JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

12
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT TUSTIN CITY COUNCIL MEETING Tuesday July 21, 2015 PIPELINES LLC WICKLAND 1 1

Transcript of JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

TUSTIN CITY COUNCIL MEETING Tuesday July 21, 2015

PIPELINES LLC WICKLAND 1 1

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PROJECT TIMELINE October 2011 – Wickland Pipelines selected by Airlines

April 2012 – Meetings with Tustin, Irvine, and Orange County

May 2014 – CEQA Mitigated Negative Declaration approved

July 2015 – Tustin City Council

September 2015 – Irvine City Council

October 2015 – FAA Permit Complete

Winter 2015 – Pipeline construction complete in 90 days

PIPELINES LLC WICKLAND 2 2

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

WICKLAND PIPELINES LLC Based in Sacramento, CA

California Public Utility Commission regulated public utility

Federal DOT and California State Fire Marshal oversight

35+ years experience in pipeline fuel distribution

Other California Airport Pipelines operated by Wickland: • Sacramento International Airport pipeline • San Jose International Airport pipeline

PIPELINES LLC WICKLAND 3 3

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PIPELINE DESCRIPTION Pipeline Size 12 inches diameter

Pipeline Length 5.3 miles

Pipe Depth 100% underground, between 5 and 50 feet deep

Pipe Material Carbon steel with fusion bonded epoxy

Product Jet Fuel (kerosene)

PIPELINES LLC WICKLAND 4 4

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PIPELINE ROUTE OVERVIEW

PIPELINES LLC WICKLAND 5 5

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PIPELINE ROUTE IN TUSTIN

PIPELINES LLC WICKLAND 6 6

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PIPELINE TIE-IN

New SNA Pipeline Equipment at Tie-in

Tustin Ranch Road

New Leased Parking

Lot

Edinger Avenue

Public Storage Facility

Existing Products Pipeline

PIPELINES LLC WICKLAND 7 7

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

CONSTRUCTION EQUIPMENT

Cranes and water trucks (San Jose, CA)

Welding equipment (San Jose, CA) HDD drill rig (San Jose, CA)

Backhoe and sideboom (San Jose, CA)

PIPELINES LLC WICKLAND 8 8

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

SYSTEM SAFETY FEATURES Epoxy coating and cathodic protection

100% of welds x-rayed and certified

Constructed to ASTM, ANSI, API, NFPA, and PHMSA standards

Hydrostatic testing and smart pigging

24-hour operator and SCADA computer monitoring

Redundant alarms and automatic shutdown

Oversight from US DOT, CA Fire Marshall, and local agencies

PIPELINES LLC WICKLAND 9 9

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PROJECT BENEFITS “Reduced risk” and “Increased safety” – Calif. Fire Marshall

Eliminates more than 44 tanker truck trips per day

Reduces traffic and wear on local roads and highways

Decreased air pollution and greenhouse gases

Enhanced security in Airport secure zone

Increased reliability and security of fuel supply

Lower jet fuel costs at John Wayne Airport

PIPELINES LLC WICKLAND 10 10

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

PROJECT BENEFITS EMISSION REDUCTIONS

0

1

2

3

4

5

6

7

8

9

10

0

100

200

300

400

500

600

700

800

900

1000

Emissions with Trucking Emissions with Pipeline

Met

ric T

ons o

f NO

x Pe

r Yea

r

Met

ric T

ons o

f CO

2 Pe

r Yea

r

Trucks CO2 per year (2008) Pipeline

CO2 per year

Trucks NOx per year (2008) Pipeline

NOx per year

PIPELINES LLC WICKLAND 11 11

JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT

TUSTIN CITY COUNCIL MEETING Tuesday July 21, 2015

PIPELINES LLC WICKLAND 12 12