June 12, 2019
Addendum No. 03
File Reference Number: RFP 2019 013
Title: ONTC Bridge Rehabilitation – Mile 26.0 Ramore
RE: Clarifications/Questions
Please note the clarification items below:
1. Refer to the addendum prepared by Hatch, attached. Note that the deadline has
been extended to June 21, 2019 at 2:00 p.m.
2. Error in email address - Addendum No. 1 contains a typo for the MTO contact. The correct email is [email protected].
Regards,
Julie Piche
Contract Administrator
705-472-4500 ext. 398
NOTICE OF CONFIDENTIALITY This facsimile message may contain privileged or confidential information intended only for the use of the individual or entity named above. Any
dissemination, distribution or copying of this communication by anyone other than the intended recipient or his agent is strictly prohibited. If you have
received this communication in error, please notify us immediately by telephone (collect if required) and destroy this message. Thank you.
H_FX.DOT, 97/08
555 Oak Street East North Bay, Ontario, CANADA P1B 8L3
Tel: (705) 472-4500 ext. 272
DATE: 12 June 2019 TIME: 1600 TOTAL PAGES 5 PROJECT NO.: H358791 (INCLUDING THIS ONE) HATCH REF. 26.0 RAMORE ADDEND_3.DOC
FROM: Julie Piche, Contract Administrator
TO: ONTC Bridge Rehabilitation
26.0 Ramore Subdivision
Contractors
LOCATION: Ramore Sub
SUBJECT: Addendum No. 3 -ONTC Rehabilitation 26.0 Ramore RFP 2019 013
CC: Ryan Pelletier - ON Rail Andrew Middleton - Hatch
Ontario Northland Railway RFP 2019 013
ADDENDUM No. 3
Receipt of Addendum must be confirmed by Email Response.
Item #1: - The submission deadline has been extended by one week to Friday June 21st, 2019 at 2 pm. Item #2: Question Received – “Are original dwgs and photos available for the Metal Bin retaining wall behind the abutments, we would need the specs of these metal bin walls?” Response: There are no drawings available for the bin walls. Some pictures have been attached. The thickness of the bin wall sections should be conservatively estimated and then verified in the field.
End of Addendum