Jeans Express Ltd. Ralex Industries Lax Lingerie...

23
Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A, CDAs, Fauzdarhat, Heavy I/A, Sagarika Road, Pahartali (22.3588E, 91.7746N) 17 May 2014 1

Transcript of Jeans Express Ltd. Ralex Industries Lax Lingerie...

Page 1: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

Jeans Express Ltd.Ralex IndustriesLax Lingerie Ltd

49/A, CDAs, Fauzdarhat, Heavy I/A, Sagarika Road, Pahartali(22.3588E, 91.7746N)

17 May 2014

1

Page 2: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

2

Observations

Page 3: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

3

Columns appear to be stressed to levels that require immediate review

Observations

Page 4: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

4Observations

Testing confirmed Stone aggregate in ground floor columns.

• Columns indicated in red appear to be stressed to a degree that requires immediate review.

• Calculations indicate that other columns are also stressed in excess of design limits.

Page 5: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

5

Concrete water tank located on roof

Toilet Build up

• Raised toilet floors to gents toilets over 3 floors (300-400mm on top of concrete slab), and a concrete water tank located at roof level, contribute to columns being stressed to levels that require immediate review

Page 6: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

6

Cracking to top of floor slabs

Page 7: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

7

Diagonal cracking was observed on the top of the floor slab around perimeter columns where the floor finish had been removed.

Cracking visible in floor slab

Page 8: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

8

Design check required due to discrepancies between ‘as-built’ drawings and building

structure

Observations

Page 9: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

9

Observations

Main Factory Building - Typical Floor Plan

Column orientation is incorrect

Stair position incorrect

Stair Ground to 1st floor only

Column orientation is changed

Page 10: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

10

Observations

Cantilever observed

Main Factory Building - Typical Floor Plan

CantileverCantilever

Cantilever incorrectly indicated on drawings

Page 11: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

11

Observations

“As-built” drawing – Additional bay indicated not constructed

No

t C

on

stru

cted

• Water tank indicated over stair core on drawings.

• Water tank is actually located on roof slab.

Permit Drawing

Page 12: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

12

Design check required for plinth loading in toilet areas to confirm flat slab load

capacity

Page 13: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

13

Toilet Build up

• Raised toilet floors to gents toilets over 3 floors.

• 300-400mm on top of concrete slab will exert load greater than that in the general factory area.

Design check required for plinth loading in toilet areas to confirm flat slab load capacity

Page 14: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

14

Load management of storage loads

Page 15: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

15

Observations

Factory Building – 1st Floor Denim Rolls Factory Building – 2nd Floor

No Floor load management system in place

Factory Building – 2nd Floor Denim Stock

Page 16: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

16

Cracking at expansion joint

Page 17: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

17

No expansion joint formed in slab. Attempted crack repairs observed

Cracking observed in the exterior masonry panel that bridges expansion joint

Page 18: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

18

Priority Actions

Page 19: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

19

Problems Observed

1. Columns appear to be stressed to levels that require immediate review

2. Cracking to finishes on top of floor slabs3. Design check required due to discrepancies between ‘as-

built’ drawings and building structure – location of stairs, location and size of cantilevers, number of bays etc.

4. Design check required for plinth loading in toilet areas to confirm flat slab load capacity

5. Load management of storage loads6. Cracking at expansion joint

Page 20: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

20

Item No. Observation Recommended Action Plan Recommended Timeline

1Columns appear to be

stressed to levels that require immediate review

Reduce loading in area shown on drawing above to 1.5kPa at 2nd, 3rd and 4th floors, and to Zero at 1st, 5th and 6th floors.

Immediate - Now

2Columns appear to be

stressed to levels that require immediate review

In all other areas, limit load to 2kN/m2 at all levels. Immediate - Now

3Columns appear to be

stressed to levels that require immediate review

Empty water tank on roof. If this water tank is a fire water tank, ensure measures are taken to provide adequate water supply in the event of a fire.

Immediate - Now

4Columns appear to be

stressed to levels that require immediate review

Factory Engineer to review design, loads and columns stresses in area identified above.

Immediate - Now

5Columns appear to be

stressed to levels that require immediate review

Verify insitu concrete strengths (using min. 4 no. 100mm dia. cores) and existing reinforcement for all columns.

Immediate - Now

6Columns appear to be

stressed to levels that require immediate review

A Detail Engineering Assessment of Factory to be commenced, see attached Scope.

Immediate - Now

7Columns appear to be

stressed to levels that require immediate review

Produce and actively manage a loading plan for all floor plates within the factory giving consideration to floor capacity and column capacity. This should include a safe level to which any water tanks can be filled.

6-weeks

8Columns appear to be

stressed to levels that require immediate review

Detail Engineering Assessment to be completed 6-weeks

9Columns appear to be

stressed to levels that require immediate review

Continue to implement load management plan. 6-months

Page 21: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

21

This Schedule develops a minimum level of information, Analysis and testing expected as part of a Detail Engineering Assessment.The Building(s) have been visually assessed and it is deemed necessary that a detailed engineering assessment be carried out by a competent Engineering Team employed by the factory Owner. This Request should be read in conjunction with the BUET developed Tripartite Guideline document for Assessment of Structural Integrity of Existing RMG Factory Buildings in Bangladesh (Tripartite Document), the latest version of this document should be referenced. T his document also gives guidance on required competency of Engineering Team.

We expect that the following will be carried out:1. Development of Full Engineering As-Built Drawings showing Structure, loading, elements, dimensions , levels, foundations and framing on Plan,

Section and Elevational drawings .2. The Engineering team are to carry out supporting calculations with a model based design check to assess the safety and serviceability of the building

against loading as set out in BNBC-2006, Lower rate provisions can be applied in accordance with the Tripartite Guidelines following international engineering practice, justification for these lower rate provisions must be made.

3. A geotechnical Report describing ground conditions and commenting on foundation systems used/proposed.4. A report on Engineering tests carried out to justify material strengths and reinforcement content in all key elements studied.5. Detailed load plans shall be prepared for each level showing current and potential future loading with all key equipment items shown with associated

loads.6. The Engineering team will prepare an assessment report that covers the following:

• As-Built drawings including• Plans at each level calling up and dimensioning all structural components • Cross sectional drawings showing structural beams, slabs, floor to floor heights, roof build-ups and Basic design information of the

structure• Highlight any variation between As-built compared to the designed structure• Results of testing for strength and materials• Results of geotechnical assessment and testing/investigation• Details of loading, inputs and results of computer modelling• Commentary on adequacy/inadequacy of elements of the structure• Schedule of any required retrofitting required for safety or performance of Structure

Any proposals for Retrofitting to follow guidance developed in the Tripartite Document

Detail Engineering Assessment

Page 22: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

22

Item No. Observation Recommended Action Plan Recommended Timeline

10Cracking to finishes on top of

floor slabsSections of floor finish to be removed to investigate if cracks penetrate the building structure.

6-weeks

11Cracking to finishes on top of

floor slabsBuilding Engineer to carry out design check on floor slab to confirm that these cracks are non-structural.(refer to Item 1)

6-months

12Cracking to finishes on top of

floor slabsBuilding Engineer to monitor location of cracks and ensure that, where required, remedial works are carried out.

6-months

13

Design check required due to discrepancies

between ‘as built’ drawings and building structure

As part of Detail Engineering Assessment, Building Engineer to commence re-survey of as-built structure and update drawings including a verification of the location of stairs, column orientation and cantilevers.

Immediate - Now

14

Design check required due to discrepancies

between ‘as built’ drawings and building structure

Complete as-built survey and commence calculations for verification of flat slab structure.

6-weeks

15

Design check required due to discrepancies

between ‘as built’ drawings and building structure

Produce and actively manage a loading plan for all floors within the Building, giving consideration to floor capacity and column capacity. (Refer to Item 1)

6-weeks

16

Design check required due to discrepancies

between ‘as built’ drawings and building structure

Building Engineer to survey as constructed building and update drawings as required.

6-months

Page 23: Jeans Express Ltd. Ralex Industries Lax Lingerie Ltdaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/19586.pdf · Jeans Express Ltd. Ralex Industries Lax Lingerie Ltd 49/A,

23

Item No. Observation Recommended Action Plan Recommended Timeline

17

Design check required for plinth loading in toilet areas

to confirm flat slab load capacity

Extent of plinth loading within toilet areas to be surveyed and capacity of floor slab to be assessed as part of Detail Engineering Assessment (Refer to Item 1)

6-weeks

18Localised areas of high

loading

Produce and actively manage a loading plan for all floor plates within the Main Building giving consideration to floor capacity and column capacity.(Refer to Item 1 – Detail Engineering Assessment)

6-weeks

19Localised areas of high

loadingContinue to implement load management plan 6-months

20 Cracking at Expansion JointIntroduce permanent expansion joint by saw-cutting masonry panels and fill joint with an a flexible joint sealant.

6-months