222 -0.0278 2.7840 -4.5923 -4.62003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.22 -9.52 -6.65 -4.97 -11.62Contribution from shifting centroid: Ad2 = 0.02

x-bar = 3.1250 in Sright = 10.35 in3x-bar = 3.1590 in Sright = 6.71 in3

Iy = 32.34 in4 Sleft = 10.35 in3 Iy = 20.74 in4 Sleft = 6.56 in3

cright = 3.1250 in A = 19.0850 in2 cright = 3.0910 in A = 15.8663 in2

cleft = 3.1250 in ry = 1.3017 in cleft = 3.1590 in ry = 1.1432 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.1260 in2 Iy = 25.1798 in2 Ix = 1055.4738 in2 Stop = 105.5474 in3

ry = 1.1786 in rx = 7.6308n Sbot = 105.5474 in3

Z = 130.3984 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 292.5 k-ft 263.87 k-ft 168.1 k-ft 168.09 k-ft AB = As-BuiltV 160.25 k 152.24 k 160.25 k 152.24 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 233: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 18.6434 -1216.5117 -1216.52992 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -122.94 -0.02 -1216.51 -1216.53Contribution from shifting centroid: Ad2 = 74.61

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 16.4816 in Stop = 610.36 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 11455.37 in4 Sbott. = 695.04 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 18.7684 in A = 53.5703 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 16.4816 in rx = 14.6232 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 Floorbeam 7 by north stringer

Gross Section (without Losses)

1

Page 234: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0000 0.0000 -57.16672 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -24.50 -57.17 0.00 -57.17Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0000 in Sright = 60.07 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 420.46 in4 Sleft = 60.07 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 53.5703 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.8016 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1525.89 k-ft 1525.89 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 235: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.3750 -5.2500 35.0625 -184.0781 -0.0615 19.1148 -1918.2162 -1918.27772 0.2500 2.0000 -0.5000 6.6875 -3.3438 -0.1667 9.2602 -42.8759 -43.04263 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.75 -187.42 -0.23 -1961.09 -1961.32Contribution from shifting centroid: Ad2 = 160.55

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 15.9477 in Stop = 559.34 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 10796.53 in4 Sbott. = 676.99 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 19.3023 in A = 51.3203 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 15.9477 in rx = 14.5043 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 Floorbeam 7 by south stringer

Gross Section (without Losses)

1

Page 236: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.3750 14.0000 -5.2500 7.0000 -36.7500 -85.7500 0.0021 0.0000 -85.75002 2.0000 0.2500 -0.5000 6.7813 -3.3906 -0.0026 0.2209 -0.0244 -0.02703 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.75 -40.14 -85.75 -0.02 -85.78Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0021 in Sright = 56.00 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 391.85 in4 Sleft = 55.96 in3

cright = 7.0000 in A = 57.0703 in2 cright = 6.9979 in A = 51.3203 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0021 in ry = 2.7632 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1398.35 k-ft 1398.35 k-ft AB = As-BuiltV 449.27 426.81 k 440.57 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 237: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.1250 -1.7500 35.1875 -61.5781 -0.0023 18.1181 -574.4629 -574.46522 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.75 -61.58 0.00 -574.46 -574.47Contribution from shifting centroid: Ad2 = 17.62

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 17.0694 in Stop = 662.27 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 12040.45 in4 Sbott. = 705.38 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 18.1806 in A = 55.3203 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 17.0694 in rx = 14.7530 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 FB11 by south str FB9 by north str

Gross Section (without Losses)

1

Page 238: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1250 14.0000 -1.7500 7.0000 -12.2500 -28.5833 0.0000 0.0000 -28.58332 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.75 -12.25 -28.58 0.00 -28.58Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0000 in Sright = 64.15 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 449.04 in4 Sleft = 64.15 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 55.3203 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.8491 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1655.67 k-ft 1612.63 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 239: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.1875 -2.6250 35.1563 -92.2852 -0.0077 18.3765 -886.4507 -886.45842 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.63 -92.29 -0.01 -886.45 -886.46Contribution from shifting centroid: Ad2 = 40.77

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 16.7798 in Stop = 636.25 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 11751.61 in4 Sbott. = 700.34 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 18.4702 in A = 54.4453 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 16.7798 in rx = 14.6916 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 Floorbeam 9 by south stringer

Gross Section (without Losses)

1

Page 240: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.1875 14.0000 -2.6250 7.0000 -18.3750 -42.8750 0.0000 0.0000 -42.87502 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.63 -18.38 -42.88 0.00 -42.88Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 7.0000 in Sright = 62.11 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 434.75 in4 Sleft = 62.11 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0000 in A = 54.4453 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 7.0000 in ry = 2.8258 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1590.61 k-ft 1590.61 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 241: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 31.3125 172.2188 13.8646 13.6875 1030.4121 1044.2767Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 5.5000 3.9375 21.6563 13.8646 13.6875 1030.4121 1044.2767

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 57.07 1005.86 1445.95 11151.35 12597.30A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 13.2500 0.2500 -3.3125 35.1250 -116.3516 -0.0173 18.7561 -1165.3130 -1165.33032 0.2500 0.6875 -0.1719 34.9063 -5.9995 -0.0068 18.5374 -59.0622 -59.06903 0.5000 0.6875 -0.3438 34.9063 -11.9990 -0.0135 18.5374 -118.1244 -118.13804 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.83 -134.35 -0.04 -1342.50 -1342.54Contribution from shifting centroid: Ad2 = 90.05

y-bar = 17.6250 in Stop = 714.74 in3y-bar = 16.3689 in Stop = 600.85 in3

Ix = 12597.30 in4 Sbott. = 714.74 in3 Ix = 11344.81 in4 Sbott. = 693.07 in3

ctop = 17.6250 in A = 57.0703 in2 ctop = 18.8811 in A = 53.2422 in2

cbottom = 17.6250 in rx = 14.8571 in cbottom = 16.3689 in rx = 14.5972 inJ = 5.8951 Z = 808.9861 in3

Z = 808.9861 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 FB11 by north stringer

Gross Section (without Losses)

1

Page 242: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66151 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 2.7500 6.5313 17.9609 0.0573 0.4688 0.6042 0.66152 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 2.7500 7.4688 20.5391 0.0573 0.4688 0.6042 0.66153 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 57.07 399.49 350.88 126.74 477.62A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 13.2500 -3.3125 6.8750 -22.7734 -48.4626 0.1114 -0.0411 -48.50372 0.6875 0.2500 -0.1719 0.1250 -0.0215 -0.0009 6.8614 -8.0916 -8.09253 0.6875 0.5000 -0.3438 13.7500 -4.7266 -0.0072 6.7636 -15.7253 -15.73254 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.83 -27.52 -48.47 -23.86 -72.33Contribution from shifting centroid: Ad2 = 0.01

x-bar = 7.0000 in Sright = 68.23 in3x-bar = 6.9864 in Sright = 57.79 in3

Iy = 477.62 in4 Sleft = 68.23 in3 Iy = 405.31 in4 Sleft = 58.01 in3

cright = 7.0000 in A = 57.0703 in2 cright = 7.0136 in A = 53.2422 in2

cleft = 7.0000 in ry = 2.8929 in cleft = 6.9864 in ry = 2.7591 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 54.2168 in2 Iy = 431.0552 in2 Ix = 11369.0596 in2 Stop = 645.0530 in3

ry = 2.8197 in rx = 14.4809 in Sbot = 645.0530 in3

Z = 768.5368 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1786.85 1612.63 k-ft 1502.14 k-ft 1502.14 k-ft AB = As-BuiltV 449.27 426.81 k 449.27 k 426.81 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 243: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.0000 in B2 = lh = 4.0000 inC1 = tf = 0.4375 in C2 = tf = 0.4375 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.5000 in do = N/A inB3 = 27.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = in C5 = inA4 = in A5 = in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.5000 27.0313 94.6094 0.0558 13.4063 629.0464 629.1022Vertical Leg 5.3047 23.7813 126.1521 16.2473 10.1563 547.1754 563.4227Horizontal Leg 3.5000 0.2188 0.7656 0.0558 13.4063 629.0464 629.1022Vertical Leg 5.3047 3.4688 18.4006 16.2473 10.1563 547.1754 563.4227

3 13.6250 13.6250 185.6406 843.1178 0.0000 0.0000 843.1178Cover Plate Top 0.0000 27.2500 0.0000 0.0000 13.6250 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 13.6250 0.0000 0.0000

Total 31.23 425.57 875.72 2352.44 3228.17A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 3.5625 0.2500 -0.8906 0.3125 -0.2783 -0.0046 14.0093 -174.7955 -174.80012 0.2500 3.0000 -0.7500 1.9375 -1.4531 -0.5625 12.3843 -115.0289 -115.59143 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.64 -1.73 -0.57 -289.82 -290.39Contribution from shifting centroid: Ad2 = 15.17

y-bar = 13.6250 in Stop = 236.93 in3y-bar = 14.3218 in Stop = 228.41 in3

Ix = 3228.17 in4 Sbott. = 236.93 in3 Ix = 2952.94 in4 Sbott. = 206.18 in3

ctop = 13.6250 in A = 31.2344 in2 ctop = 12.9282 in A = 29.5938 in2

cbottom = 13.6250 in rx = 10.1663 in cbottom = 14.3218 in rx = 9.9891 inJ = 2.2589 Z = 294.4155 in3

Z = 294.4155 in3

P101160439

Span 2 Floorbeam 11A by North Stringer

Gross Section (without Losses)

1

2

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 244: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.7500 2.0000 3.5000 2.3333 2.2500 8.8594 11.1927

(Left) Vertical Leg 2.6523 3.7813 10.0292 0.0423 0.4688 0.5828 0.62511 Horizontal Leg 1.7500 6.5000 11.3750 2.3333 2.2500 8.8594 11.1927

(Right) Vertical Leg 2.6523 4.7188 12.5157 0.0423 0.4688 0.5828 0.62512 Horizontal Leg 1.7500 2.0000 3.5000 2.3333 2.2500 8.8594 11.1927

(Left) Vertical Leg 2.6523 3.7813 10.0292 0.0423 0.4688 0.5828 0.62512 Horizontal Leg 1.7500 6.5000 11.3750 2.3333 2.2500 8.8594 11.1927

(Right) Vertical Leg 2.6523 4.7188 12.5157 0.0423 0.4688 0.5828 0.62513 Web Plate 13.6250 4.2500 57.9063 0.2839 0.0000 0.0000 0.28394 Top Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.0000

Total 31.23 132.75 9.79 37.77 47.56A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 3.5625 -0.8906 1.7813 -1.5864 -0.9419 2.5573 -5.8245 -6.76642 3.0000 0.2500 -0.7500 3.6875 -2.7656 -0.0039 0.6511 -0.3179 -0.32183 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.64 -4.35 -0.95 -6.14 -7.09Contribution from shifting centroid: Ad2 = 0.24

x-bar = 4.2500 in Sright = 11.19 in3x-bar = 4.3386 in Sright = 9.78 in3

Iy = 47.56 in4 Sleft = 11.19 in3 Iy = 40.71 in4 Sleft = 9.38 in3

cright = 4.2500 in A = 31.2344 in2 cright = 4.1614 in A = 29.5938 in2

cleft = 4.2500 in ry = 1.2339 in cleft = 4.3386 in ry = 1.1729 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 29.6727 in2 Iy = 42.9185 in2 Ix = 2913.4214 in2 Stop = 213.8291 in3

ry = 1.2027 in rx = 9.9088 in Sbot = 213.8291 in3

Z = 279.6948 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 592.32 534.57 k-ft 515.46 k-ft 515.46 k-ft AB = As-BuiltV 421.68 400.59 k 408.63 k 400.59 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Page 245: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 31.0625 186.3750 18.0000 13.4375 1083.3984 1101.3984Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 4.1875 25.1250 18.0000 13.4375 1083.3984 1101.3984

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 58.07 1023.49 1454.22 11257.32 12711.54A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 13.5000 0.3750 -5.0625 35.0625 -177.5039 -0.0593 19.2265 -1871.4017 -1871.46102 0.5000 0.6875 -0.3438 34.9063 -11.9990 -0.0135 19.0703 -125.0135 -125.02713 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.41 -189.50 -0.07 -1996.42 -1996.49Contribution from shifting centroid: Ad2 = 185.86

y-bar = 17.6250 in Stop = 721.22 in3y-bar = 15.8360 in Stop = 561.50 in3

Ix = 12711.54 in4 Sbott. = 721.22 in3 Ix = 10900.91 in4 Sbott. = 688.36 in3

ctop = 17.6250 in A = 58.0703 in2 ctop = 19.4140 in A = 52.6641 in2

cbottom = 17.6250 in rx = 14.7952 in cbottom = 15.8360 in rx = 14.3871 inJ = 5.9784 Z = 819.6736 in3

Z = 819.6736 in3

Web Plate

As-Inspected Section Properties

4

Section Losses

As-Built Section Properties

2

P101160439

Span 2 Floorbeam 12 by North Stringer

Gross Section (without Losses)

1

Page 246: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/2/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72171 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72173 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 58.07 406.49 350.90 126.96 477.86A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.3750 13.5000 -5.0625 7.2500 -36.7031 -76.8867 0.2300 -0.2677 -77.15452 0.6875 0.5000 -0.3438 0.2500 -0.0859 -0.0072 6.7700 -15.7552 -15.76233 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.41 -36.79 -76.89 -16.02 -92.92Contribution from shifting centroid: Ad2 = 0.02

x-bar = 7.0000 in Sright = 68.27 in3x-bar = 7.0200 in Sright = 55.15 in3

Iy = 477.86 in4 Sleft = 68.27 in3 Iy = 384.97 in4 Sleft = 54.84 in3

cright = 7.0000 in A = 58.0703 in2 cright = 6.9800 in A = 52.6641 in2

cleft = 7.0000 in ry = 2.8686 in cleft = 7.0200 in ry = 2.7037 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 55.1668 in2 Iy = 431.2723 in2 Ix = 11472.1644 in2 Stop = 650.9029 in3

ry = 2.796 in rx = 14.4206 in Sbot = 650.9029 in3

Z = 778.6899 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1803.06 1627.26 k-ft 1403.74 k-ft 1403.74 k-ft AB = As-BuiltV 466.67 443.34 k 466.67 k 443.34 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

As-Inspected Section Properties

Section properties with loss applied

Capacities*

Section Losses

As-Built Section Properties

Gross Section (without Losses)

Page 247: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 6.5000 in A2 = lv = 6.5000 in

Web Plate: C3 = 0.4375 in do = N/A inB3 = 33.8750 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.6875 in C5 = 0.6875 inA4 = 14.0000 in A5 = 14.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 6.0000 34.3125 205.8750 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 31.0625 186.3750 18.0000 13.4375 1083.3984 1101.3984Horizontal Leg 6.0000 0.9375 5.6250 0.1250 16.6875 1670.8359 1670.9609Vertical Leg 6.0000 4.1875 25.1250 18.0000 13.4375 1083.3984 1101.3984

3 14.8203 17.6250 261.2080 1417.2117 0.0000 0.0000 1417.2117Cover Plate Top 9.6250 34.9063 335.9727 0.3791 17.2813 2874.4254 2874.8045Cover Plate Bottom 9.6250 0.3438 3.3086 0.3791 17.2813 2874.4254 2874.8045

Total 58.07 1023.49 1454.22 11257.32 12711.54A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 14.0000 0.2500 -3.5000 35.1250 -122.9375 -0.0182 18.6224 -1213.7789 -1213.79712 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -122.94 -0.02 -1213.78 -1213.80Contribution from shifting centroid: Ad2 = 73.16

y-bar = 17.6250 in Stop = 721.22 in3y-bar = 16.5026 in Stop = 617.20 in3

Ix = 12711.54 in4 Sbott. = 721.22 in3 Ix = 11570.90 in4 Sbott. = 701.16 in3

ctop = 17.6250 in A = 58.0703 in2 ctop = 18.7474 in A = 54.5703 in2

cbottom = 17.6250 in rx = 14.7952 in cbottom = 16.5026 in rx = 14.5615 inJ = 5.9784 Z = 819.6736 in3

Z = 819.6736 in3

P101160439

Span 2 Floorbeam 12 by South Stringer

Gross Section (without Losses)

1

2

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 248: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/31/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72171 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 3.7813 11.3438 9.0000 3.2188 31.0811 40.0811

(Left) Vertical Leg 3.0000 6.5313 19.5938 0.0625 0.4688 0.6592 0.72172 Horizontal Leg 3.0000 10.2188 30.6563 9.0000 3.2188 31.0811 40.0811

(Right) Vertical Leg 3.0000 7.4688 22.4063 0.0625 0.4688 0.6592 0.72173 Web Plate 14.8203 7.0000 103.7422 0.2364 0.0000 0.0000 0.23644 Top Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.20834 Bottom Cover Plate 9.6250 7.0000 67.3750 157.2083 0.0000 0.0000 157.2083

Total 58.07 406.49 350.90 126.96 477.86A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 14.0000 -3.5000 7.0000 -24.5000 -57.1667 0.0000 0.0000 -57.16672 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.50 -24.50 -57.17 0.00 -57.17Contribution from shifting centroid: Ad2 = 0.00

x-bar = 7.0000 in Sright = 68.27 in3x-bar = 7.0000 in Sright = 60.10 in3

Iy = 477.86 in4 Sleft = 68.27 in3 Iy = 420.70 in4 Sleft = 60.10 in3

cright = 7.0000 in A = 58.0703 in2 cright = 7.0000 in A = 54.5703 in2

cleft = 7.0000 in ry = 2.8686 in cleft = 7.0000 in ry = 2.7766 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 55.1668 in2 Iy = 431.2723 in2 Ix = 11472.1644 in2 Stop = 650.9029 in3

ry = 2.796 in rx = 14.4206 in Sbot = 650.9029 in3

Z = 778.6899 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1803.06 1627.26 k-ft 1543.00 k-ft 1543.00 k-ft AB = As-BuiltV 466.67 443.34 k 466.67 k 443.34 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Page 249: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss member section properties summary

Page 250: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

1 L0-L1 1100 37.47 28.10 25.20 8.74 13.522 L1-L2 1101 37.47 28.10 25.20 8.74 13.523 L2-L3 1102 62.70 47.03 25.20 2.25 11.514 L3-L4 1103 62.70 47.03 25.20 2.25 12.295 L4-L5 1104 79.80 59.85 25.20 2.25 8.936 L5-L6 1105 79.80 59.85 25.20 2.25 10.137 L6-L7 1106 79.80 59.85 25.20 2.25 10.138 L7-L8 1107 79.80 59.85 25.20 2.25 8.939 L8-L9 1108 62.70 47.03 25.20 2.25 12.29

10 L9-L10 1109 62.70 47.03 25.20 2.25 11.5111 L10-L11 1110 37.47 28.10 25.20 8.74 13.5212 L11-L12 1111 37.47 28.10 25.20 8.74 13.5213 U1-L1 1201 18.81 14.11 36.00 5.48 7.0214 U2-L2 1202 33.25 24.94 13.20 7.10 7.0315 U2-L2 1203 33.25 24.94 27.40 7.10 7.0316 U10-L10 1209 33.25 24.94 13.20 7.10 7.0317 U10-L10 1210 33.25 24.94 27.40 7.10 7.0318 U11-L11 1211 18.81 14.11 36.00 5.48 7.0219 U3-L3 1230 18.81 14.11 18.00 5.48 7.0220 U3-L3 1231 18.81 14.11 7.00 5.48 7.0221 U3-L3 1232 18.81 14.11 20.40 5.48 7.0222 U4-L4 1240 18.81 14.11 22.60 5.48 7.0223 U4-L4 1241 18.81 14.11 2.42 5.48 7.0224 U4-L4 1242 18.81 14.11 25.00 5.48 7.0225 U5-L5 1250 18.81 14.11 22.60 5.48 7.0226 U5-L5 1251 18.81 14.11 2.42 5.48 7.0227 U5-L5 1252 18.81 14.11 25.00 5.48 7.0228 U6-L6 1260 18.81 14.11 22.60 5.48 7.0229 U6-L6 1261 18.81 14.11 2.42 5.48 7.0230 U6-L6 1262 18.81 14.11 25.00 5.48 7.0231 U7-L7 1270 18.81 14.11 22.60 5.48 7.0232 U7-L7 1271 18.81 14.11 2.42 5.48 7.0233 U7-L7 1272 17.93 13.44 25.00 5.75 7.1134 U8-L8 1280 18.81 14.11 22.60 5.48 7.0235 U8-L8 1281 18.81 14.11 2.42 5.48 7.0236 U8-L8 1282 18.81 14.11 25.00 5.48 7.0237 U9-L9 1290 18.81 14.11 18.00 5.48 7.0238 U9-L9 1291 18.81 14.11 7.00 5.48 7.0239 U9-L9 1292 19.19 14.39 20.40 4.70 7.5640 U1-L2 1301 38.00 28.50 44.00 2.25 7.5041 U2-L4 1302 36.75 27.56 32.30 7.31 9.4042 U2-L4 1303 36.75 27.56 32.40 7.31 9.40

Reference ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)

Page 251: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and usedReference

ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)43 U4-L6 1304 36.75 27.56 35.50 7.31 9.4044 U4-L6 1305 36.75 27.56 35.50 7.31 9.4045 U8-L6 1306 36.75 27.56 35.50 7.31 9.4046 U8-L6 1307 36.75 27.56 35.50 7.31 9.4047 U10-L8 1308 36.75 27.56 32.40 7.31 9.4048 U10-L8 1309 36.75 27.56 32.30 7.31 9.4049 U11-L10 1310 38.00 28.50 44.00 2.25 7.5050 M3-L2 1382 18.81 14.11 32.40 5.48 5.0951 M5-L4 1384 18.81 14.11 35.50 5.48 5.0952 M7-L8 1388 22.77 17.08 35.50 4.62 7.6153 M9-L10 1392 21.98 16.49 32.40 5.01 7.3958 U1-L0 1500 69.08 51.81 26.00 10.16 10.3759 U1-U2 1501 69.08 51.81 25.60 10.16 10.3760 U2-U3 1502 88.37 66.28 25.60 9.28 10.4961 U3-U4 1503 88.37 66.28 25.60 9.28 10.4962 U4-U5 1504 88.37 66.28 25.20 9.28 10.4963 U5-U6 1505 88.37 66.28 25.20 9.28 10.4964 U6-U7 1506 88.37 66.28 25.20 9.28 10.4965 U7-U8 1507 88.37 66.28 25.20 9.28 10.4966 U8-U9 1508 88.37 66.28 25.60 9.28 10.4967 U9-U10 1509 88.37 66.28 25.60 9.28 10.4968 U10-U11 1510 69.08 51.81 25.60 10.16 10.3769 U11-L12 1511 69.08 51.81 26.00 10.16 10.3770 U1-L0 1550 69.08 51.81 9.00 10.16 10.3771 U1-L0 1551 69.08 51.81 9.00 10.16 10.3772 U11-L12 1560 69.08 51.81 9.00 10.16 10.3773 U11-L12 1561 69.08 51.81 9.00 10.16 10.3774 L0-L1 2100 37.47 28.10 25.20 8.74 13.5275 L1-L2 2101 37.47 28.10 25.20 8.74 13.5276 L2-L3 2102 62.70 47.03 25.20 2.25 11.5177 L3-L4 2103 62.70 47.03 25.20 2.25 12.2978 L4-L5 2104 79.80 59.85 25.20 2.25 8.9379 L5-L6 2105 79.80 59.85 25.20 2.25 10.1380 L6-L7 2106 79.80 59.85 25.20 2.25 10.1381 L7-L8 2107 79.80 59.85 25.20 2.25 8.9382 L8-L9 2108 62.70 47.03 25.20 2.25 12.2983 L9-L10 2109 62.70 47.03 25.20 2.25 11.5184 L10-L11 2110 37.47 28.10 25.20 8.74 13.5285 L11-L12 2111 37.47 28.10 25.20 8.74 13.5286 U1-L1 2201 18.81 14.11 36.00 5.48 7.0287 U2-L2 2202 33.25 24.94 13.20 7.10 7.0388 U2-L2 2203 33.25 24.94 27.40 7.10 7.03

Page 252: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and usedReference

ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)89 U10-L10 2209 33.25 24.94 13.20 7.10 7.0390 U10-L10 2210 33.25 24.94 27.40 7.10 7.0391 U11-L11 2211 14.81 11.11 36.00 6.42 6.9892 U3-L3 2230 18.81 14.11 18.00 5.48 7.0293 U3-L3 2231 18.81 14.11 7.00 5.48 7.0294 U3-L3 2232 18.81 14.11 20.40 5.48 7.0295 U4-L4 2240 18.81 14.11 22.60 5.48 7.0296 U4-L4 2241 18.81 14.11 2.42 5.48 7.0297 U4-L4 2242 18.81 14.11 25.00 5.48 7.0298 U5-L5 2250 18.81 14.11 22.60 5.48 7.0299 U5-L5 2251 18.81 14.11 2.42 5.48 7.02

100 U5-L5 2252 18.81 14.11 25.00 5.48 7.02101 U6-L6 2260 18.81 14.11 22.60 5.48 7.02102 U6-L6 2261 18.81 14.11 2.42 5.48 7.02103 U6-L6 2262 18.81 14.11 25.00 5.48 7.02104 U7-L7 2270 18.81 14.11 22.60 5.48 7.02105 U7-L7 2271 18.81 14.11 2.42 5.48 7.02106 U7-L7 2272 16.05 12.04 25.00 5.89 7.02107 U8-L8 2280 18.81 14.11 22.60 5.48 7.02108 U8-L8 2281 18.81 14.11 2.42 5.48 7.02109 U8-L8 2282 18.81 14.11 25.00 5.48 7.02110 U9-L9 2290 18.81 14.11 18.00 5.48 7.02111 U9-L9 2291 18.81 14.11 7.00 5.48 7.02112 U9-L9 2292 22.77 17.08 20.40 4.62 7.61113 U1-L2 2301 38.00 28.50 44.00 2.25 7.50114 U2-L4 2302 36.75 27.56 32.30 7.31 9.40115 U2-L4 2303 36.75 27.56 32.40 7.31 9.40116 U4-L6 2304 36.75 27.56 35.50 7.31 9.40117 U4-L6 2305 36.75 27.56 35.50 7.31 9.40118 U8-L6 2306 36.75 27.56 35.50 7.31 9.40119 U8-L6 2307 36.75 27.56 35.50 7.31 9.40120 U10-L8 2308 36.75 27.56 32.40 7.31 9.40121 U10-L8 2309 36.75 27.56 32.30 7.31 9.40122 U11-L10 2310 38.00 28.50 44.00 2.25 7.50123 M3-L2 2382 18.81 14.11 32.40 5.48 5.09124 M5-L4 2384 18.81 14.11 35.50 5.48 5.09125 M7-L8 2388 18.81 14.11 35.50 5.48 5.09126 M9-L10 2392 18.81 14.11 32.40 5.48 5.09131 U1-L0 2500 69.08 51.81 26.00 10.16 10.37132 U1-U2 2501 69.08 51.81 25.60 10.16 10.37133 U2-U3 2502 88.37 66.28 25.60 9.28 10.49134 U3-U4 2503 88.37 66.28 25.60 9.28 10.49

Page 253: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and usedReference

ID Rating IDMember

P101160439

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)135 U4-U5 2504 88.37 66.28 25.20 9.28 10.49136 U5-U6 2505 88.37 66.28 25.20 9.28 10.49137 U6-U7 2506 88.37 66.28 25.20 9.28 10.49138 U7-U8 2507 88.37 66.28 25.20 9.28 10.49139 U8-U9 2508 88.37 66.28 25.60 9.28 10.49140 U9-U10 2509 88.37 66.28 25.60 9.28 10.49141 U10-U11 2510 69.08 51.81 25.60 10.16 10.37142 U11-L12 2511 69.08 51.81 26.00 10.16 10.37143 U1-L0 2550 69.08 51.81 9.00 10.16 10.37144 U1-L0 2551 69.08 51.81 9.00 10.16 10.37145 U11-L12 2560 69.08 51.81 9.00 10.16 10.37146 U11-L12 2561 69.08 51.81 9.00 10.16 10.37

Page 254: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss member capacity calculation

Page 255: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

North L0-L1 1100 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L1-L2 1101 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L2-L3 1102 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L3-L4 1103 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L4-L5 1104 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L5-L6 1105 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L6-L7 1106 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L7-L8 1107 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00North L8-L9 1108 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L9-L10 1109 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00North L10-L11 1110 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North L11-L12 1111 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97North U1-L1 1201 18.81 14.11 36.00 5.48 0.750 59.08 1936 27.26 435.78 564.30 1269.68 564.30North U2-L2 1202 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50North U2-L2 1203 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50North U10-L10 1209 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50North U10-L10 1210 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50North U11-L11 1211 18.81 14.11 36.00 5.48 0.750 59.08 1936 27.26 435.78 564.30 1269.68 564.30North U3-L3 1230 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30North U3-L3 1231 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30North U3-L3 1232 18.81 14.11 20.40 5.48 0.750 33.48 1936 29.12 465.57 564.30 1269.68 564.30North U4-L4 1240 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U4-L4 1241 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U4-L4 1242 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U5-L5 1250 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U5-L5 1251 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U5-L5 1252 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U6-L6 1260 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U6-L6 1261 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U6-L6 1262 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U7-L7 1270 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U7-L7 1271 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U7-L7 1272 17.93 13.44 25.00 5.75 0.750 39.16 1936 28.79 438.72 537.75 1209.94 537.75North U8-L8 1280 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30North U8-L8 1281 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30North U8-L8 1282 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30North U9-L9 1290 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30North U9-L9 1291 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30North U9-L9 1292 19.19 14.39 20.40 4.70 0.750 39.08 1936 28.80 469.64 575.55 1294.99 575.55North U1-L2 1301 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00North U2-L4 1302 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59North U2-L4 1303 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59North U4-L6 1304 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U4-L6 1305 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U8-L6 1306 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U8-L6 1307 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59North U10-L8 1308 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59North U10-L8 1309 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59North U11-L10 1310 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00North M3-L2 1382 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30North M5-L4 1384 18.81 14.11 35.50 5.09 0.750 62.72 1936 26.91 430.21 564.30 1269.68 564.30North M7-L8 1388 22.77 17.08 35.50 4.62 0.750 69.20 1936 26.24 507.84 683.18 1537.14 683.18North M9-L10 1392 21.98 16.49 32.40 5.01 0.750 58.25 1936 27.33 510.66 659.40 1483.65 659.40

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Page 256: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

North U1-L0 1500 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26North U1-U2 1501 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26North U2-U3 1502 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U3-U4 1503 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U4-U5 1504 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U5-U6 1505 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U6-U7 1506 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U7-U8 1507 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17North U8-U9 1508 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U9-U10 1509 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17North U10-U11 1510 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26North U11-L12 1511 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26North U1-L0 1550 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U1-L0 1551 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U11-L12 1560 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26North U11-L12 1561 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South L0-L1 2100 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South L1-L2 2101 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South L2-L3 2102 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L3-L4 2103 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L4-L5 2104 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L5-L6 2105 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L6-L7 2106 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L7-L8 2107 79.80 59.85 25.20 2.25 0.750 100.76 1936 22.02 1493.55 2394.00 5386.50 2394.00South L8-L9 2108 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L9-L10 2109 62.70 47.03 25.20 2.25 0.750 100.76 1936 22.02 1173.50 1881.00 4232.25 1881.00South L10-L11 2110 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South L11-L12 2111 37.47 28.10 25.20 8.74 0.750 25.94 1936 29.47 938.53 1123.97 2528.93 1123.97South U1-L1 2201 18.81 14.11 36.00 5.48 0.750 59.08 1936 27.26 435.78 564.30 1269.68 564.30South U2-L2 2202 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50South U2-L2 2203 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50South U10-L10 2209 33.25 24.94 13.20 7.03 0.750 16.89 1936 29.78 841.54 997.50 2244.38 997.50South U10-L10 2210 33.25 24.94 27.40 7.03 0.750 35.06 1936 29.03 820.56 997.50 2244.38 997.50South U11-L11 2211 14.81 11.11 36.00 6.42 0.750 50.47 1936 28.00 352.51 444.38 999.84 444.38South U3-L3 2230 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30South U3-L3 2231 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30South U3-L3 2232 18.81 14.11 20.40 5.48 0.750 33.48 1936 29.12 465.57 564.30 1269.68 564.30South U4-L4 2240 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U4-L4 2241 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U4-L4 2242 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U5-L5 2250 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U5-L5 2251 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U5-L5 2252 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U6-L6 2260 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U6-L6 2261 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U6-L6 2262 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U7-L7 2270 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30South U7-L7 2271 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U7-L7 2272 16.05 12.04 25.00 5.89 0.750 38.21 1936 28.85 393.62 481.50 1083.38 481.50South U8-L8 2280 18.81 14.11 22.60 5.48 0.750 37.09 1936 28.92 462.37 564.30 1269.68 564.30

Page 257: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 2

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

South U8-L8 2281 18.81 14.11 2.42 5.48 0.750 3.97 1936 29.99 479.46 564.30 1269.68 564.30South U8-L8 2282 18.81 14.11 25.00 5.48 0.750 41.03 1936 28.68 458.50 564.30 1269.68 564.30South U9-L9 2290 18.81 14.11 18.00 5.48 0.750 29.54 1936 29.31 468.69 564.30 1269.68 564.30South U9-L9 2291 18.81 14.11 7.00 5.48 0.750 11.49 1936 29.90 478.00 564.30 1269.68 564.30South U9-L9 2292 22.77 17.08 20.40 4.62 0.750 39.76 1936 28.76 556.64 683.18 1537.14 683.18South U1-L2 2301 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00South U2-L4 2302 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59South U2-L4 2303 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59South U4-L6 2304 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U4-L6 2305 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U8-L6 2306 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U8-L6 2307 36.75 27.56 35.50 7.31 0.750 43.69 1936 28.50 890.33 1102.59 2480.83 1102.59South U10-L8 2308 36.75 27.56 32.40 7.31 0.750 39.87 1936 28.75 898.16 1102.59 2480.83 1102.59South U10-L8 2309 36.75 27.56 32.30 7.31 0.750 39.75 1936 28.76 898.40 1102.59 2480.83 1102.59South U11-L10 2310 38.00 28.50 44.00 2.25 0.750 175.93 1936 9.25 298.69 1140.00 2565.00 1140.00South M3-L2 2382 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30South M5-L4 2384 18.81 14.11 35.50 5.09 0.750 62.72 1936 26.91 430.21 564.30 1269.68 564.30South M7-L8 2388 18.81 14.11 35.50 5.09 0.750 62.72 1936 26.91 430.21 564.30 1269.68 564.30South M9-L10 2392 18.81 14.11 32.40 5.09 0.750 57.24 1936 27.42 438.47 564.30 1269.68 564.30South U1-L0 2500 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26South U1-U2 2501 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26South U2-U3 2502 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U3-U4 2503 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U4-U5 2504 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U5-U6 2505 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U6-U7 2506 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U7-U8 2507 88.37 66.28 25.20 9.28 0.750 24.44 1936 29.53 2218.23 2651.17 5965.13 2651.17South U8-U9 2508 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U9-U10 2509 88.37 66.28 25.60 9.28 0.750 24.82 1936 29.52 2217.10 2651.17 5965.13 2651.17South U10-U11 2510 69.08 51.81 25.60 10.16 0.750 22.68 1936 29.60 1737.69 2072.26 4662.59 2072.26South U11-L12 2511 69.08 51.81 26.00 10.16 0.750 23.03 1936 29.58 1736.94 2072.26 4662.59 2072.26South U1-L0 2550 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U1-L0 2551 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U11-L12 2560 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26South U11-L12 2561 69.08 51.81 9.00 10.16 0.750 7.97 1936 29.95 1758.49 2072.26 4662.59 2072.26

Page 258: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss member forces output from STAAD.pro V8i model

Page 259: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2Output copied from STAAD Max Axial Forces

Reference ID Member Rating

ID

Phase 1 Compression

(k)

Phase 1 Tension (k)

Phase 2 Compression

(k)

Phase 2 Tension (k)

Phase 3 Compression

(k)

Phase 3 Tension

(k)1 L0-L1 1100 0.00 325.26 0.00 513.78 0 522.7632 L1-L2 1101 0.00 281.58 0.00 435.85 0 443.2073 L2-L3 1102 0.00 524.80 0.00 891.43 0 908.0314 L3-L4 1103 0.00 498.88 0.00 840.17 0 855.5335 L4-L5 1104 0.00 619.61 0.00 1225.01 0 1254.9346 L5-L6 1105 0.00 613.13 0.00 1209.33 0 1238.7937 L6-L7 1106 0.00 587.41 0.00 1183.76 0 1213.2288 L7-L8 1107 0.00 597.67 0.00 1203.41 0 1233.3579 L8-L9 1108 0.00 440.17 0.00 782.09 0 797.484

10 L9-L10 1109 0.00 467.75 0.00 835.23 0 851.86811 L10-L11 1110 0.00 220.84 0.00 376.40 0 383.81612 L11-L12 1111 0.00 262.10 0.00 452.30 0 461.35713 U1-L1 1201 0.00 184.30 0.00 184.30 0 184.30114 U2-L2 1202 159.81 0.00 418.99 0.00 432.058 015 U2-L2 1203 165.43 0.00 426.83 0.00 440.013 016 U10-L10 1209 200.57 0.00 459.61 0.00 472.672 017 U10-L10 1210 206.85 0.00 468.08 0.00 481.255 018 U11-L11 1211 0.00 65.58 0.00 65.58 0 65.57719 U3-L3 1230 9.68 0.00 5.81 0.00 5.617 020 U3-L3 1231 9.83 0.00 4.40 0.00 4.134 021 U3-L3 1232 0.00 65.83 0.00 128.69 0 130.18322 U4-L4 1240 0.00 47.13 0.00 55.42 0 55.31723 U4-L4 1241 0.00 48.40 0.00 58.50 0 58.45224 U4-L4 1242 0.00 47.47 0.00 57.57 0 57.5225 U5-L5 1250 15.24 0.00 16.46 0.00 16.521 026 U5-L5 1251 15.47 0.00 15.32 0.00 15.311 027 U5-L5 1252 0.00 68.30 0.00 194.01 0 200.73928 U6-L6 1260 15.27 0.00 16.53 0.00 16.588 029 U6-L6 1261 15.56 0.00 15.48 0.00 15.477 030 U6-L6 1262 19.37 0.00 19.30 0.00 19.291 031 U7-L7 1270 15.23 0.00 16.44 0.00 16.498 032 U7-L7 1271 15.44 0.00 15.28 0.00 15.267 033 U7-L7 1272 0.00 68.30 0.00 194.01 0 200.73934 U8-L8 1280 0.00 15.11 0.00 23.45 0 23.34335 U8-L8 1281 0.00 14.46 0.00 24.62 0 24.57536 U8-L8 1282 0.00 13.53 0.00 23.69 0 23.64337 U9-L9 1290 9.81 0.00 5.92 0.00 5.734 038 U9-L9 1291 10.00 0.00 4.52 0.00 4.257 039 U9-L9 1292 0.00 65.83 0.00 128.69 0 130.18340 U1-L2 1301 0.00 374.45 0.00 730.06 0 746.99241 U2-L4 1302 0.00 182.09 0.00 515.78 0 532.62442 U2-L4 1303 0.00 115.96 0.00 404.01 0 419.86943 U4-L6 1304 0.00 111.58 0.00 284.74 0 293.92444 U4-L6 1305 0.00 46.58 0.00 136.04 0 140.83145 U8-L6 1306 0.00 87.49 0.00 176.86 0 181.64446 U8-L6 1307 0.00 152.27 0.00 325.32 0 334.502

Strength I

Page 260: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2Output copied from STAAD Max Axial Forces

Reference ID Member Rating

ID

Phase 1 Compression

(k)

Phase 1 Tension (k)

Phase 2 Compression

(k)

Phase 2 Tension (k)

Phase 3 Compression

(k)

Phase 3 Tension

(k)

Strength I

47 U10-L8 1308 0.00 170.07 0.00 458.01 0 473.86748 U10-L8 1309 0.00 236.38 0.00 569.93 0 586.76449 U11-L10 1310 0.00 391.46 0.00 746.84 0 763.75550 M3-L2 1382 68.51 0.00 116.39 0.00 117.502 051 M5-L4 1384 68.91 0.00 162.71 0.00 167.825 052 M7-L8 1388 69.31 0.00 163.10 0.00 168.212 053 M9-L10 1392 69.28 0.00 117.12 0.00 118.227 058 U1-L0 1500 771.78 0.00 1231.94 0.00 1253.843 059 U1-U2 1501 628.47 0.00 1079.36 0.00 1100.825 060 U2-U3 1502 775.55 0.00 1486.95 0.00 1521.549 061 U3-U4 1503 774.08 0.00 1484.87 0.00 1519.446 062 U4-U5 1504 835.59 0.00 1652.90 0.00 1693.174 063 U5-U6 1505 835.79 0.00 1653.30 0.00 1693.584 064 U6-U7 1506 835.68 0.00 1653.12 0.00 1693.407 065 U7-U8 1507 835.31 0.00 1652.43 0.00 1692.702 066 U8-U9 1508 745.46 0.00 1456.02 0.00 1490.587 067 U9-U10 1509 746.44 0.00 1457.51 0.00 1492.093 068 U10-U11 1510 559.02 0.00 1009.63 0.00 1031.085 069 U11-L12 1511 628.66 0.00 1088.43 0.00 1110.313 070 U1-L0 1550 716.80 0.00 1148.05 0.00 1168.582 071 U1-L0 1551 729.02 0.00 1170.30 0.00 1191.304 072 U11-L12 1560 582.71 0.00 1013.69 0.00 1034.201 073 U11-L12 1561 591.90 0.00 1032.87 0.00 1053.865 074 L0-L1 2100 0.00 330.77 0.00 523.58 0 532.75875 L1-L2 2101 0.00 282.11 0.00 437.26 0 444.6676 L2-L3 2102 0.00 522.99 0.00 888.68 0 905.23977 L3-L4 2103 0.00 496.07 0.00 835.16 0 850.41878 L4-L5 2104 0.00 616.65 0.00 1219.19 0 1248.98279 L5-L6 2105 0.00 610.08 0.00 1202.86 0 1232.15180 L6-L7 2106 0.00 583.95 0.00 1176.57 0 1205.85481 L7-L8 2107 0.00 594.17 0.00 1196.37 0 1226.14582 L8-L9 2108 0.00 436.04 0.00 774.51 0 789.73983 L9-L10 2109 0.00 464.14 0.00 829.00 0 845.51684 L10-L11 2110 0.00 218.13 0.00 372.02 0 379.35585 L11-L12 2111 0.00 262.67 0.00 453.82 0 462.92686 U1-L1 2201 0.00 184.28 0.00 184.28 0 184.27687 U2-L2 2202 159.84 0.00 419.20 0.00 432.273 088 U2-L2 2203 165.47 0.00 427.03 0.00 440.213 089 U10-L10 2209 201.25 0.00 460.74 0.00 473.826 090 U10-L10 2210 207.59 0.00 469.31 0.00 482.502 091 U11-L11 2211 0.00 65.55 0.00 65.55 0 65.55292 U3-L3 2230 9.76 0.00 5.97 0.00 5.781 093 U3-L3 2231 10.01 0.00 4.74 0.00 4.485 094 U3-L3 2232 0.00 65.81 0.00 128.66 0 130.15995 U4-L4 2240 0.00 47.55 0.00 56.13 0 56.03496 U4-L4 2241 0.00 48.74 0.00 59.07 0 59.03

Page 261: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2Output copied from STAAD Max Axial Forces

Reference ID Member Rating

ID

Phase 1 Compression

(k)

Phase 1 Tension (k)

Phase 2 Compression

(k)

Phase 2 Tension (k)

Phase 3 Compression

(k)

Phase 3 Tension

(k)

Strength I

97 U4-L4 2242 0.00 47.81 0.00 58.14 0 58.09898 U5-L5 2250 15.41 0.00 16.79 0.00 16.856 099 U5-L5 2251 15.82 0.00 15.97 0.00 15.981 0

100 U5-L5 2252 0.00 68.26 0.00 193.97 0 200.701101 U6-L6 2260 15.36 0.00 16.69 0.00 16.757 0102 U6-L6 2261 15.74 0.00 15.81 0.00 15.815 0103 U6-L6 2262 19.55 0.00 19.63 0.00 19.629 0104 U7-L7 2270 15.43 0.00 16.81 0.00 16.877 0105 U7-L7 2271 15.85 0.00 16.02 0.00 16.025 0106 U7-L7 2272 0.00 68.26 0.00 193.97 0 200.702107 U8-L8 2280 0.00 15.14 0.00 23.67 0 23.572108 U8-L8 2281 0.00 14.40 0.00 24.68 0 24.635109 U8-L8 2282 0.00 13.47 0.00 23.74 0 23.703110 U9-L9 2290 9.96 0.00 6.19 0.00 6.008 0111 U9-L9 2291 10.31 0.00 5.09 0.00 4.835 0112 U9-L9 2292 0.00 65.81 0.00 128.66 0 130.159113 U1-L2 2301 0.00 374.54 0.00 730.45 0 747.387114 U2-L4 2302 0.00 182.11 0.00 516.04 0 532.899115 U2-L4 2303 0.00 115.86 0.00 404.02 0 419.884116 U4-L6 2304 0.00 111.43 0.00 284.59 0 293.783117 U4-L6 2305 0.00 46.42 0.00 135.90 0 140.685118 U8-L6 2306 0.00 87.84 0.00 177.41 0 182.208119 U8-L6 2307 0.00 152.66 0.00 325.94 0 335.13120 U10-L8 2308 0.00 170.64 0.00 458.91 0 474.779121 U10-L8 2309 0.00 237.17 0.00 571.26 0 588.116122 U11-L10 2310 0.00 392.53 0.00 748.66 0 765.612123 M3-L2 2382 68.64 0.00 116.66 0.00 117.77 0124 M5-L4 2384 69.35 0.00 163.59 0.00 168.719 0125 M7-L8 2388 69.79 0.00 164.04 0.00 169.176 0126 M9-L10 2392 69.52 0.00 117.57 0.00 118.69 0131 U1-L0 2500 772.05 0.00 1231.82 0.00 1253.703 0132 U1-U2 2501 629.37 0.00 1080.87 0.00 1102.365 0133 U2-U3 2502 776.97 0.00 1489.68 0.00 1524.344 0134 U3-U4 2503 775.98 0.00 1488.56 0.00 1523.219 0135 U4-U5 2504 837.78 0.00 1657.24 0.00 1697.625 0136 U5-U6 2505 838.30 0.00 1658.26 0.00 1698.661 0137 U6-U7 2506 838.35 0.00 1658.37 0.00 1698.773 0138 U7-U8 2507 837.94 0.00 1657.60 0.00 1697.985 0139 U8-U9 2508 747.68 0.00 1460.49 0.00 1495.161 0140 U9-U10 2509 748.39 0.00 1461.43 0.00 1496.104 0141 U10-U11 2510 559.98 0.00 1011.75 0.00 1033.26 0142 U11-L12 2511 628.41 0.00 1088.57 0.00 1110.473 0143 U1-L0 2550 717.81 0.00 1149.42 0.00 1169.966 0144 U1-L0 2551 729.91 0.00 1171.43 0.00 1192.444 0145 U11-L12 2560 583.04 0.00 1014.93 0.00 1035.492 0146 U11-L12 2561 592.14 0.00 1033.97 0.00 1054.999 0

Page 262: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss floor system member forces output from

STAAD.pro V8i model

Page 263: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

North 10000 0.00 -6050.192 89.086 N/A 504.1826667 89.086RG 10001 N/A -6781.892 29.031 -28.939 565.1576667 29.031

10002 0.00 -6054.627 N/A -89.13 504.55225 89.1310003 0.00 -5348.128 82.112 N/A 445.6773333 82.11210004 N/A -5766.547 22.052 -35.917 480.5455833 35.91710005 0.00 -4649.731 N/A -54.223 387.4775833 54.22310006 0.00 -1809.418 26.008 N/A 150.7848333 26.00810007 N/A -2012.846 8.056 -8.011 167.7371667 8.05610008 0.00 -1811.627 N/A -26.03 150.9689167 26.0310009 0.00 -1809.958 26.013 N/A 150.8298333 26.01310010 N/A -2013.646 8.061 -8.006 167.8038333 8.06110011 0.00 -1812.413 N/A -26.037 151.0344167 26.03710012 0.00 -1810.247 26.016 N/A 150.8539167 26.01610013 N/A -2013.746 8.052 -8.013 167.8121667 8.05210014 0.00 -1812.315 N/A -26.037 151.02625 26.03710015 0.00 -1810.186 26.015 N/A 150.8488333 26.01510016 N/A -2013.862 8.059 -8.008 167.8218333 8.05910017 0.00 -1812.528 N/A -26.039 151.044 26.03910018 0.00 -1810.317 26.017 N/A 150.85975 26.01710019 N/A -2013.861 8.053 -8.014 167.82175 8.05310020 0.00 -1812.393 N/A -26.037 151.03275 26.03710021 0.00 -1810.109 26.015 N/A 150.8424167 26.01510022 N/A -2013.745 8.058 -8.007 167.8120833 8.05810023 0.00 -1812.46 N/A -26.038 151.0383333 26.03810024 0.00 -1810.173 26.015 N/A 150.84775 26.01510025 N/A -2013.636 8.051 -8.016 167.803 8.05110026 0.00 -1812.174 N/A -26.035 151.0145 26.03510027 0.00 -1809.442 26.008 N/A 150.7868333 26.00810028 N/A -2012.863 8.056 -8.011 167.7385833 8.05610029 0.00 -1811.658 N/A -26.03 150.9715 26.0310030 0.00 -1833.2 26.244 N/A 152.7666667 26.24410031 N/A -2037.679 8.07 -7.995 169.8065833 8.0710032 0.00 -1837.276 N/A -26.284 153.1063333 26.28410033 0.00 -1832.133 26.233 N/A 152.67775 26.23310034 N/A -2036.533 8.076 -7.991 169.7110833 8.07610035 0.00 -1836.426 N/A -26.276 153.0355 26.276

South 20000 0.00 -6097.876 89.56 N/A 508.1563333 89.56RG 20001 N/A -6824.987 28.944 -29.026 568.7489167 29.026

20002 0.00 -6093.428 N/A -89.515 507.7856667 89.51520003 0.00 -5393.79 82.565 N/A 449.4825 82.565

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

Page 264: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

20004 N/A -5807.74 21.956 -36.013 483.9783333 36.01320005 0.00 -4686.134 N/A -54.584 390.5111667 54.58420006 0.00 -1849.033 26.401 N/A 154.0860833 26.40120007 N/A -2049.957 8.013 -8.054 170.82975 8.05420008 0.00 -1846.823 N/A -26.379 153.9019167 26.37920009 0.00 -1848.552 26.397 N/A 154.046 26.39720010 N/A -2049.245 8.009 -8.058 170.7704167 8.05820011 0.00 -1846.172 N/A -26.373 153.8476667 26.37320012 0.00 -1848.084 26.392 N/A 154.007 26.39220013 N/A -2048.835 8.015 -8.05 170.73625 8.0520014 0.00 -1846.009 N/A -26.371 153.8340833 26.37120015 0.00 -1848.346 26.394 N/A 154.0288333 26.39420016 N/A -2049.023 8.01 -8.057 170.7519167 8.05720017 0.00 -1846.01 N/A -26.371 153.8341667 26.37120018 0.00 -1848.219 26.393 N/A 154.01825 26.39320019 N/A -2049.019 8.016 -8.051 170.7515833 8.05120020 0.00 -1846.134 N/A -26.372 153.8445 26.37220021 0.00 -1848.224 26.393 N/A 154.0186667 26.39320022 N/A -2048.84 8.009 -8.056 170.7366667 8.05620023 0.00 -1845.88 N/A -26.37 153.8233333 26.3720024 0.00 -1848.36 26.395 N/A 154.03 26.39520025 N/A -2049.241 8.018 -8.05 170.7700833 8.0520026 0.00 -1846.358 N/A -26.375 153.8631667 26.37520027 0.00 -1849.083 26.402 N/A 154.09025 26.40220028 N/A -2050.005 8.013 -8.054 170.83375 8.05420029 0.00 -1846.883 N/A -26.38 153.9069167 26.3820030 0.00 -1878.36 26.693 N/A 156.53 26.69320031 N/A -2078.098 8 -8.065 173.1748333 8.06520032 0.00 -1874.272 N/A -26.652 156.1893333 26.65220033 0.00 -1879.623 26.705 N/A 156.63525 26.70520034 N/A -2079.553 7.996 -8.071 173.2960833 8.07120035 0.00 -1875.324 N/A -26.662 156.277 26.662

North 30000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 30001 0.00 -11.763 0.467 -0.467 0.98025 0.467

30002 0.00 -11.763 0.467 -0.467 0.98025 0.46730003 0.00 -11.763 0.467 -0.467 0.98025 0.46730004 0.00 -11.762 0.467 -0.467 0.980166667 0.46730005 0.00 -11.763 0.467 -0.467 0.98025 0.46730006 0.00 -11.763 0.467 -0.467 0.98025 0.46730007 0.00 -11.763 0.467 -0.467 0.98025 0.467

Page 265: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

30008 0.00 -11.763 0.467 -0.467 0.98025 0.46730009 0.00 -11.763 0.467 -0.467 0.98025 0.46730010 0.00 -11.763 0.467 -0.467 0.98025 0.46730011 0.00 -11.764 0.467 -0.467 0.980333333 0.46730012 0.00 -11.763 0.467 -0.467 0.98025 0.46730013 0.00 -11.76 0.467 -0.467 0.98 0.46730014 0.00 -11.763 0.467 -0.467 0.98025 0.46730015 0.00 -11.763 0.467 -0.467 0.98025 0.46730016 0.00 -11.763 0.467 -0.467 0.98025 0.46730017 0.00 -11.763 0.467 -0.467 0.98025 0.46730018 0.00 -11.763 0.467 -0.467 0.98025 0.46730019 0.00 -11.763 0.467 -0.467 0.98025 0.46730020 0.00 -11.763 0.467 -0.467 0.98025 0.46730021 0.00 -11.763 0.467 -0.467 0.98025 0.46730022 0.00 -11.76 0.467 -0.467 0.98 0.46730023 0.00 -11.763 0.467 -0.467 0.98025 0.46730024 0.00 -11.763 0.467 -0.467 0.98025 0.46730025 0.00 -11.763 0.467 -0.467 0.98025 0.46730026 0.00 -11.763 0.467 -0.467 0.98025 0.46730027 0.00 -11.763 0.467 -0.467 0.98025 0.46730028 0.00 -11.763 0.467 -0.467 0.98025 0.46730029 0.00 -11.763 0.467 -0.467 0.98025 0.46730030 0.00 -11.763 0.467 -0.467 0.98025 0.46730031 0.00 -11.76 0.467 -0.467 0.98 0.46730032 0.00 -11.763 0.467 -0.467 0.98025 0.46730033 0.00 -11.763 0.467 -0.467 0.98025 0.46730034 0.00 -11.763 0.467 -0.467 0.98025 0.46730035 0.00 -11.763 0.467 -0.467 0.98025 0.467

South 40000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 40001 0.00 -11.763 0.467 -0.467 0.98025 0.467

40002 0.00 -11.763 0.467 -0.467 0.98025 0.46740003 0.00 -11.763 0.467 -0.467 0.98025 0.46740004 0.00 -11.762 0.467 -0.467 0.980166667 0.46740005 0.00 -11.763 0.467 -0.467 0.98025 0.46740006 0.00 -11.763 0.467 -0.467 0.98025 0.46740007 0.00 -11.763 0.467 -0.467 0.98025 0.46740008 0.00 -11.763 0.467 -0.467 0.98025 0.46740009 0.00 -11.763 0.467 -0.467 0.98025 0.46740010 0.00 -11.763 0.467 -0.467 0.98025 0.46740011 0.00 -11.764 0.467 -0.467 0.980333333 0.467

Page 266: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

40012 0.00 -11.763 0.467 -0.467 0.98025 0.46740013 0.00 -11.76 0.467 -0.467 0.98 0.46740014 0.00 -11.763 0.467 -0.467 0.98025 0.46740015 0.00 -11.763 0.467 -0.467 0.98025 0.46740016 0.00 -11.763 0.467 -0.467 0.98025 0.46740017 0.00 -11.763 0.467 -0.467 0.98025 0.46740018 0.00 -11.763 0.467 -0.467 0.98025 0.46740019 0.00 -11.763 0.467 -0.467 0.98025 0.46740020 0.00 -11.763 0.467 -0.467 0.98025 0.46740021 0.00 -11.763 0.467 -0.467 0.98025 0.46740022 0.00 -11.76 0.467 -0.467 0.98 0.46740023 0.00 -11.763 0.467 -0.467 0.98025 0.46740024 0.00 -11.763 0.467 -0.467 0.98025 0.46740025 0.00 -11.763 0.467 -0.467 0.98025 0.46740026 0.00 -11.763 0.467 -0.467 0.98025 0.46740027 0.00 -11.763 0.467 -0.467 0.98025 0.46740028 0.00 -11.763 0.467 -0.467 0.98025 0.46740029 0.00 -11.763 0.467 -0.467 0.98025 0.46740030 0.00 -11.763 0.467 -0.467 0.98025 0.46740031 0.00 -11.76 0.467 -0.467 0.98 0.46740032 0.00 -11.763 0.467 -0.467 0.98025 0.46740033 0.00 -11.763 0.467 -0.467 0.98025 0.46740034 0.00 -11.763 0.467 -0.467 0.98025 0.46740035 0.00 -11.763 0.467 -0.467 0.98025 0.467

Floorbeam60000 0.00 -2767.865 92.663 N/A 230.6554167 92.66360001 N/A -2850.502 2.776 N/A 237.5418333 2.77660002 N/A -2910.299 1.347 -0.896 242.5249167 1.34760003 N/A -2921.213 N/A -2.325 243.4344167 2.32560004 0.00 -2768.562 N/A -92.686 230.7135 92.68660010 0.00 -67.566 2.086 N/A 5.6305 2.08660011 N/A -45.449 0.733 N/A 3.787416667 0.73360012 N/A -48.424 0.267 -0.568 4.035333333 0.56860013 N/A -33.93 N/A -1.294 2.8275 1.29460014 87.74 0 N/A -2.646 7.311583333 2.64660020 0.00 -72.457 2.222 N/A 6.038083333 2.22260021 N/A -52.527 0.869 N/A 4.37725 0.86960022 N/A -53.068 0.134 -0.702 4.422333333 0.70260023 N/A -31.868 N/A -1.168 2.655666667 1.16860024 83.21 0 N/A -2.52 6.934416667 2.5260100 0.00 -5251.48 175.443 N/A 437.6233333 175.443

Page 267: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60101 N/A -5357.328 3.414 N/A 446.444 3.41460102 N/A -5453.205 1.534 -0.67 454.43375 1.53460103 N/A -5496.104 N/A -2.55 458.0086667 2.5560104 0.00 -5250.738 N/A -175.418 437.5615 175.41860110 0.00 -67.738 2.09 N/A 5.644833333 2.0960111 N/A -45.73 0.738 N/A 3.810833333 0.73860112 N/A -48.506 0.272 -0.563 4.042166667 0.56360113 N/A -33.878 N/A -1.287 2.823166667 1.28760114 87.52 0 N/A -2.64 7.293166667 2.6460120 0.00 -73.075 2.239 N/A 6.089583333 2.23960121 N/A -53.404 0.886 N/A 4.450333333 0.88660122 N/A -52.913 0.149 -0.686 4.409416667 0.68660123 N/A -31.547 N/A -1.152 2.628916667 1.15260124 82.64 0 N/A -2.504 6.886833333 2.50460200 0.00 -2520.188 84.4 N/A 210.0156667 84.460201 N/A -2624.943 3.382 N/A 218.74525 3.38260202 N/A -2715.766 1.502 -0.702 226.3138333 1.50260203 N/A -2754.366 N/A -2.582 229.5305 2.58260204 0.00 -2518.844 N/A -84.355 209.9036667 84.35560210 0.00 -60.343 1.885 N/A 5.028583333 1.88560211 N/A -40.525 0.533 N/A 3.377083333 0.53360212 N/A -43.076 0.265 -0.571 3.589666667 0.57160213 N/A -28.474 N/A -0.969 2.372833333 0.96960214 76.06 0 N/A -2.321 6.338 2.32160220 0.00 -62.736 1.951 N/A 5.228 1.95160221 N/A -43.997 0.599 N/A 3.666416667 0.59960222 N/A -45.243 0.197 -0.638 3.77025 0.63860223 N/A -27.394 N/A -0.906 2.282833333 0.90660224 73.78 0 N/A -2.258 6.148083333 2.25860300 0.00 -1673.919 56.191 N/A 139.49325 56.19160301 N/A -1777.902 3.361 N/A 148.1585 3.36160302 N/A -1864.577 1.481 -0.724 155.3814167 1.48160303 N/A -1899.581 N/A -2.603 158.2984167 2.60360304 0.00 -1673.186 N/A -56.167 139.4321667 56.16760310 0.00 -60.346 1.885 N/A 5.028833333 1.88560311 N/A -40.531 0.533 N/A 3.377583333 0.53360312 N/A -43.08 0.265 -0.571 3.59 0.57160313 N/A -28.448 N/A -0.968 2.370666667 0.96860314 76.04 0 N/A -2.321 6.33625 2.32160320 0.00 -63.173 1.964 N/A 5.264416667 1.96460321 N/A -44.632 0.611 N/A 3.719333333 0.611

Page 268: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60322 N/A -45.248 0.209 -0.626 3.770666667 0.62660323 N/A -27.198 N/A -0.894 2.2665 0.89460324 73.36 0 N/A -2.247 6.113166667 2.24760400 0.00 -1674.109 56.197 N/A 139.5090833 56.19760401 N/A -1777.946 3.357 N/A 148.1621667 3.35760402 N/A -1864.257 1.477 -0.727 155.35475 1.47760403 N/A -1899.007 N/A -2.607 158.2505833 2.60760404 0.00 -1672.955 N/A -56.159 139.4129167 56.15960410 0.00 -60.771 1.897 N/A 5.06425 1.89760411 N/A -41.152 0.545 N/A 3.429333333 0.54560412 N/A -43.15 0.277 -0.559 3.595833333 0.55960413 N/A -28.254 N/A -0.957 2.3545 0.95760414 75.62 0 N/A -2.309 6.301583333 2.30960420 0.00 -62.891 1.956 N/A 5.240916667 1.95660421 N/A -44.223 0.603 N/A 3.68525 0.60360422 N/A -45.245 0.202 -0.634 3.770416667 0.63460423 N/A -27.322 N/A -0.902 2.276833333 0.90260424 73.62 0 N/A -2.254 6.13525 2.25460500 0.00 -1674.087 56.197 N/A 139.50725 56.19760501 N/A -1777.946 3.357 N/A 148.1621667 3.35760502 N/A -1864.333 1.478 -0.727 155.3610833 1.47860503 N/A -1899.142 N/A -2.606 158.2618333 2.60660504 0.00 -1672.974 N/A -56.159 139.4145 56.15960510 0.00 -60.49 1.889 N/A 5.040833333 1.88960511 N/A -40.741 0.537 N/A 3.395083333 0.53760512 N/A -43.108 0.269 -0.567 3.592333333 0.56760513 N/A -28.382 N/A -0.965 2.365166667 0.96560514 75.89 0 N/A -2.317 6.3245 2.31760520 0.00 -63.157 1.963 N/A 5.263083333 1.96360521 N/A -44.609 0.611 N/A 3.717416667 0.61160522 N/A -45.25 0.209 -0.627 3.770833333 0.62760523 N/A -27.205 N/A -0.895 2.267083333 0.89560524 73.37 0 N/A -2.247 6.114416667 2.24760600 0.00 -1674.162 56.199 N/A 139.5135 56.19960601 N/A -1777.986 3.356 N/A 148.1655 3.35660602 N/A -1864.273 1.477 -0.728 155.3560833 1.47760603 N/A -1899.007 N/A -2.607 158.2505833 2.60760604 0.00 -1672.965 N/A -56.159 139.41375 56.15960610 0.00 -60.754 1.896 N/A 5.062833333 1.89660611 N/A -41.125 0.544 N/A 3.427083333 0.54460612 N/A -43.15 0.276 -0.559 3.595833333 0.559

Page 269: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60613 N/A -28.264 N/A -0.958 2.355333333 0.95860614 75.64 0 N/A -2.31 6.303416667 2.3160620 0.00 -62.892 1.956 N/A 5.241 1.95660621 N/A -44.224 0.603 N/A 3.685333333 0.60360622 N/A -45.248 0.202 -0.634 3.770666667 0.63460623 N/A -27.323 N/A -0.902 2.276916667 0.90260624 73.63 0 N/A -2.254 6.1355 2.25460700 0.00 -1674.088 56.197 N/A 139.5073333 56.19760701 N/A -1777.946 3.357 N/A 148.1621667 3.35760702 N/A -1864.333 1.478 -0.727 155.3610833 1.47860703 N/A -1899.143 N/A -2.606 158.2619167 2.60660704 0.00 -1672.974 N/A -56.159 139.4145 56.15960710 0.00 -60.488 1.889 N/A 5.040666667 1.88960711 N/A -40.74 0.537 N/A 3.395 0.53760712 N/A -43.109 0.269 -0.567 3.592416667 0.56760713 N/A -28.38 N/A -0.964 2.365 0.96460714 75.89 0 N/A -2.317 6.324166667 2.31760720 0.00 -63.173 1.964 N/A 5.264416667 1.96460721 N/A -44.634 0.611 N/A 3.7195 0.61160722 N/A -45.249 0.209 -0.626 3.77075 0.62660723 N/A -27.196 N/A -0.894 2.266333333 0.89460724 73.35 0 N/A -2.246 6.112666667 2.24660800 0.00 -1674.109 56.197 N/A 139.5090833 56.19760801 N/A -1777.946 3.357 N/A 148.1621667 3.35760802 N/A -1864.259 1.477 -0.727 155.3549167 1.47760803 N/A -1899.011 N/A -2.607 158.2509167 2.60760804 0.00 -1672.957 N/A -56.159 139.4130833 56.15960810 0.00 -60.771 1.897 N/A 5.06425 1.89760811 N/A -41.149 0.544 N/A 3.429083333 0.54460812 N/A -43.148 0.277 -0.559 3.595666667 0.55960813 N/A -28.258 N/A -0.957 2.354833333 0.95760814 75.63 0 N/A -2.31 6.302416667 2.3160820 0.00 -62.745 1.952 N/A 5.22875 1.95260821 N/A -44.01 0.599 N/A 3.6675 0.59960822 N/A -45.255 0.198 -0.638 3.77125 0.63860823 N/A -27.39 N/A -0.905 2.2825 0.90560824 73.77 0 N/A -2.258 6.147333333 2.25860900 0.00 -1673.924 56.191 N/A 139.4936667 56.19160901 N/A -1777.904 3.361 N/A 148.1586667 3.36160902 N/A -1864.584 1.481 -0.723 155.382 1.48160903 N/A -1899.591 N/A -2.603 158.29925 2.603

Page 270: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60904 0.00 -1673.197 N/A -56.167 139.4330833 56.16760910 0.00 -60.341 1.885 N/A 5.028416667 1.88560911 N/A -40.518 0.533 N/A 3.3765 0.53360912 N/A -43.075 0.265 -0.571 3.589583333 0.57160913 N/A -28.459 N/A -0.969 2.371583333 0.96960914 76.06 0 N/A -2.322 6.33825 2.32260920 0.00 -62.729 1.951 N/A 5.227416667 1.95160921 N/A -43.986 0.599 N/A 3.6655 0.59960922 N/A -45.271 0.197 -0.638 3.772583333 0.63860923 N/A -27.397 N/A -0.906 2.283083333 0.90660924 73.79 0 N/A -2.258 6.14875 2.25861000 0.00 -1681.709 56.451 N/A 140.1424167 56.45161001 N/A -1786.719 3.389 N/A 148.89325 3.38961002 N/A -1878.175 1.51 -0.695 156.5145833 1.5161003 N/A -1917.157 N/A -2.574 159.7630833 2.57461004 0.00 -1681.218 N/A -56.434 140.1015 56.43461010 0.00 -68.305 2.106 N/A 5.692083333 2.10661011 N/A -46.529 0.754 N/A 3.877416667 0.75461012 N/A -48.505 0.288 -0.548 4.042083333 0.54861013 N/A -33.562 N/A -1.273 2.796833333 1.27361014 86.99 0 N/A -2.625 7.249416667 2.62561020 0.00 -72.488 2.222 N/A 6.040666667 2.22261021 N/A -52.553 0.87 N/A 4.379416667 0.8761022 N/A -52.984 0.134 -0.701 4.415333333 0.70161023 N/A -31.782 N/A -1.167 2.6485 1.16761024 83.18 0 N/A -2.519 6.931666667 2.51961100 0.00 -1689.771 56.719 N/A 140.81425 56.71961101 N/A -1795.67 3.414 N/A 149.6391667 3.41461102 N/A -1891.625 1.535 -0.67 157.6354167 1.53561103 N/A -1934.41 N/A -2.55 161.2008333 2.5561104 0.00 -1689.011 N/A -56.694 140.7509167 56.69461110 0.00 -67.719 2.09 N/A 5.64325 2.0961111 N/A -45.665 0.737 N/A 3.805416667 0.73761112 N/A -48.39 0.271 -0.564 4.0325 0.56461113 N/A -33.842 N/A -1.29 2.820166667 1.2961114 87.59 0 N/A -2.642 7.299416667 2.64261120 0.00 -72.323 2.218 N/A 6.026916667 2.21861121 N/A -52.307 0.865 N/A 4.358916667 0.86561122 N/A -53 0.13 -0.705 4.416666667 0.70561123 N/A -31.841 N/A -1.171 2.653416667 1.17161124 83.34 0 N/A -2.524 6.94525 2.524

Page 271: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 11 Strength I for Phase 1

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

61200 0.00 -883.126 29.838 N/A 73.59383333 29.83861201 N/A -965.221 2.761 N/A 80.43508333 2.76161202 N/A -1023.864 1.332 -0.911 85.322 1.33261203 N/A -1033.782 N/A -2.34 86.1485 2.3461204 0.00 -882.085 N/A -29.803 73.50708333 29.803

Page 272: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

North 10000 0.00 -6050.192 89.086 N/A 504.1826667 89.086RG 10001 N/A -6781.891 29.031 -28.939 565.1575833 29.031

10002 0.00 -6054.627 N/A -89.13 504.55225 89.1310003 0.00 -5348.127 82.112 N/A 445.67725 82.11210004 N/A -5766.547 22.052 -35.917 480.5455833 35.91710005 0.00 -4649.73 N/A -54.223 387.4775 54.22310006 0.00 -1809.424 26.008 N/A 150.7853333 26.00810007 N/A -2012.855 8.056 -8.011 167.7379167 8.05610008 0.00 -1811.64 N/A -26.03 150.97 26.0310009 0.00 -6028.256 88.868 N/A 502.3546667 88.86810010 N/A -6759.242 29.013 -28.956 563.2701667 29.01310011 0.00 -6030.796 N/A -88.892 502.5663333 88.89210012 0.00 -6028.333 88.868 N/A 502.3610833 88.86810013 N/A -6758.973 29.001 -28.963 563.24775 29.00110014 0.00 -6030.397 N/A -88.889 502.5330833 88.88910015 0.00 -6028.52 88.87 N/A 502.3766667 88.8710016 N/A -6759.468 29.011 -28.96 563.289 29.01110017 0.00 -6030.867 N/A -88.894 502.57225 88.89410018 0.00 -6028.653 88.872 N/A 502.38775 88.87210019 N/A -6759.463 29.005 -28.966 563.2885833 29.00510020 0.00 -6030.723 N/A -88.892 502.56025 88.89210021 0.00 -6028.201 88.867 N/A 502.3500833 88.86710022 N/A -6758.979 29.007 -28.956 563.24825 29.00710023 0.00 -6030.555 N/A -88.89 502.54625 88.8910024 0.00 -6028.502 88.87 N/A 502.3751667 88.8710025 N/A -6759.228 29.003 -28.968 563.269 29.00310026 0.00 -6030.494 N/A -88.89 502.5411667 88.8910027 0.00 -1809.454 26.008 N/A 150.7878333 26.00810028 N/A -2012.872 8.056 -8.012 167.7393333 8.05610029 0.00 -1811.663 N/A -26.03 150.9719167 26.0310030 0.00 -1833.198 26.244 N/A 152.7665 26.24410031 N/A -2037.678 8.071 -7.995 169.8065 8.07110032 0.00 -1837.275 N/A -26.284 153.10625 26.28410033 0.00 -1832.133 26.233 N/A 152.67775 26.23310034 N/A -2036.532 8.076 -7.991 169.711 8.07610035 0.00 -1836.426 N/A -26.276 153.0355 26.276

South 20000 0.00 -6097.876 89.56 N/A 508.1563333 89.56RG 20001 N/A -6824.988 28.944 -29.026 568.749 29.026

20002 0.00 -6093.429 N/A -89.515 507.78575 89.51520003 0.00 -5393.791 82.565 N/A 449.4825833 82.565

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

Page 273: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

20004 N/A -5807.741 21.956 -36.013 483.9784167 36.01320005 0.00 -4686.135 N/A -54.584 390.51125 54.58420006 0.00 -1849.027 26.401 N/A 154.0855833 26.40120007 N/A -2049.947 8.013 -8.054 170.8289167 8.05420008 0.00 -1846.811 N/A -26.379 153.9009167 26.37920009 0.00 -6066.796 89.251 N/A 505.5663333 89.25120010 N/A -6794.779 28.961 -29.009 566.2315833 29.00920011 0.00 -6064.487 N/A -89.227 505.3739167 89.22720012 0.00 -6066.088 89.244 N/A 505.5073333 89.24420013 N/A -6793.98 28.964 -28.999 566.165 28.99920014 0.00 -6064.011 N/A -89.223 505.33425 89.22320015 0.00 -6066.601 89.249 N/A 505.5500833 89.24920016 N/A -6794.548 28.962 -29.009 566.2123333 29.00920017 0.00 -6064.27 N/A -89.225 505.3558333 89.22520018 0.00 -6066.476 89.247 N/A 505.5396667 89.24720019 N/A -6794.54 28.968 -29.003 566.2116667 29.00320020 0.00 -6064.384 N/A -89.227 505.3653333 89.22720021 0.00 -6066.236 89.245 N/A 505.5196667 89.24520022 N/A -6793.994 28.958 -29.005 566.1661667 29.00520023 0.00 -6063.895 N/A -89.222 505.3245833 89.22220024 0.00 -6066.622 89.249 N/A 505.5518333 89.24920025 N/A -6794.771 28.969 -29.001 566.2309167 29.00120026 0.00 -6064.625 N/A -89.229 505.3854167 89.22920027 0.00 -1849.072 26.402 N/A 154.0893333 26.40220028 N/A -2049.996 8.013 -8.054 170.833 8.05420029 0.00 -1846.877 N/A -26.38 153.9064167 26.3820030 0.00 -1878.362 26.693 N/A 156.5301667 26.69320031 N/A -2078.101 8 -8.065 173.1750833 8.06520032 0.00 -1874.274 N/A -26.652 156.1895 26.65220033 0.00 -1879.623 26.705 N/A 156.63525 26.70520034 N/A -2079.554 7.996 -8.071 173.2961667 8.07120035 0.00 -1875.325 N/A -26.662 156.2770833 26.662

North 30000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 30001 0.00 -11.763 0.467 -0.467 0.98025 0.467

30002 0.00 -11.763 0.467 -0.467 0.98025 0.46730003 0.00 -11.763 0.467 -0.467 0.98025 0.46730004 0.00 -11.762 0.467 -0.467 0.980166667 0.46730005 0.00 -11.763 0.467 -0.467 0.98025 0.46730006 0.00 -11.763 0.467 -0.467 0.98025 0.46730007 0.00 -11.763 0.467 -0.467 0.98025 0.467

Page 274: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

30008 0.00 -11.763 0.467 -0.467 0.98025 0.46730009 0.00 -11.763 0.467 -0.467 0.98025 0.46730010 0.00 -11.763 0.467 -0.467 0.98025 0.46730011 0.00 -11.764 0.467 -0.467 0.980333333 0.46730012 0.00 -11.763 0.467 -0.467 0.98025 0.46730013 0.00 -11.76 0.467 -0.467 0.98 0.46730014 0.00 -11.763 0.467 -0.467 0.98025 0.46730015 0.00 -11.763 0.467 -0.467 0.98025 0.46730016 0.00 -11.763 0.467 -0.467 0.98025 0.46730017 0.00 -11.763 0.467 -0.467 0.98025 0.46730018 0.00 -11.763 0.467 -0.467 0.98025 0.46730019 0.00 -11.763 0.467 -0.467 0.98025 0.46730020 0.00 -11.763 0.467 -0.467 0.98025 0.46730021 0.00 -11.763 0.467 -0.467 0.98025 0.46730022 0.00 -11.76 0.467 -0.467 0.98 0.46730023 0.00 -11.763 0.467 -0.467 0.98025 0.46730024 0.00 -11.763 0.467 -0.467 0.98025 0.46730025 0.00 -11.763 0.467 -0.467 0.98025 0.46730026 0.00 -11.763 0.467 -0.467 0.98025 0.46730027 0.00 -11.763 0.467 -0.467 0.98025 0.46730028 0.00 -11.763 0.467 -0.467 0.98025 0.46730029 0.00 -11.763 0.467 -0.467 0.98025 0.46730030 0.00 -11.763 0.467 -0.467 0.98025 0.46730031 0.00 -11.76 0.467 -0.467 0.98 0.46730032 0.00 -11.763 0.467 -0.467 0.98025 0.46730033 0.00 -11.763 0.467 -0.467 0.98025 0.46730034 0.00 -11.763 0.467 -0.467 0.98025 0.46730035 0.00 -11.763 0.467 -0.467 0.98025 0.467

South 40000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 40001 0.00 -11.763 0.467 -0.467 0.98025 0.467

40002 0.00 -11.763 0.467 -0.467 0.98025 0.46740003 0.00 -11.763 0.467 -0.467 0.98025 0.46740004 0.00 -11.762 0.467 -0.467 0.980166667 0.46740005 0.00 -11.763 0.467 -0.467 0.98025 0.46740006 0.00 -11.763 0.467 -0.467 0.98025 0.46740007 0.00 -11.763 0.467 -0.467 0.98025 0.46740008 0.00 -11.763 0.467 -0.467 0.98025 0.46740009 0.00 -11.763 0.467 -0.467 0.98025 0.46740010 0.00 -11.763 0.467 -0.467 0.98025 0.46740011 0.00 -11.764 0.467 -0.467 0.980333333 0.467

Page 275: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

40012 0.00 -11.763 0.467 -0.467 0.98025 0.46740013 0.00 -11.76 0.467 -0.467 0.98 0.46740014 0.00 -11.763 0.467 -0.467 0.98025 0.46740015 0.00 -11.763 0.467 -0.467 0.98025 0.46740016 0.00 -11.763 0.467 -0.467 0.98025 0.46740017 0.00 -11.763 0.467 -0.467 0.98025 0.46740018 0.00 -11.763 0.467 -0.467 0.98025 0.46740019 0.00 -11.763 0.467 -0.467 0.98025 0.46740020 0.00 -11.763 0.467 -0.467 0.98025 0.46740021 0.00 -11.763 0.467 -0.467 0.98025 0.46740022 0.00 -11.76 0.467 -0.467 0.98 0.46740023 0.00 -11.763 0.467 -0.467 0.98025 0.46740024 0.00 -11.763 0.467 -0.467 0.98025 0.46740025 0.00 -11.763 0.467 -0.467 0.98025 0.46740026 0.00 -11.763 0.467 -0.467 0.98025 0.46740027 0.00 -11.763 0.467 -0.467 0.98025 0.46740028 0.00 -11.763 0.467 -0.467 0.98025 0.46740029 0.00 -11.763 0.467 -0.467 0.98025 0.46740030 0.00 -11.763 0.467 -0.467 0.98025 0.46740031 0.00 -11.76 0.467 -0.467 0.98 0.46740032 0.00 -11.763 0.467 -0.467 0.98025 0.46740033 0.00 -11.763 0.467 -0.467 0.98025 0.46740034 0.00 -11.763 0.467 -0.467 0.98025 0.46740035 0.00 -11.763 0.467 -0.467 0.98025 0.467

Floorbeam60000 0.00 -2767.865 92.663 N/A 230.6554167 92.66360001 N/A -2850.502 2.776 N/A 237.5418333 2.77660002 N/A -2910.299 1.347 -0.896 242.5249167 1.34760003 N/A -2921.213 N/A -2.325 243.4344167 2.32560004 0.00 -2768.562 N/A -92.686 230.7135 92.68660010 0.00 -67.566 2.086 N/A 5.6305 2.08660011 N/A -45.449 0.733 N/A 3.787416667 0.73360012 N/A -48.424 0.267 -0.568 4.035333333 0.56860013 N/A -33.93 N/A -1.294 2.8275 1.29460014 87.74 0 N/A -2.646 7.311583333 2.64660020 0.00 -72.457 2.222 N/A 6.038083333 2.22260021 N/A -52.527 0.869 N/A 4.37725 0.86960022 N/A -53.068 0.134 -0.702 4.422333333 0.70260023 N/A -31.868 N/A -1.168 2.655666667 1.16860024 83.21 0 N/A -2.52 6.934416667 2.5260100 0.00 -5251.479 175.443 N/A 437.62325 175.443

Page 276: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60101 N/A -5357.328 3.414 N/A 446.444 3.41460102 N/A -5453.205 1.534 -0.67 454.43375 1.53460103 N/A -5496.105 N/A -2.55 458.00875 2.5560104 0.00 -5250.738 N/A -175.418 437.5615 175.41860110 0.00 -67.738 2.09 N/A 5.644833333 2.0960111 N/A -45.73 0.738 N/A 3.810833333 0.73860112 N/A -48.505 0.272 -0.563 4.042083333 0.56360113 N/A -33.878 N/A -1.287 2.823166667 1.28760114 87.52 0 N/A -2.64 7.29325 2.6460120 0.00 -73.075 2.239 N/A 6.089583333 2.23960121 N/A -53.403 0.886 N/A 4.45025 0.88660122 N/A -52.913 0.149 -0.686 4.409416667 0.68660123 N/A -31.548 N/A -1.152 2.629 1.15260124 82.64 0 N/A -2.504 6.886916667 2.50460200 0.00 -2520.187 84.4 N/A 210.0155833 84.460201 N/A -2624.956 3.382 N/A 218.7463333 3.38260202 N/A -2715.779 1.502 -0.702 226.3149167 1.50260203 N/A -2754.381 N/A -2.582 229.53175 2.58260204 0.00 -2518.844 N/A -84.355 209.9036667 84.35560210 0.00 -60.342 1.885 N/A 5.0285 1.88560211 N/A -40.525 0.533 N/A 3.377083333 0.53360212 N/A -43.075 0.265 -0.571 3.589583333 0.57160213 N/A -28.475 N/A -0.969 2.372916667 0.96960214 76.06 0 N/A -2.322 6.338 2.32260220 0.00 -62.743 1.952 N/A 5.228583333 1.95260221 N/A -44.017 0.599 N/A 3.668083333 0.59960222 N/A -45.268 0.198 -0.638 3.772333333 0.63860223 N/A -27.428 N/A -0.906 2.285666667 0.90660224 73.77 0 N/A -2.258 6.147416667 2.25860300 0.00 -3559.557 119.046 N/A 296.62975 119.04660301 N/A -3663.526 3.36 N/A 305.2938333 3.3660302 N/A -3750.154 1.481 -0.724 312.5128333 1.48160303 N/A -3785.218 N/A -2.604 315.4348333 2.60460304 0.00 -3558.824 N/A -119.021 296.5686667 119.02160310 0.00 -60.354 1.885 N/A 5.0295 1.88560311 N/A -40.552 0.533 N/A 3.379333333 0.53360312 N/A -43.13 0.265 -0.57 3.594166667 0.5760313 N/A -28.482 N/A -0.968 2.3735 0.96860314 76.03 0 N/A -2.321 6.335666667 2.32160320 0.00 -63.187 1.964 N/A 5.265583333 1.96460321 N/A -44.675 0.612 N/A 3.722916667 0.612

Page 277: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60322 N/A -45.326 0.21 -0.626 3.777166667 0.62660323 N/A -27.266 N/A -0.894 2.272166667 0.89460324 73.34 0 N/A -2.246 6.111916667 2.24660400 0.00 -5445.311 181.904 N/A 453.7759167 181.90460401 N/A -5549.107 3.356 N/A 462.4255833 3.35660402 N/A -5635.324 1.476 -0.728 469.6103333 1.47660403 N/A -5670.191 N/A -2.608 472.5159167 2.60860404 0.00 -5444.155 N/A -181.866 453.6795833 181.86660410 0.00 -60.786 1.897 N/A 5.0655 1.89760411 N/A -41.195 0.545 N/A 3.432916667 0.54560412 N/A -43.231 0.277 -0.558 3.602583333 0.55860413 N/A -28.322 N/A -0.957 2.360166667 0.95760414 75.60 0 N/A -2.309 6.300333333 2.30960420 0.00 -62.905 1.956 N/A 5.242083333 1.95660421 N/A -44.265 0.604 N/A 3.68875 0.60460422 N/A -45.317 0.202 -0.633 3.776416667 0.63360423 N/A -27.39 N/A -0.901 2.2825 0.90160424 73.61 0 N/A -2.254 6.134083333 2.25460500 0.00 -5445.287 181.903 N/A 453.7739167 181.90360501 N/A -5549.118 3.357 N/A 462.4265 3.35760502 N/A -5635.411 1.477 -0.728 469.6175833 1.47760503 N/A -5670.339 N/A -2.607 472.52825 2.60760504 0.00 -5444.172 N/A -181.866 453.681 181.86660510 0.00 -60.504 1.889 N/A 5.042 1.88960511 N/A -40.783 0.537 N/A 3.398583333 0.53760512 N/A -43.182 0.269 -0.566 3.5985 0.56660513 N/A -28.45 N/A -0.964 2.370833333 0.96460514 75.88 0 N/A -2.317 6.32325 2.31760520 0.00 -63.171 1.964 N/A 5.26425 1.96460521 N/A -44.651 0.611 N/A 3.720916667 0.61160522 N/A -45.33 0.209 -0.626 3.7775 0.62660523 N/A -27.273 N/A -0.894 2.27275 0.89460524 73.36 0 N/A -2.247 6.11325 2.24760600 0.00 -5445.438 181.908 N/A 453.7865 181.90860601 N/A -5549.235 3.356 N/A 462.43625 3.35660602 N/A -5635.428 1.476 -0.729 469.619 1.47660603 N/A -5670.282 N/A -2.608 472.5235 2.60860604 0.00 -5444.24 N/A -181.868 453.6866667 181.86860610 0.00 -60.768 1.897 N/A 5.064 1.89760611 N/A -41.168 0.544 N/A 3.430666667 0.54460612 N/A -43.232 0.277 -0.559 3.602666667 0.559

Page 278: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60613 N/A -28.332 N/A -0.957 2.361 0.95760614 75.63 0 N/A -2.31 6.30225 2.3160620 0.00 -62.906 1.956 N/A 5.242166667 1.95660621 N/A -44.266 0.604 N/A 3.688833333 0.60460622 N/A -45.319 0.202 -0.633 3.776583333 0.63360623 N/A -27.391 N/A -0.901 2.282583333 0.90160624 73.61 0 N/A -2.254 6.134333333 2.25460700 0.00 -5445.288 181.903 N/A 453.774 181.90360701 N/A -5549.119 3.357 N/A 462.4265833 3.35760702 N/A -5635.412 1.477 -0.728 469.6176667 1.47760703 N/A -5670.341 N/A -2.607 472.5284167 2.60760704 0.00 -5444.173 N/A -181.866 453.6810833 181.86660710 0.00 -60.502 1.889 N/A 5.041833333 1.88960711 N/A -40.782 0.537 N/A 3.3985 0.53760712 N/A -43.183 0.269 -0.566 3.598583333 0.56660713 N/A -28.449 N/A -0.964 2.37075 0.96460714 75.88 0 N/A -2.316 6.323 2.31660720 0.00 -63.188 1.964 N/A 5.265666667 1.96460721 N/A -44.677 0.612 N/A 3.723083333 0.61260722 N/A -45.327 0.21 -0.626 3.77725 0.62660723 N/A -27.264 N/A -0.894 2.272 0.89460724 73.34 0 N/A -2.246 6.1115 2.24660800 0.00 -5445.311 181.904 N/A 453.7759167 181.90460801 N/A -5549.107 3.356 N/A 462.4255833 3.35660802 N/A -5635.327 1.476 -0.728 469.6105833 1.47660803 N/A -5670.196 N/A -2.608 472.5163333 2.60860804 0.00 -5444.157 N/A -181.866 453.67975 181.86660810 0.00 -60.786 1.897 N/A 5.0655 1.89760811 N/A -41.191 0.545 N/A 3.432583333 0.54560812 N/A -43.229 0.277 -0.558 3.602416667 0.55860813 N/A -28.326 N/A -0.957 2.3605 0.95760814 75.61 0 N/A -2.309 6.301166667 2.30960820 0.00 -62.752 1.952 N/A 5.229333333 1.95260821 N/A -44.03 0.599 N/A 3.669166667 0.59960822 N/A -45.305 0.198 -0.637 3.775416667 0.63760823 N/A -27.424 N/A -0.905 2.285333333 0.90560824 73.76 0 N/A -2.258 6.146833333 2.25860900 0.00 -3559.561 119.046 N/A 296.6300833 119.04660901 N/A -3663.527 3.36 N/A 305.2939167 3.3660902 N/A -3750.16 1.481 -0.724 312.5133333 1.48160903 N/A -3785.228 N/A -2.604 315.4356667 2.604

Page 279: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60904 0.00 -3558.834 N/A -119.021 296.5695 119.02160910 0.00 -60.347 1.885 N/A 5.028916667 1.88560911 N/A -40.538 0.533 N/A 3.378166667 0.53360912 N/A -43.101 0.265 -0.57 3.59175 0.5760913 N/A -28.493 N/A -0.969 2.374416667 0.96960914 76.05 0 N/A -2.321 6.337583333 2.32160920 0.00 -62.729 1.951 N/A 5.227416667 1.95160921 N/A -43.986 0.599 N/A 3.6655 0.59960922 N/A -45.269 0.197 -0.638 3.772416667 0.63860923 N/A -27.398 N/A -0.906 2.283166667 0.90660924 73.79 0 N/A -2.258 6.148833333 2.25861000 0.00 -1681.709 56.451 N/A 140.1424167 56.45161001 N/A -1786.732 3.389 N/A 148.8943333 3.38961002 N/A -1878.189 1.51 -0.695 156.51575 1.5161003 N/A -1917.173 N/A -2.575 159.7644167 2.57561004 0.00 -1681.219 N/A -56.434 140.1015833 56.43461010 0.00 -68.304 2.106 N/A 5.692 2.10661011 N/A -46.528 0.754 N/A 3.877333333 0.75461012 N/A -48.503 0.288 -0.548 4.041916667 0.54861013 N/A -33.562 N/A -1.273 2.796833333 1.27361014 86.99 0 N/A -2.625 7.2495 2.62561020 0.00 -72.488 2.222 N/A 6.040666667 2.22261021 N/A -52.553 0.87 N/A 4.379416667 0.8761022 N/A -52.984 0.134 -0.701 4.415333333 0.70161023 N/A -31.782 N/A -1.167 2.6485 1.16761024 83.18 0 N/A -2.519 6.931666667 2.51961100 0.00 -1689.771 56.719 N/A 140.81425 56.71961101 N/A -1795.67 3.414 N/A 149.6391667 3.41461102 N/A -1891.625 1.535 -0.67 157.6354167 1.53561103 N/A -1934.411 N/A -2.55 161.2009167 2.5561104 0.00 -1689.011 N/A -56.694 140.7509167 56.69461110 0.00 -67.719 2.09 N/A 5.64325 2.0961111 N/A -45.665 0.737 N/A 3.805416667 0.73761112 N/A -48.389 0.271 -0.564 4.032416667 0.56461113 N/A -33.842 N/A -1.29 2.820166667 1.2961114 87.59 0 N/A -2.642 7.299416667 2.64261120 0.00 -72.323 2.218 N/A 6.026916667 2.21861121 N/A -52.306 0.865 N/A 4.358833333 0.86561122 N/A -53 0.13 -0.705 4.416666667 0.70561123 N/A -31.841 N/A -1.171 2.653416667 1.17161124 83.34 0 N/A -2.524 6.94525 2.524

Page 280: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 12 Strength I for Phase 2

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

61200 0.00 -883.126 29.838 N/A 73.59383333 29.83861201 N/A -965.221 2.761 N/A 80.43508333 2.76161202 N/A -1023.865 1.332 -0.911 85.32208333 1.33261203 N/A -1033.782 N/A -2.34 86.1485 2.3461204 0.00 -882.086 N/A -29.803 73.50716667 29.803

Page 281: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

North 10000 0.00 -6050.192 89.086 N/A 504.1826667 89.086RG 10001 N/A -6781.891 29.031 -28.939 565.1575833 29.031

10002 0.00 -6054.627 N/A -89.13 504.55225 89.1310003 0.00 -5348.127 82.112 N/A 445.67725 82.11210004 N/A -5766.547 22.052 -35.917 480.5455833 35.91710005 0.00 -4649.73 N/A -54.223 387.4775 54.22310006 0.00 -1809.424 26.008 N/A 150.7853333 26.00810007 N/A -2012.856 8.056 -8.011 167.738 8.05610008 0.00 -1811.64 N/A -26.03 150.97 26.0310009 0.00 -6178.86 90.364 N/A 514.905 90.36410010 N/A -6956.91 30.509 -29.704 579.7425 30.50910011 0.00 -6219.054 N/A -91.884 518.2545 91.88410012 0.00 -6254.226 92.234 N/A 521.1855 92.23410013 N/A -7013.096 30.123 -30.084 584.4246667 30.12310014 0.00 -6256.291 N/A -92.255 521.3575833 92.25510015 0.00 -6254.427 92.236 N/A 521.20225 92.23610016 N/A -7013.612 30.133 -30.082 584.4676667 30.13310017 0.00 -6256.774 N/A -92.26 521.3978333 92.2610018 0.00 -6254.56 92.238 N/A 521.2133333 92.23810019 N/A -7013.606 30.127 -30.088 584.4671667 30.12710020 0.00 -6256.629 N/A -92.258 521.38575 92.25810021 0.00 -6254.095 92.233 N/A 521.1745833 92.23310022 N/A -7013.104 30.129 -30.078 584.4253333 30.12910023 0.00 -6256.449 N/A -92.256 521.37075 92.25610024 0.00 -6216.757 91.862 N/A 518.0630833 91.86210025 N/A -6956.895 29.751 -30.464 579.74125 30.46410026 0.00 -6181.098 N/A -90.386 515.0915 90.38610027 0.00 -1809.454 26.008 N/A 150.7878333 26.00810028 N/A -2012.872 8.056 -8.012 167.7393333 8.05610029 0.00 -1811.663 N/A -26.03 150.9719167 26.0310030 0.00 -1833.198 26.244 N/A 152.7665 26.24410031 N/A -2037.678 8.071 -7.995 169.8065 8.07110032 0.00 -1837.275 N/A -26.284 153.10625 26.28410033 0.00 -1832.133 26.233 N/A 152.67775 26.23310034 N/A -2036.532 8.076 -7.991 169.711 8.07610035 0.00 -1836.426 N/A -26.276 153.0355 26.276

South 20000 0.00 -6097.876 89.56 N/A 508.1563333 89.56RG 20001 N/A -6824.988 28.944 -29.026 568.749 29.026

20002 0.00 -6093.429 N/A -89.515 507.78575 89.51520003 0.00 -5393.791 82.565 N/A 449.4825833 82.565

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

Page 282: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

20004 N/A -5807.741 21.956 -36.013 483.9784167 36.01320005 0.00 -4686.135 N/A -54.584 390.51125 54.58420006 0.00 -1849.027 26.401 N/A 154.0855833 26.40120007 N/A -2049.947 8.013 -8.054 170.8289167 8.05420008 0.00 -1846.811 N/A -26.379 153.9009167 26.37920009 0.00 -6217.399 90.747 N/A 518.1165833 90.74720010 N/A -6992.444 30.457 -29.757 582.7036667 30.45720011 0.00 -6252.742 N/A -92.219 521.0618333 92.21920012 0.00 -6291.978 92.609 N/A 524.3315 92.60920013 N/A -7048.1 30.086 -30.121 587.3416667 30.12120014 0.00 -6289.9 N/A -92.589 524.1583333 92.58920015 0.00 -6292.503 92.615 N/A 524.37525 92.61520016 N/A -7048.688 30.084 -30.131 587.3906667 30.13120017 0.00 -6290.172 N/A -92.592 524.181 92.59220018 0.00 -6292.378 92.613 N/A 524.3648333 92.61320019 N/A -7048.68 30.09 -30.125 587.39 30.12520020 0.00 -6290.287 N/A -92.593 524.1905833 92.59320021 0.00 -6292.126 92.611 N/A 524.3438333 92.61120022 N/A -7048.113 30.08 -30.127 587.34275 30.12720023 0.00 -6289.785 N/A -92.588 524.14875 92.58820024 0.00 -6254.875 92.241 N/A 521.2395833 92.24120025 N/A -6992.437 29.717 -30.497 582.7030833 30.49720026 0.00 -6215.227 N/A -90.725 517.9355833 90.72520027 0.00 -1849.071 26.402 N/A 154.08925 26.40220028 N/A -2049.996 8.013 -8.054 170.833 8.05420029 0.00 -1846.877 N/A -26.38 153.9064167 26.3820030 0.00 -1878.362 26.693 N/A 156.5301667 26.69320031 N/A -2078.101 8 -8.065 173.1750833 8.06520032 0.00 -1874.274 N/A -26.652 156.1895 26.65220033 0.00 -1879.623 26.705 N/A 156.63525 26.70520034 N/A -2079.554 7.996 -8.071 173.2961667 8.07120035 0.00 -1875.325 N/A -26.662 156.2770833 26.662

North 30000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 30001 0.00 -11.763 0.467 -0.467 0.98025 0.467

30002 0.00 -11.763 0.467 -0.467 0.98025 0.46730003 0.00 -11.763 0.467 -0.467 0.98025 0.46730004 0.00 -11.762 0.467 -0.467 0.980166667 0.46730005 0.00 -11.763 0.467 -0.467 0.98025 0.46730006 0.00 -11.763 0.467 -0.467 0.98025 0.46730007 0.00 -11.763 0.467 -0.467 0.98025 0.467

Page 283: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

30008 0.00 -11.763 0.467 -0.467 0.98025 0.46730009 0.00 -11.763 0.467 -0.467 0.98025 0.46730010 0.00 -11.763 0.467 -0.467 0.98025 0.46730011 0.00 -11.764 0.467 -0.467 0.980333333 0.46730012 0.00 -11.763 0.467 -0.467 0.98025 0.46730013 0.00 -11.76 0.467 -0.467 0.98 0.46730014 0.00 -11.763 0.467 -0.467 0.98025 0.46730015 0.00 -11.763 0.467 -0.467 0.98025 0.46730016 0.00 -11.763 0.467 -0.467 0.98025 0.46730017 0.00 -11.763 0.467 -0.467 0.98025 0.46730018 0.00 -11.763 0.467 -0.467 0.98025 0.46730019 0.00 -11.763 0.467 -0.467 0.98025 0.46730020 0.00 -11.763 0.467 -0.467 0.98025 0.46730021 0.00 -11.763 0.467 -0.467 0.98025 0.46730022 0.00 -11.76 0.467 -0.467 0.98 0.46730023 0.00 -11.763 0.467 -0.467 0.98025 0.46730024 0.00 -11.763 0.467 -0.467 0.98025 0.46730025 0.00 -11.763 0.467 -0.467 0.98025 0.46730026 0.00 -11.763 0.467 -0.467 0.98025 0.46730027 0.00 -11.763 0.467 -0.467 0.98025 0.46730028 0.00 -11.763 0.467 -0.467 0.98025 0.46730029 0.00 -11.763 0.467 -0.467 0.98025 0.46730030 0.00 -11.763 0.467 -0.467 0.98025 0.46730031 0.00 -11.76 0.467 -0.467 0.98 0.46730032 0.00 -11.763 0.467 -0.467 0.98025 0.46730033 0.00 -11.763 0.467 -0.467 0.98025 0.46730034 0.00 -11.763 0.467 -0.467 0.98025 0.46730035 0.00 -11.763 0.467 -0.467 0.98025 0.467

South 40000 0.00 -11.763 0.467 -0.467 0.98025 0.467Stringer 40001 0.00 -11.763 0.467 -0.467 0.98025 0.467

40002 0.00 -11.763 0.467 -0.467 0.98025 0.46740003 0.00 -11.763 0.467 -0.467 0.98025 0.46740004 0.00 -11.762 0.467 -0.467 0.980166667 0.46740005 0.00 -11.763 0.467 -0.467 0.98025 0.46740006 0.00 -11.763 0.467 -0.467 0.98025 0.46740007 0.00 -11.763 0.467 -0.467 0.98025 0.46740008 0.00 -11.763 0.467 -0.467 0.98025 0.46740009 0.00 -11.763 0.467 -0.467 0.98025 0.46740010 0.00 -11.763 0.467 -0.467 0.98025 0.46740011 0.00 -11.764 0.467 -0.467 0.980333333 0.467

Page 284: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

40012 0.00 -11.763 0.467 -0.467 0.98025 0.46740013 0.00 -11.76 0.467 -0.467 0.98 0.46740014 0.00 -11.763 0.467 -0.467 0.98025 0.46740015 0.00 -11.763 0.467 -0.467 0.98025 0.46740016 0.00 -11.763 0.467 -0.467 0.98025 0.46740017 0.00 -11.763 0.467 -0.467 0.98025 0.46740018 0.00 -11.763 0.467 -0.467 0.98025 0.46740019 0.00 -11.763 0.467 -0.467 0.98025 0.46740020 0.00 -11.763 0.467 -0.467 0.98025 0.46740021 0.00 -11.763 0.467 -0.467 0.98025 0.46740022 0.00 -11.76 0.467 -0.467 0.98 0.46740023 0.00 -11.763 0.467 -0.467 0.98025 0.46740024 0.00 -11.763 0.467 -0.467 0.98025 0.46740025 0.00 -11.763 0.467 -0.467 0.98025 0.46740026 0.00 -11.763 0.467 -0.467 0.98025 0.46740027 0.00 -11.763 0.467 -0.467 0.98025 0.46740028 0.00 -11.763 0.467 -0.467 0.98025 0.46740029 0.00 -11.763 0.467 -0.467 0.98025 0.46740030 0.00 -11.763 0.467 -0.467 0.98025 0.46740031 0.00 -11.76 0.467 -0.467 0.98 0.46740032 0.00 -11.763 0.467 -0.467 0.98025 0.46740033 0.00 -11.763 0.467 -0.467 0.98025 0.46740034 0.00 -11.763 0.467 -0.467 0.98025 0.46740035 0.00 -11.763 0.467 -0.467 0.98025 0.467

Floorbeam60000 0.00 -2767.865 92.663 N/A 230.6554167 92.66360001 N/A -2850.502 2.776 N/A 237.5418333 2.77660002 N/A -2910.299 1.347 -0.896 242.5249167 1.34760003 N/A -2921.213 N/A -2.325 243.4344167 2.32560004 0.00 -2768.562 N/A -92.686 230.7135 92.68660010 0.00 -67.566 2.086 N/A 5.6305 2.08660011 N/A -45.449 0.733 N/A 3.787416667 0.73360012 N/A -48.424 0.267 -0.568 4.035333333 0.56860013 N/A -33.93 N/A -1.294 2.8275 1.29460014 87.74 0 N/A -2.646 7.311583333 2.64660020 0.00 -72.457 2.222 N/A 6.038083333 2.22260021 N/A -52.527 0.869 N/A 4.37725 0.86960022 N/A -53.068 0.134 -0.702 4.422333333 0.70260023 N/A -31.868 N/A -1.168 2.655666667 1.16860024 83.21 0 N/A -2.52 6.934416667 2.5260100 0.00 -5251.479 175.443 N/A 437.62325 175.443

Page 285: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60101 N/A -5357.328 3.414 N/A 446.444 3.41460102 N/A -5453.205 1.534 -0.67 454.43375 1.53460103 N/A -5496.105 N/A -2.55 458.00875 2.5560104 0.00 -5250.738 N/A -175.418 437.5615 175.41860110 0.00 -67.738 2.09 N/A 5.644833333 2.0960111 N/A -45.73 0.738 N/A 3.810833333 0.73860112 N/A -48.505 0.272 -0.563 4.042083333 0.56360113 N/A -33.878 N/A -1.287 2.823166667 1.28760114 87.52 0 N/A -2.64 7.29325 2.6460120 0.00 -73.075 2.239 N/A 6.089583333 2.23960121 N/A -53.403 0.886 N/A 4.45025 0.88660122 N/A -52.913 0.149 -0.686 4.409416667 0.68660123 N/A -31.548 N/A -1.152 2.629 1.15260124 82.64 0 N/A -2.504 6.886916667 2.50460200 0.00 -2520.187 84.4 N/A 210.0155833 84.460201 N/A -2624.956 3.382 N/A 218.7463333 3.38260202 N/A -2715.779 1.502 -0.702 226.3149167 1.50260203 N/A -2754.382 N/A -2.582 229.5318333 2.58260204 0.00 -2518.844 N/A -84.355 209.9036667 84.35560210 0.00 -60.342 1.885 N/A 5.0285 1.88560211 N/A -40.525 0.533 N/A 3.377083333 0.53360212 N/A -43.075 0.265 -0.571 3.589583333 0.57160213 N/A -28.475 N/A -0.969 2.372916667 0.96960214 76.06 0 N/A -2.322 6.338 2.32260220 0.00 -62.743 1.952 N/A 5.228583333 1.95260221 N/A -44.018 0.599 N/A 3.668166667 0.59960222 N/A -45.268 0.198 -0.638 3.772333333 0.63860223 N/A -27.428 N/A -0.906 2.285666667 0.90660224 73.77 0 N/A -2.258 6.147416667 2.25860300 0.00 -3604.439 120.542 N/A 300.3699167 120.54260301 N/A -3708.408 3.36 N/A 309.034 3.3660302 N/A -3795.035 1.481 -0.724 316.2529167 1.48160303 N/A -3830.1 N/A -2.604 319.175 2.60460304 0.00 -3603.705 N/A -120.517 300.30875 120.51760310 0.00 -60.354 1.885 N/A 5.0295 1.88560311 N/A -40.553 0.533 N/A 3.379416667 0.53360312 N/A -43.132 0.265 -0.57 3.594333333 0.5760313 N/A -28.483 N/A -0.968 2.373583333 0.96860314 76.03 0 N/A -2.321 6.335666667 2.32160320 0.00 -63.188 1.964 N/A 5.265666667 1.96460321 N/A -44.677 0.612 N/A 3.723083333 0.612

Page 286: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60322 N/A -45.33 0.21 -0.626 3.7775 0.62660323 N/A -27.269 N/A -0.894 2.272416667 0.89460324 73.34 0 N/A -2.246 6.111833333 2.24660400 0.00 -5636.052 188.262 N/A 469.671 188.26260401 N/A -5739.847 3.356 N/A 478.3205833 3.35660402 N/A -5826.058 1.476 -0.728 485.5048333 1.47660403 N/A -5860.931 N/A -2.608 488.4109167 2.60860404 0.00 -5634.896 N/A -188.224 469.5746667 188.22460410 0.00 -60.786 1.897 N/A 5.0655 1.89760411 N/A -41.197 0.545 N/A 3.433083333 0.54560412 N/A -43.235 0.277 -0.558 3.602916667 0.55860413 N/A -28.325 N/A -0.957 2.360416667 0.95760414 75.60 0 N/A -2.309 6.300333333 2.30960420 0.00 -62.905 1.956 N/A 5.242083333 1.95660421 N/A -44.268 0.604 N/A 3.689 0.60460422 N/A -45.321 0.202 -0.633 3.77675 0.63360423 N/A -27.394 N/A -0.901 2.282833333 0.90160424 73.61 0 N/A -2.253 6.134 2.25360500 0.00 -5647.248 188.635 N/A 470.604 188.63560501 N/A -5751.077 3.357 N/A 479.2564167 3.35760502 N/A -5837.366 1.477 -0.728 486.4471667 1.47760503 N/A -5872.3 N/A -2.607 489.3583333 2.60760504 0.00 -5646.133 N/A -188.598 470.5110833 188.59860510 0.00 -60.504 1.89 N/A 5.042 1.8960511 N/A -40.785 0.537 N/A 3.39875 0.53760512 N/A -43.186 0.269 -0.566 3.598833333 0.56660513 N/A -28.453 N/A -0.964 2.371083333 0.96460514 75.88 0 N/A -2.317 6.32325 2.31760520 0.00 -63.172 1.964 N/A 5.264333333 1.96460521 N/A -44.653 0.611 N/A 3.721083333 0.61160522 N/A -45.334 0.209 -0.626 3.777833333 0.62660523 N/A -27.277 N/A -0.894 2.273083333 0.89460524 73.36 0 N/A -2.247 6.113166667 2.24760600 0.00 -5647.404 188.64 N/A 470.617 188.6460601 N/A -5751.199 3.356 N/A 479.2665833 3.35660602 N/A -5837.387 1.476 -0.729 486.4489167 1.47660603 N/A -5872.247 N/A -2.608 489.3539167 2.60860604 0.00 -5646.205 N/A -188.601 470.5170833 188.60160610 0.00 -60.769 1.897 N/A 5.064083333 1.89760611 N/A -41.17 0.544 N/A 3.430833333 0.54460612 N/A -43.236 0.277 -0.559 3.603 0.559

Page 287: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60613 N/A -28.335 N/A -0.957 2.36125 0.95760614 75.63 0 N/A -2.31 6.302166667 2.3160620 0.00 -62.907 1.956 N/A 5.24225 1.95660621 N/A -44.268 0.604 N/A 3.689 0.60460622 N/A -45.323 0.202 -0.633 3.776916667 0.63360623 N/A -27.395 N/A -0.901 2.282916667 0.90160624 73.61 0 N/A -2.254 6.13425 2.25460700 0.00 -5647.25 188.635 N/A 470.6041667 188.63560701 N/A -5751.079 3.357 N/A 479.2565833 3.35760702 N/A -5837.367 1.477 -0.728 486.44725 1.47760703 N/A -5872.302 N/A -2.607 489.3585 2.60760704 0.00 -5646.135 N/A -188.598 470.51125 188.59860710 0.00 -60.502 1.889 N/A 5.041833333 1.88960711 N/A -40.784 0.537 N/A 3.398666667 0.53760712 N/A -43.187 0.269 -0.566 3.598916667 0.56660713 N/A -28.452 N/A -0.964 2.371 0.96460714 75.88 0 N/A -2.316 6.322916667 2.31660720 0.00 -63.189 1.964 N/A 5.26575 1.96460721 N/A -44.679 0.612 N/A 3.72325 0.61260722 N/A -45.331 0.21 -0.626 3.777583333 0.62660723 N/A -27.267 N/A -0.894 2.27225 0.89460724 73.34 0 N/A -2.246 6.111416667 2.24660800 0.00 -5636.052 188.262 N/A 469.671 188.26260801 N/A -5739.846 3.356 N/A 478.3205 3.35660802 N/A -5826.061 1.476 -0.728 485.5050833 1.47660803 N/A -5860.936 N/A -2.608 488.4113333 2.60860804 0.00 -5634.898 N/A -188.224 469.5748333 188.22460810 0.00 -60.786 1.897 N/A 5.0655 1.89760811 N/A -41.193 0.545 N/A 3.43275 0.54560812 N/A -43.233 0.277 -0.558 3.60275 0.55860813 N/A -28.329 N/A -0.957 2.36075 0.95760814 75.61 0 N/A -2.309 6.301083333 2.30960820 0.00 -62.752 1.952 N/A 5.229333333 1.95260821 N/A -44.031 0.599 N/A 3.66925 0.59960822 N/A -45.307 0.198 -0.637 3.775583333 0.63760823 N/A -27.425 N/A -0.905 2.285416667 0.90560824 73.76 0 N/A -2.258 6.14675 2.25860900 0.00 -3604.442 120.542 N/A 300.3701667 120.54260901 N/A -3708.409 3.36 N/A 309.0340833 3.3660902 N/A -3795.041 1.481 -0.724 316.2534167 1.48160903 N/A -3830.11 N/A -2.604 319.1758333 2.604

Page 288: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

60904 0.00 -3603.715 N/A -120.518 300.3095833 120.51860910 0.00 -60.347 1.885 N/A 5.028916667 1.88560911 N/A -40.539 0.533 N/A 3.37825 0.53360912 N/A -43.102 0.265 -0.57 3.591833333 0.5760913 N/A -28.493 N/A -0.969 2.374416667 0.96960914 76.05 0 N/A -2.321 6.337583333 2.32160920 0.00 -62.729 1.951 N/A 5.227416667 1.95160921 N/A -43.986 0.599 N/A 3.6655 0.59960922 N/A -45.269 0.197 -0.638 3.772416667 0.63860923 N/A -27.398 N/A -0.906 2.283166667 0.90660924 73.79 0 N/A -2.258 6.148833333 2.25861000 0.00 -1681.709 56.451 N/A 140.1424167 56.45161001 N/A -1786.732 3.389 N/A 148.8943333 3.38961002 N/A -1878.189 1.51 -0.695 156.51575 1.5161003 N/A -1917.174 N/A -2.575 159.7645 2.57561004 0.00 -1681.219 N/A -56.434 140.1015833 56.43461010 0.00 -68.304 2.106 N/A 5.692 2.10661011 N/A -46.528 0.754 N/A 3.877333333 0.75461012 N/A -48.503 0.288 -0.548 4.041916667 0.54861013 N/A -33.562 N/A -1.273 2.796833333 1.27361014 86.99 0 N/A -2.625 7.2495 2.62561020 0.00 -72.488 2.222 N/A 6.040666667 2.22261021 N/A -52.553 0.87 N/A 4.379416667 0.8761022 N/A -52.984 0.134 -0.701 4.415333333 0.70161023 N/A -31.782 N/A -1.167 2.6485 1.16761024 83.18 0 N/A -2.519 6.931666667 2.51961100 0.00 -1689.771 56.719 N/A 140.81425 56.71961101 N/A -1795.67 3.414 N/A 149.6391667 3.41461102 N/A -1891.625 1.535 -0.67 157.6354167 1.53561103 N/A -1934.411 N/A -2.55 161.2009167 2.5561104 0.00 -1689.011 N/A -56.694 140.7509167 56.69461110 0.00 -67.719 2.09 N/A 5.64325 2.0961111 N/A -45.665 0.737 N/A 3.805416667 0.73761112 N/A -48.389 0.271 -0.564 4.032416667 0.56461113 N/A -33.842 N/A -1.29 2.820166667 1.2961114 87.59 0 N/A -2.642 7.299416667 2.64261120 0.00 -72.323 2.218 N/A 6.026916667 2.21861121 N/A -52.306 0.865 N/A 4.358833333 0.86561122 N/A -53 0.13 -0.705 4.416666667 0.70561123 N/A -31.841 N/A -1.171 2.653416667 1.17161124 83.34 0 N/A -2.524 6.94525 2.524

Page 289: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

LOAD COMB 13 Strength I for Phase 3

Controlling moment (k-ft)

Controlling shear (k)

Rating ID Max bending moment (k-in)

Max bending moment (k-in) Max shear (k) Max shear (k)

61200 0.00 -883.126 29.838 N/A 73.59383333 29.83861201 N/A -965.221 2.761 N/A 80.43508333 2.76161202 N/A -1023.865 1.332 -0.911 85.32208333 1.33261203 N/A -1033.782 N/A -2.34 86.1485 2.3461204 0.00 -882.086 N/A -29.803 73.50716667 29.803

Page 290: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss floor system member capacity summary

Page 291: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

0 60000 443.34 1627.26 4.78 7.05 4.784 7.05 4.78 7.050 60001 443.34 1627.26 159.70 6.85 159.705 6.85 159.70 6.850 60002 443.34 1627.26 329.13 6.71 329.131 6.71 329.13 6.710 60003 443.34 1627.26 190.68 6.68 190.684 6.68 190.68 6.680 60004 443.34 1627.26 4.78 7.05 4.783 7.05 4.78 7.05

0A 60010 400.59 534.57 192.04 94.94 192.037 94.94 192.04 94.940A 60011 400.59 534.57 546.51 141.14 546.508 141.14 546.51 141.140A 60012 400.59 534.57 705.26 132.47 705.264 132.47 705.26 132.470A 60013 400.59 534.57 309.57 189.06 309.575 189.06 309.57 189.060A 60014 400.59 534.57 151.39 73.11 151.395 73.11 151.39 73.110B 60020 400.59 534.57 180.28 88.53 180.284 88.53 180.28 88.530B 60021 400.59 534.57 460.98 122.12 460.978 122.12 460.98 122.120B 60022 400.59 534.57 570.64 120.88 570.641 120.88 570.64 120.880B 60023 400.59 534.57 342.97 201.29 342.971 201.29 342.97 201.290B 60024 400.59 534.57 158.96 77.09 158.964 77.09 158.96 77.091 60100 426.81 1612.63 2.43 3.68 2.433 3.68 2.43 3.681 60101 426.81 1612.63 125.02 3.61 125.018 3.61 125.02 3.611 60102 426.81 1612.63 278.23 3.55 278.233 3.55 278.23 3.551 60103 426.81 1612.63 167.38 3.52 167.376 3.52 167.38 3.521 60104 426.81 1612.63 2.43 3.69 2.433 3.69 2.43 3.69

1A 60110 400.59 534.57 191.67 94.70 191.670 94.70 191.67 94.701A 60111 400.59 534.57 542.80 140.28 542.805 140.28 542.80 140.281A 60112 400.59 534.57 711.53 132.25 711.528 132.25 711.53 132.251A 60113 400.59 534.57 311.26 189.35 311.259 189.35 311.26 189.351A 60114 400.59 534.57 151.74 73.30 151.739 73.30 151.74 73.301B 60120 400.59 534.57 178.91 87.78 178.915 87.78 178.91 87.781B 60121 400.59 534.57 452.13 120.12 452.133 120.12 452.13 120.121B 60122 400.59 534.57 583.95 121.23 583.950 121.23 583.95 121.231B 60123 400.59 534.57 347.73 203.34 347.734 203.34 347.73 203.341B 60124 400.59 534.57 159.98 77.62 159.980 77.62 159.98 77.622 60200 426.81 1612.63 5.06 7.68 5.057 7.68 5.06 7.682 60201 426.81 1612.63 126.20 7.37 126.200 7.37 126.20 7.372 60202 426.81 1612.63 284.16 7.13 284.161 7.13 284.16 7.132 60203 426.81 1612.63 165.30 7.03 165.302 7.03 165.30 7.032 60204 426.81 1612.63 5.06 7.68 5.060 7.68 5.06 7.68

2A 60210 400.59 534.57 212.51 106.31 212.515 106.31 212.51 106.312A 60211 400.59 534.57 751.58 158.29 751.576 158.29 751.58 158.292A 60212 400.59 534.57 701.56 148.92 701.559 148.92 701.56 148.922A 60213 400.59 534.57 413.41 225.29 413.406 225.28 413.41 225.282A 60214 400.59 534.57 172.59 84.34 172.519 84.34 172.52 84.342B 60220 400.59 534.57 205.33 102.25 205.220 102.24 205.22 102.24

Moment Phase 3

C/DFloorbeam Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

Page 292: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Moment Phase 3

C/DFloorbeam Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

2B 60221 400.59 534.57 668.76 145.80 668.765 145.74 668.76 145.732B 60222 400.59 534.57 627.88 141.79 627.884 141.71 627.88 141.712B 60223 400.59 534.57 442.15 234.17 442.152 233.88 442.15 233.882B 60224 400.59 534.57 177.41 86.95 177.409 86.96 177.41 86.963 60300 426.81 1612.63 7.60 11.56 3.585 5.44 3.54 5.373 60301 426.81 1612.63 126.99 10.88 127.027 5.28 127.03 5.223 60302 426.81 1612.63 288.19 10.38 288.190 5.16 288.19 5.103 60303 426.81 1612.63 163.97 10.19 163.906 5.11 163.91 5.053 60304 426.81 1612.63 7.60 11.57 3.586 5.44 3.54 5.37

3A 60310 400.59 534.57 212.51 106.30 212.515 106.29 212.51 106.293A 60311 400.59 534.57 751.58 158.27 751.576 158.19 751.58 158.183A 60312 400.59 534.57 701.56 148.91 702.789 148.73 702.79 148.733A 60313 400.59 534.57 413.83 225.49 413.833 225.22 413.83 225.223A 60314 400.59 534.57 172.59 84.37 172.594 84.37 172.59 84.373B 60320 400.59 534.57 203.97 101.54 203.966 101.52 203.97 101.523B 60321 400.59 534.57 655.63 143.73 654.559 143.59 654.56 143.583B 60322 400.59 534.57 639.92 141.77 639.920 141.53 639.92 141.513B 60323 400.59 534.57 448.09 235.86 448.087 235.27 448.09 235.243B 60324 400.59 534.57 178.28 87.45 178.357 87.46 178.36 87.464 60400 426.81 1612.63 7.59 11.56 2.346 3.55 2.27 3.434 60401 426.81 1612.63 127.14 10.88 127.178 3.49 127.18 3.374 60402 426.81 1612.63 288.97 10.38 289.167 3.43 289.17 3.324 60403 426.81 1612.63 163.72 10.19 163.654 3.41 163.65 3.304 60404 426.81 1612.63 7.60 11.57 2.347 3.55 2.27 3.43

4A 60410 400.59 534.57 211.17 105.56 211.170 105.53 211.17 105.534A 60411 400.59 534.57 735.03 155.88 735.028 155.72 735.03 155.714A 60412 400.59 534.57 716.62 148.66 717.903 148.39 717.90 148.374A 60413 400.59 534.57 418.59 227.04 418.589 226.50 418.59 226.474A 60414 400.59 534.57 173.49 84.83 173.491 84.85 173.49 84.854B 60420 400.59 534.57 204.80 102.00 204.801 101.98 204.80 101.984B 60421 400.59 534.57 664.33 145.06 663.228 144.92 663.23 144.914B 60422 400.59 534.57 631.85 141.78 632.844 141.55 632.84 141.544B 60423 400.59 534.57 444.11 234.79 444.606 234.20 444.61 234.174B 60424 400.59 534.57 177.72 87.13 177.724 87.15 177.80 87.155 60500 426.81 1612.63 7.59 11.56 2.346 3.55 2.26 3.435 60501 426.81 1612.63 127.14 10.88 127.140 3.49 127.14 3.365 60502 426.81 1612.63 288.78 10.38 288.971 3.43 288.97 3.325 60503 426.81 1612.63 163.78 10.19 163.717 3.41 163.72 3.305 60504 426.81 1612.63 7.60 11.57 2.347 3.55 2.26 3.43

5A 60510 400.59 534.57 212.06 106.05 212.065 106.02 211.95 106.025A 60511 400.59 534.57 745.98 157.45 745.978 157.29 745.98 157.28

Page 293: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Moment Phase 3

C/DFloorbeam Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

5A 60512 400.59 534.57 706.51 148.81 707.756 148.55 707.76 148.545A 60513 400.59 534.57 415.12 226.02 415.550 225.48 415.55 225.455A 60514 400.59 534.57 172.89 84.52 172.892 84.54 172.89 84.545B 60520 400.59 534.57 204.07 101.57 203.966 101.55 203.97 101.555B 60521 400.59 534.57 655.63 143.80 655.630 143.67 655.63 143.665B 60522 400.59 534.57 638.90 141.76 639.920 141.51 639.92 141.505B 60523 400.59 534.57 447.59 235.80 448.087 235.21 448.09 235.175B 60524 400.59 534.57 178.28 87.43 178.278 87.44 178.28 87.456 60600 426.81 1612.63 7.59 11.56 2.346 3.55 2.26 3.436 60601 426.81 1612.63 127.18 10.88 127.178 3.49 127.18 3.366 60602 426.81 1612.63 288.97 10.38 289.167 3.43 289.17 3.326 60603 426.81 1612.63 163.72 10.19 163.654 3.41 163.65 3.306 60604 426.81 1612.63 7.60 11.57 2.347 3.55 2.26 3.43

6A 60610 400.59 534.57 211.28 105.59 211.170 105.56 211.17 105.566A 60611 400.59 534.57 736.38 155.98 736.379 155.82 736.38 155.816A 60612 400.59 534.57 716.62 148.66 716.619 148.38 716.62 148.376A 60613 400.59 534.57 418.15 226.96 418.589 226.42 418.59 226.396A 60614 400.59 534.57 173.42 84.81 173.416 84.82 173.42 84.826B 60620 400.59 534.57 204.80 102.00 204.801 101.98 204.80 101.976B 60621 400.59 534.57 664.33 145.05 663.228 144.92 663.23 144.916B 60622 400.59 534.57 631.85 141.77 632.844 141.55 632.84 141.546B 60623 400.59 534.57 444.11 234.78 444.606 234.20 444.61 234.166B 60624 400.59 534.57 177.72 87.13 177.724 87.14 177.72 87.157 60700 426.81 1612.63 7.59 11.56 2.346 3.55 2.26 3.437 60701 426.81 1525.89 127.14 10.30 127.140 3.30 127.14 3.187 60702 426.81 1612.63 288.78 10.38 288.971 3.43 288.97 3.327 60703 426.81 1398.35 163.78 8.84 163.717 2.96 163.72 2.867 60704 426.81 1612.63 7.60 11.57 2.347 3.55 2.26 3.43

7A 60710 400.59 534.57 212.06 106.05 212.065 106.03 212.06 106.037A 60711 400.59 534.57 745.98 157.46 745.978 157.30 745.98 157.297A 60712 400.59 534.57 706.51 148.81 707.756 148.55 707.76 148.547A 60713 400.59 534.57 415.55 226.03 415.550 225.49 415.55 225.467A 60714 400.59 534.57 172.89 84.53 172.966 84.54 172.97 84.547B 60720 400.59 534.57 203.97 101.54 203.966 101.52 203.97 101.527B 60721 400.59 534.57 655.63 143.72 654.559 143.58 654.56 143.587B 60722 400.59 534.57 639.92 141.77 639.920 141.52 639.92 141.517B 60723 400.59 534.57 448.09 235.87 448.087 235.29 448.09 235.267B 60724 400.59 534.57 178.36 87.45 178.357 87.47 178.36 87.478 60800 426.81 1612.63 7.59 11.56 2.346 3.55 2.27 3.438 60801 426.81 1590.61 127.14 10.74 127.178 3.44 127.18 3.338 60802 426.81 1612.63 288.97 10.38 289.167 3.43 289.17 3.32

Page 294: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Moment Phase 3

C/DFloorbeam Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

8 60803 426.81 1590.61 163.72 10.05 163.654 3.37 163.65 3.268 60804 426.81 1612.63 7.60 11.57 2.347 3.55 2.27 3.43

8A 60810 400.59 534.57 211.17 105.56 211.170 105.53 211.17 105.538A 60811 400.59 534.57 736.38 155.89 735.028 155.73 735.03 155.738A 60812 400.59 534.57 716.62 148.67 717.903 148.39 717.90 148.388A 60813 400.59 534.57 418.59 227.01 418.589 226.46 418.59 226.448A 60814 400.59 534.57 173.42 84.82 173.491 84.84 173.49 84.848B 60820 400.59 534.57 205.22 102.24 205.220 102.23 205.22 102.238B 60821 400.59 534.57 668.76 145.76 668.765 145.69 668.76 145.698B 60822 400.59 534.57 627.88 141.75 628.870 141.59 628.87 141.598B 60823 400.59 534.57 442.64 234.20 442.641 233.91 442.64 233.908B 60824 400.59 534.57 177.41 86.96 177.409 86.97 177.41 86.979 60900 426.81 1612.63 7.60 11.56 3.585 5.44 3.54 5.379 60901 426.81 1612.63 126.99 10.88 127.027 5.28 127.03 5.229 60902 426.81 1612.63 288.19 10.38 288.190 5.16 288.19 5.109 60903 426.81 1590.61 163.97 10.05 163.906 5.04 163.91 4.989 60904 426.81 1612.63 7.60 11.57 3.586 5.44 3.54 5.37

9A 60910 400.59 534.57 212.51 106.31 212.515 106.30 212.51 106.309A 60911 400.59 534.57 751.58 158.32 751.576 158.24 751.58 158.249A 60912 400.59 534.57 701.56 148.92 702.789 148.83 702.79 148.839A 60913 400.59 534.57 413.41 225.41 413.406 225.14 413.41 225.149A 60914 400.59 534.57 172.52 84.34 172.594 84.35 172.59 84.359B 60920 400.59 534.57 205.33 102.26 205.325 102.26 205.33 102.269B 60921 400.59 534.57 668.76 145.84 668.765 145.84 668.76 145.849B 60922 400.59 534.57 627.88 141.70 627.884 141.70 627.88 141.709B 60923 400.59 534.57 442.15 234.14 442.152 234.14 442.15 234.149B 60924 400.59 534.57 177.41 86.94 177.409 86.94 177.41 86.9410 61000 426.81 1612.63 7.56 11.51 7.561 11.51 7.56 11.5110 61001 426.81 1612.63 125.94 10.83 125.940 10.83 125.94 10.8310 61002 426.81 1612.63 282.66 10.30 282.656 10.30 282.66 10.3010 61003 426.81 1612.63 165.82 10.09 165.751 10.09 165.75 10.0910 61004 426.81 1612.63 7.56 11.51 7.563 11.51 7.56 11.51

10A 61010 400.59 534.57 190.21 93.91 190.214 93.92 190.21 93.9210A 61011 400.59 534.57 531.29 137.87 531.286 137.87 531.29 137.8710A 61012 400.59 534.57 731.00 132.25 731.004 132.26 731.00 132.2610A 61013 400.59 534.57 314.68 191.13 314.682 191.13 314.68 191.1310A 61014 400.59 534.57 152.61 73.74 152.606 73.74 152.61 73.7410B 61020 400.59 534.57 180.28 88.50 180.284 88.50 180.28 88.5010B 61021 400.59 534.57 460.45 122.06 460.448 122.06 460.45 122.0610B 61022 400.59 534.57 571.46 121.07 571.455 121.07 571.46 121.0710B 61023 400.59 534.57 343.26 201.84 343.265 201.84 343.26 201.84

Page 295: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Moment Phase 3

C/DFloorbeam Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

10B 61024 400.59 534.57 159.03 77.12 159.027 77.12 159.03 77.1211 61100 426.81 1612.63 7.52 11.45 7.525 11.45 7.52 11.4511 61101 426.81 1612.63 125.02 10.78 125.018 10.78 125.02 10.7811 61102 426.81 1612.63 278.05 10.23 278.052 10.23 278.05 10.2311 61103 426.81 1612.63 167.38 10.00 167.376 10.00 167.38 10.0011 61104 426.81 1612.63 7.53 11.46 7.528 11.46 7.53 11.46

11A 61110 400.59 534.57 191.67 94.73 191.670 94.73 191.67 94.7311A 61111 400.59 515.46 543.54 135.45 543.541 135.45 543.54 135.4511A 61112 400.59 534.57 710.27 132.57 710.266 132.57 710.27 132.5711A 61113 400.59 534.57 310.53 189.55 310.535 189.55 310.53 189.5511A 61114 400.59 534.57 151.62 73.23 151.624 73.23 151.62 73.2311B 61120 400.59 534.57 180.61 88.70 180.609 88.70 180.61 88.7011B 61121 400.59 534.57 463.11 122.64 463.110 122.64 463.11 122.6411B 61122 400.59 534.57 568.21 121.03 568.213 121.03 568.21 121.0311B 61123 400.59 534.57 342.09 201.46 342.092 201.46 342.09 201.4611B 61124 400.59 534.57 158.71 76.97 158.712 76.97 158.71 76.9712 61200 443.34 1627.26 14.86 22.11 14.858 22.11 14.86 22.1112 61201 443.34 1403.74 160.57 17.45 160.572 17.45 160.57 17.4512 61202 443.34 1627.26 332.84 19.07 332.838 19.07 332.84 19.0712 61203 443.34 1543.00 189.46 17.91 189.462 17.91 189.46 17.9112 61204 443.34 1627.26 14.88 22.14 14.876 22.14 14.88 22.14

Page 296: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

North 10000 428.23 1483.09 4.81 2.94 4.807 2.94 4.81 2.94North 10001 428.23 1483.09 14.75 2.62 14.751 2.62 14.75 2.62North 10002 428.23 1483.09 4.80 2.94 4.805 2.94 4.80 2.94North 10003 428.23 1483.09 5.22 3.33 5.215 3.33 5.22 3.33North 10004 428.23 1483.09 11.92 3.09 11.923 3.09 11.92 3.09North 10005 428.23 1483.09 7.90 3.83 7.898 3.83 7.90 3.83North 10006 428.23 1483.09 16.47 9.84 16.465 9.84 16.47 9.84North 10007 428.23 1483.09 53.16 8.84 53.157 8.84 53.16 8.84North 10008 428.23 1483.09 16.45 9.82 16.451 9.82 16.45 9.82North 10009 428.23 1483.09 16.46 9.83 4.819 2.95 4.74 2.88North 10010 428.23 1483.09 53.12 8.84 14.760 2.63 14.04 2.56North 10011 428.23 1483.09 16.45 9.82 4.817 2.95 4.66 2.86North 10012 428.23 1483.09 16.46 9.83 4.819 2.95 4.64 2.85North 10013 428.23 1483.09 53.18 8.84 14.766 2.63 14.22 2.54North 10014 428.23 1483.09 16.45 9.82 4.818 2.95 4.64 2.84North 10015 428.23 1483.09 16.46 9.83 4.819 2.95 4.64 2.85North 10016 428.23 1483.09 53.14 8.84 14.761 2.63 14.21 2.54North 10017 428.23 1483.09 16.45 9.82 4.817 2.95 4.64 2.84North 10018 428.23 1483.09 16.46 9.83 4.819 2.95 4.64 2.85North 10019 428.23 1483.09 53.18 8.84 14.764 2.63 14.21 2.54North 10020 428.23 1483.09 16.45 9.82 4.817 2.95 4.64 2.84North 10021 428.23 1483.09 16.46 9.83 4.819 2.95 4.64 2.85North 10022 428.23 1483.09 53.14 8.84 14.763 2.63 14.21 2.54North 10023 428.23 1483.09 16.45 9.82 4.818 2.95 4.64 2.84North 10024 428.23 1483.09 16.46 9.83 4.819 2.95 4.66 2.86North 10025 428.23 1483.09 53.19 8.84 14.765 2.63 14.06 2.56North 10026 428.23 1483.09 16.45 9.82 4.818 2.95 4.74 2.88North 10027 428.23 1483.09 16.47 9.84 16.465 9.84 16.47 9.84North 10028 428.23 1483.09 53.16 8.84 53.157 8.84 53.16 8.84North 10029 428.23 1483.09 16.45 9.82 16.451 9.82 16.45 9.82North 10030 428.23 1483.09 16.32 9.71 16.317 9.71 16.32 9.71North 10031 428.23 1483.09 53.06 8.73 53.058 8.73 53.06 8.73North 10032 428.23 1483.09 16.29 9.69 16.292 9.69 16.29 9.69North 10033 428.23 1483.09 16.32 9.71 16.324 9.71 16.32 9.71North 10034 428.23 1483.09 53.03 8.74 53.025 8.74 53.03 8.74North 10035 428.23 1483.09 16.30 9.69 16.297 9.69 16.30 9.69South 20000 428.23 1483.09 4.78 2.92 4.781 2.92 4.78 2.92South 20001 428.23 1483.09 14.75 2.61 14.753 2.61 14.75 2.61South 20002 428.23 1483.09 4.78 2.92 4.784 2.92 4.78 2.92South 20003 428.23 1483.09 5.19 3.30 5.187 3.30 5.19 3.30South 20004 428.23 1483.09 11.89 3.06 11.891 3.06 11.89 3.06

Running Girder Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength IShear

Phase 1 C/D

Moment Phase 3

C/D

Page 297: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Running Girder Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength IShear

Phase 1 C/D

Moment Phase 3

C/DSouth 20005 428.23 1483.09 7.85 3.80 7.845 3.80 7.85 3.80South 20006 428.23 1483.09 16.22 9.63 16.220 9.63 16.22 9.63South 20007 428.23 1483.09 53.17 8.68 53.170 8.68 53.17 8.68South 20008 428.23 1483.09 16.23 9.64 16.234 9.64 16.23 9.64South 20009 428.23 1483.09 16.22 9.63 4.798 2.93 4.72 2.86South 20010 428.23 1483.09 53.14 8.68 14.762 2.62 14.06 2.55South 20011 428.23 1483.09 16.24 9.64 4.799 2.93 4.64 2.85South 20012 428.23 1483.09 16.23 9.63 4.798 2.93 4.62 2.83South 20013 428.23 1483.09 53.20 8.69 14.767 2.62 14.22 2.53South 20014 428.23 1483.09 16.24 9.64 4.800 2.93 4.63 2.83South 20015 428.23 1483.09 16.22 9.63 4.798 2.93 4.62 2.83South 20016 428.23 1483.09 53.15 8.69 14.762 2.62 14.21 2.52South 20017 428.23 1483.09 16.24 9.64 4.799 2.93 4.62 2.83South 20018 428.23 1483.09 16.23 9.63 4.798 2.93 4.62 2.83South 20019 428.23 1483.09 53.19 8.69 14.765 2.62 14.22 2.52South 20020 428.23 1483.09 16.24 9.64 4.799 2.93 4.62 2.83South 20021 428.23 1483.09 16.23 9.63 4.798 2.93 4.62 2.83South 20022 428.23 1483.09 53.16 8.69 14.764 2.62 14.21 2.53South 20023 428.23 1483.09 16.24 9.64 4.800 2.93 4.63 2.83South 20024 428.23 1483.09 16.22 9.63 4.798 2.93 4.64 2.85South 20025 428.23 1483.09 53.20 8.68 14.766 2.62 14.04 2.55South 20026 428.23 1483.09 16.24 9.64 4.799 2.93 4.72 2.86South 20027 428.23 1483.09 16.22 9.62 16.220 9.62 16.22 9.62South 20028 428.23 1483.09 53.17 8.68 53.170 8.68 53.17 8.68South 20029 428.23 1483.09 16.23 9.64 16.233 9.64 16.23 9.64South 20030 428.23 1483.09 16.04 9.47 16.043 9.47 16.04 9.47South 20031 428.23 1483.09 53.10 8.56 53.097 8.56 53.10 8.56South 20032 428.23 1483.09 16.07 9.50 16.067 9.50 16.07 9.50South 20033 428.23 1483.09 16.04 9.47 16.036 9.47 16.04 9.47South 20034 428.23 1483.09 53.06 8.56 53.058 8.56 53.06 8.56South 20035 428.23 1483.09 16.06 9.49 16.061 9.49 16.06 9.49

Page 298: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

North 30000 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30001 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30002 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30003 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30004 152.24 168.09 325.99 171.49 325.990 171.49 325.99 171.49North 30005 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30006 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30007 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30008 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30009 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30010 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30011 152.24 168.09 325.99 171.46 325.990 171.46 325.99 171.46North 30012 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30013 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52North 30014 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30015 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30016 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30017 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30018 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30019 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30020 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30021 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30022 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52North 30023 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30024 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30025 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30026 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30027 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30028 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30029 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30030 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30031 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52North 30032 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30033 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30034 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48North 30035 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40000 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40001 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40002 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40003 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40004 152.24 168.09 325.99 171.49 325.990 171.49 325.99 171.49

Moment Phase 3

C/DStringer Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

Page 299: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

Moment Phase 3

C/DStringer Rating ID

Shear Capacity

(k)

Moment Capacity

(k-ft)

Shear Phase 1

C/D

Moment Phase 1

C/D

Shear Phase 2

C/D

Moment Phase 2

C/D

Shear Phase 3

C/D

Strength I

South 40005 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40006 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40007 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40008 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40009 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40010 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40011 152.24 168.09 325.99 171.46 325.990 171.46 325.99 171.46South 40012 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40013 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52South 40014 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40015 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40016 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40017 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40018 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40019 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40020 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40021 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40022 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52South 40023 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40024 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40025 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40026 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40027 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40028 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40029 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40030 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40031 152.24 168.09 325.99 171.52 325.990 171.52 325.99 171.52South 40032 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40033 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40034 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48South 40035 152.24 168.09 325.99 171.48 325.990 171.48 325.99 171.48

Page 300: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss member capacity to demand ratios

Page 301: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

North L0-L1 1100 N/A 3.46 N/A 2.19 N/A 2.15North L1-L2 1101 N/A 3.99 N/A 2.58 N/A 2.54North L2-L3 1102 N/A 3.58 N/A 2.11 N/A 2.07North L3-L4 1103 N/A 3.77 N/A 2.24 N/A 2.20North L4-L5 1104 N/A 3.86 N/A 1.95 N/A 1.91North L5-L6 1105 N/A 3.90 N/A 1.98 N/A 1.93North L6-L7 1106 N/A 4.08 N/A 2.02 N/A 1.97North L7-L8 1107 N/A 4.01 N/A 1.99 N/A 1.94North L8-L9 1108 N/A 4.27 N/A 2.41 N/A 2.36North L9-L10 1109 N/A 4.02 N/A 2.25 N/A 2.21North L10-L11 1110 N/A 5.09 N/A 2.99 N/A 2.93North L11-L12 1111 N/A 4.29 N/A 2.49 N/A 2.44North U1-L1 1201 N/A 3.06 N/A 3.06 N/A 3.06North U2-L2 1202 5.27 N/A 2.01 N/A 1.95 N/ANorth U2-L2 1203 4.96 N/A 1.92 N/A 1.86 N/ANorth U10-L10 1209 4.20 N/A 1.83 N/A 1.78 N/ANorth U10-L10 1210 3.97 N/A 1.75 N/A 1.71 N/ANorth U11-L11 1211 N/A 8.61 N/A 8.61 N/A 8.61North U3-L3 1230 48.44 N/A 80.74 N/A 83.44 N/ANorth U3-L3 1231 48.62 N/A 108.71 N/A 115.63 N/ANorth U3-L3 1232 N/A 8.57 N/A 4.39 N/A 4.33North U4-L4 1240 N/A 11.97 N/A 10.18 N/A 10.20North U4-L4 1241 N/A 11.66 N/A 9.65 N/A 9.65North U4-L4 1242 N/A 11.89 N/A 9.80 N/A 9.81North U5-L5 1250 30.34 N/A 28.09 N/A 27.99 N/ANorth U5-L5 1251 30.99 N/A 31.30 N/A 31.31 N/ANorth U5-L5 1252 N/A 8.26 N/A 2.91 N/A 2.81North U6-L6 1260 30.27 N/A 27.98 N/A 27.87 N/ANorth U6-L6 1261 30.82 N/A 30.97 N/A 30.98 N/ANorth U6-L6 1262 23.67 N/A 23.76 N/A 23.77 N/ANorth U7-L7 1270 30.37 N/A 28.13 N/A 28.03 N/ANorth U7-L7 1271 31.04 N/A 31.39 N/A 31.40 N/ANorth U7-L7 1272 N/A 7.87 N/A 2.77 N/A 2.68North U8-L8 1280 N/A 37.36 N/A 24.07 N/A 24.17North U8-L8 1281 N/A 39.01 N/A 22.92 N/A 22.96North U8-L8 1282 N/A 41.70 N/A 23.82 N/A 23.87North U9-L9 1290 47.76 N/A 79.13 N/A 81.74 N/ANorth U9-L9 1291 47.78 N/A 105.68 N/A 112.28 N/A

Phase 3Strength I

Span 2 Truss Capacity/Demand ratios**

Capacity/Demand = Member CapacityDead Load + Live Load

Compression Tension

Truss Member Rating IDPhase 1

Strength IPhase 2

Strength I

Compression Tension Compression Tension

Page 302: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

Phase 3Strength I

Span 2 Truss Capacity/Demand ratios**

Capacity/Demand = Member CapacityDead Load + Live Load

Compression Tension

Truss Member Rating IDPhase 1

Strength IPhase 2

Strength I

Compression Tension Compression Tension

North U9-L9 1292 N/A 8.74 N/A 4.47 N/A 4.42North U1-L2 1301 N/A 3.04 N/A 1.56 N/A 1.53North U2-L4 1302 N/A 6.06 N/A 2.14 N/A 2.07North U2-L4 1303 N/A 9.51 N/A 2.73 N/A 2.63North U4-L6 1304 N/A 9.88 N/A 3.87 N/A 3.75North U4-L6 1305 N/A 23.67 N/A 8.10 N/A 7.83North U8-L6 1306 N/A 12.60 N/A 6.23 N/A 6.07North U8-L6 1307 N/A 7.24 N/A 3.39 N/A 3.30North U10-L8 1308 N/A 6.48 N/A 2.41 N/A 2.33North U10-L8 1309 N/A 4.66 N/A 1.93 N/A 1.88North U11-L10 1310 N/A 2.91 N/A 1.53 N/A 1.49North M3-L2 1382 6.40 N/A 3.77 N/A 3.73 N/ANorth M5-L4 1384 6.24 N/A 2.64 N/A 2.56 N/ANorth M7-L8 1388 7.33 N/A 3.11 N/A 3.02 N/ANorth M9-L10 1392 7.37 N/A 4.36 N/A 4.32 N/ANorth U1-L0 1500 2.25 N/A 1.41 N/A 1.39 N/ANorth U1-U2 1501 2.76 N/A 1.61 N/A 1.58 N/ANorth U2-U3 1502 2.86 N/A 1.49 N/A 1.46 N/ANorth U3-U4 1503 2.86 N/A 1.49 N/A 1.46 N/ANorth U4-U5 1504 2.65 N/A 1.34 N/A 1.31 N/ANorth U5-U6 1505 2.65 N/A 1.34 N/A 1.31 N/ANorth U6-U7 1506 2.65 N/A 1.34 N/A 1.31 N/ANorth U7-U8 1507 2.66 N/A 1.34 N/A 1.31 N/ANorth U8-U9 1508 2.97 N/A 1.52 N/A 1.49 N/ANorth U9-U10 1509 2.97 N/A 1.52 N/A 1.49 N/ANorth U10-U11 1510 3.11 N/A 1.72 N/A 1.69 N/ANorth U11-L12 1511 2.76 N/A 1.60 N/A 1.56 N/ANorth U1-L0 1550 2.45 N/A 1.53 N/A 1.50 N/ANorth U1-L0 1551 2.41 N/A 1.50 N/A 1.48 N/ANorth U11-L12 1560 3.02 N/A 1.73 N/A 1.70 N/ANorth U11-L12 1561 2.97 N/A 1.70 N/A 1.67 N/A

Page 303: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

Phase 3Strength I

Span 2 Truss Capacity/Demand ratios**

Capacity/Demand = Member CapacityDead Load + Live Load

Compression Tension

Truss Member Rating IDPhase 1

Strength IPhase 2

Strength I

Compression Tension Compression Tension

South L0-L1 2100 N/A 3.40 N/A 2.15 N/A 2.11South L1-L2 2101 N/A 3.98 N/A 2.57 N/A 2.53South L2-L3 2102 N/A 3.60 N/A 2.12 N/A 2.08South L3-L4 2103 N/A 3.79 N/A 2.25 N/A 2.21South L4-L5 2104 N/A 3.88 N/A 1.96 N/A 1.92South L5-L6 2105 N/A 3.92 N/A 1.99 N/A 1.94South L6-L7 2106 N/A 4.10 N/A 2.03 N/A 1.99South L7-L8 2107 N/A 4.03 N/A 2.00 N/A 1.95South L8-L9 2108 N/A 4.31 N/A 2.43 N/A 2.38South L9-L10 2109 N/A 4.05 N/A 2.27 N/A 2.22South L10-L11 2110 N/A 5.15 N/A 3.02 N/A 2.96South L11-L12 2111 N/A 4.28 N/A 2.48 N/A 2.43South U1-L1 2201 N/A 3.06 N/A 3.06 N/A 3.06South U2-L2 2202 5.26 N/A 2.01 N/A 1.95 N/ASouth U2-L2 2203 4.96 N/A 1.92 N/A 1.86 N/ASouth U10-L10 2209 4.18 N/A 1.83 N/A 1.78 N/ASouth U10-L10 2210 3.95 N/A 1.75 N/A 1.70 N/ASouth U11-L11 2211 N/A 6.78 N/A 6.78 N/A 6.78South U3-L3 2230 48.03 N/A 78.57 N/A 81.07 N/ASouth U3-L3 2231 47.73 N/A 100.82 N/A 106.58 N/ASouth U3-L3 2232 N/A 8.57 N/A 4.39 N/A 4.34South U4-L4 2240 N/A 11.87 N/A 10.05 N/A 10.07South U4-L4 2241 N/A 11.58 N/A 9.55 N/A 9.56South U4-L4 2242 N/A 11.80 N/A 9.71 N/A 9.71South U5-L5 2250 30.00 N/A 27.54 N/A 27.43 N/ASouth U5-L5 2251 30.31 N/A 30.01 N/A 30.00 N/ASouth U5-L5 2252 N/A 8.27 N/A 2.91 N/A 2.81South U6-L6 2260 30.09 N/A 27.70 N/A 27.59 N/ASouth U6-L6 2261 30.47 N/A 30.32 N/A 30.32 N/ASouth U6-L6 2262 23.45 N/A 23.36 N/A 23.36 N/ASouth U7-L7 2270 29.97 N/A 27.51 N/A 27.40 N/ASouth U7-L7 2271 30.26 N/A 29.93 N/A 29.92 N/ASouth U7-L7 2272 N/A 7.05 N/A 2.48 N/A 2.40South U8-L8 2280 N/A 37.28 N/A 23.84 N/A 23.94South U8-L8 2281 N/A 39.18 N/A 22.87 N/A 22.91South U8-L8 2282 N/A 41.89 N/A 23.77 N/A 23.81South U9-L9 2290 47.05 N/A 75.70 N/A 78.01 N/ASouth U9-L9 2291 46.35 N/A 93.93 N/A 98.86 N/A

Page 304: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/17/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

Phase 3Strength I

Span 2 Truss Capacity/Demand ratios**

Capacity/Demand = Member CapacityDead Load + Live Load

Compression Tension

Truss Member Rating IDPhase 1

Strength IPhase 2

Strength I

Compression Tension Compression Tension

South U9-L9 2292 N/A 10.38 N/A 5.31 N/A 5.25South U1-L2 2301 N/A 3.04 N/A 1.56 N/A 1.53South U2-L4 2302 N/A 6.05 N/A 2.14 N/A 2.07South U2-L4 2303 N/A 9.52 N/A 2.73 N/A 2.63South U4-L6 2304 N/A 9.90 N/A 3.87 N/A 3.75South U4-L6 2305 N/A 23.75 N/A 8.11 N/A 7.84South U8-L6 2306 N/A 12.55 N/A 6.21 N/A 6.05South U8-L6 2307 N/A 7.22 N/A 3.38 N/A 3.29South U10-L8 2308 N/A 6.46 N/A 2.40 N/A 2.32South U10-L8 2309 N/A 4.65 N/A 1.93 N/A 1.87South U11-L10 2310 N/A 2.90 N/A 1.52 N/A 1.49South M3-L2 2382 6.39 N/A 3.76 N/A 3.72 N/ASouth M5-L4 2384 6.20 N/A 2.63 N/A 2.55 N/ASouth M7-L8 2388 6.16 N/A 2.62 N/A 2.54 N/ASouth M9-L10 2392 6.31 N/A 3.73 N/A 3.69 N/ASouth U1-L0 2500 2.25 N/A 1.41 N/A 1.39 N/ASouth U1-U2 2501 2.76 N/A 1.61 N/A 1.58 N/ASouth U2-U3 2502 2.85 N/A 1.49 N/A 1.45 N/ASouth U3-U4 2503 2.86 N/A 1.49 N/A 1.46 N/ASouth U4-U5 2504 2.65 N/A 1.34 N/A 1.31 N/ASouth U5-U6 2505 2.65 N/A 1.34 N/A 1.31 N/ASouth U6-U7 2506 2.65 N/A 1.34 N/A 1.31 N/ASouth U7-U8 2507 2.65 N/A 1.34 N/A 1.31 N/ASouth U8-U9 2508 2.97 N/A 1.52 N/A 1.48 N/ASouth U9-U10 2509 2.96 N/A 1.52 N/A 1.48 N/ASouth U10-U11 2510 3.10 N/A 1.72 N/A 1.68 N/ASouth U11-L12 2511 2.76 N/A 1.60 N/A 1.56 N/ASouth U1-L0 2550 2.45 N/A 1.53 N/A 1.50 N/ASouth U1-L0 2551 2.41 N/A 1.50 N/A 1.47 N/ASouth U11-L12 2560 3.02 N/A 1.73 N/A 1.70 N/ASouth U11-L12 2561 2.97 N/A 1.70 N/A 1.67 N/A

Page 305: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 2

Truss floor system member capacity to demand ratios

Page 306: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 2

Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

Main Floorbeam 0 100 6.68 4.78 6.68 4.78 6.68 4.78Main Floorbeam 1 110 3.52 2.43 3.52 2.43 3.52 2.43Main Floorbeam 2 120 7.03 5.06 7.03 5.06 7.03 5.06Main Floorbeam 3 130 10.19 7.60 5.11 3.59 5.05 3.54Main Floorbeam 4 140 10.19 7.59 3.41 2.35 3.30 2.27Main Floorbeam 5 150 10.19 7.59 3.41 2.35 3.30 2.26Main Floorbeam 6 160 10.19 7.59 3.41 2.35 3.30 2.26Main Floorbeam 7 170 8.84 7.59 2.96 2.35 2.86 2.26Main Floorbeam 8 180 10.05 7.59 3.37 2.35 3.26 2.27Main Floorbeam 9 190 10.05 7.60 5.04 3.59 4.98 3.54

Main Floorbeam 10 200 10.09 7.56 10.09 7.56 10.09 7.56Main Floorbeam 11 210 10.00 7.52 10.00 7.52 10.00 7.52Main Floorbeam 12 220 17.45 14.86 17.45 14.86 17.45 14.86

Intermediate Floorbeam 0A 101 73.11 151.39 73.11 151.39 73.11 151.39Intermediate Floorbeam 0B 102 77.09 158.96 77.09 158.96 77.09 158.96Intermediate Floorbeam 1A 111 73.30 151.74 73.30 151.74 73.30 151.74Intermediate Floorbeam 1B 112 77.62 159.98 77.62 159.98 77.62 159.98Intermediate Floorbeam 2A 121 84.34 172.59 84.34 172.52 84.34 172.52Intermediate Floorbeam 2B 122 86.95 177.41 86.96 177.41 86.96 177.41Intermediate Floorbeam 3A 131 84.37 172.59 84.37 172.59 84.37 172.59Intermediate Floorbeam 3B 132 87.45 178.28 87.46 178.36 87.46 178.36Intermediate Floorbeam 4A 141 84.83 173.49 84.85 173.49 84.85 173.49Intermediate Floorbeam 4B 142 87.13 177.72 87.15 177.72 87.15 177.80Intermediate Floorbeam 5A 151 84.52 172.89 84.54 172.89 84.54 172.89Intermediate Floorbeam 5B 152 87.43 178.28 87.44 178.28 87.45 178.28Intermediate Floorbeam 6A 161 84.81 173.42 84.82 173.42 84.82 173.42Intermediate Floorbeam 6B 162 87.13 177.72 87.14 177.72 87.15 177.72Intermediate Floorbeam 7A 171 84.53 172.89 84.54 172.97 84.54 172.97Intermediate Floorbeam 7B 172 87.45 178.36 87.47 178.36 87.47 178.36Intermediate Floorbeam 8A 181 84.82 173.42 84.84 173.49 84.84 173.49Intermediate Floorbeam 8B 182 86.96 177.41 86.97 177.41 86.97 177.41Intermediate Floorbeam 9A 191 84.34 172.52 84.35 172.59 84.35 172.59Intermediate Floorbeam 9B 192 86.94 177.41 86.94 177.41 86.94 177.41

Intermediate Floorbeam 10A 201 73.74 152.61 73.74 152.61 73.74 152.61Intermediate Floorbeam 10B 202 77.12 159.03 77.12 159.03 77.12 159.03Intermediate Floorbeam 11A 211 73.23 151.62 73.23 151.62 73.23 151.62Intermediate Floorbeam 11B 212 76.97 158.71 76.97 158.71 76.97 158.71

North Running Girder - 2.62 4.80 2.62 4.80 2.54 4.64South Running Girder - 2.61 4.78 2.61 4.78 2.52 4.62

North Stringer - 171.46 325.99 171.46 325.99 171.46 325.99South Stringer - 171.46 325.99 171.46 325.99 171.46 325.99

Capacity/Demand = Member CapacityDead Load + Live Load

Span 2 Truss Capacity/Demand ratios

Member Ref ID

Phase 1Strength I

Phase 2Strength I

Phase 3Strength I

Moment ShearMoment Shear Moment Shear

Page 307: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

As-built section property calculations

Page 308: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.8750 in Stop = 139.80 in3 y-bar = 7.8750 in Stop = 139.80 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1100.90 in4 Sbott. = 139.80 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.8750 in A = 34.6875 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 7.8750 in rx = 5.6336 in

As-Built Section Properties As-Inspected Section Properties

2

1

P101160439

Lower Chord

Gross Section (without Losses)

Section Losses

Page 309: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 9.6250 in Sright = 107.58 in3 x-bar = 9.6250 in Sright = 169.05 in3

Iy = 1035.42 n4 Sleft = 107.58 in3 Iy = 1035.42 n4 Sleft = 107.58 in3

cright = 9.6250 in A = 34.6875 in2 cright = 6.1250 in A = 34.6875 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6250 in ry = 5.4635 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531n2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

3

Page 310: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Left Channel: C15x40 Right Channel: C15x40

A1 = tw = 0.5200 in A2 = tw = 0.5200 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.5200 in C2 = bf = 3.5200 inD1 = tf = 0.6500 in D2 = tf = 0.6500 in

Top Cover Plate: Bottom Cover Plates:A3 = b = 20.0000 in A4 = b = 4.0000 inB3 = t = 0.3750 in B4 = t = 0.6875 in

Web Plate: Channel Back-to-Back DistanceA5 = t = 0.0000 in G = 12.0000 in

B5 = d = 0.0000 in Channel offset from cover plateE = 0.4800 in

X-Axis Section Properties: Assumes cover plate is the widest elementA y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2880 15.3625 35.1494 0.0806 6.7762 105.0584 105.1390

Bottom Leg 2.2880 1.0125 2.3166 0.0806 7.5738 131.2446 131.3252Web 7.1240 8.1875 58.3278 111.4253 0.3988 1.1329 112.5582

2 Top Leg 2.2880 15.3625 35.1494 0.0806 6.7762 105.0584 105.1390Bottom Leg 2.2880 1.0125 2.3166 0.0806 7.5738 131.2446 131.3252Web 7.1240 8.1875 58.3278 111.4253 0.3988 1.1329 112.5582

3 Top Plate 7.5000 15.8750 119.0625 0.0879 7.2887 398.4407 398.5286Left Plate 2.7500 0.3438 0.9453 0.1083 8.2425 186.8331 186.9414Right Plate 2.7500 0.3438 0.9453 0.1083 8.2425 186.8331 186.9414Left Plate 0.0000 8.1875 0.0000 0.0000 0.3988 0.0000 0.0000Right Plate 0.0000 8.1875 0.0000 0.0000 0.3988 0.0000 0.0000

Total 36.40 312.54 223.48 1246.98 1470.46A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

Section Losses

5

P101160439

Upper Chord

Gross Section (without Losses)

4

Page 311: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

y-bar = 8.5863 in Stop = 216.60 in3 y-bar = 8.5863 in Stop = 216.60 in3

Ix = 1470.46 in4 Sbott. = 171.26 in3 Ix = 1470.46 in4 Sbott. = 171.26 in3

ctop = 6.7887 in A = 36.4000 in2 ctop = 6.7887 in A = 36.4000 in2

cbottom = 8.5863 in rx = 6.3559 in cbottom = 8.5863 in rx = 6.3559 in

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2880 2.2400 5.1251 2.3624 7.7600 137.7779 140.1403

Bottom Leg 2.2880 2.2400 5.1251 2.3624 7.7600 137.7779 140.1403Web 7.1240 3.7400 26.6438 0.1605 6.2600 279.1725 279.3330

2 Top Leg 2.2880 17.7600 40.6349 2.3624 7.7600 137.7779 140.1403Bottom Leg 2.2880 17.7600 40.6349 2.3624 7.7600 137.7779 140.1403Web 7.1240 16.2600 115.8362 0.1605 6.2600 279.1725 279.3330

3 Plate 7.5000 10.0000 75.0000 250.0000 0.0000 0.0000 250.0000Left Plate 2.7500 2.0000 5.5000 3.6667 8.0000 176.0000 179.6667Right Plate 2.7500 18.0000 49.5000 3.6667 8.0000 176.0000 179.6667Left Plate 0.0000 3.4800 0.0000 0.0000 6.5200 0.0000 0.0000Right Plate 0.0000 16.5200 0.0000 0.0000 6.5200 0.0000 0.0000

Total 36.40 364.00 267.10 1461.46 1728.56A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 10.0000 in Sright = 172.86 in3 x-bar = 10.0000 in Sright = 172.86 in3

Iy = 1728.56 n4 Sleft = 172.86 in3 Iy = 1728.56 n4 Sleft = 172.86 in3

cright = 10.0000 in A = 36.4000 in2 cright = 10.0000 in A = 36.4000 in2

cleft = 10.0000 in ry = 6.8911 in cleft = 10.0000 in ry = 6.8911 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 34.5800n2 Iy = 1560.0259 in2 Ix = 1327.0867 in2

ry = 6.7167 in rx = 6.1949 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

4

5

Page 312: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Left Channel: C15x40 Right Channel: C15x40

A1 = tw = 0.5200 in A2 = tw = 0.5200 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.5200 in C2 = bf = 3.5200 inD1 = tf = 0.6500 in D2 = tf = 0.6500 in

Top Cover Plate: Bottom Cover Plates:A3 = b = 20.0000 in A4 = b = 4.0000 inB3 = t = 0.4375 in B4 = t = 0.5000 in

Web Plate: Channel Back-to-Back DistanceA5 = t = 0.5000 in G = 12.0000 in

B5 = d = 12.0000 in Channel offset from cover plateE = 0.4800 in Width check: OK

X-Axis Section Properties: Assumes cover plate is the widest elementA y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2880 15.1750 34.7204 0.0806 6.4161 94.1898 94.2703

Bottom Leg 2.2880 0.8250 1.8876 0.0806 7.9339 144.0207 144.1013Web 7.1240 8.0000 56.9920 111.4253 0.7589 4.1025 115.5278

2 Top Leg 2.2880 15.1750 34.7204 0.0806 6.4161 94.1898 94.2703Bottom Leg 2.2880 0.8250 1.8876 0.0806 7.9339 144.0207 144.1013Web 7.1240 8.0000 56.9920 111.4253 0.7589 4.1025 115.5278

3 Top Plate 8.7500 15.7188 137.5391 0.1396 6.9599 423.8507 423.9903Left Plate 2.0000 0.2500 0.5000 0.0417 8.5089 144.8014 144.8430Right Plate 2.0000 0.2500 0.5000 0.0417 8.5089 144.8014 144.8430Left Plate 6.0000 8.0000 48.0000 72.0000 0.7589 3.4552 75.4552Right Plate 6.0000 8.0000 48.0000 72.0000 0.7589 3.4552 75.4552

Total 48.15 421.74 367.40 1204.99 1572.39A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

4

5

P101160439

End Post

Gross Section (without Losses)

Section Losses

Page 313: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

y-bar = 8.7589 in Stop = 235.43 in3 y-bar = 8.7589 in Stop = 235.43 in3

Ix = 1572.39 in4 Sbott. = 179.52 in3 Ix = 1572.39 in4 Sbott. = 179.52 in3

ctop = 6.6786 in A = 48.1500 in2 ctop = 6.6786 in A = 48.1500 in2

cbottom = 8.7589 in rx = 5.7145 in cbottom = 8.7589 in rx = 5.7145 in

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2880 2.2400 5.1251 2.3624 7.7600 137.7779 140.1403

Bottom Leg 2.2880 2.2400 5.1251 2.3624 7.7600 137.7779 140.1403Web 7.1240 3.7400 26.6438 0.1605 6.2600 279.1725 279.3330

2 Top Leg 2.2880 17.7600 40.6349 2.3624 7.7600 137.7779 140.1403Bottom Leg 2.2880 17.7600 40.6349 2.3624 7.7600 137.7779 140.1403Web 7.1240 16.2600 115.8362 0.1605 6.2600 279.1725 279.3330

3 Plate 8.7500 10.0000 87.5000 291.6667 0.0000 0.0000 291.6667Left Plate 2.0000 2.0000 4.0000 2.6667 8.0000 128.0000 130.6667Right Plate 2.0000 18.0000 36.0000 2.6667 8.0000 128.0000 130.6667Left Plate 6.0000 3.2300 19.3800 0.1250 6.7700 274.9974 275.1224Right Plate 6.0000 16.7700 100.6200 0.1250 6.7700 274.9974 275.1224

Total 48.15 481.50 307.02 1915.45 2222.47A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 10.0000 in Sright = 222.25 in3 x-bar = 10.0000 in Sright = 222.25 in3

Iy = 2222.47 n4 Sleft = 222.25 in3 Iy = 2222.47 n4 Sleft = 222.25 in3

cright = 10.0000 in A = 48.1500 in2 cright = 10.0000 in A = 48.1500 in2

cleft = 10.0000 in ry = 6.7939 in cleft = 10.0000 in ry = 6.7939 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 45.7425n2 Iy = 2005.781 in2 Ix = 1419.078 in2

ry = 6.6219 in rx = 5.5698 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

4

5

As-Built Section Properties As-Inspected Section Properties

Gross Section (without Losses)

Page 314: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 5.0000 in B2 = lh = 5.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 3.5000 in A2 = lv = 3.5000 in

Web Plate: C3 = 0.3750 inB3 = 11.0000 in

Top Cover Plate: Btm Cover Plate: C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.0000 10.7500 53.7500 0.1042 5.2500 137.8125 137.9167Vertical Leg 3.0000 9.0000 27.0000 2.2500 3.5000 36.7500 39.0000Horizontal Leg 5.0000 0.2500 1.2500 0.1042 5.2500 137.8125 137.9167Vertical Leg 3.0000 2.0000 6.0000 2.2500 3.5000 36.7500 39.0000

3 4.1250 5.5000 22.6875 41.5938 0.0000 0.0000 41.5938Cover Plate Top 0.0000 11.0000 0.0000 0.0000 5.5000 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 5.5000 0.0000 0.0000

Total 20.13 110.69 46.30 349.13 395.43A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

y-bar = 5.5000 in Stop = 71.90 in3 y-bar = 5.5000 in Stop = 71.90 in3

Ix = 395.43 n4 Sbott. = 71.90 in3 Ix = 395.43 in4 Sbott. = 71.90 in3

ctop = 5.5000 in A = 20.1250 in2 ctop = 5.5000 in A = 20.1250 in2

cbottom = 5.5000 in rx = 4.4327 in cbottom = 5.5000 in rx = 4.4327 in

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

2

P101160439

Vertical PP2-6

Gross Section (without Losses)

1

Page 315: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.5000 2.5000 6.2500 5.2083 2.6875 18.0566 23.2650

(Left) Vertical Leg 1.5000 4.7500 7.1250 0.0313 0.4375 0.2871 0.31841 Horizontal Leg 2.5000 7.8750 19.6875 5.2083 2.6875 18.0566 23.2650

(Right) Vertical Leg 1.5000 5.6250 8.4375 0.0313 0.4375 0.2871 0.31842 Horizontal Leg 2.5000 2.5000 6.2500 5.2083 2.6875 18.0566 23.2650

(Left) Vertical Leg 1.5000 4.7500 7.1250 0.0313 0.4375 0.2871 0.31842 Horizontal Leg 2.5000 7.8750 19.6875 5.2083 2.6875 18.0566 23.2650

(Right) Vertical Leg 1.5000 5.6250 8.4375 0.0313 0.4375 0.2871 0.31843 Web Plate 4.1250 5.1875 21.3984 0.0483 0.0000 0.0000 0.04834 Top Cover Plate 0.0000 5.1875 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 5.1875 0.0000 0.0000 0.0000 0.0000 0.0000

Total 20.13 104.40 21.01 73.38 94.38A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

x-bar = 5.1875 in Sright = 18.19 in3 x-bar = 5.1875 in Sright = 18.19 in3

Iy = 94.38 n4 Sleft = 18.19 in3 Iy = 94.38 in4 Sleft = 18.19 in3

cright = 5.1875 in A = 20.1250 in2 cright = 5.1875 in A = 20.1250 in2

cleft = 5.1875 in ry = 2.1656 in cleft = 5.1875 in ry = 2.1656 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 19.1188 in2 Iy = 85.1795 in2 Ix = 356.8729 in2

ry = 2.1108 in rx = 4.3204 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

Page 316: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 5.0000 in B2 = lh = 5.0000 inC1 = tf = 0.3750 in C2 = tf = 0.3750 inB1 = lv = 3.5000 in A2 = lv = 3.5000 in

Web Plate: C3 = 0.3750 inB3 = 11.0000 in

Top Cover Plate: Btm Cover Plate: C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 3.7500 10.8125 40.5469 0.0439 5.3125 105.8350 105.8789Vertical Leg 2.3438 9.0625 21.2402 1.9073 3.5625 29.7455 31.6528Horizontal Leg 3.7500 0.1875 0.7031 0.0439 5.3125 105.8350 105.8789Vertical Leg 2.3438 1.9375 4.5410 1.9073 3.5625 29.7455 31.6528

3 4.1250 5.5000 22.6875 41.5938 0.0000 0.0000 41.5938Cover Plate Top 0.0000 11.0000 0.0000 0.0000 5.5000 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 5.5000 0.0000 0.0000

Total 16.31 89.72 45.50 271.16 316.66A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

y-bar = 5.5000 in Stop = 57.57 in3 y-bar = 5.5000 in Stop = 57.57 in3

Ix = 316.66 n4 Sbott. = 57.57 in3 Ix = 316.66 in4 Sbott. = 57.57 in3

ctop = 5.5000 in A = 16.3125 in2 ctop = 5.5000 in A = 16.3125 in2

cbottom = 5.5000 in rx = 4.4059 in cbottom = 5.5000 in rx = 4.4059 in

Web Plate

4

Section Losses

As-Built Section Properties As-Inspected Section Properties

2

P101160439

Veritcal U1-L1, U7-L7

Gross Section (without Losses)

1

Page 317: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 1.8750 2.5000 4.6875 3.9063 2.6875 13.5425 17.4487

(Left) Vertical Leg 1.1719 4.8125 5.6396 0.0137 0.3750 0.1648 0.17851 Horizontal Leg 1.8750 7.8750 14.7656 3.9063 2.6875 13.5425 17.4487

(Right) Vertical Leg 1.1719 5.5625 6.5186 0.0137 0.3750 0.1648 0.17852 Horizontal Leg 1.8750 2.5000 4.6875 3.9063 2.6875 13.5425 17.4487

(Left) Vertical Leg 1.1719 4.8125 5.6396 0.0137 0.3750 0.1648 0.17852 Horizontal Leg 1.8750 7.8750 14.7656 3.9063 2.6875 13.5425 17.4487

(Right) Vertical Leg 1.1719 5.5625 6.5186 0.0137 0.3750 0.1648 0.17853 Web Plate 4.1250 5.1875 21.3984 0.0483 0.0000 0.0000 0.04834 Top Cover Plate 0.0000 5.1875 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 5.1875 0.0000 0.0000 0.0000 0.0000 0.0000

Total 16.31 84.62 15.73 54.83 70.56A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00

x-bar = 5.1875 in Sright = 13.60 in3 x-bar = 5.1875 in Sright = 13.60 in3

Iy = 70.56 n4 Sleft = 13.60 in3 Iy = 70.56 in4 Sleft = 13.60 in3

cright = 5.1875 in A = 16.3125 in2 cright = 5.1875 in A = 16.3125 in2

cleft = 5.1875 in ry = 2.0797 in cleft = 5.1875 in ry = 2.0797 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 15.4969 in2 Iy = 63.678 in2 Ix = 285.7831 in2

ry = 2.0271 in rx = 4.2943 in

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

Page 318: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Top Cover Plate:A3 = b = 18.7500 inB3 = t = in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500

Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

3 Plate 0.0000 15.0000 0.0000 0.0000 7.5000 0.0000 0.0000Total 19.80 148.50 171.73 455.09 626.82

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 7.5000 in Stop = 83.58 in3 y-bar = 7.5000 in Stop = 83.58 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 626.82 in4 Sbott. = 83.58 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.5000 in A = 19.8000 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.5000 in rx = 5.6265 in

As-Built Section Properties As-Inspected Section Properties

P101160439

Diagonal U2-L4, U6-L4

Gross Section (without Losses)

Section Losses

No top cover plate, used

Page 319: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 2.2100 1.7000 3.7570 2.1290 7.6750 130.1814 132.3104

Bottom Leg 2.2100 1.7000 3.7570 2.1290 7.6750 130.1814 132.3104Web 5.4800 3.2000 17.5360 0.0731 6.1750 208.9558 209.0289

2 Top Leg 2.2100 17.0500 37.6805 2.1290 7.6750 130.1814 132.3104Bottom Leg 2.2100 17.0500 37.6805 2.1290 7.6750 130.1814 132.3104Web 5.4800 15.5500 85.2140 0.0731 6.1750 208.9558 209.0289

3 Plate 0.0000 9.3750 0.0000 0.0000 0.0000 0.0000 0.0000Total 19.80 185.63 8.66 938.64 947.30

A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 9.3750 in Sright = 101.05 in3 x-bar = 9.3750 in Sright = 101.05 in3

Iy = 947.30 n4 Sleft = 101.05 in3 Iy = 947.30 n4 Sleft = 101.05 in3

cright = 9.3750 in A = 19.8000 in2 cright = 9.3750 in A = 19.8000 in2

cleft = 9.3750 in ry = 6.9169 in cleft = 9.3750 in ry = 6.9169 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 854.9377 in2 Ix = 565.7082 in2

ry = 6.7418 in rx = 5.4841 in

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 320: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Left Channel: C10x20 Right Channel: C10x20

A1 = tw = 0.3790 in A2 = tw = 0.3790 inB1 = d = 10.0000 in B2 = d = 10.0000 inC1 = bf = 2.7390 in C2 = bf = 2.7390 inD1 = tf = 0.4360 in D2 = tf = 0.4360 inE1 = bf = 2.7390 in E2 = bf = 2.7390 inF1 = tf = 0.4360 in F2 = tf = 0.4360 in

Channel Back-to-Back DistanceG = 11.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274

Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

2 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

Total 11.70 58.48 48.12 109.23 157.35A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 5.0000 in Stop = 31.47 in3 y-bar = 5.0000 in Stop = 31.47 in3

Ix = 157.35 in4 Sbott. = 31.47 in3 Ix = 157.35 in4 Sbott. = 31.47 in3

ctop = 5.0000 in A = 11.6958 in2 ctop = 5.0000 in A = 11.6958 in2

cbottom = 5.0000 in rx = 3.6679 in cbottom = 5.0000 in rx = 3.6679 in

Section Losses

P101160439

Diagonal M1-L2, M3-L2, M5-L6, M7-L6

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 321: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209

Bottom Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209Web 3.4595 0.1895 0.6556 0.0414 5.3105 97.5631 97.6045

2 Top Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Bottom Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Web 3.4595 10.8105 37.3991 0.0414 5.3105 97.5631 97.6045

Total 11.70 64.33 3.07 276.62 279.69A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0

x-bar = 5.5000 in Sright = 50.85 in3 x-bar = 5.5000 in Sright = 50.85 in3

Iy = 279.69 n4 Sleft = 50.85 in3 Iy = 279.69 n4 Sleft = 50.85 in3

cright = 5.5000 in A = 11.6958 in2 cright = 5.5000 in A = 11.6958 in2

cleft = 5.5000 in ry = 4.8902 in cleft = 5.5000 in ry = 4.8902 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 11.1110 in2 Iy = 252.4228 in2 Ix = 142.0092 in2

ry = 4.7664 in rx = 3.575 in

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 322: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.0000 in B2 = lh = 4.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.5000 in do = N/A in B3 = 34.1875 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.0000 33.8750 169.3750 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 30.8750 207.4414 16.1757 13.7813 1276.0442 1292.2199Horizontal Leg 5.0000 0.3125 1.5625 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 3.3125 22.2559 16.1757 13.7813 1276.0442 1292.2199

3 17.0938 17.0938 292.1963 1664.9101 0.0000 0.0000 1664.9101Cover Plate Top 0.0000 34.1875 0.0000 0.0000 17.0938 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 17.0938 0.0000 0.0000

Total 40.53 692.83 1697.59 5368.19 7065.78A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.0938 in Stop = 413.35 in3 y-bar = 17.0938 in Stop = 413.35 in3

Ix = 7065.78 n4 Sbott. = 413.35 in3 Ix = 7065.78 in4 Sbott. = 413.35 in3

ctop = 17.0938 in A = 40.5313 in2 ctop = 17.0938 in A = 40.5313 in2

cbottom = 17.0938 in rx = 13.2034 in cbottom = 17.0938 in rx = 13.2034 inJ = 4.4762 Z = 499.0962 in3 Z = 499.0962 in3

Section Losses

As-Built Section Properties As-Inspected Section Properties

4

P101160439

End floorbeam without coverplates

Gross Section (without Losses)

1

2

Web Plate

Page 323: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.5000 2.0000 5.0000 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.6875 12.3877 0.1094 0.5625 1.0629 1.17231 Horizontal Leg 2.5000 6.5000 16.2500 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 4.8125 16.1670 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 2.0000 5.0000 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.6875 12.3877 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 6.5000 16.2500 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 4.8125 16.1670 0.1094 0.5625 1.0629 1.17233 Web Plate 17.0938 4.2500 72.6484 0.3561 0.0000 0.0000 0.35614 Top Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 4.2500 0.0000 0.0000 0.0000 0.0000 0.0000

Total 40.53 172.26 14.13 54.88 69.00A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 4.2500 in Sright = 16.24 in3 x-bar = 4.2500 in Sright = 16.24 in3

Iy = 69.00 n4 Sleft = 16.24 in3 Iy = 69.00 in4 Sleft = 16.24 in3

cright = 4.2500 in A = 40.5313 in2 cright = 4.2500 in A = 40.5313 in2

cleft = 4.2500 in ry = 1.3048 in cleft = 4.2500 in ry = 1.3048 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 38.5047 in2 Iy = 62.2757 in2 Ix = 6376.8655 in2 Stop = 373.0525 in3

ry = 1.2718 in rx = 12.8691 n Sbot = 373.0525 in3

Z = 474.1414 in3

Fy = 30.00 ksiAB AB** AI

M 1033.39 932.63 k-ft 1033.39 k-ft AB = As-BuiltV 531.24 504.68 k 531.24 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 324: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.0000 in B2 = lh = 4.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.5000 in do = N/A in B3 = 34.1875 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.7500 in C5 = 0.7500 inA4 = 8.8750 in A5 = 8.8750 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.0000 34.6250 173.1250 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 31.6250 212.4805 16.1757 13.7813 1276.0442 1292.2199Horizontal Leg 5.0000 1.0625 5.3125 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 4.0625 27.2949 16.1757 13.7813 1276.0442 1292.2199

3 17.0938 17.8438 305.0166 1664.9101 0.0000 0.0000 1664.9101Cover Plate Top 6.6563 35.3125 235.0488 0.3120 17.4688 2031.2028 2031.5148Cover Plate Bottom 6.6563 0.3750 2.4961 0.3120 17.4688 2031.2028 2031.5148

Total 53.84 960.77 1698.21 9430.60 11128.81A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.8438 in Stop = 623.68 in3 y-bar = 17.8438 in Stop = 623.68 in3

Ix = 11128.81 n4 Sbott. = 623.68 in3 Ix = 11128.81 in4 Sbott. = 623.68 in3

ctop = 17.8438 in A = 53.8438 in2 ctop = 17.8438 in A = 53.8438 in2

cbottom = 17.8438 in rx = 14.3766 in cbottom = 17.8438 in rx = 14.3766 inJ = 6.9723 Z = 731.6489 in3 Z = 731.6489 in3

4

P101160439

End floorbeam with coverplates

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 325: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.5000 2.1875 5.4688 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.8750 13.0176 0.1094 0.5625 1.0629 1.17231 Horizontal Leg 2.5000 6.6875 16.7188 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 5.0000 16.7969 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 2.1875 5.4688 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.8750 13.0176 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 6.6875 16.7188 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 5.0000 16.7969 0.1094 0.5625 1.0629 1.17233 Web Plate 17.0938 4.4375 75.8535 0.3561 0.0000 0.0000 0.35614 Top Cover Plate 6.6563 4.4375 29.5371 43.6903 0.0000 0.0000 43.69034 Bottom Cover Plate 6.6563 4.4375 29.5371 43.6903 0.0000 0.0000 43.6903

Total 53.84 238.93 101.51 54.88 156.38A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 4.4375 in Sright = 35.24 in3 x-bar = 4.4375 in Sright = 35.24 in3

Iy = 156.38 n4 Sleft = 35.24 in3 Iy = 156.38 in4 Sleft = 35.24 in3

cright = 4.4375 in A = 53.8438 in2 cright = 4.4375 in A = 53.8438 in2

cleft = 4.4375 in ry = 1.7042 in cleft = 4.4375 in ry = 1.7042 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 51.1516 in2 Iy = 141.1367 in2 Ix = 10043.7497 in2 Stop = 562.8721 in3

ry = 1.6611 in rx = 14.0126 n Sbot = 562.8721 in3

Z = 695.0665 in3

Fy = 30.00 ksiAB AB** AI

M 1559.2 1407.18 k-ft 1559.20 k-ft AB = As-BuiltV 531.24 504.68 k 531.24 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Capacities*

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 326: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.6250 in do = N/A in B3 = 34.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 34.4375 258.2813 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 31.4375 211.2207 16.1757 13.8125 1281.8378 1298.0135Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.8125 1281.8378 1298.0135

3 21.4063 17.6250 377.2852 2092.5724 0.0000 0.0000 2092.5724Cover Plate Top 6.5000 35.0000 227.5000 0.1354 17.3750 1962.2891 1962.4245Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 17.3750 1962.2891 1962.4245

Total 62.84 1107.62 2125.68 10728.16 12853.84A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 17.6250 in Stop = 729.30 in3 y-bar = 17.6250 in Stop = 729.30 in3

Ix = 12853.84 n4 Sbott. = 729.30 in3 Ix = 12853.84 in4 Sbott. = 729.30 in3

ctop = 17.6250 in A = 62.8438 in2 ctop = 17.6250 in A = 62.8438 in2

cbottom = 17.6250 in rx = 14.3016 in cbottom = 17.6250 in rx = 14.3016 inJ = 7.5734 Z = 846.9590 in3 Z = 846.9590 in3

Section Losses

As-Built Section Properties As-Inspected Section Properties

4

P101160439

Intermediate floorbeam with coverplates

Gross Section (without Losses)

1

2

Web Plate

Page 327: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/7/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42161 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42163 Web Plate 21.4063 6.5000 139.1406 0.6968 0.0000 0.0000 0.69684 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 62.84 408.48 229.22 169.84 399.06A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.5000 in Sright = 61.39 in3 x-bar = 6.5000 in Sright = 61.39 in3

Iy = 399.06 n4 Sleft = 61.39 in3 Iy = 399.06 in4 Sleft = 61.39 in3

cright = 6.5000 in A = 62.8438 in2 cright = 6.5000 in A = 62.8438 in2

cleft = 6.5000 in ry = 2.5199 in cleft = 6.5000 in ry = 2.5199 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 59.7016 in2 Iy = 360.1484 in2 Ix = 11600.5897 in2 Stop = 658.1895 in3

ry = 2.4561 in rx = 13.9395 n Sbot = 658.1895 in3

Z = 804.6110 in3

Fy = 30.00 ksiAB AB** AI

M 1823.24 1645.47 k-ft 1823.24 k-ft AB = As-BuiltV 606.28 575.97 k 606.28 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 328: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6875 in C2 = tf = 0.6875 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.5000 in do = N/A in B3 = 24.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.0000 in C5 = 0.0000 inA4 = 0.0000 in A5 = 0.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 8.2500 23.9063 197.2266 0.3250 11.7813 1145.0823 1145.4072Vertical Leg 7.3047 20.9063 152.7136 17.1798 8.7813 563.2670 580.4468Horizontal Leg 8.2500 0.3438 2.8359 0.3250 11.7813 1145.0823 1145.4072Vertical Leg 7.3047 3.3438 24.4250 17.1798 8.7813 563.2670 580.4468

3 12.1250 12.1250 147.0156 594.1882 0.0000 0.0000 594.1882Cover Plate Top 0.0000 24.2500 0.0000 0.0000 12.1250 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 12.1250 0.0000 0.0000

Total 43.23 524.22 629.20 3416.70 4045.90A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

y-bar = 12.1250 in Stop = 333.68 in3 y-bar = 12.1250 in Stop = 333.68 in3

Ix = 4045.90 n4 Sbott. = 333.68 in3 Ix = 4045.90 in4 Sbott. = 333.68 in3

ctop = 12.1250 in A = 43.2344 in2 ctop = 12.1250 in A = 43.2344 in2

cbottom = 12.1250 in rx = 9.6737 in cbottom = 12.1250 in rx = 9.6737 inJ = 5.9118 Z = 396.1870 in3 Z = 396.1870 in3

Section Losses

As-Built Section Properties As-Inspected Section Properties

4

P101160439

Stringer

Gross Section (without Losses)

1

2

Web Plate

Page 329: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/19/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 4.1250 3.0000 12.3750 12.3750 3.2500 43.5703 55.9453

(Left) Vertical Leg 3.6523 5.6563 20.6586 0.1439 0.5938 1.2876 1.43151 Horizontal Leg 4.1250 9.5000 39.1875 12.3750 3.2500 43.5703 55.9453

(Right) Vertical Leg 3.6523 6.8438 24.9957 0.1439 0.5938 1.2876 1.43152 Horizontal Leg 4.1250 3.0000 12.3750 12.3750 3.2500 43.5703 55.9453

(Left) Vertical Leg 3.6523 5.6563 20.6586 0.1439 0.5938 1.2876 1.43152 Horizontal Leg 4.1250 9.5000 39.1875 12.3750 3.2500 43.5703 55.9453

(Right) Vertical Leg 3.6523 6.8438 24.9957 0.1439 0.5938 1.2876 1.43153 Web Plate 12.1250 6.2500 75.7813 0.2526 0.0000 0.0000 0.25264 Top Cover Plate 0.0000 6.2500 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 6.2500 0.0000 0.0000 0.0000 0.0000 0.0000

Total 43.23 270.21 50.33 179.43 229.76A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.00 0.00 0.00 0.00 0.00Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.2500 in Sright = 36.76 in3 x-bar = 6.2500 in Sright = 36.76 in3

Iy = 229.76 n4 Sleft = 36.76 in3 Iy = 229.76 in4 Sleft = 36.76 in3

cright = 6.2500 in A = 43.2344 in2 cright = 6.2500 in A = 43.2344 in2

cleft = 6.2500 in ry = 2.3053 in cleft = 6.2500 in ry = 2.3053 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 41.0727 in2 Iy = 207.3581 in2 Ix = 3651.4214 in2 Stop = 301.1482 in3

ry = 2.2469 in rx = 9.4288 n Sbot = 301.1482 in3

Z = 376.3777 in3

Fy = 30.00 ksiAB AB** AI

M 834.21 752.87 k-ft 834.21 k-ft AB = As-BuiltV 465.18 441.92 k 465.18 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 330: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/23/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.0000 in A2 =b = 3.0000 inB1 = t = 0.3125 in B2 = t = 0.3125 in

C1 = b = 3.0000 in C2 = b = 3.0000 inD1 = t = 0.3125 in D2 = t = 0.3125 in

Angle Back-to-Back Dimension:E = 16.0000 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 0.9375 14.5000 13.5938 0.7031 6.5000 39.6094 40.3125Outstanding Leg 0.8398 15.8438 13.3063 0.0068 7.8438 51.6709 51.6777Connected Leg 0.9375 1.5000 1.4063 0.7031 6.5000 39.6094 40.3125Outstanding Leg 0.8398 0.1563 0.1312 0.0068 7.8438 51.6709 51.6777

Total 3.55 28.44 1.42 182.56 183.98

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 0.9375 2.8438 2.6660 0.0076 0.7088 0.4710 0.4786Outstanding Leg 0.8398 1.3438 1.1285 0.5055 0.7912 0.5258 1.0312Connected Leg 0.9375 2.8438 2.6660 0.0076 0.7088 0.4710 0.4786Outstanding Leg 0.8398 1.3438 1.1285 0.5055 0.7912 0.5258 1.0312

Total 3.55 7.59 1.03 1.99 3.02

y-bar = 8.0000 in Stop = 23.00 in3 x-bar = 2.1350 in Sright = 3.49 in3

Ix = 183.98 in4 Sbott. = 23.00 in3 Iy = 3.02 n4 Sleft = 1.41 in3

ctop = 8.0000 in A = 3.5547 in2 cright = 0.8650 in A = 3.5547 in2

cbottom = 8.0000 in rx = 7.1942 in cleft = 2.1350 in ry = 0.9217 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 331: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/23/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Built

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = b = 3.5000 in A2 =b = 3.5000 inB1 = t = 0.3125 in B2 = t = 0.3125 in

C1 = b = 3.5000 in C2 = b = 3.5000 inD1 = t = 0.3125 in D2 = t = 0.3125 in

Angle Back-to-Back Dimension:E = 16.0000 in

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1.0938 14.2500 15.5859 1.1165 6.2500 42.7246 43.8411Outstanding Leg 0.9961 15.8438 15.7819 0.0081 7.8438 61.2841 61.2922Connected Leg 1.0938 1.7500 1.9141 1.1165 6.2500 42.7246 43.8411Outstanding Leg 0.9961 0.1563 0.1556 0.0081 7.8438 61.2841 61.2922

Total 4.18 33.44 2.25 208.02 210.27

A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Connected Leg 1.0938 3.3438 3.6572 0.0089 0.8341 0.7610 0.7699Outstanding Leg 0.9961 1.5938 1.5875 0.8434 0.9159 0.8356 1.6789Connected Leg 1.0938 3.3438 3.6572 0.0089 0.8341 0.7610 0.7699Outstanding Leg 0.9961 1.5938 1.5875 0.8434 0.9159 0.8356 1.6789

Total 4.18 10.49 1.70 3.19 4.90

y-bar = 8.0000 in Stop = 26.28 in3 x-bar = 2.5096 in Sright = 4.95 in3

Ix = 210.27 in4 Sbott. = 26.28 in3 Iy = 4.90 n4 Sleft = 1.95 in3

ctop = 8.0000 in A = 4.1797 in2 cright = 0.9904 in A = 4.1797 in2

cbottom = 8.0000 in rx = 7.0927 in cleft = 2.5096 in ry = 1.0825 in

1

2

X-Axis Section Properties Y-Axis Section Properties

P101160439

X-Axis Section Properties:

1

2

Y-Axis Section Properties:

Page 332: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

STAAD.pro V8i model input

Page 333: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 1

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 1 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Job Information Engineer Checked Approved

Name: CTG NRFDate: 19-May-17 06-Jun-17

Structure Type SPACE FRAME

Number of Nodes 136 Highest Node 90007Number of Elements 305 Highest Beam 90707

Number of Basic Load Cases 3Number of Combination Load Cases 1

Included in this printout are data for:All The Whole Structure

NodesNode X

(ft)Y

(ft)Z

(ft)1100 0.000 0.000 0.0001101 14.917 0.000 0.0001102 29.833 0.000 0.0001103 44.750 0.000 0.0001104 59.667 0.000 0.0001105 74.583 0.000 0.0001106 89.500 0.000 0.0001107 104.417 0.000 0.0001108 119.333 0.000 0.0001301 14.917 14.917 0.0001303 44.750 14.917 0.0001305 74.583 14.917 0.0001307 104.417 14.917 0.0001401 23.941 23.941 0.0001403 44.750 25.917 0.0001404 59.667 25.917 0.0001405 74.583 25.917 0.0001407 95.393 23.941 0.0001502 29.833 29.833 0.0001503 44.750 29.833 0.0001504 59.667 29.833 0.0001505 74.583 29.833 0.0001506 89.500 29.833 0.0002100 0.000 0.000 17.1672101 14.917 0.000 17.1672102 29.833 0.000 17.1672103 44.750 0.000 17.167

Page 334: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 2

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 2 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)2104 59.667 0.000 17.1672105 74.583 0.000 17.1672106 89.500 0.000 17.1672107 104.417 0.000 17.1672108 119.333 0.000 17.1672301 14.917 14.917 17.1672303 44.750 14.917 17.1672305 74.583 14.917 17.1672307 104.417 14.917 17.1672401 23.941 23.941 17.1672403 44.750 25.917 17.1672404 59.667 25.917 17.1672405 74.583 25.917 17.1672407 95.393 23.941 17.1672502 29.833 29.833 17.1672503 44.750 29.833 17.1672504 59.667 29.833 17.1672505 74.583 29.833 17.1672506 89.500 29.833 17.1677002 37.292 29.833 8.5837003 52.208 29.833 8.5837004 67.125 29.833 8.5837005 82.042 29.833 8.5839200 29.833 29.833 5.7229201 29.833 29.833 11.4449202 26.887 26.887 2.8619203 26.887 26.887 8.5839204 26.887 26.887 14.3069300 44.750 29.833 4.2929301 44.750 29.833 8.5839302 44.750 29.833 12.8759303 44.750 25.917 4.2929304 44.750 25.917 8.5839305 44.750 25.917 12.8759400 59.667 29.833 4.2929401 59.667 29.833 8.5839402 59.667 29.833 12.8759403 59.667 25.917 4.2929404 59.667 25.917 8.5839405 59.667 25.917 12.8759500 74.583 29.833 4.2929501 74.583 29.833 8.5839502 74.583 29.833 12.8759503 74.583 25.917 4.2929504 74.583 25.917 8.583

Page 335: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 3

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 3 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)9505 74.583 25.917 12.8759600 89.500 29.833 5.7229601 89.500 29.833 11.4449602 92.446 26.887 2.8619603 92.446 26.887 8.5839604 92.446 26.887 14.306

10000 0.000 0.000 5.08310001 4.417 0.000 5.08310002 10.500 0.000 5.08310100 14.917 0.000 5.08310101 19.333 0.000 5.08310102 25.417 0.000 5.08310200 29.833 0.000 5.08310201 34.250 0.000 5.08310202 40.333 0.000 5.08310300 44.750 0.000 5.08310301 49.167 0.000 5.08310302 55.250 0.000 5.08310400 59.667 0.000 5.08310401 64.083 0.000 5.08310402 70.167 0.000 5.08310500 74.583 0.000 5.08310501 79.000 0.000 5.08310502 85.083 0.000 5.08310600 89.500 0.000 5.08310601 93.917 0.000 5.08310602 100.000 0.000 5.08310700 104.417 0.000 5.08310701 108.833 0.000 5.08310702 114.917 0.000 5.08310800 119.333 0.000 5.08320000 0.000 0.000 12.08320001 4.417 0.000 12.08320002 10.500 0.000 12.08320100 14.917 0.000 12.08320101 19.333 0.000 12.08320102 25.417 0.000 12.08320200 29.833 0.000 12.08320201 34.250 0.000 12.08320202 40.333 0.000 12.08320300 44.750 0.000 12.08320301 49.167 0.000 12.08320302 55.250 0.000 12.08320400 59.667 0.000 12.08320401 64.083 0.000 12.083

Page 336: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 4

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 4 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Nodes Cont...Node X

(ft)Y

(ft)Z

(ft)20402 70.167 0.000 12.08320500 74.583 0.000 12.08320501 79.000 0.000 12.08320502 85.083 0.000 12.08320600 89.500 0.000 12.08320601 93.917 0.000 12.08320602 100.000 0.000 12.08320700 104.417 0.000 12.08320701 108.833 0.000 12.08320702 114.917 0.000 12.08320800 119.333 0.000 12.08390000 7.458 0.000 8.58390001 22.375 0.000 8.58390002 37.292 0.000 8.58390003 52.208 0.000 8.58390004 67.125 0.000 8.58390005 82.042 0.000 8.58390006 96.958 0.000 8.58390007 111.875 0.000 8.583

BeamsBeam Node A Node B Length

(ft)Property

(degrees)1100 1100 1101 14.917 1 01101 1101 1102 14.917 2 01102 1102 1103 14.917 3 01103 1103 1104 14.917 4 01104 1104 1105 14.917 5 01105 1105 1106 14.917 6 01106 1106 1107 14.917 7 01107 1107 1108 14.917 8 01210 1301 1101 14.917 9 901220 1502 1102 29.833 10 901230 1503 1403 3.917 11 901231 1403 1303 11.000 12 901232 1303 1103 14.917 13 901240 1504 1404 3.917 14 901241 1404 1104 25.917 15 901250 1505 1405 3.917 16 901251 1405 1305 11.000 17 901252 1305 1105 14.917 18 901260 1506 1106 29.833 19 901270 1307 1107 14.917 20 90

Page 337: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 5

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 5 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)1310 1301 1102 21.095 21 01320 1502 1303 21.095 22 01330 1303 1104 21.095 23 01340 1305 1104 21.095 24 01350 1506 1305 21.095 25 01360 1307 1106 21.095 26 01392 1303 1102 21.095 27 01395 1305 1106 21.095 28 01500 1100 1301 21.095 29 01501 1301 1401 12.762 30 01502 1401 1502 8.333 31 01520 1502 1503 14.917 32 01530 1503 1504 14.917 33 01540 1504 1505 14.917 34 01550 1505 1506 14.917 35 01560 1108 1307 21.095 36 01561 1307 1407 12.762 37 01562 1407 1506 8.333 38 02100 2100 2101 14.917 39 02101 2101 2102 14.917 40 02102 2102 2103 14.917 41 02103 2103 2104 14.917 42 02104 2104 2105 14.917 43 02105 2105 2106 14.917 44 02106 2106 2107 14.917 45 02107 2107 2108 14.917 46 02210 2301 2101 14.917 47 902220 2502 2102 29.833 48 902230 2503 2403 3.917 49 902231 2403 2303 11.000 50 902232 2303 2103 14.917 51 902240 2504 2404 3.917 52 902241 2404 2104 25.917 53 902250 2505 2405 3.917 54 902251 2405 2305 11.000 55 902252 2305 2105 14.917 56 902260 2506 2106 29.833 57 902270 2307 2107 14.917 58 902310 2301 2102 21.095 59 02320 2502 2303 21.095 60 02330 2303 2104 21.095 61 02340 2305 2104 21.095 62 02350 2506 2305 21.095 63 02360 2307 2106 21.095 64 02392 2303 2102 21.095 65 0

Page 338: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 6

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 6 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)2395 2305 2106 21.095 66 02500 2100 2301 21.095 67 02501 2301 2401 12.762 68 02502 2401 2502 8.333 69 02520 2502 2503 14.917 70 02530 2503 2504 14.917 71 02540 2504 2505 14.917 72 02550 2505 2506 14.917 73 02560 2108 2307 21.095 74 02561 2307 2407 12.762 75 02562 2407 2506 8.333 76 06200 1502 9200 5.722 77 06201 9200 9201 5.722 78 06202 9201 2502 5.722 79 06203 1502 9202 5.054 80 06204 9202 9200 5.054 81 06205 9200 9203 5.054 82 06206 9203 9201 5.054 83 06207 9201 9204 5.054 84 06208 9204 2502 5.054 85 06209 1401 9202 5.054 86 06210 9202 9203 5.722 87 06211 9203 9204 5.722 88 06212 9204 2401 5.054 89 06300 1503 9300 4.292 90 06301 9300 9301 4.292 91 06302 9301 9302 4.292 92 06303 9302 2503 4.292 93 06400 1504 9400 4.292 94 06401 9400 9401 4.292 95 06402 9401 9402 4.292 96 06403 9402 2504 4.292 97 06500 1505 9500 4.292 98 06501 9500 9501 4.292 99 06502 9501 9502 4.292 100 06503 9502 2505 4.292 101 06600 1506 9600 5.722 102 06601 9600 9601 5.722 103 06602 9601 2506 5.722 104 06603 1506 9602 5.054 105 06604 9602 9600 5.054 106 06605 9600 9603 5.054 107 06606 9603 9601 5.054 108 06607 9601 9604 5.054 109 06608 9604 2506 5.054 110 0

Page 339: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 7

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 7 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)6609 1407 9602 5.054 111 06610 9602 9603 5.722 112 06611 9603 9604 5.722 113 06612 9604 2407 5.054 114 07020 1502 7002 11.371 115 07021 7002 2503 11.371 116 07022 2502 7002 11.371 117 07023 7002 1503 11.371 118 07030 1503 7003 11.371 119 07031 7003 2504 11.371 120 07032 2503 7003 11.371 121 07033 7003 1504 11.371 122 07040 1504 7004 11.371 123 07041 7004 2505 11.371 124 07042 2504 7004 11.371 125 07043 7004 1505 11.371 126 07050 1505 7005 11.371 127 07051 7005 2506 11.371 128 07052 2505 7005 11.371 129 07053 7005 1506 11.371 130 08300 1403 9303 4.292 131 1808301 9303 9304 4.292 132 1808302 9304 9305 4.292 133 1808303 9305 2403 4.292 134 1808400 1404 9403 4.292 135 1808401 9403 9404 4.292 136 1808402 9404 9405 4.292 137 1808403 9405 2404 4.292 138 1808500 1405 9503 4.292 139 1808501 9503 9504 4.292 140 1808502 9504 9505 4.292 141 1808503 9505 2405 4.292 142 1809300 1503 9303 5.810 143 09301 9300 9304 5.810 144 09302 9301 9305 5.810 145 09303 9302 2403 5.810 146 09304 1403 9300 5.810 147 09305 9303 9301 5.810 148 09306 9304 9302 5.810 149 09307 9305 2503 5.810 150 09400 1504 9403 5.810 151 09401 9400 9404 5.810 152 09402 9401 9405 5.810 153 09403 9402 2404 5.810 154 09404 1404 9400 5.810 155 0

Page 340: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 8

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 8 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)9405 9403 9401 5.810 156 09406 9404 9402 5.810 157 09407 9405 2504 5.810 158 09500 1505 9503 5.810 159 09501 9500 9504 5.810 160 09502 9501 9505 5.810 161 09503 9502 2405 5.810 162 09504 1405 9500 5.810 163 09505 9503 9501 5.810 164 09506 9504 9502 5.810 165 09507 9505 2505 5.810 166 0

10000 10000 10001 4.417 167 010001 10001 10002 6.083 168 010002 10002 10100 4.417 169 010100 10100 10101 4.417 170 010101 10101 10102 6.083 171 010102 10102 10200 4.417 172 010200 10200 10201 4.417 173 010201 10201 10202 6.083 174 010202 10202 10300 4.417 175 010300 10300 10301 4.417 176 010301 10301 10302 6.083 177 010302 10302 10400 4.417 178 010400 10400 10401 4.417 179 010401 10401 10402 6.083 180 010402 10402 10500 4.417 181 010500 10500 10501 4.417 182 010501 10501 10502 6.083 183 010502 10502 10600 4.417 184 010600 10600 10601 4.417 185 010601 10601 10602 6.083 186 010602 10602 10700 4.417 187 010700 10700 10701 4.417 188 010701 10701 10702 6.083 189 010702 10702 10800 4.417 190 020000 20000 20001 4.417 191 020001 20001 20002 6.083 192 020002 20002 20100 4.417 193 020100 20100 20101 4.417 194 020101 20101 20102 6.083 195 020102 20102 20200 4.417 196 020200 20200 20201 4.417 197 020201 20201 20202 6.083 198 020202 20202 20300 4.417 199 020300 20300 20301 4.417 200 0

Page 341: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 9

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 9 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)20301 20301 20302 6.083 201 020302 20302 20400 4.417 202 020400 20400 20401 4.417 203 020401 20401 20402 6.083 204 020402 20402 20500 4.417 205 020500 20500 20501 4.417 206 020501 20501 20502 6.083 207 020502 20502 20600 4.417 208 020600 20600 20601 4.417 209 020601 20601 20602 6.083 210 020602 20602 20700 4.417 211 020700 20700 20701 4.417 212 020701 20701 20702 6.083 213 020702 20702 20800 4.417 214 060000 1100 10000 5.083 215 060001 10000 20000 7.000 216 060002 20000 2100 5.083 217 060100 1101 10100 5.083 218 060101 10100 20100 7.000 219 060102 20100 2101 5.083 220 060200 1102 10200 5.083 221 060201 10200 20200 7.000 222 060202 20200 2102 5.083 223 060300 1103 10300 5.083 224 060301 10300 20300 7.000 225 060302 20300 2103 5.083 226 060400 1104 10400 5.083 227 060401 10400 20400 7.000 228 060402 20400 2104 5.083 229 060500 1105 10500 5.083 230 060501 10500 20500 7.000 231 060502 20500 2105 5.083 232 060600 1106 10600 5.083 233 060601 10600 20600 7.000 234 060602 20600 2106 5.083 235 060700 1107 10700 5.083 236 060701 10700 20700 7.000 237 060702 20700 2107 5.083 238 060800 1108 10800 5.083 239 060801 10800 20800 7.000 240 060802 20800 2108 5.083 241 090000 1100 10001 6.734 242 090001 10001 90000 4.637 243 090002 90000 20002 4.637 244 090003 20002 2101 6.734 245 0

Page 342: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 10

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 10 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)90004 2100 20001 6.734 246 090005 20001 90000 4.637 247 090006 90000 10002 4.637 248 090007 10002 1101 6.734 249 090100 1101 10101 6.734 250 090101 10101 90001 4.637 251 090102 90001 20102 4.637 252 090103 20102 2102 6.734 253 090104 2101 20101 6.734 254 090105 20101 90001 4.637 255 090106 90001 10102 4.637 256 090107 10102 1102 6.734 257 090200 1102 10201 6.734 258 090201 10201 90002 4.637 259 090202 90002 20202 4.637 260 090203 20202 2103 6.734 261 090204 2102 20201 6.734 262 090205 20201 90002 4.637 263 090206 90002 10202 4.637 264 090207 10202 1103 6.734 265 090300 1103 10301 6.734 266 090301 10301 90003 4.637 267 090302 90003 20302 4.637 268 090303 20302 2104 6.734 269 090304 2103 20301 6.734 270 090305 20301 90003 4.637 271 090306 90003 10302 4.637 272 090307 10302 1104 6.734 273 090400 1104 10401 6.734 274 090401 10401 90004 4.637 275 090402 90004 20402 4.637 276 090403 20402 2105 6.734 277 090404 2104 20401 6.734 278 090405 20401 90004 4.637 279 090406 90004 10402 4.637 280 090407 10402 1105 6.734 281 090500 1105 10501 6.734 282 090501 10501 90005 4.637 283 090502 90005 20502 4.637 284 090503 20502 2106 6.734 285 090504 2105 20501 6.734 286 090505 20501 90005 4.637 287 090506 90005 10502 4.637 288 090507 10502 1106 6.734 289 090600 1106 10601 6.734 290 0

Page 343: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 11

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 11 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beams Cont...Beam Node A Node B Length

(ft)Property

(degrees)90601 10601 90006 4.637 291 090602 90006 20602 4.637 292 090603 20602 2107 6.734 293 090604 2106 20601 6.734 294 090605 20601 90006 4.637 295 090606 90006 10602 4.637 296 090607 10602 1107 6.734 297 090700 1107 10701 6.734 298 090701 10701 90007 4.637 299 090702 90007 20702 4.637 300 090703 20702 2108 6.734 301 090704 2107 20701 6.734 302 090705 20701 90007 4.637 303 090706 90007 10702 4.637 304 090707 10702 1108 6.734 305 0

Section PropertiesProp Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

1 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL2 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL3 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL4 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL5 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL6 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL7 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL8 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL9 Prismatic General 16.313 70.557 316.657 1.000 STEEL

10 Prismatic General 20.125 94.382 395.427 1.000 STEEL11 Prismatic General 20.125 94.382 395.427 1.000 STEEL12 Prismatic General 20.125 94.382 395.427 1.000 STEEL13 Prismatic General 20.125 94.382 395.427 1.000 STEEL14 Prismatic General 20.125 94.382 395.427 1.000 STEEL15 Prismatic General 20.125 94.382 395.427 1.000 STEEL16 Prismatic General 20.125 94.382 395.427 1.000 STEEL17 Prismatic General 20.125 94.382 395.427 1.000 STEEL18 Prismatic General 20.125 94.382 395.427 1.000 STEEL19 Prismatic General 20.125 94.382 395.427 1.000 STEEL20 Prismatic General 16.313 70.557 316.657 1.000 STEEL21 Prismatic General 11.696 279.693 157.351 1.000 STEEL22 Prismatic General 19.800 947.299 626.823 1.000 STEEL23 Prismatic General 19.800 947.299 626.823 1.000 STEEL24 Prismatic General 19.800 947.299 626.823 1.000 STEEL

Page 344: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 12

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 12 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

25 Prismatic General 19.800 947.299 626.823 1.000 STEEL26 Prismatic General 11.696 279.693 157.351 1.000 STEEL27 Prismatic General 11.696 279.693 157.351 1.000 STEEL28 Prismatic General 11.696 279.693 157.351 1.000 STEEL29 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL30 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL31 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL32 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL33 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL34 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL35 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL36 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL37 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL38 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL39 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL40 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL41 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL42 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL43 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL44 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL45 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL46 Prismatic General 34.688 1.04 E +3 1.1 E +3 1.000 STEEL47 Prismatic General 16.313 70.557 316.657 1.000 STEEL48 Prismatic General 20.125 94.382 395.427 1.000 STEEL49 Prismatic General 20.125 94.382 395.427 1.000 STEEL50 Prismatic General 20.125 94.382 395.427 1.000 STEEL51 Prismatic General 20.125 94.382 395.427 1.000 STEEL52 Prismatic General 20.125 94.382 395.427 1.000 STEEL53 Prismatic General 20.125 94.382 395.427 1.000 STEEL54 Prismatic General 20.125 94.382 395.427 1.000 STEEL55 Prismatic General 20.125 94.382 395.427 1.000 STEEL56 Prismatic General 20.125 94.382 395.427 1.000 STEEL57 Prismatic General 20.125 94.382 395.427 1.000 STEEL58 Prismatic General 16.313 70.557 316.657 1.000 STEEL59 Prismatic General 11.696 279.693 157.351 1.000 STEEL60 Prismatic General 19.800 947.299 626.823 1.000 STEEL61 Prismatic General 19.800 947.299 626.823 1.000 STEEL62 Prismatic General 19.800 947.299 626.823 1.000 STEEL63 Prismatic General 19.800 947.299 626.823 1.000 STEEL64 Prismatic General 11.696 279.693 157.351 1.000 STEEL65 Prismatic General 11.696 279.693 157.351 1.000 STEEL66 Prismatic General 11.696 279.693 157.351 1.000 STEEL67 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL68 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL69 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL

Page 345: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 13

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 13 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

70 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL71 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL72 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL73 Prismatic General 36.400 1.73 E +3 1.47 E +3 1.000 STEEL74 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL75 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL76 Prismatic General 48.150 2.22 E +3 1.57 E +3 1.000 STEEL77 Prismatic General 3.555 3.020 183.980 1.000 STEEL78 Prismatic General 3.555 3.020 183.980 1.000 STEEL79 Prismatic General 3.555 3.020 183.980 1.000 STEEL80 Prismatic General 3.555 3.020 183.980 1.000 STEEL81 Prismatic General 3.555 3.020 183.980 1.000 STEEL82 Prismatic General 3.555 3.020 183.980 1.000 STEEL83 Prismatic General 3.555 3.020 183.980 1.000 STEEL84 Prismatic General 3.555 3.020 183.980 1.000 STEEL85 Prismatic General 3.555 3.020 183.980 1.000 STEEL86 Prismatic General 3.555 3.020 183.980 1.000 STEEL87 Prismatic General 3.555 3.020 183.980 1.000 STEEL88 Prismatic General 3.555 3.020 183.980 1.000 STEEL89 Prismatic General 3.555 3.020 183.980 1.000 STEEL90 L40406 LD 5.718 16.126 8.717 0.275 STEEL91 L40406 LD 5.718 16.126 8.717 0.275 STEEL92 L40406 LD 5.718 16.126 8.717 0.275 STEEL93 L40406 LD 5.718 16.126 8.717 0.275 STEEL94 L40406 LD 5.718 16.126 8.717 0.275 STEEL95 L40406 LD 5.718 16.126 8.717 0.275 STEEL96 L40406 LD 5.718 16.126 8.717 0.275 STEEL97 L40406 LD 5.718 16.126 8.717 0.275 STEEL98 L40406 LD 5.718 16.126 8.717 0.275 STEEL99 L40406 LD 5.718 16.126 8.717 0.275 STEEL

100 L40406 LD 5.718 16.126 8.717 0.275 STEEL101 L40406 LD 5.718 16.126 8.717 0.275 STEEL102 Prismatic General 3.555 3.020 183.980 1.000 STEEL103 Prismatic General 3.555 3.020 183.980 1.000 STEEL104 Prismatic General 3.555 3.020 183.980 1.000 STEEL105 Prismatic General 3.555 3.020 183.980 1.000 STEEL106 Prismatic General 3.555 3.020 183.980 1.000 STEEL107 Prismatic General 3.555 3.020 183.980 1.000 STEEL108 Prismatic General 3.555 3.020 183.980 1.000 STEEL109 Prismatic General 3.555 3.020 183.980 1.000 STEEL110 Prismatic General 3.555 3.020 183.980 1.000 STEEL111 Prismatic General 3.555 3.020 183.980 1.000 STEEL112 Prismatic General 3.555 3.020 183.980 1.000 STEEL113 Prismatic General 3.555 3.020 183.980 1.000 STEEL114 Prismatic General 3.555 3.020 183.980 1.000 STEEL

Page 346: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 14

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 14 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

115 Prismatic General 4.180 4.898 210.267 1.000 STEEL116 Prismatic General 4.180 4.898 210.267 1.000 STEEL117 Prismatic General 4.180 4.898 210.267 1.000 STEEL118 Prismatic General 4.180 4.898 210.267 1.000 STEEL119 Prismatic General 4.180 4.898 210.267 1.000 STEEL120 Prismatic General 4.180 4.898 210.267 1.000 STEEL121 Prismatic General 4.180 4.898 210.267 1.000 STEEL122 Prismatic General 4.180 4.898 210.267 1.000 STEEL123 Prismatic General 4.180 4.898 210.267 1.000 STEEL124 Prismatic General 4.180 4.898 210.267 1.000 STEEL125 Prismatic General 4.180 4.898 210.267 1.000 STEEL126 Prismatic General 4.180 4.898 210.267 1.000 STEEL127 Prismatic General 4.180 4.898 210.267 1.000 STEEL128 Prismatic General 4.180 4.898 210.267 1.000 STEEL129 Prismatic General 4.180 4.898 210.267 1.000 STEEL130 Prismatic General 4.180 4.898 210.267 1.000 STEEL131 L40406 LD 5.718 16.126 8.717 0.275 STEEL132 L40406 LD 5.718 16.126 8.717 0.275 STEEL133 L40406 LD 5.718 16.126 8.717 0.275 STEEL134 L40406 LD 5.718 16.126 8.717 0.275 STEEL135 L40406 LD 5.718 16.126 8.717 0.275 STEEL136 L40406 LD 5.718 16.126 8.717 0.275 STEEL137 L40406 LD 5.718 16.126 8.717 0.275 STEEL138 L40406 LD 5.718 16.126 8.717 0.275 STEEL139 L40406 LD 5.718 16.126 8.717 0.275 STEEL140 L40406 LD 5.718 16.126 8.717 0.275 STEEL141 L40406 LD 5.718 16.126 8.717 0.275 STEEL142 L40406 LD 5.718 16.126 8.717 0.275 STEEL143 L30305 1.780 2.406 0.618 0.060 STEEL144 L30305 1.780 2.406 0.618 0.060 STEEL145 L30305 1.780 2.406 0.618 0.060 STEEL146 L30305 1.780 2.406 0.618 0.060 STEEL147 L30305 1.780 2.406 0.618 0.060 STEEL148 L30305 1.780 2.406 0.618 0.060 STEEL149 L30305 1.780 2.406 0.618 0.060 STEEL150 L30305 1.780 2.406 0.618 0.060 STEEL151 L30305 1.780 2.406 0.618 0.060 STEEL152 L30305 1.780 2.406 0.618 0.060 STEEL153 L30305 1.780 2.406 0.618 0.060 STEEL154 L30305 1.780 2.406 0.618 0.060 STEEL155 L30305 1.780 2.406 0.618 0.060 STEEL156 L30305 1.780 2.406 0.618 0.060 STEEL157 L30305 1.780 2.406 0.618 0.060 STEEL158 L30305 1.780 2.406 0.618 0.060 STEEL159 L30305 1.780 2.406 0.618 0.060 STEEL

Page 347: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 15

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 15 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

160 L30305 1.780 2.406 0.618 0.060 STEEL161 L30305 1.780 2.406 0.618 0.060 STEEL162 L30305 1.780 2.406 0.618 0.060 STEEL163 L30305 1.780 2.406 0.618 0.060 STEEL164 L30305 1.780 2.406 0.618 0.060 STEEL165 L30305 1.780 2.406 0.618 0.060 STEEL166 L30305 1.780 2.406 0.618 0.060 STEEL167 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL168 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL169 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL170 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL171 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL172 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL173 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL174 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL175 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL176 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL177 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL178 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL179 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL180 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL181 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL182 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL183 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL184 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL185 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL186 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL187 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL188 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL189 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL190 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL191 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL192 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL193 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL194 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL195 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL196 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL197 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL198 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL199 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL200 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL201 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL202 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL203 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL204 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL

Page 348: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 16

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 16 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

205 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL206 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL207 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL208 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL209 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL210 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL211 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL212 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL213 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL214 Prismatic General 43.234 229.760 4.05 E +3 1.000 STEEL215 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL216 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL217 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL218 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL219 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL220 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL221 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL222 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL223 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL224 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL225 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL226 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL227 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL228 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL229 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL230 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL231 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL232 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL233 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL234 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL235 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL236 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL237 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL238 Prismatic General 62.844 399.056 12.9 E +3 1.000 STEEL239 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL240 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL241 Prismatic General 53.844 156.384 11.1 E +3 1.000 STEEL242 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL243 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL244 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL245 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL246 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL247 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL248 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL249 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL

Page 349: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 17

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 17 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

250 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL251 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL252 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL253 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL254 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL255 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL256 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL257 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL258 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL259 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL260 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL261 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL262 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL263 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL264 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL265 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL266 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL267 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL268 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL269 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL270 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL271 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL272 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL273 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL274 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL275 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL276 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL277 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL278 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL279 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL280 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL281 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL282 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL283 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL284 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL285 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL286 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL287 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL288 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL289 Rect 0.50x6.00 3.000 9.000 0.063 0.237 STEEL290 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL291 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL292 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL293 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL294 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL

Page 350: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 18

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 18 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Section Properties Cont...Prop Section Area

(in2)Iyy

(in4)Izz

(in4)J

(in4)Material

295 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL296 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL297 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL298 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL299 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL300 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL301 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL302 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL303 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL304 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL305 Rect 0.50x9.00 4.500 30.375 0.094 0.362 STEEL

MaterialsMat Name E

(kip/in2) Density

(kip/in3)

(/°F)1 STEEL 29 E +3 0.300 0.000 6 E -62 STAINLESSSTEEL 28 E +3 0.300 0.000 9.9 E -63 ALUMINUM 10 E +3 0.330 0.000 12.8 E -64 CONCRETE 3.15 E +3 0.170 0.000 5.5 E -6

SupportsThere is no data of this type.

ReleasesBeam ends not shown in this table are fixed in all directions.Beam Node x y z rx ry rz

1100 1100 Fixed Fixed Fixed Fixed Pin Pin1100 1101 Fixed Fixed Fixed Fixed Pin Pin1101 1101 Fixed Fixed Fixed Fixed Pin Pin1101 1102 Fixed Fixed Fixed Fixed Pin Pin1102 1102 Fixed Fixed Fixed Fixed Pin Pin1102 1103 Fixed Fixed Fixed Fixed Pin Pin1103 1103 Fixed Fixed Fixed Fixed Pin Pin1103 1104 Fixed Fixed Fixed Fixed Pin Pin1104 1104 Fixed Fixed Fixed Fixed Pin Pin1104 1105 Fixed Fixed Fixed Fixed Pin Pin1105 1105 Fixed Fixed Fixed Fixed Pin Pin1105 1106 Fixed Fixed Fixed Fixed Pin Pin1106 1106 Fixed Fixed Fixed Fixed Pin Pin1106 1107 Fixed Fixed Fixed Fixed Pin Pin

Page 351: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 19

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 19 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

1107 1107 Fixed Fixed Fixed Fixed Pin Pin1107 1108 Fixed Fixed Fixed Fixed Pin Pin1210 1301 Fixed Fixed Fixed Fixed Pin Pin1210 1101 Fixed Fixed Fixed Fixed Pin Pin1220 1502 Fixed Fixed Fixed Fixed Pin Pin1220 1102 Fixed Fixed Fixed Fixed Pin Pin1230 1503 Fixed Fixed Fixed Fixed Pin Pin1240 1504 Fixed Fixed Fixed Fixed Pin Pin1241 1104 Fixed Fixed Fixed Fixed Pin Pin1250 1505 Fixed Fixed Fixed Fixed Pin Pin1260 1506 Fixed Fixed Fixed Fixed Pin Pin1260 1106 Fixed Fixed Fixed Fixed Pin Pin1270 1307 Fixed Fixed Fixed Fixed Pin Pin1270 1107 Fixed Fixed Fixed Fixed Pin Pin1310 1301 Fixed Fixed Fixed Fixed Pin Pin1310 1102 Fixed Fixed Fixed Fixed Pin Pin1320 1502 Fixed Fixed Fixed Fixed Pin Pin1330 1104 Fixed Fixed Fixed Fixed Pin Pin1340 1104 Fixed Fixed Fixed Fixed Pin Pin1350 1506 Fixed Fixed Fixed Fixed Pin Pin1360 1307 Fixed Fixed Fixed Fixed Pin Pin1360 1106 Fixed Fixed Fixed Fixed Pin Pin1392 1303 Fixed Fixed Fixed Fixed Pin Pin1392 1102 Fixed Fixed Fixed Fixed Pin Pin1395 1305 Fixed Fixed Fixed Fixed Pin Pin1395 1106 Fixed Fixed Fixed Fixed Pin Pin1500 1100 Fixed Fixed Fixed Fixed Pin Pin1502 1502 Fixed Fixed Fixed Fixed Pin Pin1520 1502 Fixed Fixed Fixed Fixed Pin Pin1520 1503 Fixed Fixed Fixed Fixed Pin Pin1530 1503 Fixed Fixed Fixed Fixed Pin Pin1530 1504 Fixed Fixed Fixed Fixed Pin Pin1540 1504 Fixed Fixed Fixed Fixed Pin Pin1540 1505 Fixed Fixed Fixed Fixed Pin Pin1550 1505 Fixed Fixed Fixed Fixed Pin Pin1550 1506 Fixed Fixed Fixed Fixed Pin Pin1560 1108 Fixed Fixed Fixed Fixed Pin Pin1562 1407 Fixed Fixed Fixed Fixed Pin Pin2100 2100 Fixed Fixed Fixed Fixed Pin Pin2100 2101 Fixed Fixed Fixed Fixed Pin Pin2101 2101 Fixed Fixed Fixed Fixed Pin Pin2101 2102 Fixed Fixed Fixed Fixed Pin Pin2102 2102 Fixed Fixed Fixed Fixed Pin Pin2102 2103 Fixed Fixed Fixed Fixed Pin Pin2103 2103 Fixed Fixed Fixed Fixed Pin Pin

Page 352: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 20

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 20 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

2103 2104 Fixed Fixed Fixed Fixed Pin Pin2104 2104 Fixed Fixed Fixed Fixed Pin Pin2104 2105 Fixed Fixed Fixed Fixed Pin Pin2105 2105 Fixed Fixed Fixed Fixed Pin Pin2105 2106 Fixed Fixed Fixed Fixed Pin Pin2106 2106 Fixed Fixed Fixed Fixed Pin Pin2106 2107 Fixed Fixed Fixed Fixed Pin Pin2107 2107 Fixed Fixed Fixed Fixed Pin Pin2107 2108 Fixed Fixed Fixed Fixed Pin Pin2210 2301 Fixed Fixed Fixed Fixed Pin Pin2210 2101 Fixed Fixed Fixed Fixed Pin Pin2220 2502 Fixed Fixed Fixed Fixed Pin Pin2220 2102 Fixed Fixed Fixed Fixed Pin Pin2230 2503 Fixed Fixed Fixed Fixed Pin Pin2240 2504 Fixed Fixed Fixed Fixed Pin Pin2241 2104 Fixed Fixed Fixed Fixed Pin Pin2250 2505 Fixed Fixed Fixed Fixed Pin Pin2260 2506 Fixed Fixed Fixed Fixed Pin Pin2260 2106 Fixed Fixed Fixed Fixed Pin Pin2270 2307 Fixed Fixed Fixed Fixed Pin Pin2270 2107 Fixed Fixed Fixed Fixed Pin Pin2310 2301 Fixed Fixed Fixed Fixed Pin Pin2310 2102 Fixed Fixed Fixed Fixed Pin Pin2320 2502 Fixed Fixed Fixed Fixed Pin Pin2330 2104 Fixed Fixed Fixed Fixed Pin Pin2340 2104 Fixed Fixed Fixed Fixed Pin Pin2350 2506 Fixed Fixed Fixed Fixed Pin Pin2360 2307 Fixed Fixed Fixed Fixed Pin Pin2360 2106 Fixed Fixed Fixed Fixed Pin Pin2392 2303 Fixed Fixed Fixed Fixed Pin Pin2392 2102 Fixed Fixed Fixed Fixed Pin Pin2395 2305 Fixed Fixed Fixed Fixed Pin Pin2395 2106 Fixed Fixed Fixed Fixed Pin Pin2500 2100 Fixed Fixed Fixed Fixed Pin Pin2502 2502 Fixed Fixed Fixed Fixed Pin Pin2520 2502 Fixed Fixed Fixed Fixed Pin Pin2520 2503 Fixed Fixed Fixed Fixed Pin Pin2530 2503 Fixed Fixed Fixed Fixed Pin Pin2530 2504 Fixed Fixed Fixed Fixed Pin Pin2540 2504 Fixed Fixed Fixed Fixed Pin Pin2540 2505 Fixed Fixed Fixed Fixed Pin Pin2550 2505 Fixed Fixed Fixed Fixed Pin Pin2550 2506 Fixed Fixed Fixed Fixed Pin Pin2560 2108 Fixed Fixed Fixed Fixed Pin Pin2562 2407 Fixed Fixed Fixed Fixed Pin Pin

Page 353: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 21

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 21 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

6200 1502 Fixed Fixed Fixed Fixed Pin Pin6202 2502 Fixed Fixed Fixed Fixed Pin Pin6203 1502 Fixed Fixed Fixed Fixed Pin Pin6203 9202 Fixed Fixed Fixed Fixed Pin Pin6204 9200 Fixed Fixed Fixed Fixed Pin Pin6205 9200 Fixed Fixed Fixed Fixed Pin Pin6205 9203 Fixed Fixed Fixed Fixed Pin Pin6206 9203 Fixed Fixed Fixed Fixed Pin Pin6206 9201 Fixed Fixed Fixed Fixed Pin Pin6207 9201 Fixed Fixed Fixed Fixed Pin Pin6208 9204 Fixed Fixed Fixed Fixed Pin Pin6208 2502 Fixed Fixed Fixed Fixed Pin Pin6209 1401 Fixed Fixed Fixed Fixed Pin Pin6210 9202 Fixed Fixed Fixed Fixed Pin Pin6211 9204 Fixed Fixed Fixed Fixed Pin Pin6212 2401 Fixed Fixed Fixed Fixed Pin Pin6300 1503 Fixed Fixed Fixed Fixed Pin Pin6303 2503 Fixed Fixed Fixed Fixed Pin Pin6400 1504 Fixed Fixed Fixed Fixed Pin Pin6403 2504 Fixed Fixed Fixed Fixed Pin Pin6500 1505 Fixed Fixed Fixed Fixed Pin Pin6503 2505 Fixed Fixed Fixed Fixed Pin Pin6600 1506 Fixed Fixed Fixed Fixed Pin Pin6602 2506 Fixed Fixed Fixed Fixed Pin Pin6603 1506 Fixed Fixed Fixed Fixed Pin Pin6603 9602 Fixed Fixed Fixed Fixed Pin Pin6604 9600 Fixed Fixed Fixed Fixed Pin Pin6605 9600 Fixed Fixed Fixed Fixed Pin Pin6605 9603 Fixed Fixed Fixed Fixed Pin Pin6606 9603 Fixed Fixed Fixed Fixed Pin Pin6606 9601 Fixed Fixed Fixed Fixed Pin Pin6607 9601 Fixed Fixed Fixed Fixed Pin Pin6608 9604 Fixed Fixed Fixed Fixed Pin Pin6608 2506 Fixed Fixed Fixed Fixed Pin Pin6609 1407 Fixed Fixed Fixed Fixed Pin Pin6610 9602 Fixed Fixed Fixed Fixed Pin Pin6611 9604 Fixed Fixed Fixed Fixed Pin Pin6612 2407 Fixed Fixed Fixed Fixed Pin Pin7020 1502 Fixed Fixed Fixed Fixed Pin Pin7020 7002 Fixed Fixed Fixed Fixed Pin Pin7021 7002 Fixed Fixed Fixed Fixed Pin Pin7021 2503 Fixed Fixed Fixed Fixed Pin Pin7022 2502 Fixed Fixed Fixed Fixed Pin Pin7023 1503 Fixed Fixed Fixed Fixed Pin Pin7030 1503 Fixed Fixed Fixed Fixed Pin Pin

Page 354: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 22

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 22 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

7030 7003 Fixed Fixed Fixed Fixed Pin Pin7031 7003 Fixed Fixed Fixed Fixed Pin Pin7031 2504 Fixed Fixed Fixed Fixed Pin Pin7032 2503 Fixed Fixed Fixed Fixed Pin Pin7033 1504 Fixed Fixed Fixed Fixed Pin Pin7040 1504 Fixed Fixed Fixed Fixed Pin Pin7040 7004 Fixed Fixed Fixed Fixed Pin Pin7041 7004 Fixed Fixed Fixed Fixed Pin Pin7041 2505 Fixed Fixed Fixed Fixed Pin Pin7042 2504 Fixed Fixed Fixed Fixed Pin Pin7043 1505 Fixed Fixed Fixed Fixed Pin Pin7050 1505 Fixed Fixed Fixed Fixed Pin Pin7050 7005 Fixed Fixed Fixed Fixed Pin Pin7051 7005 Fixed Fixed Fixed Fixed Pin Pin7051 2506 Fixed Fixed Fixed Fixed Pin Pin7052 2505 Fixed Fixed Fixed Fixed Pin Pin7053 1506 Fixed Fixed Fixed Fixed Pin Pin8300 1403 Fixed Fixed Fixed Fixed Pin Pin8303 2403 Fixed Fixed Fixed Fixed Pin Pin8400 1404 Fixed Fixed Fixed Fixed Pin Pin8403 2404 Fixed Fixed Fixed Fixed Pin Pin8500 1405 Fixed Fixed Fixed Fixed Pin Pin8503 2405 Fixed Fixed Fixed Fixed Pin Pin9300 1503 Fixed Fixed Fixed Fixed Pin Pin9300 9303 Fixed Fixed Fixed Fixed Pin Pin9301 9300 Fixed Fixed Fixed Fixed Pin Pin9301 9304 Fixed Fixed Fixed Fixed Pin Pin9302 9301 Fixed Fixed Fixed Fixed Pin Pin9302 9305 Fixed Fixed Fixed Fixed Pin Pin9303 9302 Fixed Fixed Fixed Fixed Pin Pin9303 2403 Fixed Fixed Fixed Fixed Pin Pin9304 1403 Fixed Fixed Fixed Fixed Pin Pin9304 9300 Fixed Fixed Fixed Fixed Pin Pin9305 9303 Fixed Fixed Fixed Fixed Pin Pin9305 9301 Fixed Fixed Fixed Fixed Pin Pin9306 9304 Fixed Fixed Fixed Fixed Pin Pin9306 9302 Fixed Fixed Fixed Fixed Pin Pin9307 9305 Fixed Fixed Fixed Fixed Pin Pin9307 2503 Fixed Fixed Fixed Fixed Pin Pin9400 1504 Fixed Fixed Fixed Fixed Pin Pin9400 9403 Fixed Fixed Fixed Fixed Pin Pin9401 9400 Fixed Fixed Fixed Fixed Pin Pin9401 9404 Fixed Fixed Fixed Fixed Pin Pin9402 9401 Fixed Fixed Fixed Fixed Pin Pin9402 9405 Fixed Fixed Fixed Fixed Pin Pin

Page 355: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 23

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 23 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

9403 9402 Fixed Fixed Fixed Fixed Pin Pin9403 2404 Fixed Fixed Fixed Fixed Pin Pin9404 1404 Fixed Fixed Fixed Fixed Pin Pin9404 9400 Fixed Fixed Fixed Fixed Pin Pin9405 9403 Fixed Fixed Fixed Fixed Pin Pin9405 9401 Fixed Fixed Fixed Fixed Pin Pin9406 9404 Fixed Fixed Fixed Fixed Pin Pin9406 9402 Fixed Fixed Fixed Fixed Pin Pin9407 9405 Fixed Fixed Fixed Fixed Pin Pin9407 2504 Fixed Fixed Fixed Fixed Pin Pin9500 1505 Fixed Fixed Fixed Fixed Pin Pin9500 9503 Fixed Fixed Fixed Fixed Pin Pin9501 9500 Fixed Fixed Fixed Fixed Pin Pin9501 9504 Fixed Fixed Fixed Fixed Pin Pin9502 9501 Fixed Fixed Fixed Fixed Pin Pin9502 9505 Fixed Fixed Fixed Fixed Pin Pin9503 9502 Fixed Fixed Fixed Fixed Pin Pin9503 2405 Fixed Fixed Fixed Fixed Pin Pin9504 1405 Fixed Fixed Fixed Fixed Pin Pin9504 9500 Fixed Fixed Fixed Fixed Pin Pin9505 9503 Fixed Fixed Fixed Fixed Pin Pin9505 9501 Fixed Fixed Fixed Fixed Pin Pin9506 9504 Fixed Fixed Fixed Fixed Pin Pin9506 9502 Fixed Fixed Fixed Fixed Pin Pin9507 9505 Fixed Fixed Fixed Fixed Pin Pin9507 2505 Fixed Fixed Fixed Fixed Pin Pin

10000 10000 Slide Fixed Fixed Fixed Pin Pin10002 10100 Fixed Fixed Fixed Fixed Pin Pin10100 10100 Slide Fixed Fixed Fixed Pin Pin10102 10200 Fixed Fixed Fixed Fixed Pin Pin10200 10200 Slide Fixed Fixed Fixed Pin Pin10202 10300 Fixed Fixed Fixed Fixed Pin Pin10300 10300 Slide Fixed Fixed Fixed Pin Pin10302 10400 Fixed Fixed Fixed Fixed Pin Pin10400 10400 Slide Fixed Fixed Fixed Pin Pin10402 10500 Fixed Fixed Fixed Fixed Pin Pin10500 10500 Slide Fixed Fixed Fixed Pin Pin10502 10600 Fixed Fixed Fixed Fixed Pin Pin10600 10600 Slide Fixed Fixed Fixed Pin Pin10602 10700 Fixed Fixed Fixed Fixed Pin Pin10700 10700 Slide Fixed Fixed Fixed Pin Pin10702 10800 Fixed Fixed Fixed Fixed Pin Pin20000 20000 Slide Fixed Fixed Fixed Pin Pin20002 20100 Fixed Fixed Fixed Fixed Pin Pin20100 20100 Slide Fixed Fixed Fixed Pin Pin

Page 356: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 24

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 24 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

20102 20200 Fixed Fixed Fixed Fixed Pin Pin20200 20200 Slide Fixed Fixed Fixed Pin Pin20202 20300 Fixed Fixed Fixed Fixed Pin Pin20300 20300 Slide Fixed Fixed Fixed Pin Pin20302 20400 Fixed Fixed Fixed Fixed Pin Pin20400 20400 Slide Fixed Fixed Fixed Pin Pin20402 20500 Fixed Fixed Fixed Fixed Pin Pin20500 20500 Slide Fixed Fixed Fixed Pin Pin20502 20600 Fixed Fixed Fixed Fixed Pin Pin20600 20600 Slide Fixed Fixed Fixed Pin Pin20602 20700 Fixed Fixed Fixed Fixed Pin Pin20700 20700 Slide Fixed Fixed Fixed Pin Pin20702 20800 Fixed Fixed Fixed Fixed Pin Pin60000 1100 Fixed Fixed Fixed Fixed Pin Pin60002 2100 Fixed Fixed Fixed Fixed Pin Pin60100 1101 Fixed Fixed Fixed Fixed Pin Pin60102 2101 Fixed Fixed Fixed Fixed Pin Pin60200 1102 Fixed Fixed Fixed Fixed Pin Pin60202 2102 Fixed Fixed Fixed Fixed Pin Pin60300 1103 Fixed Fixed Fixed Fixed Pin Pin60302 2103 Fixed Fixed Fixed Fixed Pin Pin60400 1104 Fixed Fixed Fixed Fixed Pin Pin60402 2104 Fixed Fixed Fixed Fixed Pin Pin60500 1105 Fixed Fixed Fixed Fixed Pin Pin60502 2105 Fixed Fixed Fixed Fixed Pin Pin60600 1106 Fixed Fixed Fixed Fixed Pin Pin60602 2106 Fixed Fixed Fixed Fixed Pin Pin60700 1107 Fixed Fixed Fixed Fixed Pin Pin60702 2107 Fixed Fixed Fixed Fixed Pin Pin90000 1100 Fixed Fixed Fixed Fixed Pin Pin90000 10001 Fixed Fixed Fixed Fixed Pin Pin90001 10001 Fixed Fixed Fixed Fixed Pin Pin90002 20002 Fixed Fixed Fixed Fixed Pin Pin90003 20002 Fixed Fixed Fixed Fixed Pin Pin90003 2101 Fixed Fixed Fixed Fixed Pin Pin90004 2100 Fixed Fixed Fixed Fixed Pin Pin90004 20001 Fixed Fixed Fixed Fixed Pin Pin90005 20001 Fixed Fixed Fixed Fixed Pin Pin90006 10002 Fixed Fixed Fixed Fixed Pin Pin90007 10002 Fixed Fixed Fixed Fixed Pin Pin90007 1101 Fixed Fixed Fixed Fixed Pin Pin90100 1101 Fixed Fixed Fixed Fixed Pin Pin90100 10101 Fixed Fixed Fixed Fixed Pin Pin90101 10101 Fixed Fixed Fixed Fixed Pin Pin90102 20102 Fixed Fixed Fixed Fixed Pin Pin

Page 357: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 25

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 25 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

90103 20102 Fixed Fixed Fixed Fixed Pin Pin90103 2102 Fixed Fixed Fixed Fixed Pin Pin90104 2101 Fixed Fixed Fixed Fixed Pin Pin90104 20101 Fixed Fixed Fixed Fixed Pin Pin90105 20101 Fixed Fixed Fixed Fixed Pin Pin90106 10102 Fixed Fixed Fixed Fixed Pin Pin90107 10102 Fixed Fixed Fixed Fixed Pin Pin90107 1102 Fixed Fixed Fixed Fixed Pin Pin90200 1102 Fixed Fixed Fixed Fixed Pin Pin90200 10201 Fixed Fixed Fixed Fixed Pin Pin90201 10201 Fixed Fixed Fixed Fixed Pin Pin90202 20202 Fixed Fixed Fixed Fixed Pin Pin90203 20202 Fixed Fixed Fixed Fixed Pin Pin90203 2103 Fixed Fixed Fixed Fixed Pin Pin90204 2102 Fixed Fixed Fixed Fixed Pin Pin90204 20201 Fixed Fixed Fixed Fixed Pin Pin90205 20201 Fixed Fixed Fixed Fixed Pin Pin90206 10202 Fixed Fixed Fixed Fixed Pin Pin90207 10202 Fixed Fixed Fixed Fixed Pin Pin90207 1103 Fixed Fixed Fixed Fixed Pin Pin90300 1103 Fixed Fixed Fixed Fixed Pin Pin90300 10301 Fixed Fixed Fixed Fixed Pin Pin90301 10301 Fixed Fixed Fixed Fixed Pin Pin90302 20302 Fixed Fixed Fixed Fixed Pin Pin90303 20302 Fixed Fixed Fixed Fixed Pin Pin90303 2104 Fixed Fixed Fixed Fixed Pin Pin90304 2103 Fixed Fixed Fixed Fixed Pin Pin90304 20301 Fixed Fixed Fixed Fixed Pin Pin90305 20301 Fixed Fixed Fixed Fixed Pin Pin90306 10302 Fixed Fixed Fixed Fixed Pin Pin90307 10302 Fixed Fixed Fixed Fixed Pin Pin90307 1104 Fixed Fixed Fixed Fixed Pin Pin90400 1104 Fixed Fixed Fixed Fixed Pin Pin90400 10401 Fixed Fixed Fixed Fixed Pin Pin90401 10401 Fixed Fixed Fixed Fixed Pin Pin90402 20402 Fixed Fixed Fixed Fixed Pin Pin90403 20402 Fixed Fixed Fixed Fixed Pin Pin90403 2105 Fixed Fixed Fixed Fixed Pin Pin90404 2104 Fixed Fixed Fixed Fixed Pin Pin90404 20401 Fixed Fixed Fixed Fixed Pin Pin90405 20401 Fixed Fixed Fixed Fixed Pin Pin90406 10402 Fixed Fixed Fixed Fixed Pin Pin90407 10402 Fixed Fixed Fixed Fixed Pin Pin90407 1105 Fixed Fixed Fixed Fixed Pin Pin90500 1105 Fixed Fixed Fixed Fixed Pin Pin

Page 358: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 26

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 26 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Releases Cont...Beam Node x y z rx ry rz

90500 10501 Fixed Fixed Fixed Fixed Pin Pin90501 10501 Fixed Fixed Fixed Fixed Pin Pin90502 20502 Fixed Fixed Fixed Fixed Pin Pin90503 20502 Fixed Fixed Fixed Fixed Pin Pin90503 2106 Fixed Fixed Fixed Fixed Pin Pin90504 2105 Fixed Fixed Fixed Fixed Pin Pin90504 20501 Fixed Fixed Fixed Fixed Pin Pin90505 20501 Fixed Fixed Fixed Fixed Pin Pin90506 10502 Fixed Fixed Fixed Fixed Pin Pin90507 10502 Fixed Fixed Fixed Fixed Pin Pin90507 1106 Fixed Fixed Fixed Fixed Pin Pin90600 1106 Fixed Fixed Fixed Fixed Pin Pin90600 10601 Fixed Fixed Fixed Fixed Pin Pin90601 10601 Fixed Fixed Fixed Fixed Pin Pin90602 20602 Fixed Fixed Fixed Fixed Pin Pin90603 20602 Fixed Fixed Fixed Fixed Pin Pin90603 2107 Fixed Fixed Fixed Fixed Pin Pin90604 2106 Fixed Fixed Fixed Fixed Pin Pin90604 20601 Fixed Fixed Fixed Fixed Pin Pin90605 20601 Fixed Fixed Fixed Fixed Pin Pin90606 10602 Fixed Fixed Fixed Fixed Pin Pin90607 10602 Fixed Fixed Fixed Fixed Pin Pin90607 1107 Fixed Fixed Fixed Fixed Pin Pin90700 1107 Fixed Fixed Fixed Fixed Pin Pin90700 10701 Fixed Fixed Fixed Fixed Pin Pin90701 10701 Fixed Fixed Fixed Fixed Pin Pin90702 20702 Fixed Fixed Fixed Fixed Pin Pin90703 20702 Fixed Fixed Fixed Fixed Pin Pin90703 2108 Fixed Fixed Fixed Fixed Pin Pin90704 2107 Fixed Fixed Fixed Fixed Pin Pin90704 20701 Fixed Fixed Fixed Fixed Pin Pin90705 20701 Fixed Fixed Fixed Fixed Pin Pin90706 10702 Fixed Fixed Fixed Fixed Pin Pin90707 10702 Fixed Fixed Fixed Fixed Pin Pin90707 1108 Fixed Fixed Fixed Fixed Pin Pin

Basic Load CasesNumber Name

1 SELFWEIGHT OF STRUCTURE3 DL ALL PHASES4 LL ALL PHASES

Page 359: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 27

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 27 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Combination Load CasesComb. Combination L/C Name Primary Primary L/C Name Factor

11 STRENGTH I FOR ALL PHASES 1 SELFWEIGHT OF STRUCTURE 1.253 DL ALL PHASES 1.254 LL ALL PHASES 1.75

Load GeneratorsThere is no data of this type.

Node Loads : 1 SELFWEIGHT OF STRUCTURENode FX

(kip)FY

(kip)FZ

(kip)MX

(kip-in)MY

(kip-in)MZ

(kip-in)1100 - -0.250 - - - -1101 - -0.250 - - - -1102 - -0.650 - - - -1103 - -0.250 - - - -1104 - -0.900 - - - -1105 - -0.250 - - - -1106 - -0.650 - - - -1107 - -0.250 - - - -1502 - -0.250 - - - -1503 - -0.100 - - - -1504 - -0.100 - - - -1505 - -0.100 - - - -1506 - -0.250 - - - -2100 - -0.250 - - - -2101 - -0.250 - - - -2102 - -0.650 - - - -2103 - -0.250 - - - -2104 - -0.900 - - - -2105 - -0.250 - - - -2106 - -0.650 - - - -2107 - -0.250 - - - -2502 - -0.250 - - - -2503 - -0.100 - - - -2504 - -0.100 - - - -2505 - -0.100 - - - -2506 - -0.250 - - - -

Selfweight : 1 SELFWEIGHT OF STRUCTUREDirection Factor

Y -46.650

Page 360: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 28

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 28 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 3 DL ALL PHASESBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -710.000 - - - -10001 UNI lbf/ft GY -710.000 - - - -10002 UNI lbf/ft GY -710.000 - - - -10100 UNI lbf/ft GY -710.000 - - - -10101 UNI lbf/ft GY -710.000 - - - -10102 UNI lbf/ft GY -710.000 - - - -10200 UNI lbf/ft GY -710.000 - - - -10201 UNI lbf/ft GY -710.000 - - - -10202 UNI lbf/ft GY -710.000 - - - -10300 UNI lbf/ft GY -710.000 - - - -10301 UNI lbf/ft GY -710.000 - - - -10302 UNI lbf/ft GY -710.000 - - - -10400 UNI lbf/ft GY -710.000 - - - -10401 UNI lbf/ft GY -710.000 - - - -10402 UNI lbf/ft GY -710.000 - - - -10500 UNI lbf/ft GY -710.000 - - - -10501 UNI lbf/ft GY -710.000 - - - -10502 UNI lbf/ft GY -710.000 - - - -10600 UNI lbf/ft GY -710.000 - - - -10601 UNI lbf/ft GY -710.000 - - - -10602 UNI lbf/ft GY -710.000 - - - -10700 UNI lbf/ft GY -710.000 - - - -10701 UNI lbf/ft GY -710.000 - - - -10702 UNI lbf/ft GY -710.000 - - - -20000 UNI lbf/ft GY -710.000 - - - -20001 UNI lbf/ft GY -710.000 - - - -20002 UNI lbf/ft GY -710.000 - - - -20100 UNI lbf/ft GY -710.000 - - - -20101 UNI lbf/ft GY -710.000 - - - -20102 UNI lbf/ft GY -710.000 - - - -20200 UNI lbf/ft GY -710.000 - - - -20201 UNI lbf/ft GY -710.000 - - - -20202 UNI lbf/ft GY -710.000 - - - -20300 UNI lbf/ft GY -710.000 - - - -20301 UNI lbf/ft GY -710.000 - - - -20302 UNI lbf/ft GY -710.000 - - - -20400 UNI lbf/ft GY -710.000 - - - -20401 UNI lbf/ft GY -710.000 - - - -20402 UNI lbf/ft GY -710.000 - - - -20500 UNI lbf/ft GY -710.000 - - - -20501 UNI lbf/ft GY -710.000 - - - -20502 UNI lbf/ft GY -710.000 - - - -20600 UNI lbf/ft GY -710.000 - - - -20601 UNI lbf/ft GY -710.000 - - - -20602 UNI lbf/ft GY -710.000 - - - -

Page 361: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 29

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 29 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 3 DL ALL PHASES Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20700 UNI lbf/ft GY -710.000 - - - -20701 UNI lbf/ft GY -710.000 - - - -20702 UNI lbf/ft GY -710.000 - - - -

Beam Loads : 4 LL ALL PHASESBeam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)10000 UNI lbf/ft GY -450.000 - - - -10001 UNI lbf/ft GY -450.000 - - - -10002 UNI lbf/ft GY -450.000 - - - -10100 UNI lbf/ft GY -450.000 - - - -10101 UNI lbf/ft GY -450.000 - - - -10102 UNI lbf/ft GY -450.000 - - - -10200 UNI lbf/ft GY -450.000 - - - -10201 UNI lbf/ft GY -450.000 - - - -10202 UNI lbf/ft GY -450.000 - - - -10300 UNI lbf/ft GY -450.000 - - - -10301 UNI lbf/ft GY -450.000 - - - -10302 UNI lbf/ft GY -450.000 - - - -10400 UNI lbf/ft GY -450.000 - - - -10401 UNI lbf/ft GY -450.000 - - - -10402 UNI lbf/ft GY -450.000 - - - -10500 UNI lbf/ft GY -450.000 - - - -10501 UNI lbf/ft GY -450.000 - - - -10502 UNI lbf/ft GY -450.000 - - - -10600 UNI lbf/ft GY -450.000 - - - -10601 UNI lbf/ft GY -450.000 - - - -10602 UNI lbf/ft GY -450.000 - - - -10700 UNI lbf/ft GY -450.000 - - - -10701 UNI lbf/ft GY -450.000 - - - -10702 UNI lbf/ft GY -450.000 - - - -20000 UNI lbf/ft GY -450.000 - - - -20001 UNI lbf/ft GY -450.000 - - - -20002 UNI lbf/ft GY -450.000 - - - -20100 UNI lbf/ft GY -450.000 - - - -20101 UNI lbf/ft GY -450.000 - - - -20102 UNI lbf/ft GY -450.000 - - - -20200 UNI lbf/ft GY -450.000 - - - -20201 UNI lbf/ft GY -450.000 - - - -20202 UNI lbf/ft GY -450.000 - - - -20300 UNI lbf/ft GY -450.000 - - - -20301 UNI lbf/ft GY -450.000 - - - -20302 UNI lbf/ft GY -450.000 - - - -

Page 362: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Software licensed to TranSystems Corporation

Job Title

Client

Job No Sheet No Rev

Part

Ref

By Date Chd

File Date/Time

P101160439 30

Kaw River Bridge

CTG 19-May-17 NRF

11-Sep-2017 12:18Span 3 As-Built.std

Print Time/Date: 11/09/2017 12:18 Print Run 30 of 30STAAD.Pro V8i (SELECTseries 3) 20.07.08.22

Beam Loads : 4 LL ALL PHASES Cont...Beam Type Direction Fa Da

(ft)Fb Db Ecc.

(ft)20400 UNI lbf/ft GY -450.000 - - - -20401 UNI lbf/ft GY -450.000 - - - -20402 UNI lbf/ft GY -450.000 - - - -20500 UNI lbf/ft GY -450.000 - - - -20501 UNI lbf/ft GY -450.000 - - - -20502 UNI lbf/ft GY -450.000 - - - -20600 UNI lbf/ft GY -450.000 - - - -20601 UNI lbf/ft GY -450.000 - - - -20602 UNI lbf/ft GY -450.000 - - - -20700 UNI lbf/ft GY -450.000 - - - -20701 UNI lbf/ft GY -450.000 - - - -20702 UNI lbf/ft GY -450.000 - - - -

Page 363: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

As-inspected section property calculations

Page 364: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.2500 4.0000 -1.0000 2.0000 -2.0000 -1.3333 6.2847 -39.4976 -40.83092 0.2500 6.0000 -1.5000 3.0000 -4.5000 -4.5000 5.2847 -41.8922 -46.39223 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -6.50 -5.83 -81.39 -87.22Contribution from shifting centroid: Ad2 = 5.82

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.2847 in Stop = 136.57 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1019.50 in4 Sbott. = 123.06 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.4653 in A = 32.1875 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.2847 in rx = 5.6279 in

2

P101160439

North Truss L3-L4

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 365: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 4.0000 0.2500 -1.0000 4.5000 -4.5000 -0.0052 5.0454 -25.4559 -25.46122 6.0000 0.2500 -1.5000 14.7500 -22.1250 -0.0078 5.2046 -40.6320 -40.63983 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -26.63 -0.01 -66.09 -66.10Contribution from shifting centroid: Ad2 = 0.21984989

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.5454 in Sright = 99.91 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 969.54 in4 Sleft = 101.57 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.7046 in A = 32.1875 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.5454 in ry = 5.4883 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 366: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.1875 7.0000 -1.3125 3.5000 -4.5938 -5.3594 4.7074 -29.0841 -34.44352 0.1875 5.0000 -0.9375 2.5000 -2.3438 -1.9531 5.7074 -30.5382 -32.49133 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.25 -6.94 -7.31 -59.62 -66.93Contribution from shifting centroid: Ad2 = 3.83

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.2074 in Stop = 137.59 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1037.80 in4 Sbott. = 126.45 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.5426 in A = 32.4375 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.2074 in rx = 5.6563 in

2

P101160439

North Truss L4-L5

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 367: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 7.0000 0.1875 -1.3125 4.5313 -5.9473 -0.0038 5.1526 -34.8464 -34.85032 5.0000 0.1875 -0.9375 14.7188 -13.7988 -0.0027 5.0349 -23.7655 -23.76823 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.25 -19.75 -0.01 -58.61 -58.62Contribution from shifting centroid: Ad2 = 0.12028626

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6839 in Sright = 102.12 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 976.92 in4 Sleft = 100.88 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.5661 in A = 32.4375 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6839 in ry = 5.4879 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 368: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.1875 6.0000 -1.1250 3.0000 -3.3750 -3.3750 5.1105 -29.3823 -32.75732 0.1875 6.0000 -1.1250 3.0000 -3.3750 -3.3750 5.1105 -29.3823 -32.75733 3.5000 0.0625 -0.2188 15.7188 -3.4385 -0.0001 7.6082 -12.6623 -12.66244 3.5000 0.0625 -0.2188 15.7188 -3.4385 -0.0001 7.6082 -12.6623 -12.66245 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.69 -13.63 -6.75 -84.09 -90.84Contribution from shifting centroid: Ad2 = 1.92

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.1105 in Stop = 132.47 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1011.98 in4 Sbott. = 124.77 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.6395 in A = 32.0000 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.1105 in rx = 5.6236 in

2

P101160439

North Truss L6-L7

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 369: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 6.0000 0.1875 -1.1250 4.5313 -5.0977 -0.0033 5.0938 -29.1896 -29.19292 6.0000 0.1875 -1.1250 14.7188 -16.5586 -0.0033 5.0938 -29.1896 -29.19293 0.0625 3.5000 -0.2188 5.7500 -1.2578 -0.2233 3.8750 -3.2847 -3.50804 0.0625 3.5000 -0.2188 13.5000 -2.9531 -0.2233 3.8750 -3.2847 -3.50805 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.69 -25.87 -0.45 -64.95 -65.40Contribution from shifting centroid: Ad2 = 0

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6250 in Sright = 100.78 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 970.02 in4 Sleft = 100.78 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.6250 in A = 32.0000 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6250 in ry = 5.5057 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 370: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.1250 9.0000 -1.1250 4.5000 -5.0625 -7.5938 3.6083 -14.6471 -22.24082 0.1250 7.0000 -0.8750 3.5000 -3.0625 -3.5729 4.6083 -18.5816 -22.15453 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.00 -8.13 -11.17 -33.23 -44.40Contribution from shifting centroid: Ad2 = 1.89

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.1083 in Stop = 138.50 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1058.39 in4 Sbott. = 130.53 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.6417 in A = 32.6875 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.1083 in rx = 5.6903 in

2

P101160439

North Truss L7-L8

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 371: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 9.0000 0.1250 -1.1250 4.5625 -5.1328 -0.0015 5.1012 -29.2752 -29.27672 7.0000 0.1250 -0.8750 14.6875 -12.8516 -0.0011 5.0238 -22.0836 -22.08473 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.00 -17.98 0.00 -51.36 -51.36Contribution from shifting centroid: Ad2 = 0.05200196

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6637 in Sright = 102.66 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 984.11 in4 Sleft = 101.84 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.5863 in A = 32.6875 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6637 in ry = 5.4870 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 372: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C10x20 Right Channel: C10x20

A1 = tw = 0.3790 in A2 = tw = 0.3790 inB1 = d = 10.0000 in B2 = d = 10.0000 inC1 = bf = 2.7390 in C2 = bf = 2.7390 inD1 = tf = 0.4360 in D2 = tf = 0.4360 inE1 = bf = 2.7390 in E2 = bf = 2.7390 inF1 = tf = 0.4360 in F2 = tf = 0.4360 in

Channel Back-to-Back DistanceG = 11.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274

Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

2 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

Total 11.70 58.48 48.12 109.23 157.35A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0625 6.0000 -0.3750 7.0000 -2.6250 -1.1250 2.1380 -1.7141 -2.83912 0.0625 4.5000 -0.2813 7.7500 -2.1797 -0.4746 2.8880 -2.3458 -2.82043 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.66 -4.80 -1.60 -4.06 -5.66Contribution from shifting centroid: Ad2 = 0.22

y-bar = 5.0000 in Stop = 31.47 in3y-bar = 4.8620 in Stop = 29.57 in3

Ix = 157.35 in4 Sbott. = 31.47 in3 Ix = 151.91 in4 Sbott. = 31.25 in3

ctop = 5.0000 in A = 11.6958 in2 ctop = 5.1380 in A = 11.0396 in2

cbottom = 5.0000 in rx = 3.6679 in cbottom = 4.8620 in rx = 3.7096 in

Section Losses

P101160439

North Truss M1-L2

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 373: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209

Bottom Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209Web 3.4595 0.1895 0.6556 0.0414 5.3105 97.5631 97.6045

2 Top Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Bottom Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Web 3.4595 10.8105 37.3991 0.0414 5.3105 97.5631 97.6045

Total 11.70 64.33 3.07 276.62 279.69A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 6.0000 0.0625 -0.3750 0.0313 -0.0117 -0.0001 5.5152 -11.4065 -11.40662 4.5000 0.0625 -0.2813 10.9688 -3.0850 -0.0001 5.4223 -8.2692 -8.26923 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.66 -3.10 0.00 -19.68 -19.68Contribution from shifting centroid: Ad2 = 0.02522576

x-bar = 5.5000 in Sright = 50.85 in3x-bar = 5.5464 in Sright = 47.68 in3

Iy = 279.69 in4 Sleft = 50.85 in3 Iy = 260.04 in4 Sleft = 46.88 in3

cright = 5.5000 in A = 11.6958 in2 cright = 5.4536 in A = 11.0396 in2

cleft = 5.5000 in ry = 4.8902 in cleft = 5.5464 in ry = 4.8534 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 11.1110 in2 Iy = 252.4228 in2 Ix = 142.0092 in2

ry = 4.7664 in rx = 3.575 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 374: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C15x33.9 Right Channel: C15x33.9

A1 = tw = 0.4000 in A2 = tw = 0.4000 inB1 = d = 15.0000 in B2 = d = 15.0000 inC1 = bf = 3.4000 in C2 = bf = 3.4000 inD1 = tf = 0.6500 in D2 = tf = 0.6500 inE1 = bf = 3.4000 in E2 = bf = 3.4000 inF1 = tf = 0.6500 in F2 = tf = 0.6500 in

Top Cover Plate:A3 = b = 18.7500 inB3 = t = in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

2 Top Leg 2.2100 14.6750 32.4318 0.0778 7.1750 113.7722 113.8500Bottom Leg 2.2100 0.3250 0.7183 0.0778 7.1750 113.7722 113.8500Web 5.4800 7.5000 41.1000 85.7118 0.0000 0.0000 85.7118

3 Plate 0.0000 15.0000 0.0000 0.0000 7.5000 0.0000 0.0000Total 19.80 148.50 171.73 455.09 626.82

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.0625 10.0000 -0.6250 10.0000 -6.2500 -5.2083 2.6774 -4.4802 -9.68852 0.0625 8.0000 -0.5000 11.0000 -5.5000 -2.6667 3.6774 -6.7615 -9.42823 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.13 -11.75 -7.88 -11.24 -19.12Contribution from shifting centroid: Ad2 = 0.62

y-bar = 7.5000 in Stop = 83.58 in3y-bar = 7.3226 in Stop = 79.24 in3

Ix = 626.82 in4 Sbott. = 83.58 in3 Ix = 608.33 in4 Sbott. = 83.08 in3

ctop = 7.5000 in A = 19.8000 in2 ctop = 7.6774 in A = 18.6750 in2

cbottom = 7.5000 in rx = 5.6265 in cbottom = 7.3226 in rx = 5.7074 in

As-Built Section Properties As-Inspected Section Properties

P101160439

North Truss U2-L4, U6-L4

Gross Section (without Losses)

Section Losses

No top cover plate, used for overall geometry only

Page 375: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)

1 Top Leg 2.2100 1.7000 3.7570 2.1290 7.6750 130.1814 132.3104Bottom Leg 2.2100 1.7000 3.7570 2.1290 7.6750 130.1814 132.3104Web 5.4800 3.2000 17.5360 0.0731 6.1750 208.9558 209.0289

2 Top Leg 2.2100 17.0500 37.6805 2.1290 7.6750 130.1814 132.3104Bottom Leg 2.2100 17.0500 37.6805 2.1290 7.6750 130.1814 132.3104Web 5.4800 15.5500 85.2140 0.0731 6.1750 208.9558 209.0289

3 Plate 0.0000 9.3750 0.0000 0.0000 0.0000 0.0000 0.0000Total 19.80 185.63 8.66 938.64 947.30

A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 10.0000 0.0625 -0.6250 3.3688 -2.1055 -0.0002 6.0465 -22.8497 -22.84992 8.0000 0.0625 -0.5000 15.3813 -7.6906 -0.0002 5.9660 -17.7969 -17.79703 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.13 -9.80 0.00 -40.65 -40.65Contribution from shifting centroid: Ad2 = 0.03200153

x-bar = 9.3750 in Sright = 101.05 in3x-bar = 9.4152 in Sright = 97.13 in3

Iy = 947.30 in4 Sleft = 101.05 in3 Iy = 906.68 in4 Sleft = 96.30 in3

cright = 9.3750 in A = 19.8000 in2 cright = 9.3348 in A = 18.6750 in2

cleft = 9.3750 in ry = 6.9169 in cleft = 9.4152 in ry = 6.9678 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 18.8100 in2 Iy = 854.9377 in2 Ix = 565.7082 in2

ry = 6.7418 in rx = 5.4841 inTherefore, as-inspected section properties govern

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Page 376: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.2500 5.0000 -1.2500 2.5000 -3.1250 -2.6042 5.7925 -41.9410 -44.54512 0.2500 5.0000 -1.2500 2.5000 -3.1250 -2.6042 5.7925 -41.9410 -44.54513 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -6.25 -5.21 -83.88 -89.09Contribution from shifting centroid: Ad2 = 6.05

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.2925 in Stop = 136.49 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1017.85 in4 Sbott. = 122.74 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.4575 in A = 32.1875 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.2925 in rx = 5.6234 in

2

P101160439

Soutth Truss L2-L3

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 377: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 5.0000 0.2500 -1.2500 4.5000 -5.6250 -0.0065 5.1250 -32.8320 -32.83852 5.0000 0.2500 -1.2500 14.7500 -18.4375 -0.0065 5.1250 -32.8320 -32.83853 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.50 -24.06 -0.01 -65.66 -65.68Contribution from shifting centroid: Ad2 = 0

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6250 in Sright = 100.75 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 969.75 in4 Sleft = 100.75 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.6250 in A = 32.1875 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6250 in ry = 5.4889 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 378: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.2500 3.5000 -0.8750 1.7500 -1.5313 -0.8932 6.4504 -36.4070 -37.30022 0.2500 3.5000 -0.8750 1.7500 -1.5313 -0.8932 6.4504 -36.4070 -37.30023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.75 -3.06 -1.79 -72.81 -74.60Contribution from shifting centroid: Ad2 = 3.67

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.2004 in Stop = 136.43 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1029.97 in4 Sbott. = 125.60 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.5496 in A = 32.9375 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.2004 in rx = 5.5920 in

2

P101160439

Soutth Truss L3-L4

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 379: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 3.5000 0.2500 -0.8750 4.5000 -3.9375 -0.0046 5.1250 -22.9824 -22.98702 3.5000 0.2500 -0.8750 14.7500 -12.9063 -0.0046 5.1250 -22.9824 -22.98703 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -1.75 -16.84 -0.01 -45.96 -45.97Contribution from shifting centroid: Ad2 = 0

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6250 in Sright = 102.80 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 989.45 in4 Sleft = 102.80 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.6250 in A = 32.9375 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6250 in ry = 5.4809 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 380: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top flange angles: Bottom flange angles:

A1 = lh = 4.0000 in A2 = lh = 4.0000 inC1 = tf = 0.5000 in C2 = tf = 0.5000 inB1 = lv = 4.0000 in B2 = lv = 4.0000 in

Web Plate: Distance between webs:A3 = b = 15.7500 in D = 10.0000 inB3 = t = 0.6250 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal legs 4.0000 15.5000 62.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 13.5000 47.2500 3.5729 5.6250 110.7422 114.3151Horizontal legs 4.0000 0.2500 1.0000 0.0833 7.6250 232.5625 232.6458Vertical legs 3.5000 2.2500 7.8750 3.5729 5.6250 110.7422 114.3151

3 Web plates 19.6875 7.8750 155.0391 406.9775 0.0000 0.0000 406.9775Total 34.69 273.16 414.29 686.61 1100.90

A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.2500 4.0000 -1.0000 2.0000 -2.0000 -1.3333 6.2345 -38.8685 -40.20192 0.2500 4.0000 -1.0000 2.0000 -2.0000 -1.3333 6.2345 -38.8685 -40.20193 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.00 -4.00 -2.67 -77.74 -80.40Contribution from shifting centroid: Ad2 = 4.48

y-bar = 7.8750 in Stop = 139.80 in3y-bar = 8.2345 in Stop = 136.38 in3

Ix = 1100.90 in4 Sbott. = 139.80 in3 Ix = 1024.98 in4 Sbott. = 124.47 in3

ctop = 7.8750 in A = 34.6875 in2 ctop = 7.5155 in A = 32.6875 in2

cbottom = 7.8750 in rx = 5.6336 in cbottom = 8.2345 in rx = 5.5997 in

2

P101160439

Soutth Truss L5-L6

Gross Section (without Losses)

1

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 381: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.0000 6.6250 13.2500 2.6667 3.0000 18.0000 20.6667

(Left) Vertical Leg 1.7500 4.8750 8.5313 0.0365 4.7500 39.4844 39.52081 Horizontal Leg 2.0000 12.6250 25.2500 2.6667 3.0000 18.0000 20.6667

(Right) Vertical Leg 1.7500 14.3750 25.1563 0.0365 4.7500 39.4844 39.52082 Horizontal Leg 2.0000 2.0000 4.0000 2.6667 7.6250 116.2813 118.9479

(Left) Vertical Leg 1.7500 3.7500 6.5625 0.0365 5.8750 60.4023 60.43882 Horizontal Leg 2.0000 17.2500 34.5000 2.6667 7.6250 116.2813 118.9479

(Right) Vertical Leg 1.7500 15.5000 27.1250 0.0365 5.8750 60.4023 60.4388Left Web Plate 9.8438 4.3125 42.4512 0.3204 5.3125 277.8168 278.1372Right Web Plate 9.8438 14.9375 147.0410 0.3204 5.3125 277.8168 278.1372

Total 34.69 333.87 11.45 1023.97 1035.42A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 4.0000 0.2500 -1.0000 4.5000 -4.5000 -0.0052 5.1250 -26.2656 -26.27082 4.0000 0.2500 -1.0000 14.7500 -14.7500 -0.0052 5.1250 -26.2656 -26.27083 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -2.00 -19.25 -0.01 -52.53 -52.54Contribution from shifting centroid: Ad2 = 0

x-bar = 9.6250 in Sright = 107.58 in3x-bar = 9.6250 in Sright = 102.12 in3

Iy = 1035.42 in4 Sleft = 107.58 in3 Iy = 982.88 in4 Sleft = 102.12 in3

cright = 9.6250 in A = 34.6875 in2 cright = 9.6250 in A = 32.6875 in2

cleft = 9.6250 in ry = 5.4635 in cleft = 9.6250 in ry = 5.4835 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 32.9531 in2 Iy = 934.4691 in2 Ix = 993.5617 in2

ry = 5.3252 in rx = 5.491 inTherefore, as-inspected section properties govern

As-Built Section Properties As-Inspected Section Properties

Section properties with loss applied

Gross Section (without Losses)

3

Section Losses

Page 382: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Left Channel: C10x20 Right Channel: C10x20

A1 = tw = 0.3790 in A2 = tw = 0.3790 inB1 = d = 10.0000 in B2 = d = 10.0000 inC1 = bf = 2.7390 in C2 = bf = 2.7390 inD1 = tf = 0.4360 in D2 = tf = 0.4360 inE1 = bf = 2.7390 in E2 = bf = 2.7390 inF1 = tf = 0.4360 in F2 = tf = 0.4360 in

Channel Back-to-Back DistanceG = 11.0000 in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274

Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

2 Top Leg 1.1942 9.7820 11.6817 0.0189 4.7820 27.3085 27.3274Bottom Leg 1.1942 0.2180 0.2603 0.0189 4.7820 27.3085 27.3274Web 3.4595 5.0000 17.2976 24.0207 0.0000 0.0000 24.0207

Total 11.70 58.48 48.12 109.23 157.35A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 0.0625 5.0000 -0.3125 7.5000 -2.3438 -0.6510 2.6411 -2.1799 -2.83092 0.0625 5.0000 -0.3125 7.5000 -2.3438 -0.6510 2.6411 -2.1799 -2.83093 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.63 -4.69 -1.30 -4.36 -5.66Contribution from shifting centroid: Ad2 = 0.23

y-bar = 5.0000 in Stop = 31.47 in3y-bar = 4.8589 in Stop = 29.55 in3

Ix = 157.35 in4 Sbott. = 31.47 in3 Ix = 151.92 in4 Sbott. = 31.27 in3

ctop = 5.0000 in A = 11.6958 in2 ctop = 5.1411 in A = 11.0708 in2

cbottom = 5.0000 in rx = 3.6679 in cbottom = 4.8589 in rx = 3.7044 in

Section Losses

P101160439

South Truss M7-L6

Gross Section (without Losses)

As-Built Section Properties As-Inspected Section Properties

Page 383: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/3/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Top Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209

Bottom Leg 1.1942 1.3695 1.6355 0.7466 4.1305 20.3744 21.1209Web 3.4595 0.1895 0.6556 0.0414 5.3105 97.5631 97.6045

2 Top Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Bottom Leg 1.1942 9.6305 11.5008 0.7466 4.1305 20.3744 21.1209Web 3.4595 10.8105 37.3991 0.0414 5.3105 97.5631 97.6045

Total 11.70 64.33 3.07 276.62 279.69A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 5.0000 0.0625 -0.3125 0.0313 -0.0098 -0.0001 5.4688 -9.3460 -9.34612 5.0000 0.0625 -0.3125 10.9688 -3.4277 -0.0001 5.4688 -9.3460 -9.34613 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -0.63 -3.44 0.00 -18.69 -18.69Contribution from shifting centroid: Ad2 = 0

x-bar = 5.5000 in Sright = 50.85 in3x-bar = 5.5000 in Sright = 47.45 in3

Iy = 279.69 in4 Sleft = 50.85 in3 Iy = 261.00 in4 Sleft = 47.45 in3

cright = 5.5000 in A = 11.6958 in2 cright = 5.5000 in A = 11.0708 in2

cleft = 5.5000 in ry = 4.8902 in cleft = 5.5000 in ry = 4.8555 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 11.1110 in2 Iy = 252.4228 in2 Ix = 142.0092 in2

ry = 4.7664 in rx = 3.575 inTherefore, as-inspected section properties govern

Section properties with loss applied

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 384: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6875 in C2 = tf = 0.6875 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.5000 in do = N/A inB3 = 24.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = in C5 = inA4 = in A5 = in

X-Axis Section Properties:A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 8.2500 23.9063 197.2266 0.3250 11.7813 1145.0823 1145.4072Vertical Leg 7.3047 20.9063 152.7136 17.1798 8.7813 563.2670 580.4468Horizontal Leg 8.2500 0.3438 2.8359 0.3250 11.7813 1145.0823 1145.4072Vertical Leg 7.3047 3.3438 24.4250 17.1798 8.7813 563.2670 580.4468

3 12.1250 12.1250 147.0156 594.1882 0.0000 0.0000 594.1882Cover Plate Top 0.0000 24.2500 0.0000 0.0000 12.1250 0.0000 0.0000Cover Plate Bottom 0.0000 0.0000 0.0000 0.0000 12.1250 0.0000 0.0000

Total 43.23 524.22 629.20 3416.70 4045.90A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 11.5000 0.3750 -4.3125 24.0625 -103.7695 -0.0505 13.4958 -785.4625 -785.51302 0.5000 0.6875 -0.3438 23.9063 -8.2178 -0.0135 13.3395 -61.1680 -61.18153 0.5000 0.6875 -0.3438 23.9063 -8.2178 -0.0135 13.3395 -61.1680 -61.18154 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.00 -120.21 -0.08 -907.80 -907.88Contribution from shifting centroid: Ad2 = 104.98

y-bar = 12.1250 in Stop = 333.68 in3y-bar = 10.5667 in Stop = 237.00 in3

Ix = 4045.90 in4 Sbott. = 333.68 in3 Ix = 3243.00 in4 Sbott. = 306.91 in3

ctop = 12.1250 in A = 43.2344 in2 ctop = 13.6833 in A = 38.2344 in2

cbottom = 12.1250 in rx = 9.6737 in cbottom = 10.5667 in rx = 9.2097 inJ = 5.9118 Z = 396.1870 in3

Z = in3

4

P101160439

Typical Stringer

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 385: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 4.1250 3.0000 12.3750 12.3750 3.2500 43.5703 55.9453

(Left) Vertical Leg 3.6523 5.6563 20.6586 0.1439 0.5938 1.2876 1.43151 Horizontal Leg 4.1250 9.5000 39.1875 12.3750 3.2500 43.5703 55.9453

(Right) Vertical Leg 3.6523 6.8438 24.9957 0.1439 0.5938 1.2876 1.43152 Horizontal Leg 4.1250 3.0000 12.3750 12.3750 3.2500 43.5703 55.9453

(Left) Vertical Leg 3.6523 5.6563 20.6586 0.1439 0.5938 1.2876 1.43152 Horizontal Leg 4.1250 9.5000 39.1875 12.3750 3.2500 43.5703 55.9453

(Right) Vertical Leg 3.6523 6.8438 24.9957 0.1439 0.5938 1.2876 1.43153 Web Plate 12.1250 6.2500 75.7813 0.2526 0.0000 0.0000 0.25264 Top Cover Plate 0.0000 6.2500 0.0000 0.0000 0.0000 0.0000 0.00004 Bottom Cover Plate 0.0000 6.2500 0.0000 0.0000 0.0000 0.0000 0.0000

Total 43.23 270.21 50.33 179.43 229.76A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.3750 11.5000 -4.3125 6.2500 -26.9531 -47.5273 0.0000 0.0000 -47.52732 0.6875 0.5000 -0.3438 0.2500 -0.0859 -0.0072 6.0000 -12.3750 -12.38223 0.6875 0.5000 -0.3438 12.2500 -4.2109 -0.0072 6.0000 -12.3750 -12.38224 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.00 -31.25 -47.54 -24.75 -72.29Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.2500 in Sright = 36.76 in3x-bar = 6.2500 in Sright = 25.19 in3

Iy = 229.76 in4 Sleft = 36.76 in3 Iy = 157.47 in4 Sleft = 25.19 in3

cright = 6.2500 in A = 43.2344 in2 cright = 6.2500 in A = 38.2344 in2

cleft = 6.2500 in ry = 2.3053 in cleft = 6.2500 in ry = 2.0294 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 41.0727 in2 Iy = 207.3581 in2 Ix = 3651.4214 in2 Stop = 301.1482 in3

ry = 2.2469 in rx = 9.4288 in Sbot = 301.1482 in3

Z = 376.3777 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 834.21 752.87 k-ft 592.51 k-ft 592.51 k-ft AB = As-BuiltV 465.18 441.92 k 465.18 k 441.92 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 386: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.6250 in do = N/A inB3 = 34.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties: STAAD Beam 60202A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 34.4375 258.2813 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 31.4375 211.2207 16.1757 13.8125 1281.8378 1298.0135Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.8125 1281.8378 1298.0135

3 21.4063 17.6250 377.2852 2092.5724 0.0000 0.0000 2092.5724Cover Plate Top 6.5000 35.0000 227.5000 0.1354 17.3750 1962.2891 1962.4245Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 17.3750 1962.2891 1962.4245

Total 62.84 1107.62 2125.68 10728.16 12853.84A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 13.0000 0.5000 -6.5000 35.0000 -227.5000 -0.1354 19.3794 -2441.1568 -2441.29222 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -6.50 -227.50 -0.14 -2441.16 -2441.29Contribution from shifting centroid: Ad2 = 252.49

y-bar = 17.6250 in Stop = 729.30 in3y-bar = 15.6206 in Stop = 543.32 in3

Ix = 12853.84 in4 Sbott. = 729.30 in3 Ix = 10665.04 in4 Sbott. = 682.76 in3

ctop = 17.6250 in A = 62.8438 in2 ctop = 19.6294 in A = 56.3438 in2

cbottom = 17.6250 in rx = 14.3016 in cbottom = 15.6206 in rx = 13.7581 inJ = 7.5734 Z = 846.9590 in3

Z = in3

4

P101160439

Floorbeam 2 by south stringer

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 387: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42161 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42163 Web Plate 21.4063 6.5000 139.1406 0.6968 0.0000 0.0000 0.69684 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 62.84 408.48 229.22 169.84 399.06A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.5000 13.0000 -6.5000 6.5000 -42.2500 -91.5417 0.0000 0.0000 -91.54172 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -6.50 -42.25 -91.54 0.00 -91.54Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.5000 in Sright = 61.39 in3x-bar = 6.5000 in Sright = 47.31 in3

Iy = 399.06 in4 Sleft = 61.39 in3 Iy = 307.51 in4 Sleft = 47.31 in3

cright = 6.5000 in A = 62.8438 in2 cright = 6.5000 in A = 56.3438 in2

cleft = 6.5000 in ry = 2.5199 in cleft = 6.5000 in ry = 2.3362 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 59.7016 in2 Iy = 360.1484 in2 Ix = 11600.5897 in2 Stop = 658.1895 in3

ry = 2.4561 in rx = 13.9395 in Sbot = 658.1895 in3

Z = 804.6110 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1823.24 1645.47 k-ft 1358.30 k-ft 1358.30 k-ft AB = As-BuiltV 606.28 575.97 k 606.28 k 575.97 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 388: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.6250 in do = N/A inB3 = 34.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties: STAAD Beams: 60102, 60300, 60400, 60402, 60500, 60502, 60600, 60602

A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 34.4375 258.2813 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 31.4375 211.2207 16.1757 13.8125 1281.8378 1298.0135Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.8125 1281.8378 1298.0135

3 21.4063 17.6250 377.2852 2092.5724 0.0000 0.0000 2092.5724Cover Plate Top 6.5000 35.0000 227.5000 0.1354 17.3750 1962.2891 1962.4245Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 17.3750 1962.2891 1962.4245

Total 62.84 1107.62 2125.68 10728.16 12853.84A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 13.0000 0.2500 -3.2500 35.1250 -114.1563 -0.0169 18.4544 -1106.8333 -1106.85022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.25 -114.16 -0.02 -1106.83 -1106.85Contribution from shifting centroid: Ad2 = 57.24

y-bar = 17.6250 in Stop = 729.30 in3y-bar = 16.6706 in Stop = 635.34 in3

Ix = 12853.84 in4 Sbott. = 729.30 in3 Ix = 11804.23 in4 Sbott. = 708.09 in3

ctop = 17.6250 in A = 62.8438 in2 ctop = 18.5794 in A = 59.5938 in2

cbottom = 17.6250 in rx = 14.3016 in cbottom = 16.6706 in rx = 14.0740 inJ = 7.5734 Z = 846.9590 in3

Z = in3

4

P101160439

Floorbeams 1, 3, 4, 5 & 6 by stringers

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 389: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42161 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42163 Web Plate 21.4063 6.5000 139.1406 0.6968 0.0000 0.0000 0.69684 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 62.84 408.48 229.22 169.84 399.06A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.2500 13.0000 -3.2500 6.5000 -21.1250 -45.7708 0.0000 0.0000 -45.77082 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -3.25 -21.13 -45.77 0.00 -45.77Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.5000 in Sright = 61.39 in3x-bar = 6.5000 in Sright = 54.35 in3

Iy = 399.06 in4 Sleft = 61.39 in3 Iy = 353.29 in4 Sleft = 54.35 in3

cright = 6.5000 in A = 62.8438 in2 cright = 6.5000 in A = 59.5938 in2

cleft = 6.5000 in ry = 2.5199 in cleft = 6.5000 in ry = 2.4348 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 59.7016 in2 Iy = 360.1484 in2 Ix = 11600.5897 in2 Stop = 658.1895 in3

ry = 2.4561 in rx = 13.9395 in Sbot = 658.1895 in3

Z = 804.6110 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1823.24 1645.47 k-ft 1588.35 k-ft 1588.35 k-ft AB = As-BuiltV 606.28 575.97 k 606.28 k 575.97 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 390: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 6.0000 in B2 = lh = 6.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.6250 in do = N/A inB3 = 34.2500 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.5000 in C5 = 0.5000 inA4 = 13.0000 in A5 = 13.0000 in

X-Axis Section Properties: STAAD Beam 60700, 60702A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 7.5000 34.4375 258.2813 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 31.4375 211.2207 16.1757 13.8125 1281.8378 1298.0135Horizontal Leg 7.5000 0.8125 6.0938 0.2441 16.8125 2119.9512 2120.1953Vertical Leg 6.7188 3.8125 25.6152 16.1757 13.8125 1281.8378 1298.0135

3 21.4063 17.6250 377.2852 2092.5724 0.0000 0.0000 2092.5724Cover Plate Top 6.5000 35.0000 227.5000 0.1354 17.3750 1962.2891 1962.4245Cover Plate Bottom 6.5000 0.2500 1.6250 0.1354 17.3750 1962.2891 1962.4245

Total 62.84 1107.62 2125.68 10728.16 12853.84A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 13.0000 0.4375 -5.6875 35.0313 -199.2402 -0.0907 19.1383 -2083.1885 -2083.27922 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.69 -199.24 -0.09 -2083.19 -2083.28Contribution from shifting centroid: Ad2 = 188.53

y-bar = 17.6250 in Stop = 729.30 in3y-bar = 15.8929 in Stop = 566.15 in3

Ix = 12853.84 in4 Sbott. = 729.30 in3 Ix = 10959.09 in4 Sbott. = 689.56 in3

ctop = 17.6250 in A = 62.8438 in2 ctop = 19.3571 in A = 57.1563 in2

cbottom = 17.6250 in rx = 14.3016 in cbottom = 15.8929 in rx = 13.8470 inJ = 7.5734 Z = 846.9590 in3

Z = in3

4

P101160439

Floorbeam 7 by stringers

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 391: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42161 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 3.1875 11.9531 11.2500 3.3125 41.1475 52.3975

(Left) Vertical Leg 3.3594 5.8750 19.7363 0.1094 0.6250 1.3123 1.42162 Horizontal Leg 3.7500 9.8125 36.7969 11.2500 3.3125 41.1475 52.3975

(Right) Vertical Leg 3.3594 7.1250 23.9355 0.1094 0.6250 1.3123 1.42163 Web Plate 21.4063 6.5000 139.1406 0.6968 0.0000 0.0000 0.69684 Top Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.54174 Bottom Cover Plate 6.5000 6.5000 42.2500 91.5417 0.0000 0.0000 91.5417

Total 62.84 408.48 229.22 169.84 399.06A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.4375 13.0000 -5.6875 6.5000 -36.9688 -80.0990 0.0000 0.0000 -80.09902 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -5.69 -36.97 -80.10 0.00 -80.10Contribution from shifting centroid: Ad2 = 0.00

x-bar = 6.5000 in Sright = 61.39 in3x-bar = 6.5000 in Sright = 49.07 in3

Iy = 399.06 in4 Sleft = 61.39 in3 Iy = 318.96 in4 Sleft = 49.07 in3

cright = 6.5000 in A = 62.8438 in2 cright = 6.5000 in A = 57.1563 in2

cleft = 6.5000 in ry = 2.5199 in cleft = 6.5000 in ry = 2.3623 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 59.7016 in2 Iy = 360.1484 in2 Ix = 11600.5897 in2 Stop = 658.1895 in3

ry = 2.4561 in rx = 13.9395 in Sbot = 658.1895 in3

Z = 804.6110 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1823.24 1645.47 k-ft 1415.39 k-ft 1415.39 k-ft AB = As-BuiltV 606.28 575.97 k 606.28 k 575.97 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 392: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

Element Dimensions (without Section Losses):Top Angles: Bottom Angles:

A1 = lw = 4.0000 in B2 = lh = 4.0000 inC1 = tf = 0.6250 in C2 = tf = 0.6250 inB1 = lv = 6.0000 in A2 = lv = 6.0000 in

Web Plate: C3 = 0.5000 in do = N/A inB3 = 34.1875 in do = stiffener spacing for shear check

Use "N/A" for no stiffenersTop Cover Plate: Btm Cover Plate:

C4 = 0.7500 in C5 = 0.7500 inA4 = 8.8750 in A5 = 8.8750 in

X-Axis Section Properties: STAAD Beam 60800, 60802A y Ay Io d Ad2 Ix,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)Horizontal Leg 5.0000 34.6250 173.1250 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 31.6250 212.4805 16.1757 13.7813 1276.0442 1292.2199Horizontal Leg 5.0000 1.0625 5.3125 0.1628 16.7813 1408.0518 1408.2145Vertical Leg 6.7188 4.0625 27.2949 16.1757 13.7813 1276.0442 1292.2199

3 17.0938 17.8438 305.0166 1664.9101 0.0000 0.0000 1664.9101Cover Plate Top 6.6563 35.3125 235.0488 0.3120 17.4688 2031.2028 2031.5148Cover Plate Bottom 6.6563 0.3750 2.4961 0.3120 17.4688 2031.2028 2031.5148

Total 53.84 960.77 1698.21 9430.60 11128.81A y Ay Io d Ad2 Ix,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)1 8.8750 0.4375 -3.8828 35.4688 -137.7185 -0.0619 18.7170 -1360.2453 -1360.30722 0.5000 1.5000 -0.7500 28.1875 -21.1406 -0.1406 11.4357 -98.0817 -98.22233 0.3750 2.0000 -0.7500 2.3750 -1.7813 -0.2500 14.3768 -155.0190 -155.26904 2.0000 0.3750 -0.7500 1.1875 -0.8906 -0.0088 15.5643 -181.6852 -181.69405 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -6.13 -161.53 -0.46 -1795.03 -1795.49Contribution from shifting centroid: Ad2 = 64.20

y-bar = 17.8438 in Stop = 623.68 in3y-bar = 16.7518 in Stop = 496.29 in3

Ix = 11128.81 in4 Sbott. = 623.68 in3 Ix = 9397.52 in4 Sbott. = 560.99 in3

ctop = 17.8438 in A = 53.8438 in2 ctop = 18.9357 in A = 47.7109 in2

cbottom = 17.8438 in rx = 14.3766 in cbottom = 16.7518 in rx = 14.0345 inJ = 6.9723 Z = 731.6489 in3

Z = in3

4

P101160439

Floorbeam 8 by stringers

Gross Section (without Losses)

1

2

Web Plate

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 393: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 6/4/2017 Job No.Checked By NRF Date 6/7/2017

Calculations For: Kaw River Bridge Span 3 As-Inspected

P101160439

Y-Axis Section Properties:A x Ax Io d Ad2 Iy,gross

Element Description (in2) (in) (in3) (in4) (in) (in4) (in4)1 Horizontal Leg 2.5000 2.1875 5.4688 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.8750 13.0176 0.1094 0.5625 1.0629 1.17231 Horizontal Leg 2.5000 6.6875 16.7188 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 5.0000 16.7969 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 2.1875 5.4688 3.3333 2.2500 12.6563 15.9896

(Left) Vertical Leg 3.3594 3.8750 13.0176 0.1094 0.5625 1.0629 1.17232 Horizontal Leg 2.5000 6.6875 16.7188 3.3333 2.2500 12.6563 15.9896

(Right) Vertical Leg 3.3594 5.0000 16.7969 0.1094 0.5625 1.0629 1.17233 Web Plate 17.0938 4.4375 75.8535 0.3561 0.0000 0.0000 0.35614 Top Cover Plate 6.6563 4.4375 29.5371 43.6903 0.0000 0.0000 43.69034 Bottom Cover Plate 6.6563 4.4375 29.5371 43.6903 0.0000 0.0000 43.6903

Total 53.84 238.93 101.51 54.88 156.38A x Ax Io d Ad2 Iy,loss

Loss # b (in) h (in) (in2) (in) (in3) (in4) (in) (in4) (in4)

1 0.4375 8.8750 -3.8828 4.4375 -17.2300 -25.4860 0.0403 -0.0063 -25.49232 1.5000 0.5000 -0.7500 4.4375 -3.3281 -0.0156 0.0403 -0.0012 -0.01683 2.0000 0.3750 -0.7500 3.7500 -2.8125 -0.0088 0.7278 -0.3972 -0.40604 0.3750 2.0000 -0.7500 2.5625 -1.9219 -0.2500 1.9153 -2.7512 -3.00125 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total -6.13 -25.29 -25.76 -3.16 -28.92Contribution from shifting centroid: Ad2 = 0.09

x-bar = 4.4375 in Sright = 35.24 in3x-bar = 4.4778 in Sright = 29.01 in3

Iy = 156.38 in4 Sleft = 35.24 in3 Iy = 127.56 in4 Sleft = 28.49 in3

cright = 4.4375 in A = 53.8438 in2 cright = 4.3972 in A = 47.7109 in2

cleft = 4.4375 in ry = 1.7042 in cleft = 4.4778 in ry = 1.6351 in

Perecentage to account for minor section loss throughout member = 5.0%

A = 51.1516 in2 Iy = 141.1367 in2 Ix = 10043.7497 in2 Stop = 562.8721 in3

ry = 1.6611 in rx = 14.0126 in Sbot = 562.8721 in3

Z = 695.0665 in3

Fy = 30.00 ksiAB AB** AI Controlling

M 1559.2 1407.18 k-ft 1240.71 k-ft 1240.71 k-ft AB = As-BuiltV 531.24 504.68 k 505.14 k 504.68 k AI = As-Inspected

*Compact Section, but using S to be conservative M = Moment**with minor loss V = Shear

Section properties with loss applied

Capacities*

Gross Section (without Losses)

Section Losses

As-Built Section Properties As-Inspected Section Properties

Page 394: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss member section properties summary

Page 395: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/25/2017 Job No. P101160439Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 3As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and used

1 L0-L1 1100 32.95 24.71 14.90 5.49 5.332 L1-L2 1101 32.95 24.71 14.90 5.49 5.333 L2-L3 1102 32.95 24.71 14.90 5.49 5.334 L3-L4 1103 32.19 24.14 14.90 5.63 5.495 L4-L5 1104 32.44 24.33 14.90 5.66 5.496 L5-L6 1105 32.95 24.71 14.90 5.49 5.337 L6-L7 1106 32.00 24.00 14.90 5.62 5.518 L7-L8 1107 32.69 24.52 14.90 5.69 5.499 M1-L1 1210 15.50 11.62 14.90 4.29 2.03

10 U2-L2 1220 19.12 14.34 29.80 4.32 2.1111 U3-L3 1230 19.12 14.34 3.92 4.32 2.1112 U3-L3 1231 19.12 14.34 11.00 4.32 2.1113 U3-L3 1232 19.12 14.34 14.90 4.32 2.1114 U4-L4 1240 19.12 14.34 3.92 4.32 2.1115 U4-L4 1241 19.12 14.34 25.90 4.32 2.1116 U5-L5 1250 19.12 14.34 3.92 4.32 2.1117 U5-L5 1251 19.12 14.34 11.00 4.32 2.1118 U5-L5 1252 19.12 14.34 14.90 4.32 2.1119 U6-L6 1260 19.12 14.34 29.80 4.32 2.1120 M7-L7 1270 15.50 11.62 14.90 4.29 2.0321 M1-L2 1310 11.04 8.28 21.10 3.71 4.8522 U2-L4 1320 18.81 14.11 21.10 5.48 6.7423 U2-L4 1330 18.81 14.11 21.10 5.48 6.7424 U6-L4 1340 18.68 14.01 21.10 5.71 6.9725 U6-L4 1350 18.81 14.11 21.10 5.48 6.7426 M7-L6 1360 11.11 8.33 21.10 3.58 4.7727 M3-L2 1392 11.11 8.33 21.10 3.58 4.7728 M5-L6 1395 11.11 8.33 21.10 3.58 4.7729 U2-L0 1500 45.74 34.31 21.10 5.57 6.6230 U2-L0 1501 45.74 34.31 12.80 5.57 6.6231 U2-L0 1502 45.74 34.31 8.33 5.57 6.6232 U2-U3 1520 34.58 25.94 14.90 6.19 6.7233 U3-U4 1530 34.58 25.94 14.90 6.19 6.7234 U4-U5 1540 34.58 25.94 14.90 6.19 6.7235 U5-U6 1550 34.58 25.94 14.90 6.19 6.7236 U6-L8 1560 45.74 34.31 21.10 5.57 6.6237 U6-L8 1561 45.74 34.31 12.80 5.57 6.6238 U6-L8 1562 45.74 34.31 8.33 5.57 6.6239 L0-L1 2100 32.95 24.71 14.90 5.49 5.3340 L1-L2 2101 32.95 24.71 14.90 5.49 5.3341 L2-L3 2102 32.19 24.14 14.90 5.62 5.4942 L3-L4 2103 32.94 24.70 14.90 5.59 5.48

Reference ID Rating IDMember

AGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)

Page 396: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/25/2017 Job No. P101160439Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 3As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is applied and usedReference

ID Rating IDMemberAGROSS

(in2)ANET

(in2)Length

(ft)rX

(in)rY

(in)43 L4-L5 2104 32.95 24.71 14.90 5.49 5.3344 L5-L6 2105 32.69 24.52 14.90 5.60 5.4845 L6-L7 2106 32.95 24.71 14.90 5.49 5.3346 L7-L8 2107 32.95 24.71 14.90 5.49 5.3347 M1-L1 2210 15.50 11.62 14.90 4.29 2.0348 U2-L2 2220 19.12 14.34 29.80 4.32 2.1149 U3-L3 2230 19.12 14.34 3.92 4.32 2.1150 U3-L3 2231 19.12 14.34 11.00 4.32 2.1151 U3-L3 2232 19.12 14.34 14.90 4.32 2.1152 U4-L4 2240 19.12 14.34 3.92 4.32 2.1153 U4-L4 2241 19.12 14.34 25.90 4.32 2.1158 M7-L7 2270 15.50 11.62 14.90 4.29 2.0359 M1-L2 2310 11.11 8.33 21.10 3.58 4.7760 U2-L4 2320 18.81 14.11 21.10 5.48 6.7461 U2-L4 2330 18.81 14.11 21.10 5.48 6.7462 U6-L4 2340 18.81 14.11 21.10 5.48 6.7463 U6-L4 2350 18.81 14.11 21.10 5.48 6.7464 M7-L6 2360 11.07 8.30 21.10 3.70 4.8665 M3-L2 2392 11.11 8.33 21.10 3.58 4.7766 M5-L6 2395 11.11 8.33 21.10 3.58 4.7767 U2-L0 2500 45.74 34.31 21.10 5.57 6.6268 U2-L0 2501 45.74 34.31 12.80 5.57 6.6269 U2-L0 2502 45.74 34.31 8.33 5.57 6.6270 U2-U3 2520 34.58 25.94 14.90 6.19 6.7271 U3-U4 2530 34.58 25.94 14.90 6.19 6.7272 U4-U5 2540 34.58 25.94 14.90 6.19 6.7273 U5-U6 2550 34.58 25.94 14.90 6.19 6.7274 U6-L8 2560 45.74 34.31 21.10 5.57 6.6275 U6-L8 2561 45.74 34.31 12.80 5.57 6.6276 U6-L8 2562 45.74 34.31 8.33 5.57 6.62

Page 397: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss member capacity calculation

Page 398: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/25/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 3

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

North L0-L1 1100 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59North L1-L2 1101 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59North L2-L3 1102 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59North L3-L4 1103 32.19 24.14 14.90 5.49 0.750 24.43 1936 29.53 807.94 965.63 2172.66 965.63North L4-L5 1104 32.44 24.33 14.90 5.49 0.750 24.44 1936 29.53 814.21 973.13 2189.53 973.13North L5-L6 1105 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59North L6-L7 1106 32.00 24.00 14.90 5.51 0.750 24.36 1936 29.53 803.32 960.00 2160.00 960.00North L7-L8 1107 32.69 24.52 14.90 5.49 0.750 24.44 1936 29.53 820.49 980.63 2206.41 980.63North M1-L1 1210 15.50 11.62 14.90 2.03 0.750 66.15 1936 26.56 349.85 464.91 1046.04 464.91North U2-L2 1220 19.12 14.34 29.80 2.11 0.750 127.06 1936 17.31 281.28 573.56 1290.52 573.56North U3-L3 1230 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56North U3-L3 1231 19.12 14.34 11.00 2.11 0.750 46.90 1936 28.27 459.43 573.56 1290.52 573.56North U3-L3 1232 19.12 14.34 14.90 2.11 0.750 63.53 1936 26.83 435.97 573.56 1290.52 573.56North U4-L4 1240 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56North U4-L4 1241 19.12 14.34 25.90 2.11 0.750 110.43 1936 20.41 331.73 573.56 1290.52 573.56North U5-L5 1250 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56North U5-L5 1251 19.12 14.34 11.00 2.11 0.750 46.90 1936 28.27 459.43 573.56 1290.52 573.56North U5-L5 1252 19.12 14.34 14.90 2.11 0.750 63.53 1936 26.83 435.97 573.56 1290.52 573.56North U6-L6 1260 19.12 14.34 29.80 2.11 0.750 127.06 1936 17.31 281.28 573.56 1290.52 573.56North M7-L7 1270 15.50 11.62 14.90 2.03 0.750 66.15 1936 26.56 349.85 464.91 1046.04 464.91North M1-L2 1310 11.04 8.28 21.10 3.71 0.750 51.19 1936 27.94 262.18 331.19 745.17 331.19North U2-L4 1320 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30North U2-L4 1330 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30North U6-L4 1340 18.68 14.01 21.10 5.71 0.750 33.27 1936 29.13 462.40 560.25 1260.56 560.25North U6-L4 1350 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30North M7-L6 1360 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33North M3-L2 1392 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33North M5-L6 1395 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33North U2-L0 1500 45.74 34.31 21.10 5.57 0.750 34.09 1936 29.09 1130.90 1372.28 3087.62 1372.28North U2-L0 1501 45.74 34.31 12.80 5.57 0.750 20.68 1936 29.66 1153.36 1372.28 3087.62 1372.28North U2-L0 1502 45.74 34.31 8.33 5.57 0.750 13.46 1936 29.86 1160.90 1372.28 3087.62 1372.28North U2-U3 1520 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40North U3-U4 1530 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40North U4-U5 1540 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40North U5-U6 1550 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40North U6-L8 1560 45.74 34.31 21.10 5.57 0.750 34.09 1936 29.09 1130.90 1372.28 3087.62 1372.28North U6-L8 1561 45.74 34.31 12.80 5.57 0.750 20.68 1936 29.66 1153.36 1372.28 3087.62 1372.28North U6-L8 1562 45.74 34.31 8.33 5.57 0.750 13.46 1936 29.86 1160.90 1372.28 3087.62 1372.28

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

Page 399: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/25/2017 Job No.Checked By NRF Date 7/13/2017

Calculations For: Kaw River Bridge Span 3

FY 26 ksi FY 30 ksiFU 52 ksi FU 90 ksiE 29000 ksi E 29000 ksi

148.38 138.13

* MBE 6A.6.2.1

K*L

FCR

(ksi)Capacity

(kips) Yield Fract. Control

P101160439

1905 = Prior to 1905 * 1936 = 1905 to 1936 *

Truss Member Rating ID

Capacities

Type of Steel

Member CapacityTension (kips)Compression

Min rX,Y

(in)

K (AASHTO

Appendix C Table C-1)

rX,YAGROSS

(in2)ANET

(in2)Length

(ft)

South L0-L1 2100 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59South L1-L2 2101 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59South L2-L3 2102 32.19 24.14 14.90 5.49 0.750 24.43 1936 29.53 807.94 965.63 2172.66 965.63South L3-L4 2103 32.94 24.70 14.90 5.48 0.750 24.47 1936 29.53 826.73 988.13 2223.28 988.13South L4-L5 2104 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59South L5-L6 2105 32.69 24.52 14.90 5.48 0.750 24.46 1936 29.53 820.47 980.63 2206.41 980.63South L6-L7 2106 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59South L7-L8 2107 32.95 24.71 14.90 5.33 0.750 25.18 1936 29.50 826.34 988.59 2224.33 988.59South M1-L1 2210 15.50 11.62 14.90 2.03 0.750 66.15 1936 26.56 349.85 464.91 1046.04 464.91South U2-L2 2220 19.12 14.34 29.80 2.11 0.750 127.06 1936 17.31 281.28 573.56 1290.52 573.56South U3-L3 2230 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56South U3-L3 2231 19.12 14.34 11.00 2.11 0.750 46.90 1936 28.27 459.43 573.56 1290.52 573.56South U3-L3 2232 19.12 14.34 14.90 2.11 0.750 63.53 1936 26.83 435.97 573.56 1290.52 573.56South U4-L4 2240 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56South U4-L4 2241 19.12 14.34 25.90 2.11 0.750 110.43 1936 20.41 331.73 573.56 1290.52 573.56South U5-L5 2250 19.12 14.34 3.92 2.11 0.750 16.71 1936 29.78 483.96 573.56 1290.52 573.56South U5-L5 2251 19.12 14.34 11.00 2.11 0.750 46.90 1936 28.27 459.43 573.56 1290.52 573.56South U5-L5 2252 19.12 14.34 14.90 2.11 0.750 63.53 1936 26.83 435.97 573.56 1290.52 573.56South U6-L6 2260 19.12 14.34 29.80 2.11 0.750 127.06 1936 17.31 281.28 573.56 1290.52 573.56South M7-L7 2270 15.50 11.62 14.90 2.03 0.750 66.15 1936 26.56 349.85 464.91 1046.04 464.91South M1-L2 2310 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33South U2-L4 2320 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30South U2-L4 2330 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30South U6-L4 2340 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30South U6-L4 2350 18.81 14.11 21.10 5.48 0.750 34.63 1936 29.06 464.58 564.30 1269.68 564.30South M7-L6 2360 11.07 8.30 21.10 3.70 0.750 51.26 1936 27.93 262.87 332.13 747.28 332.13South M3-L2 2392 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33South M5-L6 2395 11.11 8.33 21.10 3.58 0.750 53.12 1936 27.78 262.38 333.33 749.99 333.33South U2-L0 2500 45.74 34.31 21.10 5.57 0.750 34.09 1936 29.09 1130.90 1372.28 3087.62 1372.28South U2-L0 2501 45.74 34.31 12.80 5.57 0.750 20.68 1936 29.66 1153.36 1372.28 3087.62 1372.28South U2-L0 2502 45.74 34.31 8.33 5.57 0.750 13.46 1936 29.86 1160.90 1372.28 3087.62 1372.28South U2-U3 2520 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40South U3-U4 2530 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40South U4-U5 2540 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40South U5-U6 2550 34.58 25.94 14.90 6.19 0.750 21.65 1936 29.63 870.96 1037.40 2334.15 1037.40South U6-L8 2560 45.74 34.31 21.10 5.57 0.750 34.09 1936 29.09 1130.90 1372.28 3087.62 1372.28South U6-L8 2561 45.74 34.31 12.80 5.57 0.750 20.68 1936 29.66 1153.36 1372.28 3087.62 1372.28South U6-L8 2562 45.74 34.31 8.33 5.57 0.750 13.46 1936 29.86 1160.90 1372.28 3087.62 1372.28

Page 400: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss member forces output from STAAD.pro V8i model

Page 401: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/12/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3Output copied from STAAD Max Axial Forces

Reference ID Member Rating ID Compression

(k) Tension (k)

1 L0-L1 1100 0.00 141.282 L1-L2 1101 0.00 141.413 L2-L3 1102 0.00 145.014 L3-L4 1103 0.00 145.035 L4-L5 1104 0.00 145.156 L5-L6 1105 0.00 145.117 L6-L7 1106 0.00 143.848 L7-L8 1107 0.00 143.889 M1-L1 1210 0.00 34.53

10 U2-L2 1220 0.00 78.0611 U3-L3 1230 3.87 0.0012 U3-L3 1231 5.13 0.0013 U3-L3 1232 0.00 34.6414 U4-L4 1240 3.87 0.0015 U4-L4 1241 6.46 0.0016 U5-L5 1250 3.87 0.0017 U5-L5 1251 5.12 0.0018 U5-L5 1252 0.00 34.6419 U6-L6 1260 0.00 80.4720 M7-L7 1270 0.00 34.5321 M1-L2 1310 27.45 0.0022 U2-L4 1320 0.00 61.3123 U2-L4 1330 0.00 31.1624 U6-L4 1340 0.00 30.9925 U6-L4 1350 0.00 61.1426 M7-L6 1360 30.87 0.0027 M3-L2 1392 30.40 0.0028 M5-L6 1395 30.39 0.0029 U2-L0 1500 209.67 0.0030 U2-L0 1501 181.47 0.0031 U2-L0 1502 178.65 0.0032 U2-U3 1520 166.88 0.0033 U3-U4 1530 166.84 0.0034 U4-U5 1540 166.86 0.0035 U5-U6 1550 166.76 0.0036 U6-L8 1560 211.56 0.0037 U6-L8 1561 183.36 0.0038 U6-L8 1562 181.16 0.0039 L0-L1 2100 0.00 141.3440 L1-L2 2101 0.00 141.4841 L2-L3 2102 0.00 145.08

Strength I

Page 402: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/12/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3Output copied from STAAD Max Axial Forces

Reference ID Member Rating ID Compression

(k) Tension (k)

Strength I

42 L3-L4 2103 0.00 145.1243 L4-L5 2104 0.00 144.9944 L5-L6 2105 0.00 144.9745 L6-L7 2106 0.00 143.7046 L7-L8 2107 0.00 143.7547 M1-L1 2210 0.00 34.5348 U2-L2 2220 0.00 78.0649 U3-L3 2230 3.87 0.0050 U3-L3 2231 5.12 0.0051 U3-L3 2232 0.00 34.6452 U4-L4 2240 3.87 0.0053 U4-L4 2241 6.46 0.0054 U5-L5 2250 3.87 0.0055 U5-L5 2251 5.13 0.0056 U5-L5 2252 0.00 34.6457 U6-L6 2260 0.00 80.4758 M7-L7 2270 0.00 34.5359 M1-L2 2310 27.45 0.0060 U2-L4 2320 0.00 61.1361 U2-L4 2330 0.00 30.9962 U6-L4 2340 0.00 31.1763 U6-L4 2350 0.00 61.3164 M7-L6 2360 30.87 0.0065 M3-L2 2392 30.40 0.0066 M5-L6 2395 30.39 0.0067 U2-L0 2500 209.84 0.0068 U2-L0 2501 181.64 0.0069 U2-L0 2502 178.82 0.0070 U2-U3 2520 166.88 0.0071 U3-U4 2530 166.84 0.0072 U4-U5 2540 166.86 0.0073 U5-U6 2550 166.76 0.0074 U6-L8 2560 211.38 0.0075 U6-L8 2561 183.18 0.0076 U6-L8 2562 180.98 0.00

Page 403: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss floor system member forces output from

STAAD.pro V8i model

Page 404: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3

North 10000 0.00 -528.204 14.091 N/A 44.017 14.09110001 N/A -631.879 5.681 -5.681 52.65658333 5.68110002 0.00 -528.2 N/A -14.091 44.01666667 14.09110100 0.00 -528.188 14.09 N/A 44.01566667 14.0910101 N/A -631.871 5.681 -5.681 52.65591667 5.68110102 0.00 -528.192 N/A -14.091 44.016 14.09110200 0.00 -525.369 14.037 N/A 43.78075 14.03710201 N/A -629.044 5.681 -5.681 52.42033333 5.68110202 0.00 -525.363 N/A -14.037 43.78025 14.03710300 0.00 -525.366 14.037 N/A 43.7805 14.03710301 N/A -629.041 5.681 -5.681 52.42008333 5.68110302 0.00 -525.366 N/A -14.037 43.7805 14.03710400 0.00 -525.354 14.037 N/A 43.7795 14.03710401 N/A -629.032 5.681 -5.681 52.41933333 5.68110402 0.00 -525.353 N/A -14.037 43.77941667 14.03710500 0.00 -525.363 14.037 N/A 43.78025 14.03710501 N/A -629.045 5.681 -5.681 52.42041667 5.68110502 0.00 -525.369 N/A -14.037 43.78075 14.03710600 0.00 -528.204 14.091 N/A 44.017 14.09110601 N/A -631.88 5.681 -5.681 52.65666667 5.68110602 0.00 -528.199 N/A -14.09 44.01658333 14.0910700 0.00 -528.189 14.09 N/A 44.01575 14.0910701 N/A -631.871 5.681 -5.681 52.65591667 5.68110702 0.00 -528.193 N/A -14.09 44.01608333 14.09

South 20000 0.00 -528.204 14.091 N/A 44.017 14.09120001 N/A -631.879 5.681 -5.681 52.65658333 5.68120002 0.00 -528.2 N/A -14.091 44.01666667 14.09120100 0.00 -528.188 14.09 N/A 44.01566667 14.0920101 N/A -631.871 5.681 -5.681 52.65591667 5.68120102 0.00 -528.193 N/A -14.091 44.01608333 14.09120200 0.00 -525.369 14.037 N/A 43.78075 14.03720201 N/A -629.044 5.681 -5.681 52.42033333 5.68120202 0.00 -525.363 N/A -14.037 43.78025 14.03720300 0.00 -525.366 14.037 N/A 43.7805 14.03720301 N/A -629.041 5.681 -5.681 52.42008333 5.68120302 0.00 -525.366 N/A -14.037 43.7805 14.03720400 0.00 -525.354 14.037 N/A 43.7795 14.03720401 N/A -629.032 5.681 -5.681 52.41933333 5.68120402 0.00 -525.353 N/A -14.037 43.77941667 14.03720500 0.00 -525.363 14.037 N/A 43.78025 14.037

Controlling moment (k-ft)

Controlling shear (k)

STRENGTH I

Stringer Rating ID Max bending moment (k-ft)

Max bending moment (k-ft) Max shear (k) Max shear (k)

Page 405: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3

Controlling moment (k-ft)

Controlling shear (k)

STRENGTH I

Stringer Rating ID Max bending moment (k-ft)

Max bending moment (k-ft) Max shear (k) Max shear (k)

20501 N/A -629.045 5.681 -5.681 52.42041667 5.68120502 0.00 -525.369 N/A -14.037 43.78075 14.03720600 0.00 -528.204 14.091 N/A 44.017 14.09120601 N/A -631.88 5.681 -5.681 52.65666667 5.68120602 0.00 -528.199 N/A -14.09 44.01658333 14.0920700 0.00 -528.189 14.09 N/A 44.01575 14.0920701 N/A -631.871 5.681 -5.681 52.65591667 5.68120702 0.00 -528.193 N/A -14.09 44.01608333 14.09

Floorbeam0 60000 0.00 -947.973 16.151 N/A 78.99775 16.1510 60001 N/A -965.622 0.84 -0.84 80.4685 0.840 60002 0.00 -947.981 N/A -16.15 78.99841667 16.151 60100 0.00 -1822.267 30.585 N/A 151.8555833 30.5851 60101 N/A -1842.853 0.981 -0.98 153.5710833 0.9811 60102 0.00 -1822.282 N/A -30.585 151.8568333 30.5852 60200 0.00 -1819.014 30.532 N/A 151.5845 30.5322 60201 N/A -1839.609 0.981 -0.98 153.30075 0.9812 60202 0.00 -1819.029 N/A -30.532 151.58575 30.5323 60300 0.00 -1815.746 30.478 N/A 151.3121667 30.4783 60301 N/A -1836.338 0.981 -0.98 153.0281667 0.9813 60302 0.00 -1815.761 N/A -30.478 151.3134167 30.4784 60400 0.00 -1815.744 30.478 N/A 151.312 30.4784 60401 N/A -1836.341 0.981 -0.98 153.0284167 0.9814 60402 0.00 -1815.759 N/A -30.478 151.31325 30.4785 60500 0.00 -1815.74 30.478 N/A 151.3116667 30.4785 60501 N/A -1836.332 0.981 -0.98 153.0276667 0.9815 60502 0.00 -1815.755 N/A -30.478 151.3129167 30.4786 60600 0.00 -1819.02 30.532 N/A 151.585 30.5326 60601 N/A -1839.615 0.981 -0.98 153.30125 0.9816 60602 0.00 -1819.035 N/A -30.532 151.58625 30.5327 60700 0.00 -1822.267 30.585 N/A 151.8555833 30.5857 60701 N/A -1842.852 0.981 -0.98 153.571 0.9817 60702 0.00 -1822.282 N/A -30.585 151.8568333 30.5858 60800 N/A -947.985 16.151 N/A 78.99875 16.1518 60801 N/A -965.633 0.84 -0.84 80.46941667 0.848 60802 N/A -947.991 N/A -16.15 78.99925 16.15

Page 406: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss floor system member capacity summary

Page 407: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3

0 60000 504.68 1407.18 31.25 17.810 60001 504.68 1407.18 600.81 17.490 60002 504.68 1407.18 31.25 17.811 60100 575.97 1645.47 18.83 10.841 60101 575.97 1645.47 587.13 10.711 60102 575.97 1588.35 18.83 10.462 60200 575.97 1645.47 18.86 10.862 60201 575.97 1645.47 587.13 10.732 60202 575.97 1358.30 18.86 8.963 60300 575.97 1588.35 18.90 10.503 60301 575.97 1645.47 587.13 10.753 60302 575.97 1645.47 18.90 10.874 60400 575.97 1588.35 18.90 10.504 60401 575.97 1645.47 587.13 10.754 60402 575.97 1588.35 18.90 10.505 60500 575.97 1588.35 18.90 10.505 60501 575.97 1645.47 587.13 10.755 60502 575.97 1588.35 18.90 10.506 60600 575.97 1588.35 18.86 10.486 60601 575.97 1645.47 587.13 10.736 60602 575.97 1588.35 18.86 10.487 60700 575.97 1415.39 18.83 9.327 60701 575.97 1645.47 587.13 10.717 60702 575.97 1415.39 18.83 9.328 60800 504.68 1240.71 31.25 15.718 60801 504.68 1407.18 600.81 17.498 60802 504.68 1240.71 31.25 15.71

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and usedFloorbeam Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

Moment C/D

Page 408: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3

North 10000 441.92 592.51 31.36 13.46North 10001 441.92 592.51 77.79 11.25North 10002 441.92 592.51 31.36 13.46North 10100 441.92 592.51 31.36 13.46North 10101 441.92 592.51 77.79 11.25North 10102 441.92 592.51 31.36 13.46North 10200 441.92 592.51 31.48 13.53North 10201 441.92 592.51 77.79 11.30North 10202 441.92 592.51 31.48 13.53North 10300 441.92 592.51 31.48 13.53North 10301 441.92 592.51 77.79 11.30North 10302 441.92 592.51 31.48 13.53North 10400 441.92 592.51 31.48 13.53North 10401 441.92 592.51 77.79 11.30North 10402 441.92 592.51 31.48 13.53North 10500 441.92 592.51 31.48 13.53North 10501 441.92 592.51 77.79 11.30North 10502 441.92 592.51 31.48 13.53North 10600 441.92 592.51 31.36 13.46North 10601 441.92 592.51 77.79 11.25North 10602 441.92 592.51 31.36 13.46North 10700 441.92 592.51 31.36 13.46North 10701 441.92 592.51 77.79 11.25North 10702 441.92 592.51 31.36 13.46South 20000 441.92 592.51 31.36 13.46South 20001 441.92 592.51 77.79 11.25South 20002 441.92 592.51 31.36 13.46South 20100 441.92 592.51 31.36 13.46South 20101 441.92 592.51 77.79 11.25South 20102 441.92 592.51 31.36 13.46South 20200 441.92 592.51 31.48 13.53South 20201 441.92 592.51 77.79 11.30South 20202 441.92 592.51 31.48 13.53South 20300 441.92 592.51 31.48 13.53South 20301 441.92 592.51 77.79 11.30South 20302 441.92 592.51 31.48 13.53South 20400 441.92 592.51 31.48 13.53South 20401 441.92 592.51 77.79 11.30South 20402 441.92 592.51 31.48 13.53South 20500 441.92 592.51 31.48 13.53South 20501 441.92 592.51 77.79 11.30South 20502 441.92 592.51 31.48 13.53

Stringer Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and used

Page 409: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/11/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3

Stringer Rating IDShear

Capacity (k)

Moment Capacity

(k-ft)

Shear C/D

Moment C/D

Strength I As-inspected properties utilized, if no significant loss was noted then 5% reduction to as-built is

applied and used

South 20600 441.92 592.51 31.36 13.46South 20601 441.92 592.51 77.79 11.25South 20602 441.92 592.51 31.36 13.46South 20700 441.92 592.51 31.36 13.46South 20701 441.92 592.51 77.79 11.25South 20702 441.92 592.51 31.36 13.46

Page 410: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss member capacity to demand ratios

Page 411: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/12/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3All phases will have the same force results for Span 3Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

North L0-L1 1100 N/A 7.00North L1-L2 1101 N/A 6.99North L2-L3 1102 N/A 6.82North L3-L4 1103 N/A 6.66North L4-L5 1104 N/A 6.70North L5-L6 1105 N/A 6.81North L6-L7 1106 N/A 6.67North L7-L8 1107 N/A 6.82North M1-L1 1210 N/A 13.46North U2-L2 1220 N/A 7.35North U3-L3 1230 125.12 N/ANorth U3-L3 1231 89.63 N/ANorth U3-L3 1232 N/A 16.56North U4-L4 1240 125.12 N/ANorth U4-L4 1241 51.33 N/ANorth U5-L5 1250 125.12 N/ANorth U5-L5 1251 89.68 N/ANorth U5-L5 1252 N/A 16.56North U6-L6 1260 N/A 7.13North M7-L7 1270 N/A 13.46North M1-L2 1310 9.55 N/ANorth U2-L4 1320 N/A 9.20North U2-L4 1330 N/A 18.11North U6-L4 1340 N/A 18.08North U6-L4 1350 N/A 9.23North M7-L6 1360 8.50 N/ANorth M3-L2 1392 8.63 N/ANorth M5-L6 1395 8.63 N/ANorth U2-L0 1500 5.39 N/ANorth U2-L0 1501 6.36 N/ANorth U2-L0 1502 6.50 N/ANorth U2-U3 1520 5.22 N/ANorth U3-U4 1530 5.22 N/ANorth U4-U5 1540 5.22 N/ANorth U5-U6 1550 5.22 N/ANorth U6-L8 1560 5.35 N/ANorth U6-L8 1561 6.29 N/ANorth U6-L8 1562 6.41 N/A

Truss Member Rating IDAll PhasesStrength I

Capacity/Demand = Member CapacityDead Load + Live Load

Span 3 Truss Capacity/Demand

ratios**

Compression Tension

Page 412: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 7/12/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3All phases will have the same force results for Span 3Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

**Ratios shown as "N/A" indicate that the member does not experience Tension/Compression for the applied load cases

Truss Member Rating IDAll PhasesStrength I

Capacity/Demand = Member CapacityDead Load + Live Load

Span 3 Truss Capacity/Demand

ratios**

Compression Tension

South L0-L1 2100 N/A 6.99South L1-L2 2101 N/A 6.99South L2-L3 2102 N/A 6.66South L3-L4 2103 N/A 6.81South L4-L5 2104 N/A 6.82South L5-L6 2105 N/A 6.76South L6-L7 2106 N/A 6.88South L7-L8 2107 N/A 6.88South M1-L1 2210 N/A 13.46South U2-L2 2220 N/A 7.35South U3-L3 2230 125.15 N/ASouth U3-L3 2231 89.66 N/ASouth U3-L3 2232 N/A 16.56South U4-L4 2240 125.12 N/ASouth U4-L4 2241 51.33 N/ASouth U5-L5 2250 125.09 N/ASouth U5-L5 2251 89.63 N/ASouth U5-L5 2252 N/A 16.56South U6-L6 2260 N/A 7.13South M7-L7 2270 N/A 13.46South M1-L2 2310 9.56 N/ASouth U2-L4 2320 N/A 9.23South U2-L4 2330 N/A 18.21South U6-L4 2340 N/A 18.11South U6-L4 2350 N/A 9.20South M7-L6 2360 8.52 N/ASouth M3-L2 2392 8.63 N/ASouth M5-L6 2395 8.63 N/ASouth U2-L0 2500 5.39 N/ASouth U2-L0 2501 6.35 N/ASouth U2-L0 2502 6.49 N/ASouth U2-U3 2520 5.22 N/ASouth U3-U4 2530 5.22 N/ASouth U4-U5 2540 5.22 N/ASouth U5-U6 2550 5.22 N/ASouth U6-L8 2560 5.35 N/ASouth U6-L8 2561 6.30 N/ASouth U6-L8 2562 6.41 N/A

Page 413: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Span 3

Truss floor system member capacity to demand ratios

Page 414: Kaw River Bike/Pedestrian Trail Connector Bridge Calculations

Made By CTG Date 5/26/2017 Job No. P101160439Checked By NRF Date 7/20/2017

Calculations For: Kaw River Bridge Span 3All phases will have the same force results for Span Phase 1 - 10' trail centered on bridge with platform at Pier 1Phase 2 - Phase 1 with a platform added to Span 2Phase 3 - Phase 3 with a building added to the Span 2 platform

Floorbeam 0 0 17.49 31.25Floorbeam 1 1 10.46 18.83Floorbeam 2 2 8.96 18.86Floorbeam 3 3 10.50 18.90Floorbeam 4 4 10.50 18.90Floorbeam 5 5 10.50 18.90Floorbeam 6 6 10.48 18.86Floorbeam 7 7 9.32 18.83Floorbeam 8 8 15.71 31.25

North Stringer - 11.25 31.36South Stringer - 11.25 31.36

Span 3 Truss Capacity/Demand

ratios

Capacity/Demand = Member CapacityDead Load + Live Load

Member Ref ID

All PhasesStrength I

Moment Shear