JWST PRDS Project Mangement Case Study
Jesse Doggett
Project Engineer, ITEB/OED
![Page 2: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/2.jpg)
December 1st, 2008 JWST PRDS Case Study 2
PMJC
Outline
What is the JWST PRDS?
Stakeholders & Communication
PRDS Formal Documents
Planning and Subprojects
Managing Change
Quality
![Page 3: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/3.jpg)
December 1st, 2008 JWST PRDS Case Study 3
PMJC
JWST PRDS Project Reference Database
Data Used to Operate the Space Craft
PRDS Functional Components Data Editor
Version Control
Dependency Checking
Change Management
![Page 4: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/4.jpg)
December 1st, 2008 JWST PRDS Case Study 4
PMJC
Observatory LaunchSegmentOptical TelescopeElement (OTE)Spacecraft
Science & OperationsCenter (S&OC)LaunchVehiclePayloadAdaptorLaunch SiteServicesIntegrated ScienceInstrument Module(ISIM)
MissionSegmentElementSubsystemProject ReferenceDatabase Subsystem (PRDS)
Version ControlSystem (VCS) Change ManagementSystem (CMS)Data InterchangeSystem (DIS) Cross-ReferencingSystem (XREF)Component
JWSTMissionGroundSegment
Proposal PlanningSubsystem (PPS)Flight OperationsSubsystem (FOS)Data ManagementSubsystem (DMS)
InstitutionalSupportCommonSystemsOperations ScriptSubsystem (OSS)
JWS
T W
BS
(Work B
reakdown S
tructure)
![Page 5: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/5.jpg)
December 1st, 2008 JWST PRDS Case Study 5
PMJC
Stakeholders / Communication Stakeholders
NASA, NGST, Instrument Teams, ISIM, WFS&C, OSS, S&OC, PRDS Team
Communication Working Group Meetings
Status, Requirements, Interfaces, Design
Formal Documents
NGIN - JWST Restricted Web Site
![Page 6: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/6.jpg)
December 1st, 2008 JWST PRDS Case Study 6
PMJC
Formal Documents Planning Documents
Architecture, Operations Concept, Requirements, Design
Acceptance Documents Test Plan
Test Results
Release Notes
Other Interface Control Document
![Page 7: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/7.jpg)
December 1st, 2008 JWST PRDS Case Study 7
PMJC
Planning and Subprojects Basic Plan
Project broken up into phases or sub-projects.
Initial phase, implement baseline set of requirements.
Subsequent phases, requirements and bug fix implementations tracked in the Problem Report System
Delivery Procedures Minor Releases (bug fixes)
E-Mail Notification, Delivered via Download
Major Releases (new requirements) Formal Documents, Government Witness for Acceptance,
Contracting Officer Delivers CD and Hard Documents
![Page 8: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/8.jpg)
December 1st, 2008 JWST PRDS Case Study 8
PMJC
Managing Change Requirements
Informally Discussed in Working Group Meeting
Formal Request to Change Is Negotiated
New Requirements Document Approved and Updated
Important to Agree with Government on the Set of Requirements
Personnel Unplanned Departures Between First 2 Phases
Worked with Division to Identify Other Available Personnel
Slipped Schedule a Few Weeks
![Page 9: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/9.jpg)
December 1st, 2008 JWST PRDS Case Study 9
PMJC
Certification Requirements ~20 New Requirements / No New Funding
Initially, Informed NASA We Can’t Set Completion Date
“Rolling Wave Planning” Create and Refine Schedule and Plan
Design-As-We Go
Acceptance Test Only at the End
![Page 10: JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.](https://reader036.fdocuments.in/reader036/viewer/2022083009/5697c0061a28abf838cc5348/html5/thumbnails/10.jpg)
December 1st, 2008 JWST PRDS Case Study 10
PMJC
Quality Planning Quality Assurance
Ensures that activities are being performed to verify requirements are met.
Not formally done for PRDS
Quality Control Software Testing for PRDS
Perform Regression and Problem Report Testing
Weekly Reports
Results Driver Future Action Document Failures
Determine If Immediate Fixes Required to Release