Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 1 of 63
Johannesburg City Parks and Zoo
Non Profit Company
Company Registration No: 2000/028782/08
Business Plan
for the Financial Year
2018/19
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 2 of 63
TABLE OF CONTENTS
1. STRATEGIC OVERVIEW ................................................................................. 4
1.1. Mandate and Primary Objective ............................................................... 5
1.2. Vision ....................................................................................................... 5
1.3. Mission ..................................................................................................... 6
1.4. Values ...................................................................................................... 6
1.5. JCPZ Strategic Objectives to 2021 ........................................................... 7
2. STRATEGIC ANALYSIS INFORMING THE JCPZ BUSINESS PLAN FOR
2018/19 ............................................................................................................. 9
2.1. PESTEL Analysis ..................................................................................... 9
2.2. SWOT Analysis ...................................................................................... 14
2.3. Strategic Response: Strategy and Policy Imperatives Providing Context
to the Work of JCPZ ............................................................................... 16
2.4. JCPZ Operating and Business Model..................................................... 21
3. JCPZ COMMUNICATION AND STAKEHOLDER MANAGEMENT ................. 23
3.1. Stakeholder Management ...................................................................... 23
3.2. Communication Plan .............................................................................. 27
4. JCPZ IMPLEMENTATION AND PERFORMANCE OVERVIEW ...................... 28
4.1. Past Performance Highlights .................................................................. 28
4.2. JCPZ Game Changers and Priority Projects .......................................... 32
4.2.1. Effective Horticultural and Conservation Services within the City of
Johannesburg ............................................................................. 32
4.2.2. Inner City Revitalisation: Strategy for Safe Community Parks in the
Inner City .................................................................................... 33
4.2.3. JCPZ 2018/19–2020/21 Legacy Projects .................................... 35
4.2.4. JCPZ - 2018/19 Additional Political Imperatives (Pressure Point
Focus Areas) ..................................................................................
4.3. 2018/19 IDP Corporate Scorecard and Day to Day Operations .............. 38
5. FINANCIAL IMPACT ....................................................................................... 49
5.1. Operational Revenue and Expenditure................................................... 49
5.2. Capital Expenditure ................................................................................ 49
6. MANAGEMENT AND ORGANISATION STRUCTURE ................................... 54
6.1. Capacity Analysis ................................................................................... 55
6.2. Employment Equity ................................................................................ 56
7. RISK MANAGEMENT AND MITIGATION ....................................................... 56
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 3 of 63
OFFICIAL SIGN-OFF
It is hereby confirmed that this 2018/19 Business Plan for Johannesburg City Parks and Zoo
(JCPZ):
Was developed by the management team of Johannesburg City Parks and Zoo, under
the guidance of the Board;
Takes into account all the relevant legislation, policies and other mandates for which
Johannesburg City Parks and Zoo is responsible; and
Accurately reflects the performance targets which Johannesburg City Parks and Zoo will
endeavour to achieve given the resources made available in the budget for the 2018/19
financial year.
Recommended by:
Mrs Lindokuhle Ngcongo
Chief Financial Officer
Signature:
Date:
Mr Bryne Maduka
Managing Director
Signature:
Date:
Approved by:
Mr Edgar Neluvhalani
Chairperson of the Board
Signature:
Date:
MMC
Executive Authority
Signature:
Date:
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 4 of 63
1. STRATEGIC OVERVIEW
Johannesburg City Parks and Zoo (JCPZ) is a non-profit legal entity wholly owned by the City
of Johannesburg (COJ) Metropolitan Municipality. It was established as a Municipal Owned
Entity (MOE) mandated to develop, maintain and conserve the green open spaces and
cemeteries in Johannesburg, as well as the Johannesburg Zoo. The organisation has a
growing portfolio in excess of 20 000 ha of green open spaces and 3.2 million trees (public
spaces), while the Zoo houses over 365 species of animals consisting of 3 076 specimens
housed within 54,7 ha area. The company provides the following products and services:
Urban parks, recreation and leisure facilities;
Cemeteries and crematoria;
Botanical services;
Nature reserves, including bird sanctuaries, nature trails, dams and lakes;
Environmental conservation, including biodiversity management and awareness;
Eco-tourism products and services;
Horticultural and arboriculture services;
Horticultural technical training;
Environmental education and awareness;
Bio-aquatic management;
Zoological services; and
Zoo conservation and research farm.
The JCPZ of today follows an institutional review that took place in 2011, that led to the merger
in 2013 of Johannesburg Zoo and Johannesburg City Parks. The merger was based on
alignment of interests and mandates, while reducing costs through shared services and
management. More importantly, the focus was on synergising and leveraging off the skills sets
and talent available in either entity.
The Board is the Accounting Authority in terms of the Municipal Finance Management Act
(MFMA). The Board provides strategic direction, leadership and oversight so as to enhance
shareholder value and ensure JCPZ’s long-term sustainability, development and growth. In
fulfilling its responsibilities, the Board is supported by the Managing Director and the executive
team in implementing the approved Strategic Plan and Policies. Structurally, the JCPZ is
categorised under the COJ Human and Social Development Cluster.
As JCPZ is a city-owned entity, its strategic focus must encompass its parental equivalent, the
2040 Gauteng Growth and Development Strategy (GDS). Therefore, in the latter half of 2014,
JCPZ embarked on a strategic review process that led to the development of a clear strategic
plan to ensure feasible delivery of its mandated requirements.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 5 of 63
In 2016/17, JCPZ then revised its strategic framework and strategic plan to align to the new
political mandate and priorities, and to the 2017–2021 IDP Framework. This revised response
is reflected in the sections below.
In November 2017, JCPZ then again convened to begin the 2018/19 planning cycle, resulting
in the development of this business plan and corporate scorecard, which reflects continued
focus on the alignment and integration of the business of JCPZ with its mandate, vision,
mission and values.
The organisation’s planning architecture, as well as the execution and reporting cycle are
progressing towards maturity and, through leveraging the synergy and relationship between
public good and revenue focused services, JCPZ will progress towards becoming a centre of
excellence that effectively services the needs of all its stakeholders.
1.1. MANDATE AND PRIMARY OBJECTIVE
The Constitution of South Africa and the Municipal Systems Act provide the framework within
which Local Government exists. It is from here that the mandate informing the work of the
JCPZ is derived.
In this context, the mandate of Johannesburg City Parks and Zoo is set out in the Shareholder
Agreement with the COJ, as follows:
The sustainable provision, preservation and management of open spaces,
biodiversity, environmental and conservation services through education, research,
direct conservation action and recreation, with a focus on the zoo, parks, open
spaces and cemeteries.
1.2. VISION
In delivering against its mandate, and in support of the COJ Vision for:
“Service with Pride”: We will ensure that the government is an effective partner for our
residents by reforming the administration and making key interventions to improve the
nature of service delivery and create an open opportunity society for all”,
“If Johannesburg works, South Africa works”: In order to create freedom, fairness and
opportunity, we will get this city working by creating the economic enabling environment
and social conditions in which investment grows and jobs are created.
The Johannesburg City Parks and Zoo vision is for:
A Joburg that is environmentally sustainable, liveable and socially inclusive and
equitable.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 6 of 63
1.3. MISSION
In achieving the above vision and in support of the COJ Mission “to create an enabling
economic environment by making Joburg more responsive in the delivery of quality
services”, the Johannesburg City Parks and Zoo’s mission is:
To develop, maintain and conserve animal and plant life within public open spaces,
cemeteries and the Zoo, for/with/on behalf of present and future generations.
1.4. VALUES
To support and drive its core strategy, Johannesburg City Parks and Zoo appreciates that
values identify the principles for the conduct of the institution in carrying out its mission and,
in this regard, institutional values are derived in conjunction with the JCPZ mission.
The values define a citizen-oriented approach for producing and delivering its services in line
with the Batho-Pele principles, as follows:
Value What it means in practice for JCPZ
Service excellence Conduct our work in an efficient, effective, professional and
accountable manner;
At all times render the quickest, most responsive and best
service to our customers; and
Work with a commitment to quality and high performance.
Ubuntu (Care and concern
for people)
Work with care, empathy, respect and consideration for the well-
being of our staff, customers and stakeholders;
Maintain a safe and healthy work environment and promote care
and concern for assets and facilities; and
Focus on people development, growth and work/life balance.
Teamwork Focus on collaboration and working together to achieve more;
Promote an environment of sharing knowledge and information.
Ownership and commitment Take responsibility for our actions and “do it right the first time”;
Act with integrity and in a transparent, ethical and honest
manner;
Work with pride, passion and discipline;
Demonstrate a focus on customer service and satisfaction and
in the best interests of the City.
Innovation Listen to and understand needs and create new approaches to
what we do;
A focus on cutting edge, best in class and “outside the box”
approaches and solutions.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 7 of 63
The above values require targeted management intervention to ensure they are visible and
lived, and they should be assessed as part of the performance management approach of
JCPZ.
1.5. JCPZ STRATEGIC OBJECTIVES TO 2021
As JCPZ pursues its vision and mission, the Strategic Objectives are derived from the above
strategic intent and business/operating model, and are aligned to both the GDS and COJ
strategic priorities and outcomes.
For the period 2018/19 and beyond, five Strategic Objectives have been developed in order
to enable JCPZ to effectively focus and prioritise its options in delivering on its mandate and
to respond to the identified strategic focus areas.
Note: Again, the Strategic Objectives are believed to be flexible enough to accommodate the
expansion of the scope of the portfolio under JCPZ’s control (i.e. the centralisation of
all horticulture and conservation services under JCPZ). This is not considered an
expansion to the mandate; rather only an expansion to the quantum and scope of the
portfolio under JCPZ management.
The five Strategic Objectives are elaborated upon in the table below:
JCPZ Strategic Objective
(Towards achieving the
mandate, mission and
Strategic Priorities)
Objective Focus Areas and
Programmes
Alignment to COJ Priority
and IDP Programme
1) SERVICE DELIVERY:
To provide our
services with pride to
all citizens, and to
redress imbalances of
the past
Neighbourhood
improvement.
High quality regional
maintenance and repairs
- maintain a sustainable
open space and park
system.
Greening informal
settlements.
Promote access to the
facilities for the poor.
Promote healthy
lifestyles and social
cohesion through
facilities, recreation and
environmental education.
COJ Priority 3: Create a culture
of enhanced service delivery
with pride
IDP Programme 1:
Customer Charter
Programme
COJ Priority 9: Preserve our
resources for future
generations
IDP Programme 6:
Resource Sustainability
Programme
COJ Priority 2: Ensure pro-poor
development that addresses
inequality and provides
meaningful redress
IDP Programme 6: Pro-
Poor Development
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 8 of 63
JCPZ Strategic Objective
(Towards achieving the
mandate, mission and
Strategic Priorities)
Objective Focus Areas and
Programmes
Alignment to COJ Priority
and IDP Programme
2) RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community at all
times.
Customer care (“Citizen
First”).
JCPZ Human Capital to
support responsive
delivery.
Environmental
management and
education.
Research driven
programme/intervention
design and management
(open spaces, parks, zoo
and cemeteries).
Open space planning
and management.
Stakeholder partnerships
and mobilisation.
Responsiveness through
optimised business
processes and
technology.
COJ Priority 6: Create a City
that responds to the needs of
residents
IDP Programme 4: Citizen
Relations
COJ Priority 7: Encourage
innovation and efficiency
through programmes, such as
Smart City
IDP Programme 4: Smart
City Programme
3) JOB CREATION: To
facilitate jobs through
our resources and
partnerships.
Green enterprise
support.
Promoting eco-tourism
and heritage tourism.
Green skills
development.
Partnerships in green
technology innovations.
COJ Priority 1: Promote
economic development and
attract investment
IDP Programme 1:
Economic Development
Programme
4) SAFETY IN
COMMUNITIES: To
provide safe facilities
to communities
through awareness,
technology and
patrolling.
Safety in open spaces -
through visible patrolling
and technology.
Anti-crime awareness
campaigns.
Disaster management.
Safe equipment and
safety education.
COJ Priority 4: Create a sense
of security through improved
public safety
IDP Programme 3: Safer
City Programme
5) SOUND
GOVERNANCE AND
EFFECTIVE
MANAGEMENT: To
Prevent corruption
though effective
awareness, reporting
and prevention.
COJ Priority 7: Enhance our
financial sustainability
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 9 of 63
JCPZ Strategic Objective
(Towards achieving the
mandate, mission and
Strategic Priorities)
Objective Focus Areas and
Programmes
Alignment to COJ Priority
and IDP Programme
ensure sound
governance and
financial management
and internal controls.
Sound financial
management and
internal controls
improvement.
Risk management and
mitigation.
IDP Programme 8:
Financial Sustainability
Programme
COJ Priority 5: Create an
honest and transparent City
that fights corruption
IDP Programme 4: Clean
Governance Programme
2. STRATEGIC ANALYSIS INFORMING THE JCPZ BUSINESS PLAN FOR 2018/19
Aligned to the above Strategic Objectives and strategic intent, JCPZ conducted a
comprehensive situational analysis to inform 2018/19 planning priorities, summarised as
follows:
2.1. PESTEL ANALYSIS
Emerging Issue Implications for JCPZ
Political MTSF and National
Development Plan, GDS
2050 and IDP
Strategic and programme alignment to National
policy priorities.
Programme alignment to City-wide policy
priorities.
Integrate with other GDS-led initiatives from
different municipalities.
Other socio-economic
priorities taking
precedence over
recreation, parks,
zoological and other
conservation matters
Limited budgets shared among City
departments and entities.
Need to pursue alternative funding/revenue
streams.
Need to “champion” environmental, open space
and conservation agenda.
Increase in emerging
cities in Africa
Bilateral partnership opportunities.
Programme alignment with commitments.
Need to maintain high standards to maintain
Johannesburg’s status in Africa.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 10 of 63
Emerging Issue Implications for JCPZ
JCPZ has political support to vigorously pursue programs that are associated with the priorities of
national government and the City’s GDS and IDP. The organisation is well placed to take advantage
of current and future focus around sustainable and liveable communities and climate change, and to
use these as tools to forge relationships with national and global partners with similar objectives.
Economic Low growth economy Limited budgets and, therefore, this is a strain
on infrastructure growth and development.
Pressure to service existing asset base requires
a Strategic Asset Plan.
Need to diversify income.
Increased unemployment Need to focus JCPZ towards job creation – by
leveraging instruments, co-operatives, EPWP,
CWP.
How to leverage and exploit available
mechanisms, e.g. youth Incentive grants, jobs
funds, etc.?
Decreasing public and
private sector investment
in infrastructure
Forging of partnerships/trade-offs and spin-offs
from infrastructural projects.
Need to diversify programmes and services.
Very high income
disparities
Promotion of volunteer programmes/community-
based maintenance programmes.
Enterprise/SMME
development
An optimal resource plan which balances
insourcing/outsourcing and volunteerism.
Opportunity for partnerships with SMME’s.
Good quality facilities able
to generate external
revenue
Develop management and control procedures.
Increased revenue for growth and development
projects.
Strengthen safety in JCPZ facilities.
Need to enhance maintenance of existing
assets.
Although the global and national economies are in flux, the City of Johannesburg is experiencing
positive economic growth. Johannesburg is favourable for direct investment. JCPZ has the
opportunity to capitalise on the opportunities that exist for partnerships with the private sector and
other municipal entities.
Social and
Cultural
New housing settlements/
developments
New development projects require open space
provisioning and development.
Community based planning for the development
of new open spaces.
Greening and conservation in developed
spaces.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 11 of 63
Emerging Issue Implications for JCPZ
Explore new methods of high density greening,
such as rooftop gardening.
Burial space Plan for land for cemeteries/burials.
Development of cemeteries.
Promotion of alternative burial methods, e.g.
cremation.
Ongoing urbanisation,
migration and
densification
Strain on development and maintenance of
open spaces and eco-environments.
Plan to adopt new approaches to greening in
dense urban areas, e.g. rooftops, reclaiming
tarmac, etc.
Embrace the multicultural nature of the City.
High youth unemployment Job creation opportunities, learnerships and
contracting opportunities.
Mobilising youth structures at community level
to partner JCPZ in programmes.
Vagrancy, homelessness
and crime
Requires JCPZ to be alert to social conditions
and realities of City.
Need response to homeless and vagrancy,
which deals differently with different categories
of people (on the streets by desperation vs. on
the streets willingly) – focus on dignity of people
as a means for mitigating, e.g. vandalism.
Strengthen partnerships with law enforcement
agencies.
Explore ideas such as soup kitchens and
shelters in parks facilities.
Mobilise community partnerships around
ownership/caring for parks.
Extending the reach of the judicial system (role
of municipal courts). Inculcation of a view on
the importance of protecting public resources as
assets of the City.
Food insecurity Utilisation of available public open spaces for
food cultivation using local community
involvement.
Change in JCPZ policies (for example,
ornamental trees to planting fruit trees).
Ensure urban agriculture is incorporated into
open space planning of the City.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 12 of 63
Emerging Issue Implications for JCPZ
Development of partnerships with other
government organisations, such as the
Agricultural Research Council (ARC).
More active Citizenry
Implement programmes focussed on promoting
active community participation in maintaining
and looking after City assets.
Deal with environmental illiteracy and ignorance
– strengthen environmental education.
JCPZ must be alert and be able to adapt to the changing social climate in Johannesburg, by
embracing the developments and also being a vehicle for tackling social challenges. In response to
the emphasis on improving quality of life, activities of the JCPZ should be structured towards building
sustainable and liveable communities for all members of the Joburg community.
Technological Green technology rollout
in existing facilities and
new capital developments
Development of policies around green
technologies and specifications for
developers/consultants/contractors.
Explore new technologies in facilities –
hydroponics, etc.
Explore green construction/green building. Use
of natural “green” materials. Is there opportunity
for JCPZ to be involved in supplying/facilitating
the supply of such products?
Use of new waste technologies. Explore use of
green waste to generate electricity, etc.
Look into using green technology to deal with
our eco-systems (e.g. flooding).
How technology can be better used by JCPZ
organisation (paperless environment, etc.)?
Internet accessibility at
key public facilities
Deployment of Wi-Fi technology - partnerships
with private sector.
Explore opportunities to better sell JCPZ
products using the internet. New avenues for
revenue.
Use technology to assist with cash management
(e-ticketing).
Ensure user-friendliness of facilities.
Increase in public use of
computers, the internet
and social media
Use of social media for marketing, educational
tools and community engagement.
Digitise customer interfaces, e.g. process venue
hire applications online,
Develop JCPZ cell phone application.
Use of geographic information systems to
enhance public knowledge of the location of
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 13 of 63
Emerging Issue Implications for JCPZ
parks and open spaces, e.g. in relation to transit
systems and other locations.
Alternative energy plant
and equipment
Research into cleaner technologies on grass cutting
and other equipment.
The availability of technology implies that JCPZ has the opportunity to improve productivity through
the use of more efficient and environmentally friendly equipment, and to develop maintenance
facilities that support a sustainable environment and the needs of a modern day society. Technology
can be used as a tool to enhance the customer experience, as well as to promote active community
engagement and citizenry.
Environmental Climate change mitigation
measures
Strengthen conservation and environmental
management - both in and ex-situ.
Urban greening as mitigation mechanism.
Explore carbon reduction measures.
Address environmental
degradation
Strengthen conservation and environmental
management - Both in and ex-situ.
Urban greening as mitigation mechanism.
Acid Mine drainage – how to deal with this
issue?
Resilience - mitigating environmental risks (for
example: give back to nature to reduce risk of
flooding).
Reduced waste to landfills Establish composting sites throughout the City.
Environmental education Deal with environmental illiteracy and ignorance –
strengthen environmental education.
JCPZ has a duty to pursue the continual process of greening the City, conserving its natural habitat
and educating the citizenry in respect of environmental conservation.
Legislative Compliance to applicable
legislation
Compliance - ensure policies and procedures are
aligned as legislation is changed/enhanced.
JCPZ must comply with all applicable legislation, must be accountable to its principals and the
community at large. The highest level of corporate governance and accountability underpins JCPZ’s
aspiration to contribute positively to the world class city vision of the COJ.
The above analysis highlights that JCPZ, although a local government organisation, is faced
with global issues that present both opportunities and threats. Of note is the opportunity to
engage in partnerships with both international and local partners, corporates, academia, other
government entities and spheres and NGO’s.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 14 of 63
2.2. SWOT ANALYSIS
A summary of the JCPZ SWOT analysis is reflected below:
SWOT Analysis: Internal Environment:
STRENGTHS
(What internal strengths can be leveraged?)
WEAKNESSES
(What internal weaknesses are undermining
our efforts and should be managed?)
Solid reputation for high performance within
government and communities.
Staff morale and diversity management,
including different cultures from the two merged
organisations.
History of unqualified audits and a clean audit
for 2016/17.
Gaps in management skills – especially
consistency.
Competent workforce – and opportunities to
optimise internal skills.
Ageing (maturing) workforce, limited
succession planning (multi-skilling and rotation
approaches).
Proven track record in capital development, as
well as operations management.
Lack of talent management approach.
Knowledge of best practice methodologies,
including asset management processes.
Reliance on COJ subsidy - declining revenue
generation.
Highly productive culture and diverse team
(age, race, gender).
Resource constraints meaning inability to
service all requirements and/or areas.
Work climate and Work-Life Balance needs
to be strengthened.
Internal customer/service provider relationships
via SLA’s.
Poor communication with the general public,
particularly in communicating successes.
Effective EPWP and contractor management in
place.
Silo mentalities.
Employee assistance programmes in place. Employee assistance program not optimal –
must be enhanced.
JCPZ, through its organisational alignment process, needs to ensure that it resolves these issues
to create a new organisation that is reflective of the values of the merged entity.
Furthermore, JCPZ needs to leverage its strengths of a sound reputation to enhance its revenue
streams to augment the tightening fiscal/budgetary conditions.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 15 of 63
SWOT Analysis: External Environment:
OPPORTUNITIES
(What external opportunities can we
exploit?)
THREATS
(What external threats must we mitigate)
Opportunity to qualify staff through various
NQF qualifications (in-house) - (PAAZAB,
Horticulture).
Budget limitations.
External revenue generation opportunities. CAPEX without corresponding OPEX –
maintenance cycles.
Growing green portfolio without growth in
subsidy.
Opportunity to link and comply with all relevant
international standards (ISO, etc.)
Threat in terms of ongoing compliance to
shifts in legislation and regulations (e.g.
animal management standards).
Rollout of WiFi in select public open spaces. Increase in input costs - electricity, water, fuel
and salaries, cost of providing security at
facilities.
Eco-tourism products and services. Vandalism and theft.
Opportunity to leverage reputation i.t.o.
attracting investments/partnerships – brand
value.
Service failure due to grey areas.
Use of modern technology. Youth unemployment.
Optimise asset management. Environmental disasters – and approach to
mitigate and respond.
Volunteer programmes and community co-
operatives.
Increased liabilities from members of the
public (e.g. liabilities arising from delivering
services).
Rollout of food security initiatives, such as
food gardens at parks.
Gardens in households.
Climate change – How to respond, adapt and
mitigate.
Tax rebate (carbon footprint). Increasing cost of compliance – get balance
between compliance and service delivery
focus right.
Green rating of facilities. Vagrancy and crime at facilities.
Composting plants. Limitations in terms of burial space.
Joint projects and collaboration with other
government entities.
Degradation of environment in adjacent
municipalities – other people utilising our
facilities and services – magnets for in-
migration.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 16 of 63
OPPORTUNITIES
(What external opportunities can we
exploit?)
THREATS
(What external threats must we mitigate)
JCPZ might expand influence across
boundaries – revenue generation
opportunities.
Opportunity to educate and service growing
population.
In-migration – resources outpaced by
demands on facilities.
Long term clash between green agenda and
growth of City.
Loss of open spaces due to development.
External revenue generation opportunities have to be leveraged to further enhance the position of
JCPZ in light of worsening economic conditions.
Budget limitations and the mismatch between CAPEX and OPEX spend requires resolution –
process improvements and revenue enhancement are ways in which this issue can be mitigated
somewhat.
2.3. STRATEGIC RESPONSE: STRATEGY AND POLICY IMPERATIVES PROVIDING CONTEXT TO THE WORK OF JCPZ
Designed as a broad set of programmatic interventions, the National Development Plan,
Vision 2030 (2012) (NDP) seeks to create a "virtuous cycle of growth and development" by
removing the most pressing constraints to investment and job creation, in order to eliminate
poverty and sharply reduce inequality in the country by 2030.
It prioritises improving the country's infrastructure while integrating the rural economy and
transitioning to a lower carbon economy, to improving the quality of education, achieving
quality universal healthcare, building safer communities, reforming the public service and
beating corruption. It further reflects a new development paradigm that seeks to involve
communities, youth, workers, the unemployed and business in partnership with each other
and with a more capable state.
Carried forward by the Medium Term Strategic Framework 2014–2019, the NDP stresses
the need for jobs to be located where people live, for informal settlements to be upgraded and
for housing market gaps to be closed. The plan suggests that public infrastructure investment
be set at 10% of the country's gross domestic product (GDP).
In support of the NDP, the COJ Growth and Development Strategy 2050 (GDS) presents
five systemic outcomes that serve to guide and orientate all planning in the City and shape
the priorities of the City to 2050, namely:
Outcome 1: A growing, diverse and competitive economy that creates jobs.
Outcome 2: Enhanced, quality services and sustainable environmental practices.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 17 of 63
Outcome 3: An inclusive society with enhanced quality of life that provides meaningful
redress through pro-poor development.
Outcome 4: Caring, safe and secure communities.
Outcome 5: An honest, transparent and responsive local government that prides itself on
service excellence.
As part of the Social and Human Development Cluster and located under the Department of
Community Development, with the MMC as Executive Authority, Johannesburg City Parks
and Zoo is primarily tasked to support GDS Outcome 3, aimed at a future that presents
significantly improved human and social development realities in the City; and to ensure an
integrated approach to providing a comprehensive and effective service to all citizens of the
City.
It is noted that JCPZ, as an ex-situ and in-situ environmental and conservation implementation
agent, also contributes significantly to GDS Outcome 2, in terms of ensuring the provision of
quality horticultural and conservation services, and environmental practices. It relates to
issues of equity, inclusivity and improved quality of life, supported by the establishment of
development-driven resilience.
It is further noted that Joburg City Parks and Zoo also contributes, although at a secondary
level, to the other three GDS Outcomes.
In turn then, the following figures reflect the alignment of the GDS to the 2016 electoral
mandate, the new strategic agenda and the revised 2016–2021 IDP priorities.
Alignment to the New Strategic Agenda:
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 18 of 63
The Aligned COJ Priorities:
The above priorities are then further unpacked specific to Joburg City Parks and Zoo, as
follows:
Specific priority focus areas for JCPZ to 2021:
The following table then presents the Johannesburg City Parks and Zoo alignment to the
above priorities, and outlines the specific JCPZ focus areas to 2021 for each:
COJ PRIORITIES AND IDP
PROGRAMMES
JCPZ STRATEGIC FOCUS AREAS
(Informing JCPZ Strategic Objectives and Key Result Areas)
COJ Priority 6: Create a City
that responds to the needs of
residents
IDP Programme 4: Citizen
Relations
Responsiveness – petitions and hotline/calls;
Enhanced stakeholder engagement – Social and Ethics
Committee;
Stakeholder engagement;
Enhanced communication;
Customer-centricity.
COJ Priority 1: Promote
economic development and
attract investment
IDP Programme 1:
Economic Development
Programme
SMME support;
Ensure sound and consistent supply chain management
processes that support preferential procurement, green
procurement and enhance the contribution of JCPZ to
enterprise development;
Cultivate local entrepreneurs/suppliers;
Strategic partnerships;
Revenue generation;
Increased facilities – number and quality;
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 19 of 63
COJ PRIORITIES AND IDP
PROGRAMMES
JCPZ STRATEGIC FOCUS AREAS
(Informing JCPZ Strategic Objectives and Key Result Areas)
Enhancing the image of City to attract investment.
COJ Priority 3: Create a
culture of enhanced service
delivery with pride
IDP Programme 1:
Customer Charter
Programme
Maintenance cycles;
Quality and timely delivery;
Timely implementation of projects;
Adequate resources to support delivery;
Centralisation of horticulture services;
Greening of informal settlements;
Skills development of employees;
Effective M&E;
Service delivery linked with City Delivery Model (regional
integration).
COJ Priority 4: Create a
sense of security through
improved public safety
IDP Programme 3: Safer
City Programme
Partnerships: Co-management of Parks with other
stakeholders/communities;
Design of parks and facilities (consider safety and
maintenance);
Community awareness;
Improve patrols;
Integrated approach to safety;
Lifecycle management of facilities – ensuring budgets to
maintain and rehabilitate.
COJ Priority 5: Create an
honest and transparent City
that fights corruption
IDP Programme 4: Clean
Governance Programme
Sound governance and internal controls;
Anti-fraud and corruption initiatives.
COJ Priority 2: Ensure pro-
poor development that
addresses inequality and
provides meaningful redress
IDP Programme 6: Pro-
Poor Development
Access to e.g. Zoo for poor users (package and link
programmes to this focus.);
Capital budget to focus on poor areas;
Maintenance - tend to focus on areas that are highly vocal, but
poorer areas are not as vocal. Need to reverse this logic;
Impact of reconfiguration of regions and walk-in centres;
Poverty affects women more – focus on women development;
Formalisation of informal settlements;
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 20 of 63
COJ PRIORITIES AND IDP
PROGRAMMES
JCPZ STRATEGIC FOCUS AREAS
(Informing JCPZ Strategic Objectives and Key Result Areas)
Beneficiation of poor areas – maximum resources left in
communities through targeted procurement;
Introduce greening initiatives and instil ethos;
Food gardens in parks;
Designing parks for issues of homelessness.
COJ Priority 9: Preserve our
resources for future
generations
IDP Programme 6:
Resource Sustainability
Programme
Environmental education and awareness;
Co-management (park stewardship and volunteerism);
Be guided by Sustainability Goals;
Environmental performance and compliance standards;
Urban forestry – sustainable urban forest;
Biodiversity and associated linkages (conservation – fauna
and flora);
Sustainable tourism;
Climate change mitigation and resilience;
Partnerships with communities – safeguarding (involve
interested and affected parties);
Recycling initiatives;
Promote alternative burial methods.
COJ Priority 7: Enhance our
financial sustainability
IDP Programme 8:
Financial Sustainability
Programme
Sound financial management and controls;
Cost effectiveness;
Repackage goods and services to attract investment;
Fight and prevent corruption;
Effective business development initiatives;
Quantify the value of green spaces – investment and property
value impact.
COJ Priority 8: Encourage
innovation and efficiency
through programmes such
Smart City
IDP Programme 4: Smart
City Programme
E-Learning programmes;
Enhancing service delivery and responsiveness through
enhanced business systems – improve ICT infrastructure;
Promote customer experience in facilities – Virtual Zoo,
Cemeteries;
Drone technology to enhance maintenance;
Smart Park designs.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 21 of 63
2.4. JCPZ OPERATING AND BUSINESS MODEL
JCPZ exists as a mechanism to improve the lives of the inhabitants of the City by improving
living conditions within the City. It is responsible for the protection and safeguarding of the
flora and fauna of the City to ensure that future generations can appreciate a bio-diverse,
green City that promotes social well-being for all of its inhabitants. Communities served by
JCPZ rely on them to fulfil their mandate of keeping Johannesburg green and clean, along
with uplifting quality of life through various green initiatives.
In response to the above policy, strategic and transformational priorities and to give effect to
its mandate, vision and mission; the JCPZ Service Delivery Agreement (SDA) defines the key
focus points for JCPZ and informs the business/delivery model of JCPZ, which in turn informs
its operations and the packaging of its strategic objectives, is reflected below:
Figure: JCPZ Business/Operating Model
Note: The strategic posture and the business model it informs are believed to be flexible
enough to accommodate the expansion of the scope of the portfolio under JCPZ’s
control (i.e. the centralisation of all COJ horticultural and conservation services under
JCPZ, towards effective horticultural and conservation services in the COJ). This is not
considered an expansion to the mandate (which remains the same), vision or mission;
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 22 of 63
rather only an expansion to the quantum and scope of the portfolio under JCPZ’s
management.
Ranging from horticulture, to arboriculture, to animal welfare and biodiversity, as well as green
economy interventions (ably supported by research and project design and management
capabilities) the JCPZ requires a diverse and specialised set of skills in order to adequately
deliver on its mandate. The table below summarises the core competencies required within
JCPZ.
Core Competencies within JCPZ:
Focus Core Competencies
Botanical
Gardens and
City Parks
Botanic research, monitoring and
information sharing
Conservation planning and
development
Environmental conservation
Recreation and eco-tourism
Horticulture, maintenance and
nurseries
Arboriculture
Planning, design and landscaping
Park utilisation management
Bio-aquatic management
Biodiversity, conservation and
open space education
Grass cutting and machinery
operation
Invader species control
Infrastructural maintenance
Project management and facilities
management
Climate change
Plant husbandry
Ecosystem and biodiversity
improvement
Cemetery
Management
Knowledge of governing laws
around cemetery management
Project management and facilities
management
Accurate record keeping
Spatial planning
Infrastructural maintenance
Cemeteries management: burials,
cremations and archival records
Johannesburg
Zoo
Zoology, biology, wildlife
management, animal science or
other animal study
Zoo management
Biodiversity
Bio-aquatic management
Invader species control
Project management and facilities
management
Animal husbandry
Biodiversity education
Smart City
ICT Infrastructure and
maintenance
Eco-friendly technologies
Sustainable technologies
Process implementation
Project management and facilities
management
Sustainability
and Biodiversity
Management
Rainwater harvesting
Recycling and waste management
Green living
Project management and facilities
management
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 23 of 63
Focus Core Competencies
Grass farming for agricultural
production and biofuel/biogas
Technical resources management
Infrastructural maintenance
Ecosystem and biodiversity
improvement
Climate change
Plant husbandry
Air quality
Environmental Education and
Awareness
Support
Services
Infrastructural maintenance
Finance
Business development
Marketing and campaigns
Process implementation and
management
Audit
Research and knowledge
management
Monitoring and evaluation
Ornamental Horticulture Technical
Training
Project management and facilities
management
Human resources
ICT infrastructure
Occupational Health and Safety
Stakeholder management
Reporting and business planning
Risk management
Performance management
Investment attraction (revenue
generation, partnerships,
fundraising, facility hire,
recreational programmes)
South Africa is currently experiencing a skills shortage within the environmental sector. The
relevant SETA’s and other organisations, such as the South African National Biodiversity
Institute (SANBI), continuously strive to create sustainable employment within these fields.
Similarly, JCPZ must rely heavily on training programmes, apprenticeships and internships in
order to ensure a continued skills supply within the entity through training and development,
linking personal development plans to the great skills plan, as well as ensuring talent retention
to maintain and lower the turnover rate.
3. JCPZ COMMUNICATION AND STAKEHOLDER MANAGEMENT
3.1. STAKEHOLDER MANAGEMENT
In fulfilling its strategic intent, it will be critical for JCPZ to effectively manage stakeholder
relations and collaborative partnerships.
These must address both stakeholders identified in terms of the shareholder agreement and
GDS mandate, and others that may influence the achievement of the organisation’s vision and
mission; and must include an enhanced focus on relations with institutions of higher learning,
research institutions, international agencies and public and private sector partners.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 24 of 63
Figure: JCPZ Stakeholder Map
With the above consideration in mind, JCPZ places its stakeholders at the very apex of its
strategic thinking and resultant planning; and stakeholder priorities are a critical consideration
in the development of this Strategic Plan. The following table reflects key stakeholder
considerations and programmes considered in the planning discussions:
External Stakeholders of JCPZ:
EXTERNAL STAKEHOLDER GROUPS
Key Stakeholder
Group
Key Projects/Programmes required to meet their expectations
Beneficiaries and
Communities
Historically disadvantaged communities expect rapid
development of parks, whilst more affluent areas expect
maintenance and enhancement of established facilities.
Clean, attractive and safe facilities.
Accessibility and ensuring our programmes benefit people with
disabilities and other targeted groups.
Focus on youth and women development programmes.
Incubating youth projects around procurement and addressing
youth unemployment.
Identify and implement township economy programmes.
Focus on conservation and biodiversity related projects (climate
change).
Identify and implement food security projects.
Identify and implement community participation programs -
community consultation and engagement in programmes.
Enhance contribution of JCPZ to job creation and improved
livelihoods.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 25 of 63
EXTERNAL STAKEHOLDER GROUPS
Key Stakeholder
Group
Key Projects/Programmes required to meet their expectations
A well-managed and governed entity.
Ensuring our facilities and programmes contribute to social
cohesion.
Government
Departments/Spheres
(National and
Provincial)
Awareness of national and provincial programmes and linkages to
COJ.
Meaningful participation in relevant fora.
Alignment of programmes to policies and strategies.
Enhanced collaboration and joint programmes.
Local government
partners and COJ
Departments/Entities
Build on existing relationships and contribute meaningfully at
cluster level.
Enhance communication of programmes and opportunities.
Regular forums for engagement.
Participate in City-wide planning structures and champion “green”
agenda.
Vested Interest Groups
(e.g. SPCA, NGO’s,
CDO’s, Youth
Development Agencies)
Identify and implement programmes in partnership with vested
groups - consultation and engagement in programmes.
Meaningful participation in relevant fora.
Enhance communication of programmes and opportunities.
Proactively communicate project initiatives.
Professional and
International Bodies
Compliance with relevant standards.
Programmes that give effect to agreements.
Enhance communication of programmes and opportunities.
Proactively communicate project initiatives.
Education Sector
(including SETA’s)
Partnerships around the Green Academy – and the expansion of
the service it provides internally and externally.
Explore opportunities to partner on internships, learnerships and
skills development programmes.
Joint research programmes and opportunities.
Operational programmes in collaboration with Academic
Partners.
Funding Partners/
Business
Identify strategic partners for PPP’s to support delivery of mandate.
Can’t wait for partners/sponsors to come to JCPZ. Must drive
stakeholder management and high level engagement and be
proactive.
Business Chambers want Public Sector to come forward with
projects - low hanging fruit.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 26 of 63
EXTERNAL STAKEHOLDER GROUPS
Key Stakeholder
Group
Key Projects/Programmes required to meet their expectations
Regular forums for engagement.
Enhance communication of programmes and opportunities.
Proactively communicate project initiatives.
Initiate additional partnership initiatives.
Professional service
providers, contractors
and suppliers
Focus on regional suppliers/contractors.
Strengthen enterprise development focus and support.
Enhance communication of programmes and opportunities.
Improve contract negotiation, management and reporting.
Fair SCM processes.
Consistency in application of standards.
Timeous payment for work done.
Media Enhance communication of programmes and opportunities.
Proactively package and communicate project initiatives.
Internal Stakeholders of JCPZ:
INTERNAL STAKEHOLDER GROUPS
Key Stakeholder
Group
Key Projects/Programmes required to meet their expectations
Shareholder/Executive
Authority/Council
Execute the political mandate and priorities towards sustainable
and integrated Human Settlements.
Focus on high-visibility “flagship programmes”.
Well aligned priorities and plans.
Implement Sound Governance principles.
Become central part of planning processes of
GSPCR/Development Planning.
Board Execute the JCPZ mandate.
Sound and defensible performance reporting.
Sound corporate governance.
Enhance collaboration in delivery of the strategic plan.
Employees and
employee
representatives
Implement and monitor the “living” of the corporate values.
Investigate and realign the structure in line with the strategy of
JCPZ.
Streamline various administration processes.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 27 of 63
INTERNAL STAKEHOLDER GROUPS
Key Stakeholder
Group
Key Projects/Programmes required to meet their expectations
Ensure reward systems in place, mentorship programme, training,
etc.
Good communication.
Good conditions of employment.
Employee personal growth.
A challenging and dynamic working environment.
In summary, the above stakeholder analysis discussions reflect that JCPZ is fully committed
to contribute to the COJ’s “world-class African City” vision and that, while JCPZ has no choice
on its market focus, it must serve all 4.7 million citizens of Joburg - the JCPZ stakeholder base
is broadly segmented into two categories, each with varying needs and demands on resources
which must be balanced:
1) As a local government, public service entity with a specific mandate to ensure desired
priorities and outcomes are achieved with available resources. Here JCPZ competes
for resources against other COJ Departments and Municipal Owned Entities; and
2) As an environmental company operating in the parks, conservation, recreation and
leisure industry, it competes against developers and other private and public
stakeholders for land and resources, and with other NGO’s for resources and donor
funding.
Management believes in engaging meaningfully with stakeholders so the company’s
outcomes and operations are guided by stakeholder’s inputs. This should contribute towards
building trust and making relationships more productive. To this end, the JCPZ’ Stakeholder
Unit attends the following meetings and activities: Section 79 Committee Meetings,
Councillors Briefing Sessions, consultations with Ward and PR Councillors and have a
representative at Petitions Standing Committee. The Unit also contributes towards orientation
programmes for cluster MMC’s, Section 79 Community Development Committee and Ward
Councillors. Engagements are also with Community Based Organisations, Regional Service
Delivery Meetings, Regional Councillors Forum Meetings and internal departments.
3.2. COMMUNICATION PLAN
The dissemination of information to communities is done on an as and when basis. Historically
printed flyers are used to inform communities regarding programmes, community events,
launches of facilities and so forth in their area. Other communication channels which are used
for the distribution of information are ward committees, community newspapers, community
radio and social media platforms.
Communications are focussed on pressure point such as peak season service delivery, the
extended horticultural maintenance implementation plans, alternative burials, investment
opportunities, events and facility hire. The entity is mostly known for horticultural maintenance
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 28 of 63
and often key programmes such as Environmental education, conservation programmes and
Ecotourism are not the main focus point. Our communications and activations intend to make
communities aware of additional opportunities presented by the entity.
4. JCPZ IMPLEMENTATION AND PERFORMANCE OVERVIEW
4.1. PAST PERFORMANCE HIGHLIGHTS
JCPZ continues to reflect efforts to meet and exceed the expectations of City of Johannesburg
Metropolitan Municipality (COJ) as the sole shareholder, which is determined by the service
delivery objectives in the company scorecard.
In 2017, the JCPZ conducted an end-of–term review on its performance against the key
objectives and targets reflected in the Strategic Plan for the period 2012/13 to 2016/17, which
then inform baselines for this 2018/19 Business Plan.
Key findings for high-level objectives and targets were as per the table below:
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 29 of 63
JCPZ STRATEGIC
GOAL (Strategic Plan
2013-2017)
JCPZ STRATEGIC
OBJECTIVE
(2013-2017)
KPI AND 2016/17
TARGET BASELINE (2012/13) ANNUAL TARGET
ACHIEVEMENT (TO
DATE 2016/17)
1. A financially viable
and sustainable
organisation
Effective, efficient and
transparent system of
financial management
and internal control
Clean audit with no
matters of emphasis
2 Entities - Unqualified
Audit with matters of
emphasis
Clean audit with no
matters of emphasis
Unqualified Audit with
matters of emphasis
2011/12 - 2015/16
2016/17 Clean Audit
Enhanced fiscal
discipline and the
effective management of
financial resources.
<2% variance on OPEX
budget
No overspending on
budget in 13/14
<2% variance on OPEX
budget
2013/14 no overspending
2014/15 1% overspend
2015/16 4% underspend
2016/17 2% variance
(overspent)
Percentage actual
Capex spend vs. budget
95%
98% spend % actual Capex spend
vs. budget
95%
2012/13 98%
2013/14 98%
2014/15 99%
2015/16 33%
2016/17 65%
Increased levels of
financial self-
dependency and
supplement the COJ
subsidy
Rand value of revenue
generation
R78.9m in 13/14
2013/14 R86 m
2014/15 R91m
2015/16 R95m
2016/17 R101m
2013/14 R78.1m
2014/15 R96.1m
2015/16 R59.1
2016/17 R93.5
Enterprise development
and job creation through
optimised preferential
procurement and
contractor management
Number of EPWP job
opportunities created
6 900 jobs created
1 400 in 13/14 2013/14 1 400 jobs
2014/15 2 500 jobs
2015/16 3 000 jobs
2016/17 1 450 jobs
2013/14 1 403 jobs
2014/15 3 332 jobs
2015/16 2 531 jobs
2016/17 2 265 jobs
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 30 of 63
JCPZ STRATEGIC
GOAL (Strategic Plan
2013-2017)
JCPZ STRATEGIC
OBJECTIVE
(2013-2017)
KPI AND 2016/17
TARGET BASELINE (2012/13) ANNUAL TARGET
ACHIEVEMENT (TO
DATE 2016/17)
2. An enhanced and
sustainable JCPZ
portfolio
Grow shareholder value
through the research,
planning, development,
management and
maintenance of the
JCPZ portfolio
Number of developments
(capital projects)
completed
6 parks developed 2013/14 (17
developments)
2014/15 (31
developments)
2015/16 (14
developments)
2016/17 (16
developments)
2013/14 (22
developments)
2014/15 (34
developments)
2015/16 (17
developments)
2016/17 (13
developments)
Well managed and
sustainable green
infrastructure, open
spaces and facilities
100% of targets
achieved in maintenance
of flagship parks,
developed parks,
undeveloped parks, main
arterials, sidewalks and
cemeteries
79% 100% of Targets
achieved in service
delivery
2013/14 95%
2014/15 94%
2015/16 100%
2016/17 96%
Customer care
improvement through
just in time maintenance
of portfolio
Percentage customer
satisfaction
70% customer
satisfaction
77% customer
satisfaction 13/14
2013/14 74%
2014/15 71%
2015/16 70%
2016/17 70%
2013/14 74%
2014/15 71%
2015/16 76%
2016/17 70%
3. Enhanced
ecosystem functioning
and environmental and
Protected ecosystems
and biodiversity and
improved ecosystem
functioning
Number of wetlands
rehabilitated
19 wetlands rehabilitated
5 wetlands rehabilitated 2013/14 5 wetlands
2014/15 4 wetlands
2015/16 5 wetlands
2016/17 5 wetlands
2013/14 10 wetlands
2014/15 7 wetlands
2015/16 5 wetlands
2016/17 6 wetlands
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 31 of 63
JCPZ STRATEGIC
GOAL (Strategic Plan
2013-2017)
JCPZ STRATEGIC
OBJECTIVE
(2013-2017)
KPI AND 2016/17
TARGET BASELINE (2012/13) ANNUAL TARGET
ACHIEVEMENT (TO
DATE 2016/17)
conservation
awareness Eco-culture and
environmental
awareness promoted
Number of learners
reached through
environmental education
in environmental
education centres
15 490 learners reached
through Environmental
education
2013/14 9 000 learners
2014/15 12 000 learners
2015/16 12 000 learners
2016/17 12 000 learners
2013/14 15 494 learners
2014/15 16 381 learners
2015/16 12 896 learners
2016/17 17082 learners
4. A globally visible
and credible
organisation
A contribution to
knowledge, policy and
strategy, both nationally
and globally
Number of industry
studies and research
projects completed
8 industry studies and
research projects
completed 14/15
2014/15 (8 studies)
2015/16 (6 studies)
2014/15 8 studies
2015/16 8 studies
5. Optimal internal
systems and
processes and sound
governance
Enhanced business
integration and
organisational
effectiveness
Number of business
processes Improved
5 business processes
Improved
2013/14 (5 processes)
2014/15 (5 processes)
2015/16 (5 processes)
2016/17 (5 processes)
2013/14 5 processes
2014/15 5 processes
2015/16 9 processes
2016/17 9 processes
6. A high performing
and optimally
capacitated
organisation
A high performance
culture underpinned by
an effective performance
management system
and approach
JCPZ performance
against corporate
scorecard
79% Target introduced by
COJ in 2016/17
85%
2012/13 79%
2013/14 71%
2014/15 89%
2015/16 70%
2016/17 75%
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 32 of 63
4.2. JCPZ GAME CHANGERS AND PRIORITY PROJECTS
In line with the Mayoral commitment to “Business Unusual” Game Changer projects, Legacy
projects, the Inner-City project and the Effective Horticultural and Conservation Services in
the COJ that will make a significant contribution to enhance service delivery, JCPZ has
identified the following projects for the period 2018/19 and beyond. In addressing the issues
highlighted through the above situational analysis and in giving effect to the strategic
objectives for 2018/19 is reflected in the sections below.
4.2.1. EFFECTIVE HORTICULTURAL AND CONSERVATION SERVICES
WITHIN THE CITY OF JOHANNESBURG
A project is currently underway for the strategic review, research, development and required
engagement with COJ stakeholders for the development of a strategic framework, delivery
model and region-based implementation masterplan for the effective provision of horticultural
and conservations services within the City of Johannesburg.
JCPZ recognises the critical role of green open spaces in an urban environment, the different
purposes and functions that they serve, and thus the need to provide an integrated and
effective horticultural and conservation service that supports and enables the delivery of the
priorities of the City as highlighted above.
In this regard, horticultural and conservation services is understood to mean more than simply
“grass cutting”, and covers all aspects of horticultural and conservation services provision,
aimed at:
1) Ensuring an environmentally sustainable, liveable, socially inclusive and equitable City
(JCPZ current Vision) through the full lifecycle management of horticultural and
conservation assets within public open spaces, cemeteries and the Zoo – plan, develop,
operate, maintain/renew and dispose;
2) Supporting and enabling the efficient and effective delivery of core municipal services,
including power, water, and vehicle and pedestrian mobility (roads and sidewalks) –
grass, reeds and trees maintenance, and herbicide control;
3) Creating a safe, clean and green environment (hygiene factors) for the delivery of
municipal services at citizen contact centres – community development, social
development, health, etc. – high quality, full package of H&C maintenance services;
4) Reducing the risks of vagrancy and crime by ensuring undeveloped and unoccupied
(non-leased, under JPC) municipal open spaces and facilities are maintained – grass,
reeds, trees maintenance and rubble removal;
5) The holistic management of ecological and conservation assets across the City,
including bio-aquatics management and alien plant control;
6) Ensuring a seamless quality of horticultural maintenance for all green assets spanning
different spheres of government, particularly provincial roads and provincial service
delivery points – through intergovernmental partnerships and agreements.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 33 of 63
There are a number of intricacies to the project, including how to deal with undeveloped and
unmaintained private land and ensuring all property owners and lessees take ownership for
maintaining their own land and properties. Therefore, it is important to determine what is in
budget and what is out of budget, which in turn will inform the different approaches to realising
the value proposition for effective horticultural and conservation services within the City. The
intent is ultimately for JCPZ to act as the One-Stop-Shop and to ensure, either through direct
implementation or through coordination and partnerships, that a seamless, integrated quality
of service is achieved across the City.
A detailed process of unpacking and mapping the project is currently underway to ensure the
value proposition is realised, including weekly JCPZ Project Team meetings, regular updates
to JCPZ Manco and Exco, working sessions with affected stakeholders and GIS extraction of
the various portfolios of open spaces and properties. The end product will articulate the ideal
future state and aligned resources for full coverage of the identified portfolio at optimal service
standards. While this may be ideal, it may not be affordable, and thus the project will also
reflect the trade-offs that will be required to work within available resource allocations, while
also scoping the areas where alternative service delivery mechanisms may be deployed
through partnerships and volunteerism, among others.
The high-level project plan includes:
1) Project scoping, situational analysis and stakeholder engagements
2) Stakeholder engagements
3) Development of the Strategic Framework
4) Development of the Delivery Model
5) Development of the Regional Implementation Masterplan
6) Development of 36 month implementation plan and conduct pilot implementation project
7) Project sign-off
4.2.2. INNER CITY REVITALISATION: STRATEGY FOR SAFE COMMUNITY
PARKS IN THE INNER CITY
A key highlight in the period was the finalisation of the Strategy for Safe Community Parks in
the Inner City, which responds to an important current goal of the City of Johannesburg to
establish a revived and regenerated Inner City. The Strategy for Safe Community Parks in the
Inner City was tabled at the Inner City Sub-Mayoral Committee on 30 October 2017, and
approved by the Mayoral Committee on 1 November 2017. The strategy is underpinned by a
case study on stakeholder engagement carried out at the End Street North Park, in which the
JCPZ, Department of Public Safety and Johannesburg Development Agency (JDA) were the
lead City departments. The park is currently under development by the JDA.
1) Co-management of parks. This strategy of co-management of parks envisages a more
developed relationship between the City, community and business at a practical level;
one in which there is responsibility, communication and cooperation by all. It is important
that JCPZ becomes resourced to expand its current responsiveness in this regard. It is
equally important that departments such as Citizen Relations and Urban Management
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 34 of 63
(CRUM) play a lead role in fostering citizen relations that all departments can interface
with, including for parks projects.
2) Co-investment in parks. All departments and entities must budget, so that they are
enabled to be responsive to their mandated responsibilities at Inner City parks. The
Department of Development Planning must play a strong role in coordinating and
overseeing appropriate budget provisions in this regard.
3) Socio-economic interventions by all relevant government departments and
entities. The relevant departments and entities must attend to the socio-economic
issues evident at parks.
4) Active parks. Communities must keep their parks active. Until such time as
communities are empowered to keep their parks active and the social, economic and
environmental conditions are in place for this, the City can and must help to catalyse
active parks. For example, departments engaged in social services can render such
services at parks using mobile facilities.
5) Education, monitoring and enforcement. JCPZ must keep communities and local
business employees informed on how to use their parks appropriately and how to keep
their parks active. Various departments are to offer education on safety, pedestrian
safety and environmental awareness and appreciation. At the same time, there needs
to be monitoring and enforcement. Structures such as the Johannesburg Metropolitan
Police Department (JMPD) and the South African Police Service (SAPS) are essential
in this regard. Park rangers can also be promoted to peace officers once JCPZ is
reintegrated into the City structure and once they receive training. Further, the
enforcement and policing structures can help to set up and support Community Policing
Forums and street patrols, so that communities can participate in keeping public open
spaces safe in an appropriate manner.
6) Security infrastructure. The Department of Public Safety must assist JDA and JCPZ
to put in place security infrastructure that is appropriate for each park and this may vary
from park to park.
7) Maintenance of parks. JCPZ has a primary responsibility for the maintenance of parks,
but additional resources are required to enable more frequent, consistent and
comprehensive maintenance. They can not only continue to involve local communities
through programmes such as the EPWP, but also through mechanisms such as
volunteerism.
8) Physical (re)development of parks and their vicinities in a clustered approach.
JDA and JCPZ must work together more closely together to enhance the quality of park
(re)developments and better provide for maintenance considerations. Attention also
needs to be given to the vicinity surrounding the parks and to considerations such as
traffic management and pedestrian safety, as well as suitable adjacent land uses and
corresponding land use management – departments and entities such as the
Department of Development Planning, the Department of Transport and the
Johannesburg Roads Agency have a role to play in this regard.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 35 of 63
4.2.3. JCPZ 2018/19–2020/21 LEGACY PROJECTS
Although not funded from the fiscus and, therefore, not included in the JCPZ Performance
Information, JCPZ is actively pursuing partnerships and/or commercialisation opportunities
towards the implementation of key Legacy Projects, as summarised below:
Open Space
Development Inputs/Requirements 2018/19
Cemetery
modernisation
Create parks of
remembrance
Partnerships to upgrade cemeteries to support
rest of maintenance and development
requirements (alternative):
CCTV cameras, security contracts;
Security App;
App;
GPS tracking and electronic record system;
Wi-Fi and charging of devices with security
scanner.
UNFUNDED
No current budget, but
required R70 million.
Zoo
revitalisation
Business development: in terms of tourist
attraction – tree top, tree houses, Curio shops,
public transport and cashless accessibility
Events partnership;
One-stop-shop for family and corporate
celebrations;
Seal enclosure.
UNFUNDED
No current budget, but
required R60 million.
Strategic
partnerships for
Golden Harvest
Park
Development of a development inclusive of
accommodation, business park and themed
outdoor adventure experience
UNFUNDED
No budget, but requires
R3.4 billion.
Strategic
partnership for
Randjiesfontein
Lifestyle Hub
Development of a conference, entertainment
and farming tourist attraction.
UNFUNDED
No budget, but requires
R358 million.
Strategic
partnership for
Zoo Lake
precinct
Master plan of Zoo Lake to develop a park with
adequate parking, access, entertainment space
and link to JHB Zoo.
UNFUNDED
No budget, but requires
R100 million estimated.
Rietkuil Zoo
Farm in Parys
Facility for tertiary education and outdoor
adventure such as trail running, mountain bike
cycling and hot air balloon.
UNFUNDED
No budget, but requires
R315 million
Huddle Park
Nursery
Commercial development inclusive of aquatic
farming, solar factory, nursery selling to the
public and coffee shop.
UNFUNDED
No budget, but requires
R70 million.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 36 of 63
Open Space
Development Inputs/Requirements 2018/19
Smart City Business development to make parks and
cemeteries smart and attractive to visitors:
Smart benches;
Wi-Fi;
Big screens;
Electronic record system;
Electronic bookings system;
Cashless pay points;
Google track;
Virtual zoo/reserve.
-
Pro-poor
programmes
1) Indigent burials.
2) Free educational programmes:
JHB Zoo,
Reserves,
JHB botanical gardens,
Mobile Zoo.
3) Pop-up tourism
Mobile Zoo,
Mobile theatre,
Physical activity – yoga, aerobics, boot
camp, MTB, trail running.
4) Job creation:
EPWP,
Co-operatives and small business
development and training.
-
Land
acquisition as
part of city
process
1) Burial space;
2) Close to residential development;
3) One-stop-shop.
-
Partnerships
with private
sector as a
process
Development of PPP, concessions, BOT and
BOTT for the development of the special
infrastructure projects of which some are already
listed:
Water Park (R30m);
Jozi Trails (R5 M for pilot phase);
Randjiesfontein conference and lifestyle
centre;
Rietkuil Zoo Farm – conference centre;
-
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 37 of 63
Open Space
Development Inputs/Requirements 2018/19
Zoo Lake precinct.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 38 of 63
4.3. 2018/19 IDP CORPORATE SCORECARD AND DAY TO DAY OPERATIONS
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
Strategic Objective 1: SERVICE DELIVERY: To provide our services with pride to all citizens, and to redress imbalances of the past
COJ Priority 3: Create a culture of enhanced service delivery with pride
COJ Priority 9: Preserve our resources for future generations
COJ Priority 2: Ensure pro-poor development that addresses inequality and provides meaningful redress
COJ Priority 7: Encourage innovation and efficiency through programmes such Smart City
IDP Programme 1: Customer Charter Programme
Neighbourhood improvement
Neighbourhood improvement
Implementation of capital expenditure projects
1)Percentage of annual Capex spent
95% of annual Capex spent
95%of annual Capex spent
95% of annual Capex spent
95% Budget report 36 000 COO 5%
Q1 5%
20%
Q2 15%
50%
Q3 30%
95%
Q4 45%
2)Percentage monthly reporting into Capital Management System (iRIS)
New KPI 100% (12 reports)
100% (12 reports)
100% (12 reports)
Monthly report - COO 25% (3 reports)
Q1 25% (3 reports)
50% (6 reports)
Q2 25% (3 reports)
75% (9 reports)
Q3 25% (3 reports)
100% (12 reports)
Q4 25% (3 reports)
Co-management and partnerships
3) Number of new partnerships secured
New indicator 12 new partnerships secured
12 new
partnerships
secured
12 new
partnerships
secured
Partnering agreements/ MOU’s
- Business Development
3 new partnerships secured
Q1 3 new partnerships secured
6 new partnerships secured
Q2 3 new partnerships secured
9 new partnerships secured
Q3 3 new partnerships secured
12 new partnerships secured
Q4 3 new partnerships secured
IDP Programme 6: Pro-Poor Development
Fruit tree distribution
4)Number of fruit trees distributed
1 000 fruit trees distributed
1 000 fruit trees distributed
1 000 fruit trees distributed
1 000 fruit trees distributed
Tree register
Acknowledgement of receipt by recipient
1 500 COO 250 fruit trees distributed
Q1 250 fruit trees distributed
500 fruit trees distributed
Q2 250 fruit trees distributed
750 fruit trees distributed
Q3 250 fruit trees distributed
1 000 fruit trees distributed
Q4 250 fruit trees distributed
IDP Programme 6: Pro-Poor Development
Ornamental tree distribution and planting
5)Number of ornamental trees planted
2 500 of ornamental trees planted
2 500 of ornamental trees planted
2 500 of ornamental trees planted
2 500 of ornamental trees planted
Tree register
Acknowledgement by Regional Management
Part of
1 5 00 above
COO 625 ornamental trees planted
Q1 625 ornamental trees planted
1250 ornamental trees planted
Q2 625 ornamental trees planted
1 875 ornamental trees planted
Q3 625 ornamental trees planted
2 500 of ornamental trees planted
Q4 625 ornamental trees planted
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 39 of 63
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
IDP Programme 1: Customer Charter Programme
Maintain a sustainable open space and park system
Maintenance of designated green public open space in flagship facilities, developed parks, undeveloped parks, landscaped islands and town entrances, active cemeteries, passive cemeteries and the Zoo.
6.) Percentage Compliance of horticulture and arboriculture maintenance cycles completed
New KPI 85% 85% 85%
System Generated Report - Flagform Completed Work Orders Report, Maintenance Schedule
43 352 total for all grass cutting maintenance cycles
COO and Head of the Zoo
85% 85% 85% 85%
IDP Programme 1: Customer Charter Programme
Maintain a sustainable open space and park system
Effective Horticultural maintenance for external clients
Note: Relates to expanded horticulture services mandate.
7 )Percentage compliance with grass cutting schedule orders for CoJ Departments and Entities
80% Percentage compliance with grass cutting schedule
95%
Percentage
compliance
with grass
cutting
schedule
orders for CoJ
Departments
and Entities
95%
Percentage
compliance
with grass
cutting
schedule
orders for CoJ
Departments
and Entities
100%
Percentage
compliance
with grass
cutting
schedule
orders for
CoJ
Departments
and Entities
Completed Work Orders Report, Maintenance Schedule
127 000 (not within JCPZ budget. It is under internal recoveries)
Bus. Development
95%
Percentage
compliance
with grass
cutting
schedule
orders for
CoJ
Departments
and Entities
95%
Percentage
compliance
with grass
cutting
schedule
orders for
CoJ
Departments
and Entities
95%
Percentage
compliance
with grass
cutting
schedule
orders for CoJ
Departments
and Entities
95%
Percentage
compliance
with grass
cutting
schedule
orders for CoJ
Departments
and Entities
Animal management practices
Animal management practices as per checklist
8)Percentage adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
Animal management monthly completed checklists signed by duly authorised officials
- Head of the ZOO
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
100% adherence to animal management practices as per checklist
IDP Programme 1: Customer Charter Programme
Sustainable tourism;
Promoting and advertising of the Zoo
9)Number of visitors to the Zoo
480 000 visitors to the Zoo
480 000 visitors to the Zoo
500 000 visitors to the Zoo
510 000 visitors to the Zoo
Zoo visitor report
- Head of the ZOO
120 000
Q1 120 000 visitors to the Zoo
240 000
Q2 120 000 visitors to the Zoo
340 000
Q3 100 000 visitors to the Zoo
480 000
Q4 140 000 visitors to the Zoo
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 40 of 63
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
IDP Programme 6: Resource Sustainability Programme
Environmental management
Removal of alien vegetation, Wetland rehabilitation Cleaning of invasive plants from water bodies, Reeds control and Cleaning of river trails.
Conservation areas maintenance: Johannesburg Botanical Gardens (JBG), all nature reserves ,ridges and koppies, bird sanctuaries and conservation & research farm
10)Percentage compliance of Bio-diversity and ecosystem management requirements
New KPI 100% 100% 100%
Job cards, work orders, checklists, signed acceptance forms and before and after pictures
Part of 43 352 as stated above in KPI 6
COO 100% 100% 100% 100%
Strategic Objective 2: RESPONSIVE GOVERNMENT: To provide a service based on the needs of the community at all times
COJ Priority 6: Create a City that responds to the needs of residents
COJ Priority 7: Encourage innovation and efficiency through programmes such Smart City
IDP Programme 4: Citizen Relations
Customer care (“Citizen First”) and service with pride culture
Customer satisfaction index/survey
11)Percentage Customer Satisfaction achieved
76% Customer Satisfaction
78% Customer Satisfaction
80% Customer Satisfaction
82% Customer Satisfaction Survey Results
259 MD
SSD to report
N/A N/A N/A 80%
Provision of environmental education and awareness
Zoo to you programme
Zoo school programme
Masibambisane programme
12)Number of educational programmes implemented per annum
New KPI 4 educational
programmes
implemented
per annum
4 educational
programmes
implemented
per annum
4 educational
programmes
implemented
per annum
Approved list of targeted schools
List Of Beneficiaries;
Attendance Registers;
- Zoo
Corporate services
4 educational
programmes
implemented
per annum
4 educational
programmes
implemented
per annum
4 educational
programmes
implemented
per annum
4 educational
programmes
implemented
per annum
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 41 of 63
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
Environmental Education programme
Pictures;
Reports
Research informing open space planning and management
Research areas identification
Regional profiles produced
13)Number of open space planning and management research projects completed
2 Regional profiles in line with Open space Master Plan and Spatial Development Framework
2 Regional profiles in line with Open space Master Plan and Spatial Development Framework
2 Regional profiles in line with Open space Master Plan and Spatial Development Framework
City-wide public Open Space Strategy
Research reports
462 SSD Draft profile. Preliminary finding for 3d region
N/A Draft profile. Preliminary finding for 4th region
2 Regional profiles in line with Open space Master Plan and Spatial Development Framework
Strategic Objective 3: JOB CREATION: To facilitate jobs through our resources and partnerships
COJ Priority 1: Promote economic development and attract investment
IDP Programme 1: Economic Development Programme
Green job creation
EPWP programme
Skills development
14)Number of EPWP job opportunities created
1 550 EPWP job opportunities created
1 550 EPWP
job
opportunities
created
1 550 EPWP
job
opportunities
created
1 550 EPWP
job
opportunities
created
EPWP job opportunity report, quarterly report
30 295 for maintenance as stated above
R 5 million is for Safety Officers
# See footnote
CFO 200 job opportunities created
Q1 200 job opportunities created
615 job opportunities created
Q2 415 job opportunities created
1 245 job opportunities created
Q3 630 job opportunities created
1 550 job opportunities created
Q4 305 job opportunities created
Green enterprise support
Enterprise Development programme
Empowerment
15)Number of jobs created through the Enterprise Development programme
500 Enterprise Development programme jobs created
500 Enterprise Development programme jobs created
500 Enterprise Development programme jobs created
500 Enterprise Development programme jobs created
Quarterly report 13 057 CFO 50 Enterprise Development programme jobs created
Q1 50 Enterprise Development programme jobs created
125 Enterprise Development programme jobs created
Q2 75Enterprise Development programme jobs created
375 Enterprise Development programme jobs created
Q3 250 Enterprise Development programme jobs created
500 Enterprise Development programme jobs created
Q4 125 Enterprise Development programme jobs created
Promotion and growth of co-operatives to be self- sustainable
16)Number of primary co-operatives developed and supported
40 primary co-operatives developed and supported
40 primary co-operatives developed and supported
40 primary co-operatives developed and supported
40 primary co-operatives developed and supported
List of co-operatives, EPWP/ report
9 167 CFO 5 primary co-operatives developed and supported
Q1 5 primary co-operatives developed and supported
15 primary co-operatives developed and supported
Q2 10 primary co-operatives developed and supported
30 primary co-operatives developed and supported
Q3 15 primary co-operatives developed and supported
40 primary co-operatives developed and supported
Q4 10 primary co-operatives developed and supported
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 42 of 63
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
# Footnote: R 5 million is for Safety Officers (This is a ring-fenced amount)
IDP Programme 1: Economic Development Programme
Eco-tourism and heritage tourism
Promoting eco-tourism and heritage tourism
17)Development and approval of an ecotourism , outdoor and adventure plan for JCPZ facilities
Development and approval of an ecotourism plan
Roll out of 50% of an ecotourism , outdoor and adventure plan for JCPZ facilities
Roll out of 75% ecotourism plan
Roll out of 100% of an ecotourism , outdoor and adventure plan for JCPZ facilities
Approved eco-tourism plan
- Business Development
Development of terms of reference, SCM process
Consultation with all stakeholders
Feedback, further consultation and draft report
Approval of an ecotourism , outdoor and adventure plan for JCPZ facilities
Strategic Objective 4: SAFETY IN COMMUNITIES: To provide safe facilities to communities through awareness, technology and patrolling
COJ Priority 4: Create a sense of security through improved public safety
IDP Programme 3: Safer City Programme
Safety in open spaces through safety interventions and technology
Management of facilities
Design of facilities
Infrastructure of facilities
18) Percentage compliance to safety requirements as per the green leave standards
New KPI 85% of compliance
85% of
compliance 85% of
compliance Patrol attainment schedule Reports
Design of facilities
Pictorials
COO 85% of
compliance 85% of
compliance 85% of
compliance 85% of
compliance
Strategic Objective 5: SOUND GOVERNANCE AND EFFECTIVE MANAGEMENT: To ensure sound governance and financial management and internal controls.
COJ Priority 7: Enhance our financial sustainability
COJ Priority 5: Create an honest and transparent City that fights corruption
IDP Programme 8: Financial Sustainability Programme
Revenue generation
Admission, rental, parking, restaurant and
cemeteries
19)Rand value of revenue secured per annum
R53.5m revenue
R54m revenue R56.6m revenue
R59.9 m Financial report
8 653 Business Development
R13 m revenue
Q1 R13 m revenue
R27.7 m revenue
Q2 R14.7 m revenue
R41.5 m revenue
Q3 R13.8 m revenue
R54 m revenue
Q4 R12.5 m revenue
Sound financial management and control
Internal budget control
20)Percentage of operational budget spent
New KPI 95% Opex budget spent
95% Opex budget spent
95% Opex budget spent
Budget Report
- CFO 95% Opex budget spent
95% Opex budget spent
95% Opex budget spent
95% Opex budget spent
Timeous approval of invoices by officials
21)Percentage of valid invoices paid within 30 days of invoice date
New KPI 98% of valid invoices paid within 30 days of invoice date
100% of valid invoices paid within 30 days of invoice date
100% of valid invoices paid within 30 days of invoice date
Debtor age/payment report
- CFO 98% of valid invoices paid within 30 days of invoice date
98% of valid invoices paid within 30 days of invoice date
98% of valid invoices paid within 30 days of invoice date
98% of valid invoices paid within 30 days of invoice date
Internal budget control
22)Percentage of repairs and
New KPI 85% of annual repairs &
90% of annual repairs &
95% of annual repairs &
Budget report 36 702 COO 5% of annual repairs &
15% of annual repairs &
45% of annual repairs &
85% of annual repairs &
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 43 of 63
IDP Programme
Strategy/KPA Interventions Key
Performance Indicator
Strategic Objective Annual Targets
Means of Verification
2018/19 Budget Allocation
(R,000.00)
Unit Responsible
2018/19 Performance Targets
Baseline 2017/18 Estimate
2018/19 Target
2019/20 Target
2020/21 Target
Q1 Jul - Sep
2018
Q2 Oct - Dec
2018
Q3 Jan - Mar
2019
Q4 Apr - Jun
2019
maintenance budget spent
maintenance budget spent
maintenance budget spent
maintenance budget spent
maintenance budget spent
Q1 5% of annual repairs & maintenance budget spent
maintenance budget spent
Q2 10% of annual repairs & maintenance budget spent
maintenance budget spent
Q3 25% of annual repairs & maintenance budget spent
maintenance budget spent
Q4 40% of annual repairs & maintenance budget spent
IDP Programme 4: Clean Governance Programme
Internal controls improvement
Compliance and sound governance
23) Attainment of a clean audit
Clean audit attained in 2016/17
Attainment of a clean audit
Attainment of a clean audit
Attainment of a clean audit
AG Report
Internal audit memos for closure of findings
- Finance and All Divisions
100% Closure of open findings
Attainment of a clean audit
25% Closure
of open
findings
50% Closure
of open
findings
Company performance monitoring and reporting
Implementation of improvement plans
24)% of performance targets achieved
85% achievement of performance targets
85% achievement of performance targets
85% achievement of performance targets
85% Quarterly reports
Organisation performance reports
- SSD 85% achievement of performance targets
85% achievement of performance targets
85% achievement of performance targets
85% achievement of performance targets
IDP Programme 4: Clean Governance Programme
Internal controls improvement
Human resources Index
25)Percentage of employees receiving performance coaching and review as per the policy
New 80% 80% 80% HR report - CORP. SERV
80% 80% 80% 80%
IDP Programme 4: Clean Governance Programme
Internal controls improvement
26)Average number of days taken to resolve disciplinary cases
New 90 days 90 days 90 days HR report - CORP. SERV
90 days 90 days 90 days 90 days
IDP Programme 4: Clean Governance Programme
Internal controls improvement
27)Average number of days taken to fill critical vacancies
New 90 days 90 days 90 days HR report - CORP. SERV
90 days 90 days 90 days 90 days
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 44 of 63
KPI DESCRIPTIONS
KPI
NUMBER
KPI KPI DESCRIPTION
1 Percentage of annual Capex
Spent
The monitoring of capital expenditure re the implementation of capital expenditure projects
2 Percentage monthly reporting into
Capital Management System
(iRIS)
The monitoring of monthly reporting into the Capital Management System (iRIS)
3 Number of new partnerships
secured
The indicator reports on partnerships secured through a call for fully funded proposals. The
intention is to be transparent as partnerships utilise external resources and also provide an
opportunity for a return on investment.
Partnerships with business and community to secure additional resources, either cash or in
kind such as park furniture, security solutions etc. to enhance the business of JHB City
Parks and Zoo
4 Number of fruit trees distributed To ensure the full roll-out of the Pro-Poor Programme Fruit trees distributed to different
stakeholders city-wide
5 Number of ornamental trees
planted
Monitor the ornamental trees planted city-wide as part of climate change response
6 Percentage Compliance of
horticulture and arboriculture
maintenance cycles completed
This KPI monitors the maintenance cycles completed at: Flagship, Developed &
Undeveloped Parks; Main Arterials, Landscaped Islands & Town Entrances; Cemeteries
(Active & Passive);
Maintenance: Horticultural maintenance, arboriculture maintenance, litter-picking, weeding
and alien invasive plant control
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 45 of 63
KPI
NUMBER
KPI KPI DESCRIPTION
7 Percentage compliance with grass
cutting schedule orders for CoJ
Departments and Entities
JCPZ has been appointed as the preferred service supplier in terms of Horticulture and
conservation management for the City of JHB. The indicator reports the progress of
implementation of work schedules as agreed to between JCPZ and the City.
8 Percentage adherence to animal
management practices as per
checklist
JCPZ have in its Zoo more than 2 760 animals which are fed on a daily bases. There is a
need to measure the amount of food which is consumed to prevent wasteful expenditure,
Keepers record food usage on a daily bases. Other areas of animal management practises
include cleaning of enclosures, enrichment, and pest control.
9 Number of visitors to the Zoo To monitor and increase the number of patrons visiting the Zoo per annum
10 Percentage compliance of Bio-
diversity and ecosystem
management requirements
To ensure visible service delivery & protection of ecosystem within the city of Johannesburg.
Horticulture & Arboriculture Maintenance Cycles completed at: JBG & The Wilds, Nature
Reserves, Ridges & Koppies, Bird Sanctuaries and Conservation & Research Farm.
11 Percentage Customer Satisfaction
achieved
Gauging residents and users satisfaction with JCPZ services, facilities and programmes. To
measure how services, facilities and programmes meet or surpass residents and users
satisfaction in order to manage and improve business.
12 Number educational programmes
implemented per annum
This KPI monitors the provision of environmental education and awareness programmes:
Zoo to you programme, Zoo school programme, Masibambisane programme,
Environmental Education programme and Food education programme
13 Number of open space planning
and management research
projects completed
The inventory and assessment of public open space initiative is aimed at assessing the
status quo of public open spaces in the City of Johannesburg, to establish per capita
provision, quality, distribution and network, accessibility and preparation of city-wide
strategy on public open space for Johannesburg which will entail a restoration and
rehabilitation plan.
14 Number of EPWP job
opportunities created
EPWP is a National Program which focuses on job creation and the skilling of labour intense
workers.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 46 of 63
KPI
NUMBER
KPI KPI DESCRIPTION
The program focuses on temporary or short term job opportunities with the aim to alleviate
poverty and decrease the unemployment rate. EPWP was implemented by the City of
Joburg from 2004.
15 Number of jobs created through
the Enterprise Development
programme
The Enterprise Development Programme focuses on giving opportunities to start-up
businesses. It also promotes the use of businesses within the community (live and work in
the same area). The program is one of the City’s initiatives to increase job creation and to
give opportunities to small start-up businesses.
16 Number of primary co-operatives
developed and supported
The KPI is designed to ensure the success and sustainability of primary Cooperatives
(primary co-operative means a co-operative formed by a minimum of five natural persons
whose object is to provide employment or services to its members and to facilitate
community development in other words start-up businesses). The Program is aimed at
training and exposing cooperatives to the working environment. It also assists with
networking them with government and private sectors that can assist with the growth of their
business.
17 Development and approval of an
ecotourism plan for JCPZ facilities
Eco-tourism relates to responsible tourism to natural areas that preserves the environment
and offers activities that enhances the sustainability of local communities. JHB City Parks
and zoo strives to roll out a strategy for its natural areas where local communities will benefit.
It is a business enhancement strategy but focuses on preserving or enhancing natural areas
such as the JHB zoo, botanical gardens and reserves.
18 Percentage compliance to safety
requirements as per the green
leave standards
Safety interventions rolled-out in developed public open spaces through the management
of facilities which will include park patrols, design of facilities and infrastructure of facilities.
19 Rand value of revenue secured
per annum
The entity has a number of activities that generate revenue – the KPI reports on the financial
performance of these activities
20 Percentage of operational budget
spent
This measures the utilisation of the operational expenditure budget in implementing
programs/activities of the organisation.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 47 of 63
KPI
NUMBER
KPI KPI DESCRIPTION
21 Percentage of valid invoices paid
within 30 days of invoice date
Measures the time it takes JCPZ to make payments to suppliers in light of the requirements
of MFMA
22 Percentage of repairs and
maintenance budget spent
It measures utilisation of the repairs and maintenance budget allocation.
23 Attainment of a clean audit The indicators demands from management to improve the internal control, implementation
of recommendations and daily financial disciplines. The importance of clean administration
would improve the administration thereby resulting in clean administration: clean audit:
unqualified with material findings.
24 % of performance targets
achieved
The purpose of this indicator is to measure the performance of JCPZ in term of its
predetermined objectives in the form of actual performance against the targets of its Key
Performance Indicators. It also monitors if there is progress of identifies non-performance.
25 Percentage of employees
receiving performance coaching
and review as per the policy
Timeously tracking of the employee performance against the predetermined organisational
objectives. The alignment of the employees’ performance to the organisational
performance
26 Average number of days taken to
resolve disciplinary cases
The indicator seeks to ascertain how long it takes to resolve disciplinary inquiries. The
indicator reflects on showing that consequence management is applied as a corrective
measure.
27 Average number of days taken to
fill critical vacancies
Tracking vacancies to determine whether they are timeously filled to achieve service
delivery objectives. Vacancies are filled to address gaps within the organisation.
28 Percentage implementation of the
electronic business plan
management system (SAP SSM)
The indicator measures the percentage implantation of performance information as per the
corporate scorecard on the SAP SSM system.
Performance targets needs to be uploaded on the system and then updated with actuals
on a quarterly basis. The indicator is intended to show the progress of the implementation
of the project until it is fully functional. JCPZ is not on the SAP system yet.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 48 of 63
4.4 SERVICE STANDARDS
Core Service Service Level Standard
1. Maintenance of designated green public open spaces1
80% of maintenance conducted
2. Response to calls logged for removal of fallen trees
80% of calls attended to
3. Response to calls logged for damaged park infrastructure
80% of calls attended to
4. Compliance to the PAAZA ( Pan-African Association of Zoos and Aquaria) standards
100% compliance
1 Flagship facilities, developed parks, undeveloped parks, landscaped islands and town entrances, active cemeteries, passive cemeteries and the Zoo
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 49 of 63
5. FINANCIAL IMPACT
4.4. OPERATIONAL REVENUE AND EXPENDITURE
The overall planned revenue and expense estimate for the 2018/19 financial year is as follows:
Description
YTD
Actual
Oct
2017
R m
Full Year
Forecast
2017/18
R m
Approved
Budget
2017/18
R m
Change
R m
Revised
Budget
2017/18
R m
Approved
Budget
2018/19
R m
Change
R m
Draft
Budget
2018/19
R m
Approved
Budget
2019/20
R m
Change
R m
Draft
Budget
2019/20
R m
Draft
Budget
2020/21
R m
Service Charges 13,8 45,8 99,3 (53,5) 45,8 105,1 (56,7) 48,4 110,8 (60,1) 50,7 53,7
Hiring of Facilities 1,3 5,2 5,9 (0,7) 5,2 6,3 (0,7) 5,6 6,6 (0,7) 5,9 6,2
Operating Grants 0 1,3 1,3 0 1,3 0 0 0 0 0 0 0
Other Income 3,7 13,6 13,6 0 13,6 14,4 0 14,4 15,1 0 15,1 16,1
Interest on Sweeping Account
12,5 37,4 35,0 2,4 37,4 37,0 2,5 39,5 39,0 2,7 41,7 44,2
Subsidy 245,4 737,0 736,3 0,7 737,0 785,0 17,5 802,5 833,0 24,1 857,1 915,7
Internal Recoveries 0 74,1 74,1 0 74,1 80,2 52,4 132,6 86,8 0 86,8 91,9
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 50 of 63
Description
YTD
Actual
Oct
2017
R m
Full Year
Forecast
2017/18
R m
Approved
Budget
2017/18
R m
Change
R m
Revised
Budget
2017/18
R m
Approved
Budget
2018/19
R m
Change
R m
Draft
Budget
2018/19
R m
Approved
Budget
2019/20
R m
Change
R m
Draft
Budget
2019/20
R m
Draft
Budget
2020/21
R m
Total Revenue 276,7 994,0 914,5 (51,0) 914,5 1028,0 15.0 1 043,0 1 091,4 (34,0) 1 057,4 1 127,8
Employee related cost
167,5 523,8 523,8 0 523,8 559,9 22,4 582,3 595,8 0 595,8 631,5
Debt impairment 0 9,9 9,9 0 9,9 10,5 0 10,5 11,1 0 11,1 11,7
Depreciation 7,8 29,1 29,1 0 29,1 30,8 0 30,8 32,5 0 32,5 34,5
Repairs/maintenance
3,6 40.0 34,8 (14,8) 34,8 52,5 (15,8) 36,7 55,3 (16,6) 38,7 40,9
Interest paid - - - - - - - - - - - -
Bulk purchases - - - - - - - - - - - -
Contracted services 14,9 43,4 43,4 (5,3) 43,4 51,6 (5,8) 45,8 54,4 (5,9) 48,5 51,4
Other 59,5 322,1 247,7 (31,0) 247,7 256,1 53,4 309,5 272,3 29,7 260,8 327,2
Internal Expenditure 5,7 25,7 25,7 0 25,7 66,6 (39,2) 27,4 70,0 (41,2) 28,8 30,5
Total Expenditure 259,0 994,0 914,5 (51,0) 914,5 1028,0 15,0 1 043,0 1 091,4 (34,0) 1057,4 1 127,8
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 51 of 63
Description
YTD
Actual
Oct
2017
R m
Full Year
Forecast
2017/18
R m
Approved
Budget
2017/18
R m
Change
R m
Revised
Budget
2017/18
R m
Approved
Budget
2018/19
R m
Change
R m
Draft
Budget
2018/19
R m
Approved
Budget
2019/20
R m
Change
R m
Draft
Budget
2019/20
R m
Draft
Budget
2020/21
R m
Surplus / (Deficit) 17,7 - - - - - - - - - - -
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 52 of 63
4.5. CAPITAL EXPENDITURE
The following capital developments are envisaged for financial year 2018/19 to 2020/21 and
the MTEF.
PROJECT
DESCRIPTION
Budget 2018/19
R’m
Budget 2019/20
R’m
Budget 2020/21
R’m
Mayibuye 0 0 3,0
Mapetla Park 1
Diepsloot River 1,0
Pieter Roos Park 2 0 0
Louis Botha Corridor 3 2 3,5
Inner- City Parks 6,0 5,0 4,0
JHB Botanical Gardens 3,0 7,0 2,0
Bird Sanctuary 0 0,5 0,5
Protea Glen 0 0 2,0
Emdeni Park 0 0 2,0
Pimville Koppies 0 1,0 2,0
Kliprivier Nature Reserve 0 0 2,0
Upgrade of existing parks to OHASA
2,0 3,0 2,0
Road Islands 0 0 2,0
IT Equipment 2,1 0 0
Plant and Equipment 4,0 6,0 6,0
Olifansvlei Cemetery 0 0 11,0
Furniture 0,7 0 0
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 53 of 63
PROJECT
DESCRIPTION
Budget 2018/19
R’m
Budget 2019/20
R’m
Budget 2020/21
R’m
Riverlea Park 0 2,0 0
Zoo – Animal hospital 1,0 0 0
Zoo – Animal Purchases 2,0 7,0 2,0
Zoo – Zoo Infrastructure 5,0 5,0 6,0
Zoo – Parking Area 1,1 0 0
Rabie Ridge Park 3,0 0 2,0
Lenasia WetlandsRehabilitation
1,0 0 0
TOTALS 36,000 39 500 53 000
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 54 of 63
6. MANAGEMENT AND ORGANISATION STRUCTURE
The JCPZ Board is the Accounting Authority in terms of the Municipal Finance Management
Act (MFMA). The Board provides strategic direction, leadership and oversight so as to
enhance shareholder value and ensure JCPZ’s long-term sustainability, development and
growth.
In fulfilling its responsibilities, the Board is supported by the Managing Director and the
Executive Team ensuring good corporate governance practices.
JCPZ has ensured a capable and effective leadership team to ensure that the company is
able to deliver on its mandate. The current staff compliment stands at 1 641 employees.
However, it is acknowledged that capacity within the lower levels of the organisation must be
unlocked through skills development of current staff, as well as the recruitment of new staff,
as the current structure portrays as ‘top-heavy’.
The current organisational structure is as follows:
Figure: Current Organisational Structure of JCPZ
From a work flow perspective, the key consideration is the fact that within City Parks and Zoo
there are two distinct cores, namely Service Delivery, and Conservation and Biodiversity.
Managing both under a single executive puts forward a challenge to the entity to ensure both
focuses are prioritised. The critical point is to ensure adequate organisational alignment to
ensure operations are effectively capacitated to deliver on its service delivery mandate.
However, based on current statistics, the entity is currently at a point whereby employee costs
are high, yet capacity yielded is low. Furthermore, there is a general consensus that the
aforementioned organisational structure is ‘top heavy’.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 55 of 63
It is apparent that the structure provides too many support functions and too few operational
functions. This inhibits the ability of JCPZ to deliver on its mandate. The key issue is that the
organisational structure, from the bottom up, has not been designed to effectively utilise the
resources at hand – meaning there is significant unlocked potential that can add capacity
through optimisation initiatives.
Unlocking capacity has, therefore, been recognised as a key priority for JCPZ in two respects.
First, to unlock current capacity within the organisation means to maximise productivity
through
1) Efficient human resource planning/workforce planning;
2) Training and development of current resources; and
3) Earlier transfer of skills to job through on-the-job training.
Furthermore, JCPZ must ensure effective staffing and capacity building through the hiring and
training of new employees. From a strategic perspective there are few key components in
ensuring that capacity is unlocked – requiring specific intervention from the Human Resource
function. This includes:
1) Understanding the skills and competency gaps that are present within the organisation;
2) Preparing a strategy to close the skills gap through targeted capacitating interventions
such as training; and
3) Aligning the performance management system to the strategic initiatives.
These key elements are further elaborated on in the approved Human Resource Strategy,
which must be implemented.
5.1. CAPACITY ANALYSIS
We have managed to maintain a stable labour environment and have recently been informed
that the Entity will be reabsorbed into the City of Johannesburg. All of the above creates a
very complex Human Resource environment, which requires that change management
practices be implemented in order to quell the rising anxiety levels within the organisation.
The staff complement for the organisation has been reducing since inception, when
Johannesburg City Parks had a staff complement in excess of three thousand five hundred
(3 500). Over the years the strategy to contract out the maintenance of a portion of the portfolio
has resulted in a decreased workforce, increased administrative staff and an added
complication was that the current employees were and are aging. The finding of this Resource
Management Strategy is that JCPZ are currently operating with an aging workforce with
termination numbers comprising mainly of retirements and deaths.
At the end of the 2016/17 financial year our staff complement stood at just above one thousand
four hundred (1 400). The Executive have put in place a process to address critical positions
related to service delivery and efforts are underway to conclude on the filling of critical
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 56 of 63
positions as previously approved by the Executive Committee. This will augment the capacity
that is much required in fulfilling our service delivery mandate. New requisitions for vacancies
are being addressed in compliance with the City’s directive regarding the approval process.
5.2. EMPLOYMENT EQUITY
The Employment Equity Act No. 55 of 1998 seeks to achieve equity in the workplace by
promoting equal opportunity and fair treatment in employment through the elimination of unfair
discrimination and implementing affirmative action measures to redress the disadvantages in
employment experienced by designated groups. The Act provides for additional reporting
requirements, which include the submission of Employment Equity reports by employers.
JCPZ supports the principles espoused in the Act and has taken measures to eliminate any
form of discrimination against designated groups, and has further actively pursued efforts to
attract and retain employees from previously disadvantaged groups, including persons with
disabilities.
JCPZ has engaged with Organised Labour through a process of consultations in the
development of the JCPZ Employment Equity Plan. The final Employment Equity Plan, which
is attached hereto, is also advised by and aligned to the Gauteng provincial demographics.
The JCPZ Employment Equity Plan has been submitted to the Department of Labour as
required in terms of legislation, and is further submitted to the Human Resources Committee
for information.
7. RISK MANAGEMENT AND MITIGATION
Key strategic risks for 2018/19 have been identified for the JCPZ and summary of the risks,
their root causes and planned mitigation actions is presented in the table below. These risks
are spread across the JCPZ’s strategic objectives, with the majority of risks relating to
Strategic Objectives 1 and 2 – Service Delivery and Responsive Government, respectively.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 57 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
1 Priority 8 - Encourage innovation and
efficiency through the Smart City
programme.
IDP programme 4 - SMART City
Programme.
SO 2 - RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community all
times.
1) Misalignment of
programmes
driving Smart City
innovation.
2) Inadequate ICT
governance.
3) Cyber threats.
Out-dated legacy
ICT infrastructure
and business
systems.
1) Monthly and/or quarterly review of
Risk Register and Audit findings
(compliance management).
2) Ensure alignment to COJ ICT
Institutional changes and service
delivery mandate of the company
upon finalisation by the City.
3) Plan for system migration plan in the
event of absorption into the COJ, in
line with the Group CIO forum
mandate.
4) Report regularly on implementation
of the reviewed and approved ICT
Strategy.
5) Continuous ICT awareness and
training undertaken amongst staff.
6) Alignment of ICT budget
requirements to revised business plan
and other citywide funding options.
7). Increase fibre layout at the Zoo and
key facilities.
8). Draft and implement patch
management system.
2 Priority 2 - Ensure pro-poor
development that addresses spatial and
SO 1 - SERVICE
DELIVERY: To
provide our services
with pride to all
Inability to meet high
increasing demand of
service delivery
(housing, water,
Unavailability of
land for key
infrastructure
programmes and
1) Undertake the City wide inventory
and assessment of public open
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 58 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
income inequality and provides
meaningful redress.
IDP programme 6: Pro-Poor
Development.
Priority 6 - Create a City that responds
to the needs of citizens, customers,
stakeholders and businesses
IDP programme 4 - Citizens Relations.
citizens, and to
redress imbalances of
the past.
SO 2 - RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community at all
times.
electricity, transport,
food).
sustainable
projects.
spaces (EISD, Development
Planning and CRUM).
2) JCPZ Public Dialogue focussing on
community based situational
analysis on alternative burials
3) Acquisition of land through City
processes for additional space.
4) Compliance based permits to be
sought for Eldorado Park Cemetery,
Ennerdale Cemetery, and Finetown
Cemetery.
3 Priority 1 - Ensure pro-poor
development that addresses spatial
and income inequality and provides
meaningful redress.
IDP programme 6: Pro-Poor
Development.
Priority 6 - Create a City that
responds to the needs of citizens,
customers, stakeholders and
businesses
IDP programme 4 - Citizens Relations.
SO 1 - SERVICE
DELIVERY: To
provide our services
with pride to all
citizens, and to
redress imbalances of
the past.
SO 2 - RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community at all
times.
Inability to meet high
increasing demand of
service delivery
(housing, water,
electricity, transport,
food.
Inability to deliver
on expanded
mandate
1) Revise and update Company
Strategy in line with changed
institutional arrangement, mandate
and service delivery requirements.
2) Undertake review and update of
Operational Model and plans in line
with the expanded portfolio by:
− Determination of budget
requirements to service
expanded mandate;
− Motivating for additional budget
to the shareholder in line with
service delivery requirements
and standards (SDA);
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 59 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
− Develop resource plan in
support of expanded mandate.
3) Develop Revenue Generation
(Enhancement) Strategy, to augment
grants and subsidies
− PPP initiatives sector funding.
4) Undertake steps to ensure transfer
of funds for green services to JCPZ
budget votes.
4 Priority 3. Create a culture of
enhanced service delivery with pride –
IDP Programme1. Customer Charter
Programme. Priority 6. Create a City
that responds to the needs of citizens,
customers, stakeholders and
businesses –
IDP Programme 4. Citizens Relation
SO 1. SERVICE
DELIVERY: To
provide our services
with pride to all
citizens, and to
redress imbalances of
the past
SO 2 - RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community at all
times.
N/A - none identified. Low staff morale 1) Continuous engagements with
labour.
2) 2) Implementation of the Culture and
Climate Assessment outcomes.
3) Continuous participation of HCM
department in COJ Forum, with
regards to reintegration.
4) 4) Develop and implement Change
Management Process/Plan in response
to the institutional review
5) 5)Replacement of exiting employees
on an ongoing basis subject to
institutional review requirements and
service delivery prioritisation.
6) 6). Upskilling and reskilling of
employees.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 60 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
7) 7). Management and Leadership
Development programme
5 Priority 4 - Create a sense of security
through improved public safety.
IDP programme 3: Safer City
Programme.
SO 4 - SAFETY IN
COMMUNITIES: To
provide safe facilities
to communities
through awareness,
technology and
patrolling.
Increasing crime and
security incidents.
Criminal incidents
affecting safety and
security of public
facilities.
1) Implement an integrated Safety
Management Plan for parks and
other designated open spaces.
2) Review and capacitation of the Park
Rangers Unit in alignment to
company requirements.
3) Formalisation of the collaboration
between JCPZ and enforcement
agencies to drive volunteerism and
community engagement through
initiatives such as the “Adopt a Park”
campaign.
4) Installation of electric fence at the
ZOO.
5) Procurement and Installation of
standby generator at the Zoo.
6 Priority 9. Preserving our resources for
future generations –
IDP Programme 6. Resource
Sustainability Programme.
Priority 6. Create a City that responds
to the needs of citizens, customers,
stakeholders and businesses –
IDP Programme 4. Citizens Relations.
SO 1. SERVICE
DELIVERY: To
provide our services
with pride to all
citizens, and to
redress imbalances of
the past.
SO 2. RESPONSIVE
GOVERNMENT: To
Security of supply and
environmental
degradation
Negative impact of
biodiversity loss
and ecosystem
collapses
1). Implementatio n of Climate Change
Response Plan.
2). Active participation in the CoJ town
planning processes.
3). Environmental education and
awareness campaigns.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 61 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
provide a service
based on the needs of
the community at all
times
4). Periodic measurement of
environmental pollutants and corrective
action.
7 Priority 7. Enhance financial
sustainability –
IDP programme 8. Financial
Sustainability Programme.
Priority 5. Create an honest and
transparent city that fights corruption –
IDP programme 4. Clean Governance
Programme.
SO 5. SOUND
GOVERNANCE AND
EFFECTIVE
MANAGEMENT: To
ensure sound
governance and
financial management
and internal controls
Theft, fraud and
corruption
Theft, fraud and
corruption
1). Review and update existing
controls, policies and procedures.
2). Undertake Fraud and Ethics Risk
assessment and report on
improvements implemented.
3). Probity reviews of senior
management and governance
structures.
8 Priority 7 - Enhance our financial
sustainability.
IDP programme 8: Financial
Sustainability Programme.
Priority 5 - Create an honest and
transparent city that fights corruption.
IDP programme 4: Clean Governance
Programme.
SO 5 - SOUND
GOVERNANCE AND
EFFECTIVE
MANAGEMENT: To
ensure sound
governance and
financial management
and internal controls.
Non-compliance to
legislation, policies
and procedures.
Incidences of non-
compliance to
legislation, policies
and procedures
1). Roll out robust communicatio n and
awareness programme in relation to
approved company policies and
procedures including frameworks.
2). Effective implementatio n of
Contracts Management system via
isometrix.
3). Develop and implement a
compliance risk management
procedure for JCPZ.
4). Prioritisation of filling of critical
vacant positions.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 62 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
5. Roll out of central repository (share
point)
9 Priority 2: Ensure pro-poor
development that addresses inequality
and provides meaningful redress.
IDP programme 6: Resource
Sustainability Programme.
Priority 3: Create a culture of
enhanced service delivery with pride.
IDPProgramme1: Customer Charter
Programme.
SO1 - SERVICE
DELIVERY: To
provide our services
with pride to all
citizens, and to
redress imbalances of
the past.
SO 2. RESPONSIVE
GOVERNMENT: To
provide a service
based on the needs of
the community at all
times
Inability to meet high
increasing demand of
service delivery
(housing, water,
electricity, transport,
food).
Service delivery
breakdown.
1) Reabsorption business readiness
review to be conducted across the
JCPZ, including:
a) ICT systems and infrastructure;
b) Conditions of employment,
employee benefits (pension
funds, medical aid, etc.);
c) All business processes not
shared with the COJ.
2) Develop and Implement Business
Continuity Programme
3) Install alternative power supply
or standby generator at the Zoo
10 Priority 1 - Ensure pro-poor
development that addresses spatial
and income inequality and provides
meaningful redress.
IDP programme 6: Pro-Poor
Development.
SO 1 - SERVICE
DELIVERY: To
provide our services
with pride to all
citizens, and to
redress imbalances of
the past.
SO 2 - RESPONSIVE
GOVERNMENT: To
Inability to meet high
increasing demand of
service delivery
(housing, water,
electricity, transport,
food)
Inadequate
funding.
1) Develop and implement a Revenue
Generation Strategy to address
financial sustainability and service
delivery mandate of the organisation.
2) Develop guidelines on austerity
measures to be implemented
internally and report on
achievements attained.
3) Explore commercialisat ion
opportunities.
Johannesburg City Parks and Zoo: 2018-2019 Business Plan Page 63 of 63
RISK
NO Mayoral Priorities
JCPZ Strategic
Objectives CoJ Top Risks Risk Description Mitigating Actions
Priority 6 - Create a City that responds
to the needs of residents.
IDP programme 4 - Citizens Relations.
provide a service
based on the needs of
the community at all
times.
4) Increase PPPs. Develop and
implement financial strategy.
Additional risk management information in support of this table can be found in the JCPZ 2018/19 Strategic Risk Register. Risk mitigation actions
will be allocated to responsible persons and the completion thereof will be monitored and reported on, on a quarterly basis by the JCPZ Risk and
Audit Committee.