June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps...

8
June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and milestones

Transcript of June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps...

Page 1: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 1

Plans for a new TCC for the endcaps

• Characteristics: reminder• Preliminary list of tasks and

milestones

Page 2: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 2

Characteristics: reminder (1)

• 2 TCCs per 20 degree sector • 4 TCCs are connected to 1 Clock and Control System (CCS)

board and 1 Data Crate Concentrator (DCC) (2 sectors coverage)

• VME 64XP, 9U, 20.2 mm width• Functions:

– Completes Trigger Primitives (TP) computations (ET: total tranvserse energy per trigger tower, FGVB: fine grain veto bit)

– Encodes ET using a non linear scale (10 bits ---> 8 bits)– Computes Trigger Tower Flags (TTF, 3 bits) for Selective

Readout Processor (SRP)– Stores TP, TTF during L1 accept latency

Page 3: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 3

Characteristics: reminder (2)

• Receives 4 x 12 optical signals @ 800 Mbits/s (10 bits ET + 1 bit FGVB per pseudo-strip)

• Sends 16(outer part) or 32(inner part) Trigger Primitives to the Regional Calorimeter Trigger via 2 or 4 Synchro and Link Boards (SLBs) @ 40 MHz, signals are grouped by 8

• Sends 16 or 32 Trigger Towers Flags (TTF) to the Selective Readout Processor via 1 serial optical link @ 1600 Mbits/s, L1 accept rate, data format independant of inner/outer: 22 16-bit words

• Sends 16 or 32 (TP + TTF) to the Data Concentrator Card via LVDS @ 720 Mbits/s, L1 accept rate, data format independant of inner/outer: 37 16-bit words

Page 4: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 4

How to build trigger towers in EE(old geometry, new style mapping)

Trigger meeting 11/06/2002

Page 5: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 5

Inputs for TCC Endcap: rule

• One trunk cable per 20-degree sector ie 8 ribbons of 12 fibers• 4 ribbons per TCCEndcap (1 to 4)• Order is exclusively driven by outputs, ie 2 signals of TT of

type A are sent to the RT (via SLBs) on a single electrical differential pair, 2 signals of TT type B …

• for each 20-degree sector Trigger Towers we define eta-phi indexes: ieta (1 to 11, from outer towards inner), jphi (1 to 4)

• Ideal inputs order: ribbon 1 with [pseudo-strips for TT ieta = 1, jphi = 1 to 4]; [ieta = 2, jphi = 1 to 4]; etc … ie we follow the «color lines» (blue&red or yellow&green). The pseudo-strips inputs of one TT can be arranged in any order

• The PCB of the TCCendcap will be unique ---> exchange of signals between « processors » (the number of processors is not yet known 2,3 or 4)

• Remark: ribbon order (from top to bottom, or from bottom to top in the front panel) has to be defined within OD team

Page 6: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 6

Task 0

• Milestone: setup the TCC48 team by end 09/2005, list of tasks

– mechanics, – schematic, – layout, – firmware development, – tests prototype, – reception tests, – software for test bench (XDAQ, HAL)– software online: hardware configuration, monitoring &

data quality check (XDAQ, HAL)– software offline: data quality check in reconstruction prog

(ORCA)– data base: ConstructionDB, ConfigurationDB, ConditionDB – integration in Off Detector crate at CERN (XDAQ, HAL)

Page 7: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 7

Task 1: prototype

• From 03/10/2005 to 30/06/2006– Milestone: finalize list of signals shared between FPGAs

03/11/2005 (ECAL week), 3 cases: 2,3 or 4 FPGAs– Milestone: check that Virtex 4 FX (from Xilinx) - GOH

connection is OK (latency budget) 30/10/2005– Milestone: check that all inputs/outputs, SLBs fit in 20.2

mm width is OK 30/10/2005– Milestone: board ready for tests 30/04/2006 --->– Milestone: board ready for production 28/02/2006– Milestone: completion of modifications for final version

30/06/2006

Page 8: June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.

June 29th 2005 Ph. BUSSON LLR Ecole polytechnique, Palaiseau 8

Task 2 : preproduction, production and reception of final version

• From 05/06/2006 to 29/09/2007– Milestone: start production 31/03/2007– Milestone: start reception 30/05/2007– Milestone: start integration of first board in Off Detector

Crate 29/06/2007– Milestone: end integration 29/09/2007