Katie Orona – Lead Brian Senft Katie Trujillo Curtis Amble Kyle Benalil Jack Holloway Jeremiah...

download Katie Orona – Lead Brian Senft Katie Trujillo Curtis Amble Kyle Benalil Jack Holloway Jeremiah Duran Brigitte Ek Darien Williams Joe Landavazo Colton Fascitelli.

If you can't read please download the document

Transcript of Katie Orona – Lead Brian Senft Katie Trujillo Curtis Amble Kyle Benalil Jack Holloway Jeremiah...

  • Slide 1
  • Katie Orona Lead Brian Senft Katie Trujillo Curtis Amble Kyle Benalil Jack Holloway Jeremiah Duran Brigitte Ek Darien Williams Joe Landavazo Colton Fascitelli Michael Pitonzo Liz Lyons - Management Design Team Volunteers Advisors Professor William Marcy Mr. Emrah Kulunk Powell Brown Isabella Acevedo Abigail Montoya Robert Perea
  • Slide 2
  • American Institute of Aeronautics and Astronautics Fourth year AIAA competitor Last year: Joint Strike Fighter Mission requirements change each year Plan-form must change Experimental data can be carried over
  • Slide 3
  • Gain knowledge of aircraft design/construction Attend the April 2014 AIAA competition Complete every mission
  • Slide 4
  • Mission 1 Ground Taxi Mission Mission 2 Ferry Flight Mission 3 Maximum Load Mission Mission 4 Emergency Medical Mission
  • Slide 5
  • Payload configuration 2 lb minimum payload 15 Amp draw batteries 1.5 lb max battery 40ft takeoff runway 3.5in ground clearance Taxi over Palruf roof tiles
  • Slide 6
  • Education Conceptual design Detailed design Prototype construction Testing Design refinement Competition aircraft construction
  • Slide 7
  • Aerodynamics Crash Course Small Model Construction Build by number Almost ready to fly RC Flying Experience
  • Slide 8
  • Aerodynamics Materials/Structures Controls/Stability Propulsion
  • Slide 9
  • Number of propeller blades 2 or 3 Materials Carbon fiber, fiberglass, balsa, foam Wing configuration Bi-plane or mono-plane Engine Twin or single
  • Slide 10
  • 9/2 Education 9/7 Conceptual Design 10/7 Prototype Construction Begins 11/10 Detailed Design Begins 11/20 Final Design Construction Begins 2/3 Final Design Construction Complete 2/3 Flight Testing Begins 2/20 Competition paper completed 4/10 Leave for Competition
  • Slide 11
  • Slide 12
  • Big Thank You To: Bill Marcy Tom Harper Daniel Montano