July 13, 2010 Temporary Terminal Presentation

description

Temporary Terminal Presentation. July 13, 2010. Program Status. Finalizing Temporary Terminal construction Striping and traffic changes in progress SFMTA and other operators move to Temporary Terminal on August 7 th Demolition of existing ramps and Terminal begin on August 14 th - PowerPoint PPT Presentation

Transcript of July 13, 2010

Page 1: July 13, 2010

July 13, 2010

Temporary Terminal Presentation

Page 2: July 13, 2010

Program Status

• Finalizing Temporary Terminal construction

• Striping and traffic changes in progress

• SFMTA and other operators move to Temporary Terminal on August 7th

• Demolition of existing ramps and Terminal begin on August 14th

• Seven year schedule for construction of the new Transit Center

Page 3: July 13, 2010

Temporary Terminal Access

Page 4: July 13, 2010

Temporary Terminal

Page 5: July 13, 2010

Phase 1 Temporary Terminal Operation

August to November 2010

10871

71L82X

5

3838L

4138

38L

Page 6: July 13, 2010

Temporary Terminal

Page 7: July 13, 2010

Phase 2 Temporary Terminal Operation

Page 8: July 13, 2010

Key Outreach Dates

• Install banners & re-launch website July 1st

• Handouts available at Terminal July 19th

• Ambassador Training July 19th

• Launch ambassador program July 21th

• Commemoration Event July 30th

• Open House at Temporary Terminal August 3rd

• Begin Operations at Temporary Terminal August 7th

• Transit Center Groundbreaking Event August 11th

Page 9: July 13, 2010

Outreach Signage

Page 10: July 13, 2010

Signage

Page 11: July 13, 2010

Wayfinding Signage

Page 12: July 13, 2010

Signage

Page 13: July 13, 2010

Outreach Materials

trifold

Page 14: July 13, 2010

Outreach Materials

Fold-out map

Page 15: July 13, 2010

Website

Page 16: July 13, 2010

Questions?