© ABB Group Slide 1
NSP Maritime Link Project ABB Supplier Information Morning Session Presentation
Jeff Buckner – ABB Canada Project Manager
© ABB Group September 26, 2014 | Slide 2
~150,000 employees
Present in
countries +100
Formed in
1988 merger of Swiss (BBC, 1891) and Swedish (ASEA, 1883) engineering companies
In revenue (2013)
billion 42 $
NSP Maritime Link Project Introduction to ABB - Our Company
© ABB Group | Slide 3 �February 13, 2014
As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way.
NSP Maritime Link Project Introduction to ABB – Our Mission
© ABB Group | Slide 4 �February 13, 2014
NSP Maritime Link Project Introduction to ABB – Five Global Divisions
© ABB Group Slide 5 PowDoc id
High Voltage Direct Current (HVDC)
Power Semiconductors
Power Cables
Offshore Wind Connections
Consulting
Service and Upgrades
NSP Maritime Link Project Introduction to ABB – Power Systems, Grid Systems
© ABB Group September 26, 2014 | Slide 6
Transmission and Distribution Substations
T&D Infrastructure and Grid Integration
Solutions Service
Flexible AC Transmission Systems
NSP Maritime Link Project Introduction to ABB – Power Systems, Substations
Trans. stn
Trans. stn
345 kV AC
230 kV AC
230 kV AC
1 km Underground Cable (Installation Only)
HVDC
HVDC
HVDC Light Converter Stations with AC Substation � Bottom Brook, NL � Woodbine, NS
3 Transitions stations � Cape Ray, NL � Point Aconi, NS � Woodbine, NS
AC Substation � Granite Canal, NL
NSP Maritime Link Project ABB Scope of Work
Our Commitment – Every ABB employee, as well as those of our suppliers, is responsible for creating a safe, healthy, and environmentally friendly culture which includes strict compliance with EH&S requirements.
Our passion and priority is to ensure everyone's health & safety while sustaining the environment.
NSP Maritime Link Project ABB Environmental, Health, and Safety Expectations
© ABB Group September 26, 2014 | Slide 8
� ABB fully supports the local economic benefits for the Maritime Link project and is committed to all diversity targets established by NSPML.
� ABB and all of our subcontractors will provide the following:
� Opportunities for workers to self-identify as part of an underrepresented group.
� Invite qualified applicants from NS and NL for supply and labor.
� Ensure employees attend project orientation.
� Immediate investigation of any and all complaints of harassment/discrimination.
NSP Maritime Link Project ABB Local Benefits Commitments
© ABB Group September 26, 2014 | Slide 9
NSP Maritime Link Project ABB Purchasing Processes
Purchases (Equipment/Material):
� Two stage qualification process with second stage only required for major purchases.
� Examples of information required in stage two are financial statements, insurance certificates, health and safety records, bonding limits, etc.
Services (Professional):
� For subcontracted services prequalification occurs through the global supplier qualification process questionnaire.
© ABB Group September 26, 2014 | Slide 10
NSP Maritime Link Project ABB Purchasing Processes and Requirements
© ABB Group September 26, 2014 | Slide 11
� Potential suppliers of services or components complete the prequalification process.
� ABB will send a request for proposal or quotation package to applicable suppliers.
� All submittals which meet the commercial terms will be evaluated based on the technical requirements, price, and experience with prior supply.
� Suppliers must agree to ABB terms & conditions, which include signing and strictly abiding by the ABB Code of Conduct.
� Environmental and Wildlife Management
� Civil and Electrical Engineering Design
� Geotechnical and Laboratory Testing
� Signage and Jobsite Consumables
� Personal Protective Equipment (PPE)
� Accommodations for ABB Personnel
� Ports of Entry for International Shipments
NSP Maritime Link Project ABB Procurement
Professional and Other Services
© ABB Group September 26, 2014 | Slide 12
NSP Maritime Link Project ABB Procurement – con’t
Station Service Systems
� 125 and 48 Volt DC Battery Systems
� 120 Volt AC UPS Inverter Systems
� Diesel Generators and Related Control Equipment
� Cables – Control, Power, and Fiber Optic
© ABB Group September 26, 2014 | Slide 13
NSP Maritime Link Project ABB Procurement – con’t
Other Materials
� Galvanized Steel (Lattice, Tubular, and Plate)
� Insulators
� Tubular Bus, Conductors, Connectors, and Hardware
� Outdoor Lighting
� Cable Trench
� Conduit
© ABB Group September 26, 2014 | Slide 14
NSP Maritime Link Project ABB Overall Project Schedule
© ABB Group September 26, 2014 | Slide 15
DESIGN
2014 2015 2016 2017
PROCURE
CONSTRUCT
COMMISSION
NSP Maritime Link Project ABB Supply Chain Contact
Peter Prahalis Supply Chain Manager Email: [email protected] Format email as follows: Subject Line: Maritime Link Project Supplier Interest Body of Email: Company name with contact information Business address Explain the type of supply you are interested in Provide any certifications, registrations, etc. Reference list for similar work/supply
© ABB Group September 26, 2014 | Slide 16
© ABB Group September 26, 2014 | Slide 17
© ABB Group September 26, 2014 | Slide 18
© ABB Group September 26, 2014 | Slide 19
© ABB Group September 26, 2014 | Slide 20
© ABB Group September 26, 2014 | Slide 21
© ABB Group September 26, 2014 | Slide 22
NSP Maritime Link Project ABB Closing
ABB is very proud to be a part of this historic project and appreciative of the warm welcome into your communities.
© ABB Group September 26, 2014 | Slide 23