#PRD2020 #CleanHydrogen JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU – JRC framework contract under H2020 FCH 2 JU Programme Review Days 23. 11. 2020

Transcript of JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC...

Page 1: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

JRC activities for the FCH 2 JU 2020 & planned activities 2021

As part of FCH 2 JU – JRC framework contract under H2020

FCH 2 JU Programme Review Days 23. 11. 2020

Page 2: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Knowledge Management

TIM

EMM European Media Monitor

RCS

Strategy Tests

Safety

Data bases

EHSPProgrammetargets

Programme assessment

JRC activities 2020

Page 3: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Based on:

• JRC methodologies (patents analysis)

• TRUST data

• TIM analyses

Knowledge Management

Page 4: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Annual Programme Review

MAWP KPI methodology

Knowledge Management

Page 5: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Knowledge Management

Impact:

• Establishing current status

• Input to AWP2020

• Preparation of increased

support of JRC for

sustainability topic

(projects, reports)

Page 6: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

• FCH Media Monitoring system regularly maintained and general helpdesk support

• Weekly monitoring of the results of the categories

• Monthly newsletter preparation, together with FCH

• Updated categories with keywords including keywords for new projects

EMM - Media Monitoring

Page 7: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

TIM developments

• Cleaner, richer data

• New technology spaces

• FCH funding tracking

• Tracking of results by

beneficiaries

• Estimation of publications and

patents numbers by the Clean

Hydrogen Industry

Page 8: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

• HARMONISED PROTOCOLS FOR Testing of

LOW TEMPERATURE WATER Electrolysers -

the delayed report is ready for stakeholder

comments

• Its scope ranges from cells to systems in the

energy system, including the most recent

input of project QUALYGRIDS

RCS Regulations & Standards

Strategy

Tests Harmonisation

Page 9: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Strategy

Tests Harmonisation

(1) JRC has delivered a hardware allowing real MEA

testing by minimising effects of the testing device;

(2) design shared with ID FAST;

(3) however the third party manufacturing for IDFAST

partners had not respected the quality level

required;

(4) corrective actions to identify manufacturing

shortcoming and optimising IDFAST testing ongoingJRC ZERO∇CELL

single cell test hardware

RCS Regulations & Standards

Page 10: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

Safety-supporting activities

HIAD2.0 & HELLEN databases

Contribution to EHSP

DELETED

LOW QUALITY -UNPUBLISHED

Page 11: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

#PRD2020#CleanHydrogen

JRC activities foreseen in 2021

Knowledge Management

TIM improvements: less noise, new technologies, patents/safety analysis

EMM maintenance/customisation

RCS

Support to the new RCS approach

Testing harmonisation high

T electrolysers

Safety

Databases: upgrade &

ownership change

Sustainability: LCA contribution, H2 transport sustainability analysis

JRC involvement in EHSP phased out

ZeroCellProject support

Annual programme review

MAWP finalisation / Historical analyses

Page 12: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum

Page 13: JRC activities for the FCH 2 JU 2020 & planned activities 2021. E... · 2020. 12. 2. · JRC activities for the FCH 2 JU 2020 & planned activities 2021 As part of FCH 2 JU –JRC

#CleanHydrogen#EUHydrogenForum