July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana...

20
July 19, 2006 VLCW-06 Vancouver 1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University

Transcript of July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana...

Page 1: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 1

Scint/MAPMT Muon Prototype Operation

Robert Abrams

Indiana University

Page 2: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 2

Outline

• Current Status

• Detector Setup and Layout

• ADC Calibration Procedure

• Measurement Plan

• Data Analysis and Preliminary Results

• Next Steps and Conclusions

Page 3: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 3

Current Status of Testing

• Four (1.25m X 2.5m) prototype modules built at Notre Dame in 2005.

• Detector is set up in Fermilab test beam (MTEST or MTBF)

• Short test run in February, some preliminary results presented at LCWS06 in Bangalore in March.

• Just finished a run, from end of June to mid-July.• There have been some problems, mainly DAQ-related.

Significant time spent investigating source of problem.• Respectable amounts of data collected, not all analyzed

yet.• Plan to request another week in August, and more

testing toward the end of 2006.

Page 4: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 4

Muon Detector Setup

Page 5: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 5

Monitoring and Positioning

96 inch horizontalmotion along rail,Hydraulic scissorsjack cart has 45 inchvertical travel.

Position monitoringwith 2 commercialLaser levels.Horizontal line atbeam height, andvertical line alongbeam line. LinesIntersect at beam

Position.

Video monitor andMotor controls forremote adjustment

Page 6: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 6

4322

64

1

4322

64

Clear fibers to cookie (S+ Readout Side)

Clear fibers to cookie (S- Readout Side)

Cookie

Prototype S+Strips at +45º

Prototype S-Strips at -45º

1

MAPMT

Single Module Layout

S+

S-

Page 7: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 7

Prototype D+Strips at +45º.Fibers from farEnd go to D+b

Prototype D-Strips at -45º.Fibers from farEnd go to D-b

4322

64

1

Clear fibers to cookie (D-b Readout Side)

Clear fibers to cookie (D-a Readout Side)

D-a

D-b

4322

64

1

Clear fibers to cookie (D+b Readout Side)

MAPMTCookie

Clear fibers to cookie (D+a Readout Side)

D+b

D+a

Fibers to

D+

aD+

b

Fibers

Fibers to D

-a

D-b

Fibers

Layout of Dual Readout Modules

Page 8: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 8

Calibration of ADCs

• Pulser to 12X fanout to 12 ADCs at a time.

• Record pulses on digital scope and Integrate to get charge.

• Bypass the 10X amplifiers used in beam tests to stay within ADC ranges.

• Measure response at ADC

• Calibrate with 3 different pulses.

• Compare to LeCroy spec: 0.25 pC/chan

Page 9: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 9

Integral of 900mV 8ns Pulse

-40

-30

-20

-10

0

10

-1.00E-08

0.00E+00

1.00E-08

2.00E-08

3.00E-08

Seconds

(Vo

lts/

0.02

*10*

*-9)

sec

Pulse Integral

7.25 e-09 V-secQ = 145 pC

Integral of 600 mV 4 ns Pulse

-15

-10

-5

0

-2.00E-08

-1.00E-08

0.00E+00

1.00E-08

2.00E-08

Time (Sec)

Vo

lts/

(0.0

2*10

**-9

) S

ec

Integral

2.77 e-09 V-secQ = 55.4 pC

ADC Calibration

0

0.1

0.2

0.3

0.4

0.5

0 10 20 30

ADC Channel

pC

per

AD

C C

ou

nt

55.4 pC Pulse

ADC Calibration

0

0.1

0.2

0.3

0.4

0.5

0 10 20 30

ADC Channel

pC

per

AD

C C

ou

nt

145 pC Pulse

900 mV 8 ns Pulse

-1

-0.8

-0.6

-0.4

-0.2

0

0.2

-1.00E-08

0.00E+00

1.00E-08 2.00E-08 3.00E-08

Calibration Pulse

600 mV 4 ns Pulse

-0.8

-0.6

-0.4

-0.2

0

0.2

-2.00E-08

-1.00E-08

0.00E+00

1.00E-08

2.00E-08

Seconds

Vo

lts

Series1

6

Pulses and ASC Calibrations

Page 10: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 10

900 mV 14 ns Pulse Integral

-60-50-40-30-20-10

010

-1.00E-08

0.00E+00

1.00E-08

2.00E-08

3.00E-08

Seconds

(Vo

lts/

0.02

*10*

*-9)

Sec

Pulse Integral

107.2 e-10 V-sQ=214 pC

ADC Calibration

0

0.1

0.2

0.3

0.4

0.5

0 10 20 30

ADC Channel

pC

per

AD

C C

ou

nt

214pC Pulse

900 mV 14ns Calibration Pulse

-1-0.8-0.6-0.4-0.2

00.2

-1.00E-08

0.00E+00

1.00E-08

2.00E-08

3.00E-08

Seconds

Vo

lts

Calibration Pulse

Page 11: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 11

Measurement Plan

• Position detector so that beam hits particular (+, -) pairs of counters.

• Measure: – multiple strips with beam at center or

comparable points– at different positions along strips. – near boundaries between strips

• Also record coincidence rates of each signal with beam with CAMAC scalers.

Page 12: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 12

Schematic Measurement Grid

+22 +26 +30 +34 +38 +42 +46 +50 +54 +58

-22 -26 -30 -34 -38 -42 -46 -50 -54 -58

HorizontalScribed Lines

So far we have concentrated on +/- 22 to +/- 42, at 4 Strip intervals.Some runs had low statistics and need to be repeated.

o o o o o o

o o o o o

o

o

o

o

o

o

o

o

o

o

oo

o

o

o

o

o

o

o

o

o

o

o

o

Page 13: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 13

Data Processing

• Problems with DAQ resulted in badly structured ADC distributions and double peaked (split) pedestal distributions.

• Intermittant problem due to 5th bit failing to clear for beam and cosmic ray triggers.

• Problem did not occur for pulser triggers.• Filter out events with bad pedestals• Apply pedestal subtraction• Apply ADC calibration. Compensate for 10X

amplifiers.

Page 14: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 14

Run 6103 Before Cuts

Bad Structures present in signal channels, some pedestals are split

Page 15: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 15

Run 6103 After Cuts on Split Pedestals

Events with ADC19 < 80. This run was at strips (+42, -34)

Page 16: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 16

Preliminary Result:Response at Points Along Strip +42

Response Along Strip +42

012345678

22 26 30 34 38 42 46 50 54

Crossing (-) Strip Number

Mea

n C

har

ge

(pC

)

S+

D+a

D+b

Strip +42 Sum of a and b Means

012345678

22 26 30 34 38 42 46 50 54 58 62

Crossing Strip Number

Mea

n C

har

ge

(pC

)

S+

D+(a+b)

Response Along Strip +42

0

2

4

6

8

0 25 50 75 100 125 150 175

Distance from Readout End (cm)

Mea

n C

har

ge

(pC

)

S+

D+a

D+b

Photelectron Yields:

D+a or D+b separately: ~ 5 PEsD+a and D+b combined: ~ 10 PEsS+: ~14 PEs

Page 17: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 17

Preliminary Result:Response at Strip Centers

Response at Centers of Strips

0

2

4

6

8

10

20 30 40 50

Strip Number

Mea

n C

har

ge

(pC

)S+

D+a

D+b

D-a

D-b

S-

Strips 22 to 42 are equal length, 1.77m long

Page 18: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 18

Next Steps

• Continue to test modules• Calibrate MAPMTs to be able to correct for gain

variations.• Implement LED/PIN calibration and monitoring

system• Replace Lecroy ADCs with version of Minerva

front end digitizers.• Possibly build additional prototypes with faster

wavelength shifters, different scintillator extrusions.

• Test with new digitizers

Page 19: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 19

Conclusions

• Gained experience in use of test beam• Data collection rate is limited to ~40/sec by

CAMAC/DAQ. Requires 1-2 hours per 12000 event point.

• Need to replace aging CAMAC system.• Additional running time needed.• Preliminary results indicate we should be able to

extract useful information about performance of prototypes

• ADC distribution shown at Bangalore was structured due to split pedestal problem.

Page 20: July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.

July 19, 2006 VLCW-06 Vancouver 20

Acknowledgements

• Fermilab Mechanical and Electrical Departments, Electronics Shop for help with Motion table and installation

• Erik Ramberg, for MTEST and DAQ support• Gene Fisk for providing Fermilab support, and for help

with planning and runs. • Caroline Milstene for help with runs and software

contributions• Amy Roberts, grad student from Notre Dame, for help

with setup and runs• Alfredo Gutierrez from Wayne State for help with runs