JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data...

58
JTLS 4.1 Version Description

Transcript of JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data...

Page 1: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

JTLS 4.1

Version Description

Page 2: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 2

• Currently No Concrete Plan– JTLS 4.1 - ECPs - Require New Data

• Planned For May 2013

– JTLS 5.0 - Major Restructuring• Temporarily On Hold• JCW Says They Will Not Fund

– Service Oriented Architecture• U.S. Government Concentration From Here Forward

Plan Of Way Forward

December 2012

Page 3: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 3

• Implementation Plan– Alpha Test – One Week Test

• Week 7 January 2013 – Monterey

– Beta Test – Two Week Test• Starting Week Of 4 February 2013 – Suffolk

– NATO Test – One Week Test• Week 25 February 2013 – Monterey

– PACOM Test – One Week Test• Week 4 March 2012 – Pearl Harbor

Plan Of Way Forward

December 2012

Page 4: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 4

• Implementation Plan (Con’t)– Acceptance Test – Two Week Test

• Starting Week Of 1 April 2013 – Suffolk

– Delivery – 1 May 2013• Beta Copies

– Available 22 February 2013

Plan Of Way Forward

December 2012

Page 5: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 5

• Allow For A Frozen Pane Section– Usually Name Column– May Include Other Columns – As Needed– As User Scrolls Left and Right

• Columns Are Frozen• Allows You To See The Name At All Times

– Will Not Be User Definable• Feel Interface Is To Complicated Already

– Available To See On Wednesday

JTLS 2012-11239IMT Frozen Pane

December 2012

Page 6: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 6

• U.S. Government Requirement– Remove Non-Secure Socket Connections– Current Solution

• Disable The Connection

– New Solution• Secure Tunnel Telnet• Awaiting Approval For This Solution

– Available To See On Wednesday

JTLS 2012-11205DIACAP Restrictions

December 2012

Page 7: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 7

• LEAFLET PACKET WEIGHT– Exists In The Database

• Is Not Used

– Model Uses:• TW WEIGHT• When Drawn From CATEGORY LEAFLET

– Solve The Issue• Difficult To Properly Represent Logistics

JTLS 2012-11204Leaflet Packet Weight

December 2012

Page 8: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 8

• Rescuing Life Boats– Send Insert / Extract Air Missions– Send Ship Along Side

• Have HRU Go Into Coalition Support

• Neither Method Works For Enemy– Don’t Really Want To Remove The Restriction– Need Alternative Method– Still In Design Phase - Not Full POW Design

JTLS 2011-10956Rescue Enemy Lifeboats

December 2012

Page 9: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 9

• Current Model– Not All Missions Can Be Placed On Alert

• Logistics Missions• Search and Rescue Missions (Insert/Extract)

• Represent– Allow All Mission Types To Be On Alert

• Design– This Leads To Mission Execution Plans

JTLS 2009-10396Full Alert Missions Types

December 2012

Page 10: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 10

• What Else Does An Execution Plan Mean– Whether Mission Should Go Back On Alert

• Stop Double Cancel Mission Orders

JTLS 2009-10396Full Alert Missions Types

December 2012

Page 11: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 11

• Current Capability– CAP and OAS – Automatically Assigned– Other Orbiting Missions – Assign Orbit Location

• Problem– Cannot Represent Alert Packages

• Send CAP As Part Of Package, i.e. Escort

JTLS-2010-10543Robust Alert Missions

December 2012

Page 12: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 12

• Current Capability– ATO Lists Several Orbit Points– We Current Translate As

• Go To First Point – Stay For Entire Mission• Air Player Responsible For Entering Change Orbit• If Using OEC – The Order Is Automatically Entered

• Desired Capability– Have Order Allow Multiple Orbit Points

JTLS-2008-10101Multiple Orbit Points

December 2012

Page 13: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 13

• Plans– Provide Air Mission Plans

• Similar To Naval Unit Execution Plans• Delivery Item

– Insert / Extract Missions and Air Transport Missions

– Viewable On IMT– Types Of Orders

• Change Orbit• Change Mission Type

JTLS-2008-10101Multiple Orbit Points

December 2012

Page 14: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 14

• Current Model– All Alert Missions Are On Immediate Alert

• Represent– 15 Minute, 30 Minute Alert

• Not Sure This Is Really Desired– I Feel Restriction Will Be Too Much

• Open For Discussion

JTLS 2011-10938Improve Alert Type

December 2012

Page 15: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 15

• New IMT Column– Provide Remaining Battery Time

• Absolute Time: 151956ZJUN12

JTLS 2011-10926Remaining Sub Battery Time

December 2012

Page 16: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 16

• Quickly Implemented– Ability To Display

• Cruise Missiles• Ballistic Missiles

– Full Implementation• Symbol Selection And Differences• Filtering Capability

– Open For Discussion

JTLS 2011-10837Ballistic Missile Display

December 2012

Page 17: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 17

• Current Situation– So Many WHIP Messages

• Poor Decisions Concerning Broadcast Messages• Difficult For User

– To Quickly Pickup On Important Messages– Quickly Assess Situation After Short Time Away From WHIP

• Create New Concept– Transient Alert Messages

JTLS 2012-11430WHIP Alert Messages

December 2012

Page 18: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 18

• Show Up Next To Object– Click It Provides Short Alert Message

• Once Clicked Goes Away• Filter Panel

– Longer Message In Message Browser• Only Extremely Important Messages

– Entered Combat / Air Attack – Damage Inflicted– Optimized Across Forbidden National Boundary

JTLS 2012-11430WHIP Alert Messages

December 2012

!

Page 19: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 19

• Current Capability– Stop a WHIP– It Immediately Trys To Reconnect– You Must Try And Start It Before It Does So– Then Manually Stop WHIP

• Provide Capability To Stop WHIP– Probably a Synapse Will Be Sent To WHIP– Maybe Transient Message Capability

JTLS 2010-10703Stop Specific WHIP

December 2012

Page 20: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 20

• Current Capability– Aircraft Shelter / Hide Aircraft

• Rename Aircraft Shelter– Becomes Equipment Shelters– For All Combat Systems

• Not Just Personnel

– Allow Tunnels To Hide Objects Too

JTLS 2009-10280Personnel Bunkers

December 2012

Page 21: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 21

• Current Capability– Start Separately

• Planned Capability– Move Them To Web Services Manager– How To Properly Monitor

• Everyone Is Use To Debug Output

JTLS 2010-10470JOI, SOI, TOI Services

December 2012

Page 22: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 22

• Improve Displayed Information – Consistency– More Importantly

• Standards For Service Oriented Architecture• Needed For SOA Requirements

JTLS 2010-10466Print Service Current Time

December 2012

Page 23: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 23

• No Functional Change• Simply A Name Change

– Order– Documentation– Won’t Be Changed In Code

JTLS 2008-10082Wild Weasel -> SEAD

December 2012

Page 24: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 24

• MSEND Button– Brings Up New Definition Panel– Select Field

• Input Increment Value• Input Number Sends

– Example – On Station Time• Increment – 2 Hours• Number Sends – 36 Times

– Available To See On Wednesday

JTLS-2008-10040Multiple Send (MSEND)

December 2012

Page 25: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 25

• There Are Various Complaints– Supply Storage Areas Not Damaged

• Only Supplies In The Area

– Hit Damaged Target• Report Says No Damage - Confusing

– Dropping On Moved Target• No Reason Given Why Target Not Damaged

– Damage Reported By Dropped Weapon• Need Summary Report

JTLS-2007-2262Improve Damage Reports

December 2012

Page 26: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 26

• There Are Various Complaints (Con’t)– More Robust AAR Damage Summary Capability

JTLS-2007-2262Improve Damage Reports

December 2012

Page 27: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 27

• Order Problems– Extremely Long Orders

• We Have Removed Some Fields– Squawk Modes Became Silent Fields

– Fields Out Of Order• Groups Had To Be At Bottom Of Panel• See Some Formation / Naval Unit Orders

• Create Tabs – Place Optional Information On Tabs

JTLS-0332Redesign Order Panels

December 2012

Page 28: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 28

• All Orders Have Been Reviewed– Combined

• SET and SHOW Orders Combined• Multiple SET Orders For Same Object

– Additional Features• Groups Within Groups• Better Error Reporting

– Available To See On Wednesday• Definitely Open For Suggestions

JTLS-0332Redesign Order Panels

December 2012

Page 29: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 29

• Current– All ATO Fields Not On Order Panel

• Because Of Order Size• Examples

– Squawk Codes– Call Sign

– New Order Panel Capability Solves The Issue• These Optional Fields Are Now On A Tab

JTLS-2007-1975Allow All Order ATO Fields

December 2012

Page 30: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 30

• Also Known As Tomahawk® Block IV• Additional Capability Required

– Reprogram The Missile While In-Flight• Already A JTLS Capability• Will Not Represent Real-World Restrictions

– Required Two-way Satellite Communications– Can Only Strike15 Pre-Programmed Alternate Targets– Alternate Strike Any Target Coordinates

JTLS-2006-1658Model TLAM-E

December 2012

Page 31: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 31

• Additional Capability Required (Con’t)– Can Loiter Over Target Area

• Current Capability In JTLS• What Is Not Current Capability

– Intel Collection While Doing So Using On Board Camera

– Not Mentioned In ECP: TLAM-D• Multiple Bomblets Can Be Independently Delivered• Still Talking About Whether This Can Be Done

– Major Concern – Exercise Audience Input

JTLS-2006-1658Model TLAM-E

December 2012

Page 32: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 32

• Multiple ECPs (Con’t)– JTLS-2006-1845

• Allow HRU Creation Outside HUP Restrictions– List Of HUPs That Can Be Used– Take Fewer / Not More Combat Systems– Take Fewer Or More Supplies– Small Boat: Mandatory, Optional, Do Not Take– Results

» Fewer HUPs

Complete HRU Redesign

December 2012

Page 33: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 33

• Multiple ECPs (Con’t)– JTLS-2006-1828

• Make HRU Order Effective Time Consistent

– JTLS-2006-1826• Allow HRUs to Attack Convoys

– JTLS-2006-1747• BDA Boxes Include HRU Damage

– JTLS-2006-1744• Expand HRU Patrol – OPAREA, Route, Polygon

Complete HRU Redesign

December 2012

Page 34: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 34

• Multiple ECPs (Con’t)– JTLS-0260

• HRU Overwatch Convoy

– JTLS-0237• Allow HRU To Start Game In Coalition Support

– JTLS-0216• HRU Overwatch Airbase

– JTLS-0172• Transport HRUs Via Any Means (Rail, Barge)

Complete HRU Redesign

December 2012

Page 35: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 35

• Multiple ECPs– JTLS-2009-10393

• Controller Kill / Damage HRU

– JTLS-2009-10283• Detect and Attack Specific HRU From Air

– JTLS-2009-10280• Include HRUs In Personnel Bunker Design

– JTLS-2008-10080• HRUs Should Always Collect Information

Complete HRU Redesign

December 2012

Page 36: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 36

• Multiple ECPs (Con’t)– JTLS-2006-1715

• HRUs Should Include Covert Information In SITREP

– JTLS-0452• Use Existing Data HUP WIPED OUT THRESHOLD

– Will Really Delete The Data Element– When HRU Loses Last Person – It is Wiped Out

– JTLS-0114 • Allow Insert / Extract Of HRU Via Amphibious

Complete HRU Redesign

December 2012

Page 37: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 37

• Multiple ECPs (Con’t)– JTLS-0419

• HRU Intelligence Reports (HOTR)

– JTLS-0451• Use Existing Data HUP MOVE DET TIME MULT

– JTLS-0450• Implement HRU Compromise When Reporting

– HUP PROB COMP URGENT REPORT– HUP PROB COMP ROUTINE REPORT

Complete HRU Redesign

December 2012

Page 38: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 38

• Multiple ECPs (Con’t)– JTLS-0465

• Override HRU Ammunition Constraints To Fight

– JTLS-0464• Allow User To Specify Range At Which Attack

Starts

– JTLS-0462• Limit Withdrawing HRU Targets

Complete HRU Redesign

December 2012

Page 39: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 39

• JTLS-0446– Limit Disengaging HRU Choice Of Victims

• JTLS-0447– HRU Range At Which To Open Fire

• JTLS-0448– HRU Perimeter Penetration

• JTLS-0449– HRU Response Limits

Complete HRU Redesign

December 2012

Page 40: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 40

• JTLS-0095– Negative Intel Reports

• JTLS-2011-10928– Fix Real World Intel Message Format

• IIRs – Provide Change Information– Currently Only Help For BE Facilities– May Hold On DSA Too – Still Considering Impact

• No Interest In RECCEXREP

Intel Reporting

December 2012

Page 41: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 41

• JTLS-2012-11386– Add GDP Capabilities To DDS

• Map / Terrain Changes• Object Movement• Network Creation• Logistics Hierarchy

• JTLS-2008-10000– Data Repository– Copying And Pasting Between Scenarios

DDS Improvements

December 2012

Page 42: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 42

• JTLS-2008-2340– Automatic Supply Calculation

• Select Individual TUPs• No Longer Worry About

– Supplies For Combat Systems– When You Change, Values Automatically Updated

• JTLS-2012-11387– Command Hierarchy Delete And Copy

DDS Improvements (Con’t)

December 2012

Page 43: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 43

• JTLS-0108– SUP DDS Reports

• Take All SIP Reports Move To DDS• DDS Report Panels• DDS Report Browser

DDS Improvements (Con’t)

December 2012

Page 44: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 44

• JTLS-2012-11385– More Than One Glassfish On Single Server– Still Need One Glassfish

• Per DDS Scenario• Per Executing Scenario

• JTLS-2012-11381– View SVP Warnings On DDS– Automatically Correct SVP Errors / Warnings

• Two or Three Options

DDS Improvements (Con’t)

December 2012

Page 45: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 45

• Better Representation Of– Detection

• No Change – Assign Un-Identified Number

– Classification• Obtain Ship Basic Type (Symbol)

– Recognition• Obtain Ship Class

– Identification• Obtain Ship Name

JTLS-2012-11305Naval Detections

December 2012

Page 46: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 46

• Existing– Sensor Detects Ship

• Initial Report Time – Get Unidentified Ship Detection• Fusion Time – Get Identification

• Basic New Concept– Not Every Sensor Can Accomplish Task

• Requires Imagery Of Some Type

– Not A Matter Of Time – Matter Of Distance– Fusion Time Only Used If Previously Detected

JTLS-2012-11305Naval Detections

December 2012

Page 47: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 47

• Current Capability– Ship Has JU Source - Generate 2.3 PPLI– We Do Not Support Link-16 Surface Tracks

• Designed Capability– Ships Surface Sensors Can Create Tracks– Requires Moving Tracks Block From Target

• Moves To Unit• Solves POT Target Problems

JTLS-2012-11377Self Report Link-16 Ships

December 2012

Page 48: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 48

• NATO Sponsored– J 3.6 Space Track Message – J 3.0 Reference Point – J 7.0 Track Management (Drop Track) – J 13.3 Surface (Maritime) Platform and System Status – J 13.5 Surface (Land) Platform and System Status

• Only for SSM & SAM Sites

– J 3.5 Land Point or Track – J 2.6 Land Track PPLI – J 10.2 Engagement Status

JTLS-2012-11412Expand Link-16 Messages

December 2012

Page 49: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 49

• Current Capability– Send MISREP Generated By JTLS

• Desired Capability– New Version Of ICC

• Divides Report Into Six Parts• ADatP-3 Compatible Format

JTLS-2012-11413ICC 6-Part MISREP

December 2012

Page 50: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 50

• User Defined Using NATO Report Order– Specify

• Units• Report Generation Interval

– Report Indicates Changes In• Posture• Strength• Location

JTLS-2012-11414Unit Differences Report

December 2012

Page 51: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 51

• JTLS Order of Battle Editor– Creates Windows-Capable OB Editor– No Target Filtering Capability

• Databases With 50,000 Targets Causes Issues

• Allow Definition Of Assets Included– Filter By Target Type

JTLS-2012-11415JOBE Extended Filtering

December 2012

Page 52: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 52

• When Entering DSA Name– Goes In Text Field– User Needs To Spell Correctly

• Create Drop-Down List– User Can Select Legal DSAs– Filtering By Type

• National• Strategic

JTLS-2012-11416DSAs Visible On WHIP

December 2012

Page 53: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 53

• JTLS-2012-11378– Support Java 7

• JTLS-2012-11379– Support New OpenMap Version

• JTLS-2012-11380– Support Linux 6

System Upgrades

December 2012

Page 54: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 54

• Idea From Previous Employee– Looked At Code And It Has Little Payoff

• Remove List Of Keywords– Allows User To Search And Retrieve

• Based On Message Strings• Never Implemented• Takes Up An Inordinate Amount Of Time

– Major Hold Ups In Two Recent Exercises

JTLS-2012-11383XMS Multi-Threading

December 2012

Page 55: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 55

• Old Capability– GIAC-Based– Never Moved To Web Environment

• Currently In Design Phase– Since It Is Model Support

• Lower Priority

– Primary Goal• Make It Web-Enabled

JTLS-2007-2012Integrate ATOG Into WHIP

December 2012

Page 56: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 56

• JTLS-2012-11384– Direct Link To MUSE

• JTLS-2006-1659– River / Terrain Network

• JTLS-2008-10017– Link To Multiple JCATS Instances

• JTLS-2012-11382– Satellite Service

More Detailed Discussions

December 2012

Page 57: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

ROLANDS & ASSOCIATES Corporation 57

• JTLS-2012-10001– Feed TACELINT To C4I

More Detailed Discussions

December 2012

Page 58: JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS 4.1 - ECPs - Require New Data Planned For May 2013 –JTLS 5.0 - Major Restructuring Temporarily.

Questions

December 2012 ROLANDS & ASSOCIATES Corporation 58