Kandil PPQM E2E Integration V4 0
-
Upload
hossammosallam -
Category
Documents
-
view
217 -
download
0
Transcript of Kandil PPQM E2E Integration V4 0
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 1/56
Business Blueprint – PPQM Workshop
E2E PPQM Integration
© EDRAKY CONSULTING 2014
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 2/56
Objective
Production Planning and Quality Management E2E Integration
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 3/56
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 4/56
Hal: 4
End to End Order to Cash
Sales
Planning(CIR)
Daily
Planning
Sales
Inquiry
MRP
Warehous
e Transfer
SLOC
Preventive
Maintenance
Plan
AccountReceivabl
e
Bankdetermin
ation
payment
SD PPQM MM FI
Sales
Quotation
Sales
Order
Weekly
Planning
Production
ExecutionQuality
Inspection
Material
Transfer from
Warehouse
to SLOC
Delivery
PlanningDelivery
Inspection
Goods
IssueBilling
PM CO
Cost
Estimate
Transfer order
(picking)Transportation
Custo
mer
cleara
nce
variance &
settlement
Credit
Management
Stock
Transfer
(905/904)
WM
Stock
Transfer
(905/904)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 5/56
Hal: 5
End to End Order to Cash (Internal Subcontracting)
SalesPlanning
(CIR)
Daily
Planning
Sales
Inquiry
MRP
Warehouse
Transfer
SLOC and
BIN
Account
ReceivableIncomingpayment
Cash /Bank
SD PPQM MM FI
Sales
Quotation
Sales
Order
Credit
Management
Weekly
Planning
Production
Execution
Quality
Inspection
Warehouse
Transfer RM
to SLOC
Delivery
Planning
Delivery
Inspection
Delivery
ExecutionBilling
PM CO
Receive
Material From
Customer
WM
Stock
Transfer
(905/904)
Good
Receipt
(901)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 6/56
PROCESS END-TO-END
Class
Bill Of MaterialWork
Center
InspectionMethod
MasterInspection
Characteristic
Characteristic TableObject Dependency
Routing
SamplingProcedure
SamplingScheme
Inspection Plan
Characteristic
Material Master
Catalog
MASTER DATA
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 7/56
PROCESS END-TO-END
Long Term Planning
Quarterly Planning
Weekly Planning
Daily Planning
Monthly Planning
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 8/56
PROCESS END-TO-END
Goods Issue Production Order & Consumable
In-Process Inspection
Goods Receipt
Goods Receipt Inspection
Confirmation
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 9/56
PROCESS END-TO-END
Reinspection CompletionProduction Order
Trial ProductionQuality InGrinding
QualityCalibration
SUPPORTING
Return / Claimmanagement
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 10/56
Production Planning
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 11/56Hal: 11
PPQM Business process
1. Long Term Planning
2. Quarterly Planning
3. Monthly Planning
4. Weekly Planning
5. Daily Planning
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 12/56
Long Term Planning
E
v e n t
M R P C o n t r o l l e r
Start – Initiate Sales
Forecast
W a r e h o u s
e
S a l e s P e r s o n
EvaluationPurchaseInvormati
on
CreatePlanningScenario
Start – Define
ComodityCapacity
CreateSales
Forecast
Run LTP Evaluate
LTP
ExportingTo
Purchasin
g
ExportingTo Cost
Accountin
g
ExportingTo
InventoryManageme
nt
P u r c h a s i n
g C o s t
A c c o u n t i n
gEvaluation
CostAccountin
g
EvaluationInventoryManageme
nt
PredefinedCapacity
Monthly
Planning
(M+3)
EvaluationCapacityPlanning
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 13/56Hal: 13
Quarterly Planning (M+3)
Quarterly Planning :
- The Process is to Net off the requirement from sales order forecast on monthly
based with the proposal for procure the raw material.
- The Business process is start with the changing of sales forecast until creation
PR and the production planning monitoring raw Material.
- Note: the vendor evaluation(supplier list for each items), the changing of
material and the changing of Plan arrival date will be in purchase order
business process will be part of the integration which is delivered by MM
Module.
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 14/56
Quarterly Planning
E
v e n t
M R P C o n t r o l l e r
Start – Initiate Sales
Forecast
P u r c h a s i n g
S a l e s P e r s o n
EvaluationRough
CapacityPlanning
Start – Define
ComodityCapacity
ChangedSales
Forecast(M+2)
Run MRP
CheckPurchase
List
EvaluationProductionPlanningfor RM
monitoring
PredefinedCapacity ifNecessary
MRPEvaluation
Purchasing
Process
PR Creation
Internal
Meetingfor full fill
capacity
Required
new so
Required
Meeting
Yes
NO
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 15/56Hal: 15
Monthly Planning
Monthly Planning :
- The Process is preparation for the Planning execution / Shop floor control
(MPS). The process will be collecting the order which is it will be produce within
next weeks. And then continue with matching the Raw material and free stock
and mapped to the sales order. Certain rules will be defined for the matching
raw materials (order closer, production exist, cover critical product, suitability
material for each product, follow forecast, and full fill capacity
(local/export/rejection).
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 16/56
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 17/56
Weekly Planning
E
v e n t
M R P C o n
t r o l l e r
Start – Initiate Sales
Order
S a l e s P e r s o n
CreateSalesOrder
Run MRP
ReportOrder Vs
Stock
allocation
Daily
Planning
Pland Ordercreation
N
Check The
Matching
Rules
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 18/56
Daily Planning
E
v e n t Start –
WeeklyPlanning
S h o p F l o o r C o n t r o l
Createproduction
Order
Production
Execution
Infored to
production
CheckingDetail Plan
CheckingStock
situation
Stockallocation
Ordersorting orsequencin
g
Start – Rework
Start – InsternalSubcont
Start – TrialProduction
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 19/56
Trial Production
E
v e n t Start – Initial
TrialProduction
P r o d
u c t D e v e l o p m e n t
CreateNotification
Daily
Planning
Decided
Trial result
ReleaseNotification
Create CIRTrial
Production
CompleteNotificatio
n
Completeactivity
Notification
Preparatio
n Trial
production
Approved
Trial
Production
Production
Execution
Quality
Managemen
t
Stop
S h o p F l o o r
C o n t r o l
P r o d u c t i o n
Q u a l i t y
MRP RunCheck
Notification
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 20/56
Production Order Completion
E v e n t
C o n t r o l l i n
g
Production order
completion
Result RecordingQuality Inspection
Order
Complete
?
Yes
No
Stock Allocation to
Finish free or other
order
No
YesEvaluation order
info system . Order
progress
M R P C
o n t r o l l e r
Excess
Stock
exist ?
Stop
Order
Settlement
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 21/56
Production execution
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 22/56
|22
Production Order Cycle
Sales Order
MRP
Production
OrderOrder Release /
Inspection Lot
Goods IssueInsprocess
Inspection
Confirmation
Goods Receipt
GR Inspection
TECO
Cost Settlement
Archive / Delete
1. Goods Issue : to Note intothe system the
consumption of raw
material and semi finish
2. Inproses Inspection : note
the result of Inprocess
Inspection3. Confirmation : to note the
production activity in to the
system. Eg : Processing
time, gas, electric, dll.
4. Goods Receipt : : to Note
into the system the goods
receipt of SF, FG dan scrap
5. GR Inspection : note in to
the system the result of
Inspection Product related
and do Usage decision.
Production Execution
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 23/56
Hal: 23
Bill Of Material (alt 1)
GCCF
FBC
FC
HPC FCT AC ABHRC
CCM CCT
Note : The selection component will using Variant configuration.
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 24/56
Hal: 24
Bill Of Material (Alt 2)
CCF
PD
FC
FCC FCT
AC
AB
HB
CCMCCTNote : The selectioncomponent and alsoQuantity will usingVariant configuration.
CC
Level 1.
Level 2.
Level 3.
Level 4.
Level 5.
Level 6.
Level 7.
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 25/56
Hal: 25
Routing (3)
CPL BAF
CAL TPM
SHR/SLT/RECMPL
TCM ECL
0010 0020 0030
0040
0050
0060
0070/0080/00900100
Proposed Routing for CRM :
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 26/56
Integration of Production & Inventory Control in SAP
Journal:
material
consumption
Journal:
overhead &
quality
Order
Receive
Sales
Order
Production
Order
Material
Consumption
(Goods
Issue)
Activity
Confirmation
(Overhead
usage)
Finished
Goods
Receipt +
QC
inspection
Order
settlement
Delivery +
QC
inspection
Billing Collection
BOM &
Routing
Firmed
BOM &
Routing
Qty & value
issued
Qty & value
confirmed
Qty & value
received
Standard
Cost
Estimate
Target Cost
determi-
nation
Consumption
recording
Activity value
record
Goods
Receipt
value record
Variance
settlement
Product’s
actual cost
Profitability
Accounting
Sales COGS
Discount
Costing Processes Profitability Analysis
Sales Processes Sales ProcessesProduction & Quality Management processes
Goods issue
value
Goods
receipt
value +
quality cost
Settlement
value
Goods issuevalue +
quality
costs
Sales &
discount
value
A/R open
item
Journal:
finished
goods &
quality
Journal:
finished
goods
Journal:
COGS &
quality
Journal:
account
receivables
Journal: cash
receipt
Financial Accounting Processes
Confirma-
tion value +
quality cost
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 27/56
Production Execution
E
v e n t
Q u a l i t y
Start – DailyPlanning
P r o d u c t i o n
RecordGoods
Receipt
Quality In
Production
Preparatiio
n before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
Issue Coil tto machineInprocess
Inspection
RecordGoodsIssue
Consumable
RecordConfirmati
on
Warehouse
Stop
ProductionExecution
RecordGoods
Issue Coil
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 28/56
Production Execution – GI TO PROD (1)
Goods Issue to production order : is Consumption of
the component to the production order as reference. Theconsumption of this component that has relation with BOM.
In this case is COILs mostly, Zinc for galvanizing and Paint
for preprinting.
Goods issue will be done when loading the coils to the
machine.
Those goods issue will be applied at all work center.
Some of the work center will be required production order
combined as a reference for Work Center Slit and Work
Center Cut to length
Preparatiio
n before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
Iloading
Coil to
Machine
RecordGoods
Issue Coil
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 29/56
Production Execution GI TO PROD (2)
Goods Issue Zinc :
The aim for this material is to put zinc as component BOM to makestandard cost for galvanize product more accurate and also for MRP
Purposes. But to put zinc in to component then need to calculate standard
consumption Zinc per ton in to the BOM. And the consequences for the
production is need to input proper quantity for each component of zinc per
coils.
The complexity is the consumption in the current is manual calculation
based on the (exit + scrap) - entry and the remaining is considered as
ZINC (but Zinc come from the Pot) but SAP required the consumption in to
Material levels by means is ZINC, Aluminum, antimony that need to beconsumpt instead
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 30/56
Pro Cons – alternative W/O Production order has choosen
Has 2 alternative with production order or without
With Production Order
Has to create monthly production order
to manage inventory of zinc pot.
Can measure the goods issue of the
component as it is.
Has to do Goods receipt of Zinc pot bymanual calculation goods issue – dross
– loss (1%) = Goods receipt.
Dross + Loss will be charge to
production order and already
considered in Cost estimate for the Zinc
Pot The consumption of Zinc can be per coil
based on the Zinc Pot.
Will have inventory Zinc pot in each pot
approximate 240 to.
The physical inventory will be correct
between system and real situation.
Without Production Order
Not required production order
Goods issue per coil will be manual
calculation in the first time, it might
discrepancy between the real stock.
Dross and Loss will be charge to
Production order on shift based
No inventory of zinc pot, only inventory
of raw material
The physical inventory might be
misleading because of some material is
already become Zinc Pot
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 31/56
ZINC POT
Min Level
80 toMin Level
80 to
Zinc
35.2To Zn-AL
4 to Level adjustment
120 to
Goods
Issue
Goods
Issue
GoodsReceipt
P d ti E ti R j t d
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 32/56
Production Execution - Rejected
E v e
n t
Start
P r o d u c t i o n
Preparatiio
n before
production
CreationProduction
Ordermonthly
CheckingActualStock
RecordConfirmati
on
Warehouse
Production
Execution
RecordGoods
Issue Zinc,Al, Anti
RecordGoods
ReceiptZinc Pot
Preparatio
n for
goods
issue Zinc
Pot
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 33/56
Paint - Illustration
Sales Order
Creation for PP
MRP
Create
Production order
of PP
Special
Paint?
Buy RAL As it is
Buy Paint
Component
Create
Production order
of RAL
Goods issue
Coil
261
Paint
Goods Issue
261
Coil
Goods Receipt
101
Component
Goods Issue
261
Paint
Goods Receipt
101
Production Order PP
Production Order Paint
Yes
No
WC Paint Mixer
WC Galvanize
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 34/56
Goods Issue Transaction
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 35/56
Goods Issue to Production Order
No Material Work Center1 Coils ALL
2 ZINC,ZINC AL,
ANTIMONY
GALVANIZING
3 PAINT CC
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 36/56
Production execution – GI consumable (1)
Goods Issue consumable : is the consumption of material
which Is cannot refer to production order / Coil. Forexample : Acid, Oil, Hydrogen, nitrogen. For this case SAP
recognize as goods issue to cost center.
This goods issue will be done on shiftily based and will be
done by production.
Those Goods issue will be applied at all work center
Preparatio
n before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
Loading
Coil to
Machine
RecordGoods
Issue Coil
InprocessInspection
RecordGoodsIssue
Consumabl
e
Production
Execution
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 37/56
Goods Issue Consumable (2)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 38/56
Goods Issue Consumable (3)
No Material Work Center1 ACID ALL
2 Tin,LID GALVANIZING
3 OIL CC
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 39/56
Production Execution – Inprocess insp.
In process Inspection: is the feature to inspect in process
parameter. At Kandil Steel will be using this to record the
production parameter. For example : Speed and
temperature.
This goods issue will be done on event based, the tools will
be integrated with PLC and will be done by production.
Those in process inspection will be applied at all work
center.
No integration necessary, only for reporting only if required.
Preparatio
n before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
Loading
Coil to
Machine
RecordGoods
Issue Coil
InprocessInspection
RecordGoodsIssue
Consumable
Production
Execution
C f (1)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 40/56
Production Execution – Confirmation (1)
Confirmation production order : is Confirmation the
activity of production per coil accept for BAF. Theconfirmation of production order will be involve the quantity
and the actual consumption of machine hours. And the
confirmation also required to fill in the start and finished
time of the machine and also break time with the reason of
break time.
The break time will be recorded with the reason. The
reason example is machine break down, setup, change roll,
and else.
Preparatiio
n before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
Iloading
Coil to
Machine
RecordGoods
Issue Coil
InprocessInspection
RecordGoodsIssue
Consumabl
e
Production
ExecutionRecord
Confirmation
P d ti E ti C fi ti (2)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 41/56
Those Confirmation will be applied at all work center.
Some of the work center will be required production order
combined as a reference for Work Center BAF, Slit and
Work Center Cut to length.
Production Execution – Confirmation (2)
C fi ti
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 42/56
Confirmation
P d ti E ti G d i t (1)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 43/56
Production Execution – Goods receipt (1)
Goods receipt production order : is the activity to
receive the product after process in the machine. Thegoods receipt can be semi finished or finished goods
product. Goods receipt will be receipt coil by coil.
Goods receipt will be done by quality / inspector.
Those Goods Receive will be applied at all work center. Goods receive will be inspection lot automatically.
Goods receipt will be involve creation a new batch Number.
Preparation before
production
CheckingThe
ProductionDaily Plan
CheckingActualStock
LoadingCoil to
Machine
RecordGoodsIssue Coil
InprocessInspection
RecordGoodsIssue
Consumable
Production
ExecutionRecord
Confirmation
GoodsReceived
B t h N b
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 44/56
Batch Number
Batch Number : this is will be considered as coil number for
Coil and Considered bundle number Sheet or small slit.
The number will be follow mother Coil.
The number will adjust with alphabet if mother coil is cut or
split.
The illustration as mention below
Shearing Line
(SHL1)
Operation 0020
Batch #900101A
PrdOrd# 021
5 Ton
Batch #900101B
PrdOrd# 021
5 Ton
Batch #900101
PrdOrd# 140000110 Ton
G d R i t P d ti O d
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 45/56
Goods Receipt Production Order
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 46/56
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 47/56
Quality Management
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 48/56
Hal: 48
PPQM Business process
1. Quality in incoming
2. Quality In Production
3. Quality return / Claim
4. Quality Delivery Inspection
5. Quality in Grinding6. Quality in Calibration
Quality Management for Incoming
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 49/56
Quality Management for Incoming
E v e n t
B u y e r
W a r e h o u s e C l e r k
DefectsRecording
QualityInspection Defect
Q u a l i t y i n c o m i n g I n s p e c t o r
InspectionLot
RecordUsage Decision
Move Materialto Unrestricted
Stock
CompleteNotification
Goods Receiptfrom Purchase
Order Return ToVendor
No
Yes
RecordUsage Decision
Move Materialto Block stock 1
1Move Materialfrom Block
stock toquarantine Sloc
Claim DailyPlanning
No
Yes
M R P Realloc
ated
Yes
No
Purchase
Order
Vendorevaluation
MaterialReturn
Yes
No
Quality Management in production
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 50/56
Quality Management – in production
E v e n t
Q u a l i t y
No
YesDefect
Acceptor not
Yes
No
Move to BlockStock.
PerformInspection
Move ToUnrestricted
Use
Move fromBlock stock
to Free stock
M R P C o n t r o l l e r
Acceptqc
recommendat
ion
Plannerevaluate
based on QCrecommendation Vs Margin
Yes
RejectionReport
No
PerformResult
Recording
DefectRecording
Usagedecision
Notificationmanual byInspection
Put therecommendation to
rejectionreport
Warehouse
Move fromBlock stock
toUnrestricted
Use
Daily
Planning
Production
Execution
Quality Management for Delivery
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 51/56
y g y
Inspection
E v e n t
R e q u e s t o r
DefectsRecording
Defect
D e l i v e r y I n s p e c t o r
InspectionLot
RecordUsage Decision
Move Materialto Unrestricted
Stock
MaterialMovement for
Reinspect
No
Yes
RecordUsage Decision
Move Materialto Block stock
Daily
Planning
Reinspect
ion
Delivery
PerformInspection
Sales Returns with Quality Management (QM)
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 52/56
Sales Returns with Quality Management (QM)
E v e n t
W a r e h o u s e
C l e r k
S a l e s a d m i n i -
s t r a t i o n
Q u a l i t y I n s p e c t o r
CreateReturn Delivery
Post GoodsReceipt
ResultRecording
QualityInspection
CreateReturn Order
Record UsageDecision
Stock TransferReturns to Own
UnrestrictedStock
UpdateNotification
Automaticcreation
Inspection Lot
Create Billingfor Return
DefectDefect
Recording
Yes
No
Yes
No
CreateNotification
Inspectionat
Customerlocation
ReturnMaterial
?
Stock TransferReturns to
Blocked Stock
CreditMemo
Credit Note
Visiting report
PerformInspection
Record UsageDecision
1
1
1
CustomerClaim andComplain
YesNo
NeedCreditmemo
Stop
Test Equipment - Grinding
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 53/56
Test Equipment Grinding
E v e n t
Q u a l i t y I n s p e c t o r
M
a i n t e n a n c e P l a n n e r G r o u p
Result RecordingQuality Inspection
Defect
found
Yes
No
Follow UpRoot
cause and
resolve
Record Usage
Decision Accept
No
Yes
1
PerformInspection
Automatic creation
of Inspection Lot
with equipment
CalibrationMaintenance
Order
DefectRecording
Closed
Maintenance Order
Stop
Maintenance
order
P r o d u c t i o n
Test Equipment - Calibration
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 54/56
Test Equipment Calibration
E v e n t
C a l i b r a t i o n C o o r d i n a t o r
M
a i n t e n a n c e P l a n n e r G r o u p
Result RecordingQuality Inspection
Defect
found
Yes
No
Follow UpRoot
cause and
resolve
Record Usage
Decision Accept
No
Yes
1
PerformInspection
Automatic creation
of Inspection Lot
with equipment
CalibrationMaintenance
Order
DefectRecording
Closed
Maintenance Order
Stop
Maintenance
order
Quality Management for Reinspection
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 55/56
Quality Management for Reinspection
E v e n t
R e q u e s t o r
DefectsRecording
Defect
R
e i n s p e c t I n s p e c t o r
InspectionLot
RecordUsage Decision
Move Materialto Unrestricted
Stock
MaterialMovement for
Reinspect
No
Yes
RecordUsage Decision
Move Materialto Block stock
Daily
Planning
Reinspect
ion
Stop
PerformInspection
8/11/2019 Kandil PPQM E2E Integration V4 0
http://slidepdf.com/reader/full/kandil-ppqm-e2e-integration-v4-0 56/56
Thank youSendy Priatmojo & Mohamed Salah
Contact information:
Edraky Consulting
E-Mail: [email protected] & [email protected]
Phone: +201159777708 & +2010167699928
www.edraky.com