Jefferies Global Energy Conference Houston, Texas TURBINE PUMPING TECHNOLOGY Green Field Energy...
Transcript of Jefferies Global Energy Conference Houston, Texas TURBINE PUMPING TECHNOLOGY Green Field Energy...
CLEAN TURBINE PUMPING TECHNOLOGY
Jefferies Global Energy ConferenceHouston, Texas
November 28/29, 2012
Green Field is an oilfield services company formed in 1969 with multiple lines of business:
1. Hydraulic Fracturing Services
A. Provide hydraulic fracturing services using turbine-powered pressure pumping equipment. All new and state-of-the art.
2. Well Services
A. Provide cementing, coiled tubing, pressure pumping, acidizing and other pumping services.
3. Wellsite Power Generation
A. Provide well-site power generation using turbine-powered natural gas fueled technology.
2
Turbine Frac Pumps
Coil Tubing Cementing
Power Generation
About Green Field Energy Services
1. Smaller Footprint
2. Less Noise
3. Less Emissions
4. Natural Gas Fuel Capability – Now!
4
4500 HP on single trailer
What Makes Us Different – Use Turbine Driven Frac Pumps
The NOx is86.9% less
The CO is76.8% less
DieselEngine
TurbineEngine
TurbineEngine
DieselEngine
Meets EPA Tier IV LevelWith Diesel
CLEAN TURBINE PUMPING TECHNOLOGY
LNG CNG LPG Field Gas
All these benefits at Competitive Prices!
Enclosed engines allows
Noise attenuation
CLEAN TURBINE PUMPING TECHNOLOGY
Green Field Energy Services – TF- 40 Turbine
Only weighs about 800 lbs.
Description TFP Diesel Frac Comments
Size – Single Frac 8’ x 9’ x 11’ 40’ – 45’ Trailer The TFP unit can fit two on a trailer with a full control house. Three per trailer without a control house.
Weight – Single Frac 32,000 lbs. 65,000 lbs +/- Weights are w/o trailer. GFES’s frac unit is road legal with two on a trailer.
Exhaust Heat Massive exhaust heat available
No waste heat available
The turbine produces 27 lbs/sec of 1,000 F heat. Use for process work, fuel heating, including well water evaporation.
Portability Chopper, air cargo and highway Highway The TFP frac is manufactured with forklift pockets and is light
enough for air transport .
Multi-Fuel CapabilityBio-fuel, diesel #2, kerosene , natural
gas or Jet A Diesel #2 Natural Gas is a proven fuel source for the TFP.
Emissions 75 – 85% Lower Higher emissions The TFP was certified on #2 diesel and B-100 bio-fuel. The TFP was 75% - 85% lower Nox and CO than a diesel.
Maintenance Easy PM’s and
same day exchanges
Higher labor hours The turbine only weighs 770 lbs – PM’s only take 4 hours –Field repairs and engine exchanges done on one shift.
Operating life 10,000 hours TBO Life is reduced when running at max power
The turbine has fewer moving parts - designed for harsh military duty and high cycles. Overhaul @ 10,000 hours +/-.
Noise Level 78 – 91 DBA No sound attenuation Two TFPs were measured on one trailer with all equipment running (14 bpm @ 9000 psi).
High Altitude Power Excess power available
Cannot achieve rated power
The 3800 turbine has power to spare to meet pump demand when at high altitude.
Turbine Frac Pump (TFP) vs. Diesel
Green Field Energy Services Features: Turbine Frac Pump (TFP) vs. Diesel
CLEAN TURBINE PUMPING TECHNOLOGY
The Green Field Footprint – 4500 HHP
WebsiteContent
Management
Company Logo,
Trademarks, Materials
Management
IndustryTrade Shows
& Events
Marketing and Industry Data
CLEAN TURBINE PUMPING TECHNOLOGY
CLEAN TURBINE PUMPING TECHNOLOGY
Green Field Energy Services – Turbine Frac Pump (TFP)
TFP Noise Attenuation
• Noise reduced by 10 dBA.
• Deflects noise upward.
• Less hearing protection.
• Eliminates sound walls in residential areas.
Our “Gasification” Initiative
• Can run on Natural Gas NOW!
– Going to Diesel was the hard part.
– Moving “back to gas” is simple.
– No engine re-design needed.
– Ran TFP on Field Gas!
• Only pumps capable of 100% Gas!
– Run either on diesel OR Natural gas.
– Maximum fuel flexibility.
• Gain efficiency going to Natural Gas!
CLEAN TURBINE PUMPING TECHNOLOGY
CLEAN TURBINE PUMPING TECHNOLOGY
Natural Gas Commissioning
Key Points:• TFP uses 7.4 mcf per hour on idle and 27 mcf per hour 2000 HP.• Gas system simpler than diesel with less mechanical auxiliary
systems - 10% more mechanical horsepower!• No visible smoke signature – even better emissions.
CLEAN TURBINE PUMPING TECHNOLOGY
Job Parameters :
• Rate: 80 BPM
• Treating Pressure: 8,500 psi
• Pump time: 2 hrs.
• HP: 31,500 HHP (5 TFP dual Units on line, 2 idling)
Fuel consumption per stage:
• Diesel = 3,150 gals @ 4.00/gal = $12,600
• LNG = 5,355 gals @1.50/gal = $8,032
• Natural Gas = 540 mcf @3.50 mcf = $1,890
@5.00 mcf = $2,700
5 Stages/day = $50k/day or $1.0M per month!
Fuel Comparison ( Diesel vs. LNG vs Nat Gas )