Just in time

22
Manoj Lawate

description

Just in Time, what it means? how it developed? steps in implementing it, waste according to it.

Transcript of Just in time

Page 1: Just in time

Manoj Lawate

Page 2: Just in time
Page 3: Just in time

Introduction

• “a philosophy of manufacturing based on planned elimination of all waste & on continuous improvement of productivity”

• a production strategy that strives to improve a business return on investment by reducing

1. in-process inventory 2. associated carrying costs

Page 4: Just in time

Just In Time!!! Air Traffic Control

Page 5: Just in time

Founder of JIT

• Founded by Taiichi Ohno • A vice president of

Toyota• Basically implemented

in Toyota plant 1950, well established after 1970

• Well known as Toyota Production System

Page 6: Just in time

Followers of JIT

• Adopted by General Electrical in the USA in the 1980

• Some companies referred JIT with different names;

– TOYOTA = ‘Toyota System’

– IBM = ‘continuous flow manufacturing’

– HEWLETT-PACKARD = ‘stockless production & repetitive manufacturing system’

– GE = ‘management by sight’

Page 7: Just in time

Some Statistics …

Comparison GM TOYOTA

Assembly Hours 40.7 Hours 16 Hours

Defects per 100 Hours 130 Defects 45 Defects

Average inventory level 2 Weeks 2 Hours

Page 8: Just in time

JIT Goals…

• Eliminate disruptions• Make the system flexible• Reduce set up times & lead time • Minimize inventory• Eliminate waste• Increase productivity• Give the customer the products they want, when

and where they want them at the minimum cost

Page 9: Just in time

Steps in JIT• Introduce the speed

design of process, target, use of recourses – 1000 cars in a month, 500 workers– 1000 cars in a week, 1500 workers

• Eliminate or Reduce Stock zero inventory level is ideal

• Examples of KANBAN involves a customer & a supplier aim = to satisfy the customer’s needs

Page 10: Just in time

Steps in JIT• Design of Plant arranging machinery, people & activities

• Reducing & Avoiding set ups & Preventive Maintenance

so that activity should not stopped

• Simplifying the planning so that replacement can be possible

Page 11: Just in time

Tools of JIT

• The 7 wastes• The 5 Ss• Kanban Inventory• Visual Control• Pokayoke• Kaizen• Cellular Work Flow• Standard Work Concept• Make it Ugly• Just Do It

Page 12: Just in time

The 7 Wastes

Page 13: Just in time
Page 14: Just in time
Page 15: Just in time
Page 16: Just in time
Page 17: Just in time
Page 18: Just in time
Page 19: Just in time
Page 20: Just in time

Waste according to JIT

Page 21: Just in time

Concluding JIT

• Advantage of JIT - reduces cost of production

• Disadvantage of JIT - it takes time to establish

Page 22: Just in time

Thank You!