Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy...

24
Joint Mission Environment Test Capability (JMETC) Overview ITEA Test Instrumentation Workshop AJ Pathmanathan JMETC Deputy PM - Engineering May 16, 2012

Transcript of Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy...

Page 1: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

Joint Mission Environment Test Capability (JMETC)

Overview

ITEA Test Instrumentation Workshop

AJ Pathmanathan

JMETC Deputy PM - Engineering

May 16 2012

Risk mitigation needs Technology shortfalls

Risk mitigation solutions Advanced development

Capabilities

Service

Modernization and

Improvement

Programs

Acquisition Programs

and Advanced Concept

Technology

Demonstrations

TampE Multi-

ServiceAgency

Capabilities

DoD Corporate

Distributed

Test Capability

TRMC

Joint Investment

Programs

FY12 PB

Budget Request

$2503M

Transition

Requirements

Strategic Plan for

DoD TampE Resources

Service

TampE Needs and

Solutions Process

DoD SampT Investment

Plans Priority

Investment Areas

Strategic Planning Guidance

(63 Funding) (65 Funding) (64 Funding)

The TRMC ldquoBlueprintrdquo Putting Test Capabilities on the DoD Map

2

Established in FY2002

Develops technologies required to test future warfighting capabilities

63 RDTampE funds

~$95M year

8 current Test Tech Areas

Directed Energy

High Speed Systems

Netcentric Systems

Cyberspace Test

Autonomous Systems

Advanced Instrumentation

Spectrum Efficiencies

Electronic Warfare

Established in FY1991

Develops or improves test capabilities that have multi-Service utility

64 RDTampE funds

~$140M year

43 current projects

19 projects developing core Joint capabilities

ndash 4 projects improving interoperability test cap

11 projects improving threat representations used in testing

13 projects addressing near-term OT shortfalls

Established in FY2007

Provides corporate infrastructure for distributed Joint testing

65 RDTampE funds

~$19M year

68 current sites

Maintains Network connections Security agreements

Integration software Interface definitions Distributed test tools

Reuse repository

3 3

TRMC Investment Programs Overview

TampESampT CTEIP JMETC

2012 2030

Individual Systems WHAT do we test Mission-Level

amp Systems of Systems Capabilities

Events WHEN do we test Continuously

Decision-Makers For WHOM do we test Decision-Makers

amp Warfighters

Agile

Streamlined

Affordable

Continuous

Goal Distributed Integrated Testing and Training

The DoD TampE process must evolve to be

Test Resource Management Center

Future TampE Process

4

What is Distributed Testing

A process preferably persistent and continuous for linking

various geographically separated live virtual and

constructive sites and capabilities together in a distributed

environment for use across the acquisition life cycle to

support and conduct the Test and Evaluation (TampE) of a

system or systems-of-systems in a Joint and cyberspace

environment

A new way of thinking for many in the

Test and Evaluation Community

5

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 2: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

Risk mitigation needs Technology shortfalls

Risk mitigation solutions Advanced development

Capabilities

Service

Modernization and

Improvement

Programs

Acquisition Programs

and Advanced Concept

Technology

Demonstrations

TampE Multi-

ServiceAgency

Capabilities

DoD Corporate

Distributed

Test Capability

TRMC

Joint Investment

Programs

FY12 PB

Budget Request

$2503M

Transition

Requirements

Strategic Plan for

DoD TampE Resources

Service

TampE Needs and

Solutions Process

DoD SampT Investment

Plans Priority

Investment Areas

Strategic Planning Guidance

(63 Funding) (65 Funding) (64 Funding)

The TRMC ldquoBlueprintrdquo Putting Test Capabilities on the DoD Map

2

Established in FY2002

Develops technologies required to test future warfighting capabilities

63 RDTampE funds

~$95M year

8 current Test Tech Areas

Directed Energy

High Speed Systems

Netcentric Systems

Cyberspace Test

Autonomous Systems

Advanced Instrumentation

Spectrum Efficiencies

Electronic Warfare

Established in FY1991

Develops or improves test capabilities that have multi-Service utility

64 RDTampE funds

~$140M year

43 current projects

19 projects developing core Joint capabilities

ndash 4 projects improving interoperability test cap

11 projects improving threat representations used in testing

13 projects addressing near-term OT shortfalls

Established in FY2007

Provides corporate infrastructure for distributed Joint testing

65 RDTampE funds

~$19M year

68 current sites

Maintains Network connections Security agreements

Integration software Interface definitions Distributed test tools

Reuse repository

3 3

TRMC Investment Programs Overview

TampESampT CTEIP JMETC

2012 2030

Individual Systems WHAT do we test Mission-Level

amp Systems of Systems Capabilities

Events WHEN do we test Continuously

Decision-Makers For WHOM do we test Decision-Makers

amp Warfighters

Agile

Streamlined

Affordable

Continuous

Goal Distributed Integrated Testing and Training

The DoD TampE process must evolve to be

Test Resource Management Center

Future TampE Process

4

What is Distributed Testing

A process preferably persistent and continuous for linking

various geographically separated live virtual and

constructive sites and capabilities together in a distributed

environment for use across the acquisition life cycle to

support and conduct the Test and Evaluation (TampE) of a

system or systems-of-systems in a Joint and cyberspace

environment

A new way of thinking for many in the

Test and Evaluation Community

5

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 3: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

Established in FY2002

Develops technologies required to test future warfighting capabilities

63 RDTampE funds

~$95M year

8 current Test Tech Areas

Directed Energy

High Speed Systems

Netcentric Systems

Cyberspace Test

Autonomous Systems

Advanced Instrumentation

Spectrum Efficiencies

Electronic Warfare

Established in FY1991

Develops or improves test capabilities that have multi-Service utility

64 RDTampE funds

~$140M year

43 current projects

19 projects developing core Joint capabilities

ndash 4 projects improving interoperability test cap

11 projects improving threat representations used in testing

13 projects addressing near-term OT shortfalls

Established in FY2007

Provides corporate infrastructure for distributed Joint testing

65 RDTampE funds

~$19M year

68 current sites

Maintains Network connections Security agreements

Integration software Interface definitions Distributed test tools

Reuse repository

3 3

TRMC Investment Programs Overview

TampESampT CTEIP JMETC

2012 2030

Individual Systems WHAT do we test Mission-Level

amp Systems of Systems Capabilities

Events WHEN do we test Continuously

Decision-Makers For WHOM do we test Decision-Makers

amp Warfighters

Agile

Streamlined

Affordable

Continuous

Goal Distributed Integrated Testing and Training

The DoD TampE process must evolve to be

Test Resource Management Center

Future TampE Process

4

What is Distributed Testing

A process preferably persistent and continuous for linking

various geographically separated live virtual and

constructive sites and capabilities together in a distributed

environment for use across the acquisition life cycle to

support and conduct the Test and Evaluation (TampE) of a

system or systems-of-systems in a Joint and cyberspace

environment

A new way of thinking for many in the

Test and Evaluation Community

5

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 4: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

2012 2030

Individual Systems WHAT do we test Mission-Level

amp Systems of Systems Capabilities

Events WHEN do we test Continuously

Decision-Makers For WHOM do we test Decision-Makers

amp Warfighters

Agile

Streamlined

Affordable

Continuous

Goal Distributed Integrated Testing and Training

The DoD TampE process must evolve to be

Test Resource Management Center

Future TampE Process

4

What is Distributed Testing

A process preferably persistent and continuous for linking

various geographically separated live virtual and

constructive sites and capabilities together in a distributed

environment for use across the acquisition life cycle to

support and conduct the Test and Evaluation (TampE) of a

system or systems-of-systems in a Joint and cyberspace

environment

A new way of thinking for many in the

Test and Evaluation Community

5

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 5: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

What is Distributed Testing

A process preferably persistent and continuous for linking

various geographically separated live virtual and

constructive sites and capabilities together in a distributed

environment for use across the acquisition life cycle to

support and conduct the Test and Evaluation (TampE) of a

system or systems-of-systems in a Joint and cyberspace

environment

A new way of thinking for many in the

Test and Evaluation Community

5

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 6: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

The JMETC Mission

6

JMETC provides the persistent and robust

infrastructure (network integration

software tools reuse repository) and

technical expertise to integrate Live Virtual

and Constructive systems for test and

evaluation in a Joint Systems-of-Systems

environment

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 7: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

7

JMETC Enables Distributed Testing

Systems

Under

Test

Joint Operational Scenarios

Integrated

Test

Resources

JMETC

Infrastructure

Reuse Repository

Distributed Test Support Tools

Data Management Solutions

JMETC

Network on

SDREN

Customer Support TENA Test and Training Enabling Architecture

Virtual

Prototype

Hardware

in the

Loop

Installed

Systems

Test

Facility

Range

Environment

Generator

Threat

Systems

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA Standard Interface Definitions

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

TENA

Common

Middleware

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 8: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Connectivity

Ft Huachuca (4)

JITC JTDL CMIS JTRS

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB SIMAF

As of 30 Apr 2012

0

20

40

60

80

FY06 FY07 FY08 FY09 FY10 FY11

JMETC Site Expansion

Sites

Dedicated trusted connectivity on SDREN (part of the GIG)

Encrypted for Secret ndash System High

DISA-registered IP address space

Active monitoring of network performance

Capable of supporting multiple simultaneous test events Bethpage NGC BAMS

Functional Sites 68

New Sites Planned 9

Connection Points to Other Networks 7

Ft Greely CRTC

MHPCC

PMRF Bldg 105

Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr

Aberdeen ACCN

Langley (2) C-GIIF TDLITC

JS J8 DDC4 C4AD

Wallops Island (2) SCSC SSDS

Dahlgren (2) CEDLIWSL

Dam Neck CDSA

Newport News NGC VASCIC

Norfolk COMOPTEVFOR

McLean MITRE NCEL

Bethpage NGC BCN

Eglin AFB (5) AOC DTF GWEF KHILS JDAT

Hurlburt Field C2DAC

Camp Pendleton MCTSSA

China Lake (3) FA-18 IBAR TSPIL

Edwards (2)

Corona NSWC

Point Loma SSC-PAC 59140 SSC-PAC HAIPE

Point Mugu (2) ITEC EA-6B

West Agg Rtr

Rancho Bernardo NGC BAMS

412th EWG IFAST Ridley

Palmdale NGC BAMS

Redstone (10) SMDC

RTC DTCC GMAN

SED Patriot THAAD FAAD

GSIL JLENS MUSE SIV

(2) SED-PSEM AMRDEC

LMCO Global Vision Network Arlington VA

Moorestown CSEDS

Crane NWSC RDTampE

Army

Air Force

Navy

Marines

Joint

Industry

Academia

GTRI

Sites in Hawaii

Site in Alaska

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 9: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

How a Test Planner Views JMETC

Hardware-in-the-Loop (HWIL) Availability

Army

Air Force

Navy

Marines

Joint

Industry

Ft Huachuca JITC

Redstone (3) DTCC GMAN SED

Charleston (2) IPC MEF-MEU

Ft Hood (2) CTSF TTEC

WPAFB

SIMAF

Bethpage NG BAMS

Whiteman B-2

MHPCC

PMRF Bldg 105

Sites in Hawaii

9

CNR Radio JLENS

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 10: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

10

JMETC Network

Reusable Persistent Connectivity

bull Reuse enables the customer to avoid

bull Acquiring network equipment

bull Processing the security agreements bull Obtaining Authority to Connect (ATC)

bull Obtaining Authority to Operate (ATO)

bull Generating agreements to connect with test partners

bull Testing the equipment installation

bull Testing the network configuration

bull Reuse enables the customer to

bull Test capabilities early and often

bull Execute Unscheduled Unplanned testing whenever needed

bull Focus on the test rather than the network

Customer time and dollars not spent on

infrastructure by leveraging JMETC sites

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 11: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

Common Infrastructure

Components

Technical Expertise

Persistent Network Connectivity

Common Tools

Standard

Interfaces

Definitions

Enabling

Middleware

TENA

JMETC Network on SDREN

TENA Standard

Object Models

JMETC Tools Evaluation (including InterTEC)

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 12: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

12

JMETC FY12 Major Events

Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run

Customer Event Record Event Dates

Joint JITC Joint Interoperability Tests JIT 12 - 12345

(Continuous) October 2011--September 2012

Navy Broad Area Maritime Surveillance (BAMS) Environment

Integration October 2011--September 2012

Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012

Air Force AGILE Fire Phase V February 2012

Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012

Joint JIAMDO CorrelationDe-correlation Interoperability Test

(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012

Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with

AGILE Fire Phase VI) August 2012

Joint AGILE Fire Phase VI September 2012

Army Network Integration EventNetwork Integration Rehearsal

(NIENIR) Risk Reduction 3d4th QTR 2012

Navy Accelerated Mid-Term Interoperability Improvement

Program (AMIIP) October 2011--May 2012

ArmyNavy Vengeance January--August 2012

Navy NavAir Integrated Warfare Capability (IWC) March--August 2012

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 13: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

13

Example FA-18 Interoperability Check

China Lake

One week from initial coordination to test complete

Sequence

FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008

Learned which sites are already connected by JMETC

Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin

JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls

First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day

Successful re-test the following day on 25 June

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 14: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

14

Description

bull Assessment of B-2 Link-16

interoperability with AWACS

bull Connected live B-2 on ramp at

Whiteman AFB MO an

AWACS HITL at Tinker AFB

OK within a distributed C2

environment

IMPACT-- Cost Savings and Better

Product

bull Early testing led to early identification

and correction of Link 16 interoperability

issues

bull No range or flying costs

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

Army

Air Force

Navy

Marines

Joint

Industry

As of 14 Sep 2009

Tinker AFB AWACS

Whiteman B-2

Eglin 46TS

WPAFB SIMAF

JMETC

Langley GCIC

B-2 Spirit ICE Data Link Test

Sample of Measures

Timeliness and accuracy of

message exchanges

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 15: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

15

Joint Integrated Air and Missile

Defense Organization (JIAMDO)

bull Supported several test initiatives focused on track management

bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD

bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes

IMPACTmdashEfficiency bull Near real time test-fix-test

bull CDIT FY-11 TampE events accelerated

into FY10 wno funding impacts to

FY-10

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 16: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JIAMDO CDIT OCONUS

Ongoing from August 2010

bull Executed first JMETC supported

Coalition Test in 4 months

bull High visibility and kudos bull ldquoThis is the first air platform engineering

level coalition testing we are aware of for

IAMDrdquo - RADM Archer M Macy Director

JIAMDO Email to General Cartwright JCS

Vice Chairman 10102010

bull ldquo[CDIT participants supported by JMETC]

accomplished what no one has been able to

do in the last ten years in bringing high

fidelity coalition systems engineering testing

to fruitionrdquo ndash CDR Tony Simmons

Capabilities Development Division Chief

JIAMDO Email to ADM Macy1072010

bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities

bull System(s) Under Test US E2-C and UK E3-D

bull Key Lessons Learned Takeaways

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 17: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Customer Testing Success

Battlefield Airborne

Communication Node (BACN)

Joint Urgent Operational Need

bull Integration of BACN payload onto

multiple platforms for solution to

net-centric warfare challenges of

o Beyond line-of-sight comm

o Relay bridge and range

extension for ground forces and

supporting aircraft

bull Distributed testing included Live-fly

DT and Operational Utility Evaluation

in Fall 2010

bull Acceptance and additional platform

testing will continue throughout FY

2012

IMPACT--Cost Savings and

Better Product

bull Efficient integration of DT and OT

bull All required assets not available on-site

bull Distributed testing saved ldquo$12Mrdquo

bull Urgent capability fielded

17

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 18: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

18

Interoperability Certification

Joint Interoperability Test

Command (JITC)

Joint Tactical Data Link

(JTDL) Testing

bull JITC conducts interoperability

assessments standards conformance

and interoperability certification testing

of joint tactical data links in HWIL and

operationally realistic environments to

validate the implementation of

approved standards in a Joint

environment

bull Typically 5year

IMPACT--Joint Interoperability

JITC 12-02

bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS

bull Testing completed ahead of schedule

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 19: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Customer Testing Success

Air-to-Ground Integrated

Layer Exploration (AGILE)

bull Sponsored by the Simulation and

Analysis Facility (SIMAF) USAF Air Systems Command

bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires

bull JMETC provides infrastructure and technical support for all AGILE events

bull AGILE VI scheduled for Aug 2012

IMPACT--TampE Efficiencies

bull AGILE Phase V MainEx Feb 2012

bull 13 sites connected by JMETC

bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture

bull Operationally realistic LVC scenarios

bull 80 of systems were live

19

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 20: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Customer Testing Success

Broad Area Maritime

Surveillance System

(BAMS)

bull Integrated SoS providing multi-sensor

persistent maritime ISR to the

Maritime Patrol and Reconnaissance

Force

bull Distributed testing used as solution for

distinct test data and network

requirements

o Programmatic needs

o Engineering needs

IMPACT--Efficiency Lower

Technical Risk

bull Test earlytest often

bull Real time connectivity between system

developer (NG) and Navy System

Integration Laboratory (Pax) to address

risks before flight testing 20

System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 21: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Sites and Test Activities

21

0

50

100

150

200

250

300

350

400

450

FY07 FY08 FY09 FY10 FY11 FY12

of Test Days

of JMETC Sites

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 22: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Users Group

bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs

bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues

bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers

22

Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks

bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking

bull An established forum for the Distributed Test Community to

o Identify core infrastructure requirements and use cases

o Identify investigate and resolve issues

o Identify opportunities to collaborate

o Discuss available solutions tools and techniques

o Share lessons learned

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 23: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

JMETC Program Points of Contact

JMETC Program Manager Chip Ferguson chipfergusonosdmil

571-372-2697

JMETC Senior Technical Advisor George Rumford

georgerumfordosdmil

571-372-2711

JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil

571-372-2702

JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil

571-372-2701

JMETC Website wwwjmetcorg

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702

ArjunaPathmanathanosdmil

Page 24: Joint Mission Environment Test Capability (JMETC) Overview · October 2011--September 2012 Navy Broad Area Maritime Surveillance (BAMS) Environment Integration October 2011--September

Questions

AJ Pathmanathan

JMETC Deputy PM for Engineering

(571) 372-2702