Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER
J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC
description
Transcript of J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC
![Page 1: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/1.jpg)
1
![Page 2: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/2.jpg)
2
Civil Engineering works for Linear Colliders* :-Brief introduction on the overall machine layout (just for CLIC at this stage)-Experimental Area Layout for CLIC-Experimental Area Layout for ILC -CMS concept-What next ?
*CLIC=Compact Linear Collider, ILC =International Linear Collider
J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler (Fermilab) for ILC
![Page 3: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/3.jpg)
3
![Page 4: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/4.jpg)
4
![Page 5: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/5.jpg)
5
70cm
![Page 6: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/6.jpg)
6
![Page 7: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/7.jpg)
7
![Page 8: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/8.jpg)
8
![Page 9: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/9.jpg)
9
![Page 10: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/10.jpg)
10
![Page 11: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/11.jpg)
11
![Page 12: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/12.jpg)
CLIC Detector hall layout developed by :
A.Gaddi
H.Gerwig
A.Herve
CES will now use this as starting point for CE & services design, including cost estimates
![Page 13: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/13.jpg)
1319/10/2010 [email protected]
2 Detector Caverns (60×28×28m) linked together by a transfer Tunnel
* Driven by Push-Pull concept* Offers stability at the interface between the tunnel and the detector
![Page 14: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/14.jpg)
1419/10/2010 [email protected]
The detector would be moved into beam position on a moving platformThe concept could be similar to the PX56 plug (2200 tons)
N Siegrist – PH-CMX
![Page 15: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/15.jpg)
ILC IR Layout (CERN)
Date Event Global Design Effort 15
![Page 16: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/16.jpg)
RDR Baseline Layouts for Interaction Region
![Page 17: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/17.jpg)
ILC 3d models developed at CERN using CATIA :
CLIC models to follow once draughtsman is identified
![Page 18: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/18.jpg)
2004
Sliding Cover over the CMS experimental shaft
CMS Concrete platform just before concreting
![Page 19: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/19.jpg)
2004
Sliding Cover complete prior to completion of Phase 2 of experimental building
![Page 20: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/20.jpg)
2019/10/2010 [email protected]
![Page 21: J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC](https://reader036.fdocuments.in/reader036/viewer/2022062501/56816345550346895dd3d5f9/html5/thumbnails/21.jpg)
21
Main Goals of this workshopThe goals are the mini-workshop are to see how we proceed with a
design study for :
• 1. The underground concrete platforms envisaged to move the detectors on/off the beamline
• 2. Ground movement / vibration studies i.e. potential movements induced from caverns excavation and detector movement