Job on Hand - Utaya Kumar Work Action TNST Roof Drawing Rev. 3 Submitted to MES (2 drawing as per comment) Wall raming Rev. ! Submitted to MES" Staircase Drawing received partiall# from $%S$  &wning Drawing received" will 'ave discussion wit' $%S$ * Hong Leong Rebar rus'ing Waiting for +, revise drawing D$S - / Drawings omplete Design drawings CSC  &s0built iling Data E draw ing Submitted to MES to get RE sign &S$ 1% 1$EM Roof rame ast0in item Drawing commented" waiting for revise cop# Revise ast0in drawing  &mmend drawing as per in latest wall dra wing  &s0/uilt Drawing , &s0built Revise drawings wit' approved R1 / &s0/uilt Revise drawings wit' approved R1

Transcript of Job on Hand

Page 1: Job on Hand

7/23/2019 Job on Hand

http://slidepdf.com/reader/full/job-on-hand 1/2

Job on Hand - Utaya Kumar 

Work Action

TNST

Roof Drawing Rev. 3 Submitted to MES (2 drawing as per comment)

Wall raming Rev. ! Submitted to MES"

Staircase Drawing received partiall# from $%S$ &wning Drawing received" will 'ave discussion wit' $%S$ *

Hong Leong

Rebar rus'ing Waiting for +, revise drawing

D$S - / Drawings omplete Design drawings

CSC

 &s0built iling Data E drawing Submitted to MES to get RE sign

&S$ 1% 1$EM

Roof rame ast0in item Drawing commented" waiting for revise cop#

Revise ast0in drawing  &mmend drawing as per in latest wall drawing

 &s0/uilt Drawing

, &s0built Revise drawings wit' approved R1

/ &s0/uilt Revise drawings wit' approved R1

Page 2: Job on Hand

7/23/2019 Job on Hand

http://slidepdf.com/reader/full/job-on-hand 2/2

Target Approval

-!4-24!5

-!4-24!5

-!4-24!5 -!6-24!5-!4-24!5 -!6-24!5

-!4-24!5 -!7-24!5

-!4-24!5 -!7-24!5

-8-24!5 --24!5

-3-24!5 -!6-24!5

--24!5 -!6-24!5

will coordinate from +9

will coordinate from +9