KM 1

KAIZEN ManagementCharacteristics of

Japanese Production Systems

Page 2: Kaizen management

KM 2

Continuous improvement

KAI-ZEN

V:  Green walking

Page 3: Kaizen management

KM 3

What is Industry ?

ProductsServices

Industry

Input Output

Man-powerMachinesMaterialsMethods(4M’s)

TechnologySkill

Page 4: Kaizen management

KM 4

Q, C, D

Evaluation of the output ?

Q: QualityC: CostD: Delivery

Industry

Input Output

KAIZENaction

Page 5: Kaizen management

KM 5

KAIZEN is a corrective action

KAIZEN is a feedback

Industry

Input Output

KAIZENaction

Page 6: Kaizen management

KM 6

KAIZEN is a Japanese word

改 : change 善 : better

Page 7: Kaizen management

KM 7

Definition of KAIZEN

Page 8: Kaizen management

KM 8

1. A selection of better means or a change of current method for achieving an objective.

The Japan HR Association

Definitions of KAIZEN

2. An accumulation of small changes

Page 9: Kaizen management

KM 9

How do farmers pack How do farmers pack oranges?oranges?

Page 10: Kaizen management

KM 10

I need help.

Page 11: Kaizen management

KM 11

Productivity: 1 net per min.

Page 12: Kaizen management

KM 12

Page 13: Kaizen management

KM 13

Productivity: 5 nets per min. with 2 workers

Page 14: Kaizen management

KM 14

Can you think of a better method to pack oranges?

A selection of better means ora change of current method for achieving an objective.

Page 15: Kaizen management

KM 15

Productivity: 5 nets per min. with 1 worker

Page 16: Kaizen management

KM 16

1. A selection of better means or a change of current method for achieving an objective.

The Japan HR Association

Definitions of KAIZEN

2. An accumulation of small changes

Page 17: Kaizen management

KM 17

Chopsticks

Page 18: Kaizen management

KM 18

Children hold their chopsticks improperly

Page 19: Kaizen management

KM 19

Page 20: Kaizen management

KM 20Training

… but still difficult to use

Page 21: Kaizen management

KM 21

Soft paddings (Japanese fish paste)

… for some children, balancing the chopsticks is difficult

Page 22: Kaizen management

KM 22

Page 23: Kaizen management

KM 23

Training chopsticks

Page 24: Kaizen management

KM 24

Page 25: Kaizen management

KM 25

KAIZEN is a continuous improvement

Continuous = again and again

Page 26: Kaizen management

KM 26

Question

Page 27: Kaizen management

KM 27

- I picked up a garbage and put it in a trashcan.

- I wiped the windows and made them clean.

- I used a mop to clean the gasoline left on the floor.

KAIZEN is a small change to make something better.

Where is a division between our jobs and KAIZEN?

Page 28: Kaizen management

KM 28

A waitress was working at a restaurant in Tokyo

Page 29: Kaizen management

KM 29

A small change of a method (approach)

Any way to pick up the mop?Any way to store the mop?Any way to carry the mop?

KAIZEN is a small change

Page 30: Kaizen management

KM 30

Page 31: Kaizen management

KM 31

Page 32: Kaizen management

KM 32

Page 33: Kaizen management

KM 33

toothbrush

Page 34: Kaizen management

KM 34

Swatter

Page 35: Kaizen management

KM 35

tweezers

Page 36: Kaizen management

KM 36

Page 37: Kaizen management

KM 37

Improvement by changing methods

How do we change methods?

Page 38: Kaizen management

KM 38

KAIZEN Steps

Page 39: Kaizen management

KM 39KAIZEN Steps

Page 40: Kaizen management

KM 40KAIZEN Steps Review

Page 41: Kaizen management

KM 41

EliminationRemove this sliding door

What is the use of the sliding doors?

Page 42: Kaizen management

KM 42

Before After

Why are shoe box doors needed?

1

Page 43: Kaizen management

KM 43

Before After

Why is the toilet cover needed?

Page 44: Kaizen management

KM 44ToiletsCDG(Paris) Frankfurt

Hong Kong Tokyo

Page 45: Kaizen management

KM 45

Before

After

No sleeves down-jacket is easy to work

Page 46: Kaizen management

KM 46

Reduce the number of lights

ReduceA fluorescent light bulb was removed.

Page 47: Kaizen management

KM 47

Before

Why two bricks?

Page 48: Kaizen management

KM 48

Parking Lot

Page 49: Kaizen management

KM 49

AfterBefore

One brick is enough to stop a car

1

Page 50: Kaizen management

KM 50

Zebra Zone

1

Page 51: Kaizen management

KM 51

Before

After

Side lines of the zebra zone are removed.

1

Page 52: Kaizen management

KM 52

Before After

Long or short brush part?

Page 53: Kaizen management

KM 53

toothbrushes

Page 54: Kaizen management

KM 54

Ribbon waving?

Change

Visual Management

Page 55: Kaizen management

KM 55

Page 56: Kaizen management

KM 56

Pinwheelturns around

Visual Management

Page 57: Kaizen management

KM 57

Before

After

The hollow about the key hole smoothes the key movement.

1

Page 58: Kaizen management

KM 58

Before

After

To oil the pan, a small teapot is more convenient than a ladle.

Page 59: Kaizen management

KM 59

Page 60: Kaizen management

KM 60

Before

After

Stairways at the railway station should have signs of up and down.

Page 61: Kaizen management

KM 61

At JR Kurume StationAt JR Kurume StationAt JR Kurume StationAt JR Kurume Station

Page 62: Kaizen management

KM 62

Page 63: Kaizen management

KM 63

Rush Hour

Page 64: Kaizen management

KM 64

Before

After

Page 65: Kaizen management

KM 65

Hanging Straps in JR trains

Page 66: Kaizen management

KM 66

Hanging strap in Hanging strap in Hong Kong subwaysHong Kong subways

The Japan HR Association

Page 67: Kaizen management

KM 67

Suggestion Systemvs.

KAIZEN Suggestion System

Page 68: Kaizen management

KM 68

Suggestion SystemYou suggest your ideas, and I will

examine them and implement some of your ideas later.

Page 69: Kaizen management

KM 69

Suggestion System Concept

Rew

ard

Idea

Idea

Page 70: Kaizen management

KM 70

KAIZEN Suggestion System

KAIZEN

sheet

Implemented KAIZEN ideas must be submitted

Page 71: Kaizen management

KM 71

Workers’ responsibility

Workers’ responsibility

Management responsibility

Management responsibility

Suggestion System

KAIZEN Suggestion System

generation Idea

Page 72: Kaizen management

KM 72

Suggestion SystemPropose improvement ideas for any

activity in the company.

KAIZEN Suggestion SystemPropose only improvement ideas which will improve your own work.

Page 73: Kaizen management

KM 73

KAIZEN Memo 1

Page 74: Kaizen management

KM 74

AOTS KAIZEN

Page 75: Kaizen management

KM 75

AOTS KAIZEN

Page 76: Kaizen management

KM 76Reward

For an excellent KAIZEN, a large amount of reward is given (5000 yen, 10000 yen, 50000 yen)

Page 77: Kaizen management

KM 77

Award Payment for Each KAIZEN Suggestion (2008)

18

24

110

109

163

83

11

10

0 50 100 150 200

0

1-99

100-299

300-499

500-999

1000-2999

3000-4999

5000+

Jp

n Y

en

Surveyed 528 companies

Average 385 yen

Page 78: Kaizen management

KM 78

88.7%1

Implemented suggestions

All suggestions

Among (527) companies,

Total number of employees

Employees who suggested at lease one idea

74.4%

2008

Page 79: Kaizen management

KM 79

1. Small change

2. Medium change

3. Big change

(KAIZEN)

(Small group activities)

(Innovation)

--- By individual effort, a better way of proceeding a job is considered. (Idea creation)

--- By group effort, a better way is proposed by following predetermined steps (or rule).

--- By investments in new technology or equipment, dramatic alterations are achieved.

Different styles of change

2

Page 80: Kaizen management

KM 80

Process

ChangeTool Change

Tomato Juice

Page 81: Kaizen management

KM 81

Nikkei News, Nov. 22,1997

Newspaper Article

Page 82: Kaizen management

KM 82

Hydroponics CultivationHydroponics Cultivation

6000 tomatoes6000 tomatoes

1http://www.arigat.net/kandoh.html

Page 83: Kaizen management

KM 83

Material

ChangeProcess

ChangeTool Change

Tomato Juice

2

Man-powerMachinesMaterialsMethods

(4M’s)

Industry

Input Output

KAIZENaction

Page 84: Kaizen management

KM 84

Breakthrough

Status quo

Management

Staff

Floor people

Two Attitudes

Page 85: Kaizen management

KM 85

KAIZEN

Statu

s quo

Innova

tion

KAIZEN

Statu

s quo

Management

Staff

Floor people

Management

Staff

Floor people

Innova

tion

Japanese firms

Non-Japanese firms

Page 86: Kaizen management

KM 86

Fin