1
Joint Inspection Team (JIT) Report for National Horticulture
Mission Scheme in Uttar Pradesh State
STATE: UTTAR PRADESH
2
TABLE OF CONTENTS
SO.
No.
PARTICULARS PAGE
No.
1 Uttar Pradesh-Introduction 3
2 Field Visit to District: Barabanki 5
3 Field Visit to District: Faizabad 18
4 Field Visit to District: Sultanpur 38
5 Field Visit to District: Lucknow 65
6 Recommendations 72
Team Members:
1. Dr. H V L Bathla, Chief Consultant (NHM), Ministry of Agriculture, Govt. of
India, New Delhi.
2. Dr. V K Singh, PI (PFDC), Central Institute for Subtropical Horticulture,
Rehmankhera, Lucknow.
3. Dr. A K Dubey, Professor (Horticulture), CSAUAT, Kanpur.
Dates of visit:
8.10.2012 to 13.10.2012
3
Uttar Pradesh
INTRODUCTION: Uttar Pradesh is the fifth largest State in the country in terms of area and first in terms of population. The State is bounded by Nepal on the north, Uttrakhand on the north-east, Himachal Pradesh on the northwest, Haryana on the west, Rajasthan on the south-west, Madhya Pradesh on the south and southwest and Bihar on the east. It spreads over a large area, and the plains of the State are quite different from the high mountains in the north. State is blessed with rich climatic condition, ideal for growing a large variety of horticultural crops. The sector which includes fruits, vegetable, floriculture, plantation crops, spices & medicinal and aromatic plants, has gained importance in term of enhancing income per unit area, providing nutritional security , source of raw materials for many food processing industries, earning considerable amount of foreign exchange leading to socio-economic improvement of the people of the State. Uttar Pradesh ranks third in fruit production among all States. Major fruit grown are Mango, Guava, Banana, and Litchi. The State is leading in mango production and the prime growing areas for mango are Saharanpur, Muzaffarnagar, Bijnaur, Meerut, Lucknow, Barabanki, Unnao, Sitapur and Hardoi. The overall productivity of fruits in the State is about 12.30 tons / ha. against national average of 11.9 tons / ha. The area, production & productivity of non perennial fruits registered continuous upward trend in the post NHM period while downward trend in case of perennial fruits. The State ranks second in vegetable production among all States. Major vegetables are Potato, Peas & Cabbage.It is a leading Stat e in production of Potato & Peas and ranks second in production of Sweet Potato and 6th in production of cabbage among all the States. The productivity of vegetables in the state is 18.89 tons / ha against national average of 13.9 tons / ha. The continuous upward trend with respect to area, production & productivity of loose as well as cut flower has been ascertained during post NHM period .The important spices produced in the State are Onion (6th among States) Turmeric, Chili, Garlic, Fennel, Fenugreek and Coriander. The area under spices crop is 0.78 lakh hectare and productivity is 0.1 MT/ha. The programme is being implemented in the State of Uttar Pradesh by the State Horticulture Development Society through District Mission Committees involving farmers, Societies, NGOs, Grower Associations, SHGs, State institutions etc. The programme is being implemented in 45 districts with cluster approach. The crops identified under the programme include Mango, Litchi, Guava, Aonla, Bael, Ber, Banana, Betel vine, Spices, Aromatic Plants, Medicinal plants and flowers. Activities undertaken in the project are production and distribution of planting material ( model nursery, small nursery, tissue culture units), area expansion (through establishment of new gardens), rejuvenation of existing gardens, production of vegetable seed, seed infrastructure, protected cultivation, IPM/INM, organic farming, bee keeping, integrated development of Mushroom, development of marketing infrastructure (modern and terminal markets, rural markets, flower markets, functional infrastructure etc), Post Harvest Management( pack houses, multi chamber cold storages, C A storages, refrigerated vans, mobile processing units etc), Human Resource Development and Mission Management.
4
Geography and Climate: The climatic condition of U.P. varies from temperate to tropical with alluvial and clayey alluvial soils. The soil of terai region is mostly alluvial and clayey alluvial and contains sufficient quantity of carbonic materials with the average annual rainfall of this zone 115mm. Western Plain Region is very fertile region and the soil type is mostly sandy and clayey. The average annual rainfall of this zone is 700-100mm. The soils of Central Western Zone are clayey alluvial, alluvial, sandy alluvial and sandy types. The average annual rainfall of this zone is 600-965 mm. The soil of South-Western Zone is mostly of sandy, sandy alluvial, alluvial and clayey alluvial type. Some are also has saline and sodic soils. The average annual rainfall of this zone is 75mm. Major area of Central Plain Zone is covered by saline and sodic soils. Beside this, alluvial sandy, alluvial clayey and alluvial types are also found. The average annual rainfall is 850-90mm.The soil of Bundelkhand Zone is mostly rocky. The average annual rainfall is 800-100mm. The average annual rainfall in North-Eastern Plain Zone is 1000- 120mm.Major soil types of Eastern Plain region are sandy alluvial, clayey and sodic soil. The average annual rainfall is 1000-120mm. Maximum and minimum temperature range is between 40-420C and 40C. In Vindhya Region Zone, soils of plain are light black clay and red alluvial. The average annual rainfall of this zone is 110mm. Maximum and minimum temperature ranges between 40-490C and 30C. The climate of Uttar Pradesh can also vary widely, with temperature as high as 47oC in summer, and as low as -1oC in winter. Seasons: 1. Summer (March-June): Hot & dry (temperature rise to 45oC, sometimes 47-48oC); low relative humidity (20%); dust laden winds. 2. Monsoon (June-September): 85% of average annual rainfall of 990 mm. fall in temperature 40-45o on rainy days. 3. Winter (October-February): Cold (temperature drop to 3-4oC, sometimes below -1oC, clear skies; foggy condition in some tracts.
5
DISTRICT: BARABANKI
Barabanki district is situated between 27°19' and 26°30' north latitude, and 80°05'
and 81°51’ east longitude and the area of the district was 3895.4 km². The upper part of
the district soil is sandy, and in the lower part is clayey and produces all crops. Irrigation in
the district is provided by rivers Ghaghra and Gomti for the major part of the year. The
changing course of the river Ghagra changes the land area in the district, year to year.
The principal crops are rice, wheat, pulse and other food-grains and sugarcane. The
district may be topographically divided into three main regions viz. Tarai region, Gomti par
region and Har region.
List of Farmers Field visited:
Sri Chandra & Rajesh Maurya, Belahara, Fatehpur Barabanki, Vermi Compost
Sri Ram kishor maurya s/o Bachchulal, Belahara Fatehpur, Barabanki, Honey & bees.
Sharafuddin & others, Belahara Road Fatehpur Barabanki,Potato & ice Factory
Audhyanik Utpadak & vipnan samiti Belahara, Fatehpur Barabanki,Fruit & vegetable
Sri Jamunesh Maurya s/o Satyanam maurya, pavaiyabad block- Deva, 2.00, Mango
Manoj kumar s/o Lal bahadur, Dafedarpurva, block- Deva, Barabanki, 1.00 ha, Tomato
Sri Suresh Chand s/o Vidya prasad, Gangauli, Fatehpur Barabanki, 1.00 ha, Guava (L-49)
Moinuddin s/o Makbul hussain, Dafedarpurva, Block- Deva Barabanki, 2.50 ha, Jarwera Flower.
Sri Mohd Shabbier khan s/o Ishreef Khan, Jaganpur, Shohawal, 1.00 hec, Mango Dasahari.
The beneficiary-wise details of activities are given as per the prescribed performa below:
6
District: Barabanki
Beneficiary No.1
S.N. Details Remarks
1 Name of Project Vermi Compost Unit
2 Year of Implementation 2007-08
3 Project Period 2007-08
4 Name of Implenenting Agency
Sri Chandra & Rajesh Maurya, Belahara, Fatehpur Barabanki
5 Location of Project as above
6 Total Project cost 60000 each
7 Amount Released by DAC 30000 each
8 Expenditure Incurred -
9 Status of Project Incomplete
• Name of Produced
Vermi Compost
• Whether NHM Logo Displayed Yes
Beneficiary No.2
S.N. Details Remarks
1 Name of Project Bee Keeping Unit
2 Year of Implementation 2010-11
3 Project Period 2010-11
4 Name of Implenenting Agency
Sri Ram kishor maurya s/o Bachchulal, Belahara Fatehpur, Barabanki
7
5 Location of Project as above
6 Total Project cost 45000
7 Amount Released by DAC 22500
8 Expenditure Incurred -
9 Status of Project Good
• Name of Produced
Honey & bees
• Whether NHM Logo Displayed Yes
Beneficiary No.3
S.N. Details Remarks
1 Name of Project Cold Storage
2 Year of Implementation 2008-09
3 Project Period 2008-09
4 Name of Beneficiary Sharafuddin & others
5 Location of Project Belahara Road Fatehpur
Barabanki
6 Total Project cost 2.20 cror
7 Amount Released & Date 50 lac, March 2009
8 Expenditure Incurred 50 lac
9 Status Good
Capacity of Unit
14060.2 Mt.
Commodity
Potato & ice Factory
Equipments Purchased By Owner
8
Condition of Infrastucture Good
Whether NHM Logo Displayed yes
Whether Funds Disburesed to Agency yes
8 Expenditure Incurred 1.50 Lac
9 Status Good
Capacity of Unit
41 Hp.
Commodity
Tractor
Equipments Purchased Rotaveter
Condition of Infrastucture Good
Whether NHM Logo Displayed yes
Whether Funds Disburesed to Agency yes
Beneficiary No.4
S.N. Details Remarks
1 Name of Project Grading Packing Center
2 Year of Implementation 2005-06
3 Project Period 2005-06
4 Name of Beneficiary
Audhyanik Utpadak & vipnan samiti Belahara, Fatehpur
Barabanki
5 Location of Project as above
6 Total Project cost 10.00 Lac
7 Amount Released & Date 2.50 Lac march 2006
9
8 Expenditure Incurred -
9 Status Good
Capacity of Unit
-
Commodity
Fruit & vegetable
Equipments Purchased Essinial equipment
Condition of Infrastucture Good
Whether NHM Logo Displayed No.
Whether Funds Disburesed to Agency yes
Beneficiary No.5
S.N. Details Remarks
1 Name & Address of Beneficiary Whose Field Visited
Sri Jamunesh Maurya s/o Satyanam maurya, pavaiyabad block- Deva
2 Total Land Available With the Beneficiary (ha). 2.00
3 Crop Cluster Under Which Covered. 0.50
4 Name & Vairiety of Crop Planted Mango
5 Source of Planting Material. Govt. Nursery
6 Number of Planting Material. 65
7 Number of Plants Planted/Rejuvenated. 65
8 Date of Plants Which Survived (also indicate percentage survival) 100%
9 Total Amount of subsidy assistance due to the beneficiary as (Rs.) 7500
10
Beneficiary No.6
Area Expansion / R.K.V.Y.
10 Amount paid and date of payment. 7500/- March 2007
11 Mode of payment. A/c payee Cheque
12 Source of Irrigation Water (Bore well/Tube well/ Canel) Canel
13 Whether Drip/Sprinkle System in use. No.
14 Other inputs provided. No.
15 Whether assistance available for Organic Farming No.
16 If so, area covered No.
17 Assistance available No.
18 Available Marketing facility for the crop. Local mandi
19 Other infrastructure available in the vicinity. -
20 General upkeep of the plot; Very good/Average/Poor. Very Good
21 Any other relevant observation by the JIT. -
S.N. Details Remarks
1 Name & Address of Beneficiary Whose Field Visited
Manoj kumar s/o Lal bahadur, Dafedarpurva, block- Deva,
Barabanki
2 Total Land Available With the Beneficiary (ha). 1.00
3 Crop Cluster Under Which Covered. 0.20
4 Name & Vairiety of Crop Planted Tomato
5 Source of Planting Material. Govt. Agency
6 Number of Planting Material. -
7 Number of Plants -
11
Beneficiary No.7
Area Expansion
Planted/Rejuvenated.
8 Date of Plants Which Survived (also indicate percentage survival) 100%
9 Total Amount of subsidy assistance due to the beneficiary as (Rs.) 9500/- (RKVY Scheme)
10 Amount paid and date of payment. _
11 Mode of payment. in inputs
12 Source of Irrigation Water (Bore well/Tube well/ Canel) Tube well
13 Whether Drip/Sprinkle System in use. -
14 Other inputs provided. Seed & Bio Fattilizer &
pestiside
15 Whether assistance available for Organic Farming No.
16 If so, area covered No.
17 Assistance available No.
18 Available Marketing facility for the crop. Local mandi
19 Other infrastructure available in the vicinity. Low Tunnel
20 General upkeep of the plot; Very good/Average/Poor. Good
21 Any other relevant observation by the JIT. -
S.N. Details Remarks
1 Name & Address of Beneficiary Whose Field Visited
Sri Suresh Chand s/o Vidya prasad, Gangauli, Fatehpur
Barabanki
2 Total Land Available With the Beneficiary (ha). 1.00
3 Crop Cluster Under Which Covered. 0.60
12
Beneficiary No.8
Protected Cultivation
4 Name & Vairiety of Crop Planted Guava (L-49)
5 Source of Planting Material. Govt. Nursery
6 Number of Planting Material. 166
7 Number of Plants Planted/Rejuvenated. 166
8 Date of Plants Which Survived (also indicate percentage survival) 100%
9 Total Amount of subsidy assistance due to the beneficiary as (Rs.) 4500
10 Amount paid and date of payment. 4500
11 Mode of payment. A/c payee Cheque
12 Source of Irrigation Water (Bore well/Tube well/ Canel) Tube well
13 Whether Drip/Sprinkle System in use. No.
14 Other inputs provided. No.
15 Whether assistance available for Organic Farming No.
16 If so, area covered No.
17 Assistance available No.
18 Available Marketing facility for the crop. Local mandi
19 Other infrastructure available in the vicinity. -
20 General upkeep of the plot; Very good/Average/Poor. Very Good
21 Any other relevant observation by the JIT. _
S.N. Details Remarks
1 Name & Address of Beneficiary Whose Field Visited
Moinuddin s/o Makbul hussain, Dafedarpurva, Block- Deva
Barabanki
13
Beneficiary No.9
Area Expansion
1 Name & address of Beneficiary whose field
visited.
Sri Mohd Shabbier khan s/o
Ishreef Khan, Jaganpur,
Shohawal
2 Total land available with the beneficiary
(ha).
1.00 Hec.
3 Crop Cluster under which covered. Mango
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material.
2 Total Land Available With the Beneficiary (ha).
2.50
3 Type of Protected cultivation activity (Hi-tech / Normal Gh, Shade net, Plastic tunnel
poly house 1000 Sqm.
4 Year of establishment 2010-11
5 Size of Stucture (Sq. m) 1000 Sqm.
6 Total cost 12.184 lac
7 Agency involved in fabrication and installation
Sri raj consultant pvt.ltd. pune
8 Total subsidy paid and date of payment.
4.675 Lac march 2011
9 crop being grown Jarwera Flower
10 Condition of Structure Good
11 Condition of Crop Very good
12 Tie up with market Mumbai & Delhi
13 General upkeep (Very good/Good/Avarage/Poor)
Very good
14 Any other relevant observation by JIT. Other than above crop Tube Rose
Gladiolus in open field
14
6 Number of planting material.
7 Number of plants planted! rejuvenation 100 Plant
8 Date of plants which survived (also indicate
percentage survival).
100%
9 Total amount of subsidy assistance due to
the beneficiary as (Rs.)
12000.00
10 Amount paid and date of payment. By Cheque 31 March 2012
11 Mode of payment. A/c Payee Cheque
12 Source of Irrigation Water (Bore well / Tube
well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. Plastic Mulching Sheet
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available
18 Available marketing facility for the crop. No
19 Other infrastructure available in the vicinity.
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
Good
21 Any other relevant observation by the JIT.
District: Barabanki
Observations:
Sri Jamunesh Kumar Maurya S/o Satya Ram, village- Pawaiyabad, Block- Deeva has rejuvenated 40 years old mango orchard during 2007-08. All plants are now in bearing stage. The beneficiary is happy with the increased yield of each plant.
Mr. Moinuddin S/o Sri Maqbool Hussain, village- Dafedar Ka Purva, Block- Deeva has established 1000 sq.m. Poly- house unit under NHM for gerbera flower production . The gerbera cut flowers are sold in the Delhi, Mumbai, Ahmadabad, Lucknow and Gorakhpur markets. He got about Rs.7.0-7.50 lakh of net benefit in a year.The unit has been maintained very well.
Sri Suresh Chandra S/o Vidya Prasad,village- Gangrauli, Block- Fatehpur established 0.6 ha of guava variety L-49 during 2010-11. The orchard has been well maintained with proper tillage practices.The beneficiary was informed that it needs immediate irrigation.
M/s Nizamuuddin Cold & Allied Industries, Belhera Road, Fatehpur expanded one chamber for 80,000 q capacity during 2008-09 through financial assistance from NHM. Presently, only potato seed was stored in the cold storage
15
The Horticultural Co-operative Society in village Bilhaura, block Fatehpur is working under the Chairmanship of Mr. Ramesh Chandra Maurya and has 136 members.. The society has one tractor with Rotavator, potato planter and cultivator with NHM support. The farmers cultivated potato, garlic, tomato, chilli, etc. The society also have one pack- house and Vermicompost unit under financial assistance from NHM but are not working.
District Barabanki Photographs:
Guava variety G-9 planted during 2010-11 at field of Mr. Suresh Chandra Village gangrauli block Fatehpur, Barabanki.
Cold storage assisted under NHM at Bielhera Road Fatehpur, Barabanki.
16
Inside view of cold storage, potato seed kept in gunny bags.
Tractor purchased by society at village Belhera, Fatehpur Block.
Packed house constructed under NHM assistance through Horticultural society.
17
Vermi-Compost pits prepared by society under NHM assistance.
Beehives kept inside packed house.
Honey separator provided under NHM to the society.
18
District: Faizabad
Profile of District Faizabad:
1. Total Geographical Area ( Sq. Km.) - 2178
2. Total No of Revenue Village.- 592
3. Total No of Tahsil.- 5
4. Total Block Office - 11
5. Total Agricultural Land ( Hac.)- 168934
6. Irrigated Area – 123546
7. Average Rainfall (mm.)- 1035
8. Area Under Horticulture ( Hec)- 24180
9. Area Under Vegetable & Spices- 78366.92
10. Area Under Potato Cultivation – 4400
19
Departmental Structural facilities Available in District:
1. No. of Government Nurseries 5
2. Government Community Fruits Preservations Center 1
3. Food Science Training Center 1
4. Government Garden 10
5. Bee Keeping Sub-center 1
6. No. of Cold Storage 9
7. Major Fruits Production Area – Maya Bazar Sohawal, Rudauli
8. Major Vegetable Production Area – Pura Bazar, Masaudha, Bikapur, Sohawal
9. Major Spices Production Area – Tarun, Bikapur
10. Major Flower Production Area- Pura Bazar, Masaudha
11. Major Mintha Production Area - Mawai, Rudauli, Amaniganj Maya Bazar
List of Farmers Field visited in district Faizabad:
Sri Shabbier s/o Sri Subraati, Maksumganj, Sohawal, 0.10 Hec.(2012-13), Hybrid F-
1 Botalgard (Anokhi).
Sri Vinod s/o Devi Baksha Singh Katrauli, Shohawal, 1.00 Hec., Mango Dashari.
Sri Puneet Gupta& Smt. Rama Gupta, Kisan cold storage& alied Industries, Potato
Sri Rajesh Pratap Shingh s/o Sri Narendra Bhadur singh Deramussi, Sohowal, 1.0
Hec., Mango Dashari.
Sri Mahendra Pratap Shingh s/o Sri Narendra Bhadur singh Deramussi,Sohowal,
1.0 Hec., Mango Dashari.
Sri Vijay Pratap Shingh s/o Sri Narendra Bhadur singh Deramussi, Sohowal, 1.0
Hec., Mango Dashari.
Sri Raghav Pratap Shingh s/o Sri Narendra Bhadur singh Deramussi, Sohowal, 1.0
Hec., Mango Dashari.
Sri Heera Lal s/o Sri Neemar, Semara, Bikapur, 0.70 Hec., T.C. Banana(2012-13).
20
Smt. Gulabwati w/o Sri Deshraj Semara, Bikapur, 0.30 Hec., T.C. Banana(2012-
13).
Smt. Alka Verma w/o Sri Ram Manohar Semara, Bikapur, 0.30 Hec., T.C.
Banana(2012-13).
Sri Seetla Prashad Verma s/o Sri Ram Tezz verma Vill. Semra Block Bikapur, 1.5
Hec, Closed Spacing Crops (Potato, tomato,Briangil etc.).
Sri Ram Ganesh Verma S/O Sri Vishvanath, Maksoomganj, Sohawal, 1.00 Hec,
Banana, Tomato, Chilly.
Sri Ram Bahor S/O Sri Siya Ram, Maksoomganj, Sohawal, 1.00 Hec, Banana,
Tomato, Chilly.
The details of activities visited, as per prescribed proforma are as below:
Beneficiary No.1
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose field
visited.
Sri Shabbier s/o Sri
Subraati, Maksumganj,
Sohawal
2 Total land available with the beneficiary (ha). 0.10 Hec.(2012-13)
3 Crop Cluster under which covered. Bottelgard
4 Name & variety of crop planted. Hybrid F-1 Botalgard
(Anokhi)
5 Source of planting material. Departmental Supply
6 Number of planting material. 150 Gm. Seed
7 Number of plants planted! rejuvenation 400 Plant
8 Date of plants which survived (also indicate
percentage survival).
100%
9 Total amount of subsidy assistance due to the
beneficiary as (Rs.)
5000.00
10 Amount paid and date of payment. Rs. 5000.00(Include cost
of Seed Rs. 885) Paid
After verification
11 Mode of payment. By Account payee cheque
21
12 Source of Irrigation Water (Bore well / Tube
well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. Yes (As per Guideline)
15 Whether assistance available for Organic
Farming
No.
16 If so, area covered N.A.
17 Assistance available Yes
18 Available marketing facility for the crop. Yes
19 Other infrastructure available in the vicinity. No
20 General upkeep of the plot; Very good! Good
! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.2
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose field
visited.
Sri Vinod s/o Devi Baksha
Singh Katrauli, Shohawal
2 Total land available with the beneficiary (ha). 1.00 Hec.
3 Crop Cluster under which covered. Mango
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material.
6 Number of planting material.
7 Number of plants planted! rejuvenation 100 Plant
8 Date of plants which survived (also indicate
percentage survival).
100%
9 Total amount of subsidy assistance due to the
beneficiary as (Rs.)
11000.00
10 Amount paid and date of payment. By Cheque 31 March
2012
11 Mode of payment. A/c Payee Cheque
12 Source of Irrigation Water (Bore well / Tube
well Canal)
Tube well
22
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. Plastic Mulching Sheet
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available
18 Available marketing facility for the crop. No
19 Other infrastructure available in the vicinity.
20 General upkeep of the plot; Very good! Good
! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.3
Post Harvest Management
Pack House/ Cold Storage/ Ref Van/ Primary processing
Sr. Detail Remarks
1 Name of the project Kisan cold storage& alied Industries
2 Year of implementation 2008-09
3 Project period 2008-09
4 Name of beneficiary Sri Puneet Gupta& Smt. Rama
Gupta
5 Location of project Shahnawazpur Darshannagar Near
Ayodaya bypass
6 Total Project Cost 202.70 Laks.
7 Amout Released & Date 21.83 Laks Date 10-11-2009
21.84 Laks Date 01-02-2010
8 Expenditure incurred 207.70 Laks.
9 Status
Capacity of unit 45219.84 Qu.
Commodity Potato
Equipments purchase Compreser-2, Motor 75 Hp-2,
Monoblock Pump 7.5 Hp-2,
Recever-1, Banker-4, Valb& Fiting-
100, Generator 72 Hp-1 etc.
Condition of infrastructure Good
23
Whether NHM logo displayed In front of wall
Whether fund disbursed to agency
Beneficiary No.4
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose
field visited.
Sri Rajesh Pratap Shingh s/o
Sri Narendra Bhadur singh
Deramussi, Sohowal
2 Total land available with the beneficiary
(ha).
1.0 Hec.
3 Crop Cluster under which covered. Mango (2008-09)
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material. Govt. Nursery
6 Number of planting material. 100 Plant
7 Number of plants planted! rejuvenation 100 Plant
8 Date of plants which survived (also
indicate percentage survival).
100%
9 Total amount of subsidy assistance due
to the beneficiary as (Rs.)
22500.00
10 Amount paid and date of payment. As Per Guideline in Three
Year Last Payment 31-3-11
11 Mode of payment. A/C Payee Cheque
12 Source of Irrigation Water (Bore well /
Tube well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. As per Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Complete
18 Available marketing facility for the crop. No
19 Other infrastructure available in the
vicinity.
Yes
24
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.5
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose
field visited.
Sri Mahendra Pratap Shingh
s/o Sri Narendra Bhadur
singh Deramussi, Sohowal
2 Total land available with the beneficiary
(ha).
1.0 Hec.
3 Crop Cluster under which covered. Mango (2008-09)
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material. Govt. Nursery
6 Number of planting material. 100 Plant
7 Number of plants planted! rejuvenation 100 Plant
8 Date of plants which survived (also
indicate percentage survival).
100%
9 Total amount of subsidy assistance due
to the beneficiary as (Rs.)
22500.00
10 Amount paid and date of payment. As Per Guideline in Three
Year Last Payment 31-3-11
11 Mode of payment. A/C Payee Cheque
12 Source of Irrigation Water (Bore well /
Tube well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. As per Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Complete
18 Available marketing facility for the crop. No
19 Other infrastructure available in the Yes
25
vicinity.
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.6
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose
field visited.
Sri Vijay Pratap Shingh s/o
Sri Narendra Bhadur singh
Deramussi, Sohowal
2 Total land available with the beneficiary
(ha).
1.0 Hec.
3 Crop Cluster under which covered. Mango (2008-09)
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material. Govt. Nursery
6 Number of planting material. 100 Plant
7 Number of plants planted! rejuvenation 100 Plant
8 Date of plants which survived (also
indicate percentage survival).
100%
9 Total amount of subsidy assistance due
to the beneficiary as (Rs.)
22500.00
10 Amount paid and date of payment. As Per Guideline in Three
Year Last Payment 31-3-11
11 Mode of payment. A/C Payee Cheque
12 Source of Irrigation Water (Bore well /
Tube well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. As per Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Complete
18 Available marketing facility for the crop. No
26
19 Other infrastructure available in the
vicinity.
Yes
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.7
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose
field visited.
Sri Raghav Pratap Shingh
s/o Sri Narendra Bhadur
singh Deramussi, Sohowal
2 Total land available with the beneficiary
(ha).
1.0 Hec.
3 Crop Cluster under which covered. Mango (2008-09)
4 Name & variety of crop planted. Mango Dasahari
5 Source of planting material. Govt. Nursery
6 Number of planting material. 200 Plant
7 Number of plants planted! rejuvenation 200 Plant
8 Date of plants which survived (also
indicate percentage survival).
100%
9 Total amount of subsidy assistance due
to the beneficiary as (Rs.)
45000.00
10 Amount paid and date of payment. As Per Guideline in Three
Year Last Payment 31-3-11
11 Mode of payment. A/C Payee Cheque
12 Source of Irrigation Water (Bore well /
Tube well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. No
14 Other inputs provided. As per Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Complete
27
18 Available marketing facility for the crop. No
19 Other infrastructure available in the
vicinity.
Yes
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.8
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose
field visited.
Sri Heera Lal s/o Sri
Neemar, Semara, Bikapur
2 Total land available with the beneficiary
(ha).
0.70 Hec.
3 Crop Cluster under which covered. T.C. Banana(2012-13)
4 Name & variety of crop planted. G-9
5 Source of planting material. Departmental Supply
6 Number of planting material. 2160 Plant
7 Number of plants planted! rejuvenation 2160 Plant
8 Date of plants which survived (also
indicate percentage survival).
100%
9 Total amount of subsidy assistance due
to the beneficiary as (Rs.)
Rs. 29120.00
10 Amount paid and date of payment. Year 2012-13 Subsidy Rs.
21840 Paid in kind of T.C.
Banana Plant 2nd Year
Maintaniance Amonut Rs.
7280.00 Will be paid Next
Year
11 Mode of payment. As Above
12 Source of Irrigation Water (Bore well /
Tube well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. NO
14 Other inputs provided. Proposed as Per Guideline
15 Whether assistance available for Organic No
28
Farming
16 If so, area covered N.A.
17 Assistance available Yes
18 Available marketing facility for the crop. Yes
19 Other infrastructure available in the
vicinity.
No
20 General upkeep of the plot; Very good!
Good ! Average! Poor.
21 Any other relevant observation by the JIT.
Beneficiary No.9
Area Expension /Rejuvenation
1 Name & address of Beneficiary whose field
visited.
Smt. Gulabwati w/o Sri
Deshraj Semara, Bikapur
2 Total land available with the beneficiary (ha). 0.30 Hec.
3 Crop Cluster under which covered. T.C. Banana(2012-13)
4 Name & variety of crop planted. G-9
5 Source of planting material. Departmental Supply
6 Number of planting material. 926 Plant
7 Number of plants planted! rejuvenation 926 Plant
8 Date of plants which survived (also indicate
percentage survival).
100%
9 Total amount of subsidy assistance due to
the beneficiary as (Rs.)
Rs 12480.00
10 Amount paid and date of payment. Year 2012-13 Subsidy
Rs. 9352.00 Paid in kind
of T.C. Banana Plant 2nd
Year Maintaniance
Amonut Rs.3120.00 Will
be paid after verification
11 Mode of payment. As Above
12 Source of Irrigation Water (Bore well / Tube
well Canal)
Tube well
29
13 Whether Drip! Sprinkle System in use. NO
14 Other inputs provided. Proposed as Per
Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Yes
18 Available marketing facility for the crop. Yes
19 Other infrastructure available in the vicinity. No
20 General upkeep of the plot; Very good! Good
! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.10
1 Name & address of Beneficiary whose field
visited.
Smt. Alka Verma w/o Sri
Ram Manohar Semara,
Bikapur
2 Total land available with the beneficiary (ha). 0.30 Hec.
3 Crop Cluster under which covered. T.C. Banana(2012-13)
4 Name & variety of crop planted. G-9
5 Source of planting material. Departmental Supply
6 Number of planting material. 926 Plant
7 Number of plants planted! rejuvenation 926 Plant
8 Date of plants which survived (also indicate
percentage survival).
100%
9 Total amount of subsidy assistance due to
the beneficiary as (Rs.)
Rs 12480.00
10 Amount paid and date of payment. Year 2012-13 Subsidy
Rs. 8946.00 Paid in kind
of T.C. Banana Plant 2nd
Year Maintaniance
Amonut Rs.3120.00 Will
be paid after verification
11 Mode of payment. As Above
30
12 Source of Irrigation Water (Bore well / Tube
well Canal)
Tube well
13 Whether Drip! Sprinkle System in use. NO
14 Other inputs provided. Proposed as Per
Guideline
15 Whether assistance available for Organic
Farming
No
16 If so, area covered N.A.
17 Assistance available Yes
18 Available marketing facility for the crop. Yes
19 Other infrastructure available in the vicinity. No
20 General upkeep of the plot; Very good! Good
! Average! Poor.
Good
21 Any other relevant observation by the JIT.
Beneficiary No.11
Micro Irrigation
Sr. Detail Remark
1 Name & address of beneficiary visited. Sri Seetla Prashad Verma s/o
Sri Ram Tezz verma Vill.
Semra Block Bikapur
2 Total land available with the beneficiary
(ha).
1.5 He.
3 Type of MI system availed Drip! Sprinkler Drip Irrigation System
4 Crop(s) covered Closed Spacing Crops
(Potato, tomato,Briangil etc.)
5 Total area covered (ha) 1.0 He
6 Crop Spacing (for drip) 0.3x0.45
7 Year of establishment 2010-11
8 Name of Manufacturer! Supplier Naagarguna Fertilizer &
Cemicals Hyderabad
Syplier Chandra Agrotech
31
Basti
9 Total subsidy paid & date of payment Rs. 67343.00
31-3-2011
10 Mode of payment By cheque
11 Status of crop
12 General upkeep (Very good! Good!
Average! Poor)
Good
13 Any other relevant observation by JIT.
Beneficiary No.12
Protected Cultivation
SR Detail Remark
1 Name & address of Beneficiary whose field
visited.
Sri Ram Ganesh Verma
S/O Sri Vishvanath,
Maksoomganj, Sohawal
2 Total land available with the beneficiary (ha). 1.00 Hec.
3 Type of: Protected cultivation activity (Hi-tech
/ Normal GH, Shade net, Plastic tunnel )
Shade Net
4 Year of establishment 2012-13
5 Size of Structure (Sq. m) 1000 Squ. Mtr.
6 Total cost 600000.00
7 Agency involved in fabrication and installation Shailly Biotech. Pvt.Ltd.
8 Total subsidy paid and date of payment. 300000.00 / Under
Process after verification
subsidy release
9 Crop being grown Banana, Tomato, Chilly
10 Condition of Structure Good
32
11 Condition of Crop Good
12 Tie up with market Yes
13 General upkeep (Very good! Good! Average!
Poor)
Very Good
14 Any other relevant observation by JIT.
Beneficiary No.13
Protected Cultivation
SR Detail Remark
1 Name & address of Beneficiary whose field
visited.
Sri Ram Bahor S/O Sri
Siya Ram, Maksoomganj,
Sohawal
2 Total land available with the beneficiary (ha). 1.00 Hec.
3 Type of: Protected cultivation activity (Hi-tech
/ Normal GH, Shade net, Plastic tunnel )
Shade Net
4 Year of establishment 2012-13
5 Size of Structure (Sq. m) 1000 Squ. Mtr.
6 Total cost 600000.00
7 Agency involved in fabrication and installation Shailly Biotech. Pvt.Ltd.
8 Total subsidy paid and date of payment. 300000.00 / Under
Process after verification
subsidy release
9 Crop being grown Banana, Tomato, Chilly
10 Condition of Structure Good
11 Condition of Crop Good
12 Tie up with market Yes
33
13 General upkeep (Very good! Good! Average!
Poor)
Very Good
14 Any other relevant observation by JIT.
District: Faizabad
Observations: .
Mr. Ram Ganesh Verma, village- Maksoodganj, Block Sohabal maintained 4000 sq.m shade-net for banana, tomato, cauliflower seedling production out of which 1000 sqm shade-net has been provided under NHM during 2012-13.
Mr. Manjoor Ahmed Khan,village- Pure Ramdeen Maglaushi produced bottle guard in 0.1 ha. on wavered system under RKVY assistance. The bottle gourd variety Varad was sown in the month of February –March, 2012 and is doing well.
Sri Rajesh Pratap Singh, block: Sohabal has done only light pruning in old mango plants instead of rejuvenation.
Mr. Md. Jumman Khan, village Jaganpur, Sohabal , Faizabad rejuvenated his 40 years mango orchard during 2011-12 and plants are having good growth.
Mr. Rajesh Pratap Singh S/o Narendra Bahadur Singh, village- Dera Mausi, Block- Sohabal, Mr. Vijay Pratap Singh, Mr. Mahendra Pratap Singh and Raghvendra Pratap Singh of same village established 1.0 ha each of Mango orchard Dusheri, Chaunsha and Langra varieties in the year 2009-10 are being well maintained.
Mr. Heera Lal S/o Neemar Pd. Verma, village- Simra, Block Bikapur planted Banana G-9 in 0.5 ha during 2012-13.The growth is satisfactory.
Mrs. Gulab Bati W/o Deshraj Vilage Simra Block Bikapur harvested banana from her field. This crop was planted during 2011-12. The yield obtained is good.
Mr. Sheetla Prasad Verma S/o Ramtej Verma, village Simra, Bikapur has established drip irrigation system for tomato production during 2010-11and is working satisfactorily.The farmer feels that it is beneficial.
Mr. Shamshuddin, village- Nandrauli, Block- Bikapur got 50 beehives during 2010-11 and produced 50-60 kg. of honey from each boxes.
M/s Kisan Cold Storage, village- Shah Niwajpur, Block- Pura Bazar, Faizabad added one Chamber of 45,000 q capacity during 2008-09 for potato seed storage. All the inside chamber and machinery were running properly.
The team also visited Govt. Food Science Training Centre, Gulabwadi, Reedhganj, Faizabad. Mr. Dharmendra Rajan I/c Principal told about training programmes of the centre. The centre have well equipped labs for preservation activities. However, recurring contingencies are not available for smooth functioning of newly established unit under DASP.
The team also visited Narendra Dev University of Agriculture & Technology, Kumarganj, Faizabad to on spot information of projects as funded by NHM. As the complete information was not readily available, Dr. Bhagwan Deen (member JIT) has been requested to get detailed information/progress about all the projects supported under NHM in the University.
34
District Faizabad Photographs:
Cooling machineries of M/s Kisan Cold Storage Village Shah Niwajpur block Pura Bajar, Faizabad.
Potato seeds kept in gunny begs for planting at farmer’s field.
Govt. Food
Science Training centre Gulab Vadi, Radhe Ganj, Faizabad.
35
Preservation lab developed through DASP assistance at centre.
Machineries of training centre under DASP.
JIT members met with University officers and PIs at NDUA&T, Kuamrganj, Faizabad.
36
Instruments seen in Bio-Control lab of Faizabad University.
Mr. Javnesh Kumar Maurya Village- Pavaiyabad Block Deva, Barabanki showing 40 years old rejuvenated mango
orchard.
Gervera flowers grown under poly house of Mr. Moinuddin field.
37
Mr. Moinuddin in happy mood with his gervera flowers.
Different colours of Gervera grown in poly house.
Gladiolous corns ready for planting.
38
District: Sultanpur
INTRODUCTION:
Sultanpur is located at 26.27° N 82.07° E. Sultanpur had a population of 2000,085. It was
observed that there was no progress for activities of nursery, poly house cultivation
,INM/IPM, Organic farming and also water community ponds. Absolutely no progress was
made for post harvest management and marketing.
The financial outlay of the district was Rs.177.80 lakh and out of which expenditure was
made for Rs.50.30 lakh (up to Dec.2010) i.e. 28.29%.
List of Farmers Field visited:
Small Nursery, Govt. Vegetable Form Dikhauli, Dubepur, Sultanpur, Dikhauli
Mango, Aonla, Guava, Small Nursery.
Vegetable (Pea) Seed Production, Govt. Vegetable Form Dikhauli, Dubepur,
Sultanpur, Pea Azad P-1, F-2.
Potato Seed Production, Govt. Vegetable Form Dikhauli, Dubepur, Sultanpur.
39
Sri. Ram Kumar Verma Vill. Narayanpur Block Bhadaiya, 1.575 ha., Banana
Tissuculture G-9.
Sri. Ram Pratap singh, Uturi, 1.783 ha., Banana Tissuculture G-9.
Sri. Addul Rauph Vill. Pakharauli Block Bhadaiya, 0.5810 ha, Mango, Dashhari.
Smt. Sahini Begam Vill. Pakharauli Block Bhadaiya. 0.774 ha., Mango, Dashhari.
Sri. Ram Nayak singh Vill. Hanumanganj Block Bhadaiya, 0.779 ha., Turmaric
(Rajendra Sonia).
Sri. Ram Nayak singh Vill. Hanumanganj Block Bhadaiya, 0.779 ha., Mango,
Dashhari.
Sri. Ram Raj Verma Vill. Gopalpur Block Bhadaiya, 1.488 ha., Banana Tissuculture
G-9.
Sri. Raj Bahadur Verma Vill. Gopalpur Block Bhadaiya, 1.085 ha., Turmaric
(Rajendra Sonia).
Sri. Vimlesh Bahaur singh vill. Teryan Block Bhadaiya, 6.00 Ha, Banana
Tissuculture G-9.
Sri. Brijendra Bikram singh vill. Teryan Block Bhadaiya, 2.00 ha, Banana
Tissuculture G-9.
Cold Storage ( Multi chamber), Sri Durga Prasad Mishra, Lohramau, block
Dubepur, Sultanpur.
Sri. Wahid khan s/o sri. Yasin khan, Vill. Mahanpur, block Dubepur, 1.431 ha.,
Tomato, Brinjal and other vegetable crop.
Sri. Shiv Karan Shukla s/o sri ram deen, Vill. Abhiyakalan, block bhadaiyan, 1.267
ha., Potato & Pea.
The details of activities visited as per the prescribed performae are as below:
40
Beneficiary No.1
Production of Planting Material
Nursery ( Year 2007-08 )
Sr.
No.
Details Remarks
1 Name of the Project. Small Nursery
2 Year of Implementation 2007-2008
3 Project Period. 2007-2008
4 Name of Implementing Agency Sell Point, Gomti Nagar Lucknow.
5 Location of Project Govt. Vegetable Form Dikhauli,
Dubepur, Sultanpur
6 Total Project Cost. 3.00 lacs.
7 Amount Released by DAC 3.00 lacs.
8 Expenditure incurred 3.00 lacs
9 Status of Project
· Name of Nursery and Crop for
which plants are produced
Small Nursery Dikhauli Mango,
Aonla, Guava
· Name of Crops for which seed
Produced.
-
· Quantity produced Mango-6000, Guava-5000, Aonla -
4000
· Quantity sold Mango-6000, Guava-5000, Aonla -
4000
· Rate Mango- Rs.18.00, Guava- Rs. 14.00,
Aonla – Rs.14.00
· Whether NHM logo displayed Yes
41
Beneficiary No.2
Production of Planting Material
Vegetable Seed Production ( Year 2011-12 )
Sr.
No.
Details Remarks
1 Name of the Project. Vegetable (Pea) Seed Production
2 Year of Implementation 2011-2012
3 Project Period. 2011-2012
4 Name of Implementing Agency State Horticulture Mission.
5 Location of Project Govt. Vegetable Form Dikhauli,
Dubepur, Sultanpur
6 Total Project Cost. 2.15 lacs.
7 Amount Released by DAC 2.15 lacs.
8 Expenditure incurred 2.14742 lacs
9 Status of Project
· Name of Nursery and Crop for
which plants are produced
-
· Name of Crops for which seed
Produced.
Pea Azad P-1, F-2
· Quantity produced 69.40 Qt.
· Quantity sold 69.40 Qt.
· Rate Rs. 60.00 Per kg
· Whether NHM logo displayed -
42
Beneficiary No.3
Production of Planting Material
Vegetable Seed Production ( Year 2012-13 )
Sr.
No.
Details Remarks
1 Name of the Project. Potato Seed Production
2 Year of Implementation 2012-2013
3 Project Period. 2012-2013
4 Name of Implementing Agency State Horticulture Mission.
5 Location of Project Govt. Vegetable Form Dikhauli,
Dubepur, Sultanpur
6 Total Project Cost. 2.50 lacs.
7 Amount Released by DAC 2.50 lacs.
8 Expenditure incurred -
9 Status of Project
· Name of Nursery and Crop for
which plants are produced
-
· Name of Crops for which seed
Produced.
-
· Quantity produced -
· Quantity sold -
· Rate -
· Whether NHM logo displayed -
43
Beneficiary No.4
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Ram Kumar Verma Vill.
Narayanpur Block Bhadaiya
2 Total land available with the beneficiary
(ha.)
1.575 ha.
3 Crop Cluster under which covered. 1.00 ha.
4 Name & variety of crop Planted. Banana Tissuculture G-9
5 Source of planting material. Sheel Biotech Gurgaon Hariyana
6 Number of Planting material. 2228
7 Number of plants planted/ rejuvenated. 2228
8 Date of Plants which survived ( also indicate
percentage survival).
25-07-2012
9 Total Amount of subsidy assistance due to
the beneficiary as (Rs.)
Rs. 31192.00
10 Amount paid and date of payment. -
11 Mode of payment. Tissuculture plants
12 Source of irrigation Water ( Bore well/ Tub
well/ Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good.
Good/ Average / Poor.
21 Any other relevant obstruction by the JIT.
44
Beneficiary No.5
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Ram Pratap singh, Uturi
2 Total land available with the beneficiary (ha.) 1.783 ha.
3 Crop Cluster under which covered. 1.75 ha.
4 Name & variety of crop Planted. Banana Tissuculture G-9
5 Source of planting material. Aryav Biotech Haridwar
6 Number of Planting material. 3899
7 Number of plants planted/ rejuvenated. 3899
8 Date of Plants which survived ( also indicate
percentage survival).
29-07-2011
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 54586.00
10 Amount paid and date of payment. -
11 Mode of payment. Tissuculture plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
45
Beneficiary No.6
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Addul Rauph Vill.
Pakharauli Block Bhadaiya
2 Total land available with the beneficiary (ha.) 0.5810 ha.
3 Crop Cluster under which covered. 0.40 ha.
4 Name & variety of crop Planted. Mango, Dashhari
5 Source of planting material. Govt. Small Nursury Dikhauli,
Sultanpur
6 Number of Planting material. 40
7 Number of plants planted/ rejuvenated. 40
8 Date of Plants which survived ( also indicate
percentage survival).
03-08-2012
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
3960.00
10 Amount paid and date of payment. -
11 Mode of payment. Plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic Farming -
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
46
Beneficiary No. 7
Area Expansion/Rejuvenation
Sr. No. Details Remarks
1 Name & address of Beneficiary whose field
visited.
Smt. Sahini Begam Vill.
Pakharauli Block Bhadaiya
2 Total land available with the beneficiary (ha.) 0.774 ha.
3 Crop Cluster under which covered. 0.40 ha.
4 Name & variety of crop Planted. Mango, Dashhari
5 Source of planting material. Govt. Small Nursury
Dikhauli, Sultanpur
6 Number of Planting material. 40
7 Number of plants planted/ rejuvenated. 40
8 Date of Plants which survived ( also indicate
percentage survival).
03-08-2012
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
3960.00
10 Amount paid and date of payment. -
11 Mode of payment. Plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
47
Beneficiary No.8
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Ram Nayak singh Vill.
Hanumanganj Block
Bhadaiya
2 Total land available with the beneficiary (ha.) 0.779 ha.
3 Crop Cluster under which covered. 0.20 ha.
4 Name & variety of crop Planted. Turmaric (Rajendra Sonia)
5 Source of planting material. NEFED, Lucknow
6 Number of Planting material. 39.600 kg.
7 Number of plants planted/ rejuvenated. 39.600 kg.
8 Date of Plants which survived ( also indicate
percentage survival).
02-07-2012
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 2500.00
10 Amount paid and date of payment. -
11 Mode of payment. Turmaric seed
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
48
Beneficiary no. 9
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field visited.
Sri. Ram Nayak singh Vill. Hanumanganj Block
Bhadaiya
2 Total land available with the beneficiary (ha.) 0.779 ha.
3 Crop Cluster under which covered. 0.40 ha.
4 Name & variety of crop Planted. Mango, Dashhari
5 Source of planting material. Govt. Small Nursury Dikhauli, Sultanpur
6 Number of Planting material. 40
7 Number of plants planted/ rejuvenated. 40
8 Date of Plants which survived ( also indicate
percentage survival).
12-07-2010
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
3300.00
10 Amount paid and date of payment. 2800.00
11 Mode of payment. Bio Fartiliser & pasticite
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
49
Beneficiary No.10
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Ram Raj Verma Vill.
Gopalpur Block Bhadaiya
2 Total land available with the beneficiary (ha.) 1.488 ha.
3 Crop Cluster under which covered. 1.00 ha.
4 Name & variety of crop Planted. Banana Tissuculture G-9
5 Source of planting material. Aryav Biotech Haridwar
6 Number of Planting material. 2228
7 Number of plants planted/ rejuvenated. 2228
8 Date of Plants which survived ( also indicate
percentage survival).
20-07-2011
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 31192.00
10 Amount paid and date of payment. -
11 Mode of payment. Tissuculture plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
50
Beneficiary No.11
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Raj Bahadur Verma Vill.
Gopalpur Block Bhadaiya
2 Total land available with the beneficiary (ha.) 1.085 ha.
3 Crop Cluster under which covered. 0.20 ha.
4 Name & variety of crop Planted. Turmaric (Rajendra Sonia)
5 Source of planting material. NEFED, Lucknow
6 Number of Planting material. 39.600 kg.
7 Number of plants planted/ rejuvenated. 39.600 kg.
8 Date of Plants which survived ( also indicate
percentage survival).
03-08-2012
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 2500.00
10 Amount paid and date of payment. -
11 Mode of payment. Turmaric seed
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
51
Beneficiary No.12
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Vimlesh Bahaur singh vill.
Teryan Block Bhadaiya
2 Total land available with the beneficiary (ha.) 6.00 ha.
3 Crop Cluster under which covered. 4.00 ha.
4 Name & variety of crop Planted. Banana Tissuculture G-9
5 Source of planting material. Aryav Biotech Haridwar
6 Number of Planting material. 8912
7 Number of plants planted/ rejuvenated. 8912
8 Date of Plants which survived ( also indicate
percentage survival).
05-08-2011
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 124768.00
10 Amount paid and date of payment. -
11 Mode of payment. Tissuculture plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
52
Beneficiary No.13
Area Expansion/Rejuvenation
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose field
visited.
Sri. Brijendra Bikram singh
vill. Teryan Block Bhadaiya
2 Total land available with the beneficiary (ha.) 2.00 ha.
3 Crop Cluster under which covered. 1.00 ha.
4 Name & variety of crop Planted. Banana Tissuculture G-9
5 Source of planting material. Sheel Biotech Gurgaon Hariyana
6 Number of Planting material. 2228
7 Number of plants planted/ rejuvenated. 2228
8 Date of Plants which survived ( also indicate
percentage survival).
10-08-2012
9 Total Amount of subsidy assistance due to the
beneficiary as (Rs.)
Rs. 31192.00
10 Amount paid and date of payment. -
11 Mode of payment. Tissuculture plants
12 Source of irrigation Water ( Bore well/ Tub well/
Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic
Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity. -
20 General upkeep of the Plot; Very good. Good/
Average / Poor.
21 Any other relevant obstruction by the JIT.
53
Beneficiary No.14
Post Harvest Management
Pack House/ Cold Storage/ Ref. Van/ Primary processing
Sr.
No.
Details Remarks
1 Name of the Project. Cold Storage ( Multi
chamber)
2 Year of Implementation 2007-2008
3 Project Period. 2007-2008
4 Name of beneficiary Sri Durga Prasad Mishra
5 Location of Project Lohramau, block Dubepur,
Sultanpur
6 Total Project Cost. 86.00 Lacs.
7 Amount Released & date 20.50 Lacs.
8 Expenditure incurred
9 Status
10 Capacity of unit 35000 Begs.
11 Commodity Potatoes
12 Equipments Purchased
13 Condition of infrastructure Good
14 Whether NHM logo displayed yes
15 Whether funds disbursed to agency yes
Beneficiary No.15
Micro Irrigation- Drip
Sr.
No.
Details Remarks
1 Name & address of Beneficiary visited. Sri. Wahid khan s/o sri. Yasin
khan, Vill. Mahanpur, block
Dubepur
54
2 Total land available with the beneficiary (ha.) 1.431 ha.
3 Type of MI system availed Drip/ Sprinkler Drip ( close spacing )
4 Crop(s) covered 0.40 ha.
5 Total area covered (ha) 0.40 ha.
6 Crop Spacing ( for Drip) 0.60x1.20 mtr.
7 Year of establishment 2010-11
8 Name of Manufacturer/ Supplier Parixit Ind. India ltd.
9 Total subsidy paid & date of payment Rs. 41576.00
10 Mode of Payment By cheque
11 Status of crop Tomato, Brinjal and other
vegetable crop.
12 General upkeep (Very good. Good/ Average /
Poor)
Good
13 Any other relevant obstruction by the JIT.
Beneficiary No.16
Micro Irrigation- Sprinkler
Sr.
No.
Details Remarks
1 Name & address of Beneficiary visited. Sri. Shiv Karan Shukla s/o sri
ram deen, Vill. Abhiyakalan,
block bhadaiyan
2 Total land available with the beneficiary (ha.) 1.267 ha.
3 Type of MI system availed Drip/ Sprinkler Sprinkler
4 Crop(s) covered 0.40 ha.
5 Total area covered (ha) 1.00 ha.
6 Crop Spacing ( for Drip) _
7 Year of establishment 2011-12
8 Name of Manufacturer/ Supplier Parixit Ind. India Ltd.
9 Total subsidy paid & date of payment Rs. 13058.00
10 Mode of Payment By cheque
55
11 Status of crop Potato & Pea.
12 General upkeep (Very good. Good/ Average /
Poor)
13 Any other relevant obstruction by the JIT.
District: Sultanpur Observations:
Government Vegetable Farm, Village- Dikhauli, P.O. Dubeypur. Farm Incharge has potato and table pea seed production under NHM at this farm. Fruit plants nursery of Mango, Guava and Aonla has also been maintained at this farm and the propagated plants are being supplied to farmers and other agencies.
Mr. Ram Kumar Verma, village Narainpur, Block- Bhadayian planted one ha tissue cultured banana on his field during current year(2012-13) and is doing well.The progress is very good.
Mr. Wahid Khan village- Mohanpur, Block- Dubeypur, maintained one acre drip irrigation system for vegetable production (tomato, cauliflower and capsicum).The working of this system is satisfactory.
M/s Sriganga Cold Storage,village- Lohramau, Sultanpur added one chamber under NHM support to increase the capacity for potato seed storage. The cold storage is being used for potato seed.
Mrs. Shaheen Begum w/o Mr. Abdul Rauf, village- Pakrauli, Block- Bhaddyian, planted mango (Dusheri) in 2.0 acre area during 2012-13 and maintainence part is good.
Mr. Ram Naik Singh, village- Hanumanganj, Block - Bhaddyian, maintained 1.0 acre mango orchard in second year with proper inputs to the plants. He has also sown turmeric (0.2 ha) variety Rajendra Sonia in this year.
Mr. Ramraj Verma ,village- Gopalpur, Block Bhaddyian, maintained 2nd year 1.0 ha of banana crop and is ready to harvest at his field.
Mr. Raj Bahadur Verma ,village- Gopalpur sown 0.2 ha of turmeric under NHM during 2012-13 and is doing well.
Mr. Vimlesh Bahadur Singh, village-Tayrain Block Bhaddayain maintained 4.0 ha second year banana crop. The harvesting of matured banana was going on.The yield is good.
Mr. Shiv Karan Shukla S/o Ram Deen produced table pea in one ha during 2011-12 through use of sprinkler system.
56
Sultanpur District Photographs:
Govt. vegetable Farm Village Dikhauli, P.O. Dubeypur, Sultanpur.
Mango mother plants for grafting purpose.
Grafted mango saplings of DUsheri, Chaunsa and Lagra varieties.
57
Tissue cultured banana variety G-9 planted during 2012-13 at Ramkumar Verma’s field.
Mr. Wahid Khan Village- Mohanpur, Block- Dubeypur seen with drip irrigation system.
laterals of drip irrigation erected on raised beds.
58
low tunnels poly house used for nursery raising.
Cauliflower planted on raised beds.
Nursery raising in poly-net house
59
frontage of M/s Durga Cold Storage.
Team is inspecting machinery of Sri Ganga Cold Storage.
Potato Seeds drying in pre cooling chamber.
60
Newly established Mango orchard in the field of Mrs. Shaheen Begum.
IInd year Banana crop of Mr. Ram Raj Verma Village Hanuman Ganj.
Fresh harvest of matured Banana at Mr. Vimlesh Bahadur Singhfield.
61
Mr. Shiv Karan Shukla showing sprinkler set to the JIT.
Nurseries of Cauliflower and Tomato planted in net house.
Banana saplings kept in plastic crates for transportation.
62
Mr. Manzoor Ahmed Khan Village Jaganpur showing bottle guard on bowered system under RKVY
programme.
Mr. Rajesh Pratap Singh Vilalge Shah Niwajpur showing rejuvenation on mango plants.
Mr. Arshad Sahab showing mango rejuvenation in 40 years old orchards
63
rejuvenated mango trees.
Mr. Heera Lal Verma Village -Simra showing banana plantation in the year 2012-13.
Mrs. Gulam Bati Vilage Simra harvested banana crop and loaded for market.
64
Mr. sheetal Prasad Verma Village Simra showing drip irrigation system for tomato raising.
Mr. Shamsuddin Village Nandrauli Block Bikapur showing Beehives.
65
District: Lucknow
INTRODUCTION:
It lies at 26 degree 30 minutes and 27 degree 10 minutes north latitude and 80 degree 30
minutes and 81 degree 13 minutes east longitude. Lucknow covers an area of 2528 sq
km. Lucknow District has uniformed tropical climate. The temperature varies from 45
degree Celsius in summer to 5 degree Celsius in winter season. Average rainfall is 1000
mm per annum. The main fruit crops are mango, guava, Banana; vegetables and
floricultural crops. . Mangoes grown in the district are exported to other countries. The
Joint Inspection team visited Kakori, Malihabad, Bakshi Ka Talab, and Gushaiganj blocks
of Lucknow district .Team also visited nursery of CISH (ICAR), Rehmankhera .CISH is
producing disease free elite seedlings of recommended varieties of Mango, Guava and
Aonla. Team visited Malihabad block area expansion programme in cluster of Mango and
Aonla. It is observed that there are many old orchards which needs to be rejuvenated.
Team visited a cluster of Banana in a area of about 75 ha. at Ahmedpur Kherda. Mr.Habib
Khan established a good plantation with tissue culture seedlings of Banana var. Grand
Nene. The financial outlay of the district was Rs.488.60 lakh and out of which expenditure
was made for Rs.118.47 lakh (up to Dec.2010) i.e. 24.24%.
66
List of Farmers Field visited:
Radhey Raman Agarwal, navi Kat, B.K.T-1.0 hec (GuavaH.D)Janki Prasad,
Kalyanpur, B.K.T-0.40 hec.(Banana). (Total Beneficiary 12). Banana –CADILA, K.F,
TERI, GOGLE Mango & Gava form govt. Nursaries.
Sobha Rani, Rasulpur Sadat, B.K.T., Poly House, 5.0 hec, Capsicum.
Anil kumar singh, Raipur-raza, B.K.T., Brinjal in last stage and it is being uprooted,
2.0 hec.
Field Visit
Beneficiary No.1
Sr.
No.
Details Remarks
1 Name & address of Beneficiary whose
field visited.
1. Radhey Raman Agarwal, navi Kat,
B.K.T-1.0 hec (GuavaH.D)
2. Janki Prasad, Kalyanpur, B.K.T-
0.40 hec.(Banana)
3. Pushpa Devi, Kalyanpur, B.K.T-
0.50hec.(Banana)
4. Sohan Lal, Kundapur, B.K.T. 0.50
hec (Banana)
5. Mataparsad Sing SoniKpur, B.K.T-
1.0 hec (Banana)
6. Anil Kumar singh Raipur Raza,
B.K.T-1.0hec(Banana)
7. Nadeen Khan, Ahmedpur Khera,
B.K.T-1.0(Banana)
8. Babu ,oam. Otimka, B.K.T 0.30
hec (Banana)
9. Krishna kumkar singh, Singnamau,
B.K.T-0.50 hec(Banana)
10. Gokhran prasad, Nevada, B.K.T
1.0hec(Mango)
11. Govind prasad, Nevada, B.K.T.-
0.50hec (Guava)
12. Ram Nath Nevada, B.K.T.- 1.0 hec
Mango (reju.)
67
2 Total land available with the beneficiary
(ha.)
8.70
3 Crop Cluster under which covered. 6.20 hec., Banana
4 Name & variety of crop Planted. Banana-G9, Guava-L49, Mango-
Dushhehri
5 Source of planting material. Banana –CADILA, K.F, TERI, GOGLE
Mango & Gava form govt. Nursaries
6 Number of Planting material.
7 Number of plants planted/ rejuvenated. Guava-1100,
Banana-3806/hec.
Mango-100/hec
8 Date of Plants which survived ( also
indicate percentage survival).
95%
9 Total Amount of subsidy assistance due to the beneficiary as (Rs.)
Mango-16,500/hec Guava-16,463/hec Banana-41,602/hec Mango(rej’n)-15,000/hec
10 Amount paid and date of payment.
11 Mode of payment. By A/c Cheque
12 Source of irrigation Water ( Bore well/
Tub well/ Canel).
Tube well
13 Whether Drip/ sprinkle System in use. -
14 Other inputs provided. -
15 Whether assistance available for Organic Farming
-
16 If so, area covered -
17 Assistance available -
18 Available marketing facility for the crop. -
19 Other Infrastructure available in the vicinity.
-
20 General upkeep of the Plot; Very good.
Good/ Average / Poor.
Good
21 Any other relevant obstruction by the
JIT.
-
68
Beneficiary No.2
Sr.
No.
Detail Remark
1 Name & address of Beneficiary whose field
visited.
Sobha Rani, Rasulpur
Sadat, B.K.T.
2 Total land available with the beneficiary (ha). 5.0 hec
3 Type of: Protected cultivation activity (Hi-tech
/ Normal GH, Shade net, Plastic tunnel )
Poly House
4 Year of establishment 2012-13
5 Size of Structure (Sq. m) 1000 sqm.
6 Total cost 9.71 Lakhs
7 Agency involved in fabrication and installation Yes
8 Total subsidy paid and date of payment. Under process
9 Crop being grown Capsicum
10 Condition of Structure Good
11 Condition of Crop Neurly Planted in size of
above 9 inches.
12 Tie up with market -
13 General upkeep (Very good! Good! Average!
Poor)
Very good
14 Any other relevant observation by JIT. -
69
Beneficiary No.3
Sr.
No.
Detail Remark
1 Name & address of Beneficiary visited. Anil kumar singh, Raipur-
raza, B.K.T.
2 Total land available with the beneficiary (ha.) 2.0 hec
3 Type of MI system availed Drip/ Sprinkler Drip
4 Crop(s) covered Vegetable
5 Total area covered (ha) 1.0 hec
6 Crop Spacing ( for Drip) 3.0 feet
7 Year of establishment 2010-11
8 Name of Manufacturer/ Supplier Jain irrigation
9 Total subsidy paid & date of payment Directly paid to frim
10 Mode of Payment By A/c cheque
11 Status of crop Brinjal in last stage and it
is being uprooted
12 General upkeep (Very good. Good/ Average /
Poor)
Good
13 Any other relevant obstruction by the JIT. -
70
District: Lucknow Observations:
The three activities listed above viz: G-9 Banana, Polyhouse and drip irrigation are well maintained and doing very well.The team also visited M/s Suyash Naturaceutical Foods Pvt. Ltd., Village- Nizampur Malhour, Lucknow for overall verification of ripening unit for Banana, Papaya and Mango. The unit is being operated by the beneficiary Sh.. M.P. Bhatt. The chamber is running on ethylene based technology at fixed temperature and time. The ripened banana taken away from the chambers and loaded to the Mini trucks for marketing. This is a very well maintained unit and the quality of ripened banana is very good.
Lucknow District: Photos
Ripening chamber prepared through NHM assistance at Nizampur Malhaur, Lucknow
Ethylene based ripen Banana
71
Mini Van for marketing of naturally ripened banana
Four units of ripening chambers
72
Recommendations
1. The JIT visited some parts of Districts: Lucknow, Sultanpur, Faizabad and
Barabanki.There is a need to have more emphasis on activities related to PHM, drip
irrigation and protected cultivation.
2. The rejuvenation of old plants undertaken is very less and at some places it has not
been done properly. There is lot of scope for this activity and need to be undertaken
as per the prescribed method.
3. In district Barabanki the units namely: Vermicompost and Packhouse visited by the
team and supported under NHM are not working at all. The Department should take
necessary action to restart them.
4. The Department needs to take steps to get the activities completed which are given
to NDUAT under NHM.
5. The Govt. Food Science Training Centre, Faizabad has lot of equipments
purchased for Diploma students but are not being used even for practicals. This
needs to be looked into.