JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

11
JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    215
  • download

    0

Transcript of JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

Page 1: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

JETTY FACILITYCANVEY ISLAND, UKPRESENTED BY: FLOATING PLANT SERVICES LTD

Page 2: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

JETTY FACILITYCANVEY ISLAND, UK

Unused jetty / marine facility constructed in 1974

Designed by the renowned Peter Fraenkel & Partners, Victoria, London, UK

Structure fabricated & erected by part of the Kier Group of companies

Recent survey reports show the structure to be in excellent condition

Page 3: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

LOCATION OF JETTY

Page 4: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

ARIEL VIEW OF JETTY

Page 5: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

KEY SPECIFICATIONS:

Total length of jetty is approx. 1500 meters

Weight of steel structure is approx. 7770 MT

Weight of reinforced deck slabs approx. 1500 MT

A minimum water depth of 17 meters at low tide

Designed to simultaneously handle 2 x VLCC (Very Large Crude Carrier) Vessels each of 225,000 DWT

Page 6: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

KEY SPECIFICATIONS:

Constructed using the highest quality British steel

Full length oil and gas pipelines (unserviceable)

Mooring dolphins of suitable size and strength

Many original technical drawings available

Additional unused deck slabs available

Page 7: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.
Page 8: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

VIABLE USES & REPLACEMENT VALUE:

Ideal for the importation of crude oil & natural gas

Ideal for the exportation of refined oil products

Easily adaptable for the importation / exportation of bulk products

Current replacement value would be in excess of £150 million GBP and would take four years to design & build

Page 9: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.
Page 10: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

FLOATING PLANT SERVICES HAVE IN PLACE:

An exclusivity contract direct with the owner

A first class contractor to dismantle, clean, scratch mark, accurately record and transport the entire steel work to Tilbury Docks, UK

A project shipping company to organise the complete logistical operation to any reasonable worldwide port

Page 11: JETTY FACILITY CANVEY ISLAND, UK PRESENTED BY: FLOATING PLANT SERVICES LTD.

FLOATING PLANT SERVICES LIMITED

Telephone: +44 (0)208 144 5142Email: [email protected]

Web: www.floatingplantservices.com