Nov 20, 2012 Mission College Presented by: Rick Bennett, VP Admin Services.
JE17KK POST MISSION PRODUCT VP-8 DATE: 17 JAN 2010 MISSION NUMBER: JE17KK EXECUTIVE SUMMARY
8
JE17KK POST MISSION PRODUCT VP-8 DATE: 17 JAN 2010 MISSION NUMBER: JE17KK EXECUTIVE SUMMARY (UNCLAS) On 17 JAN 2010, one P-3C (AIP) flew a Humanitarian Assistance Disaster Relief (HADR) Mission from NAS Jacksonville over Port-au-Prince, Haiti returning to NAS Jacksonville. During the mission, Electro-Optical and Infrared (EO/IR) imaging equipment was used to capture images of earthquake damage. CPRW 11 Intel: IS3 Lind CPRW 11 Analyst Overwater UNCLASSIFIED
-
Upload
dorothy-cross -
Category
Documents
-
view
16 -
download
0
description
Overwater. JE17KK POST MISSION PRODUCT VP-8 DATE: 17 JAN 2010 MISSION NUMBER: JE17KK EXECUTIVE SUMMARY - PowerPoint PPT Presentation
Transcript of JE17KK POST MISSION PRODUCT VP-8 DATE: 17 JAN 2010 MISSION NUMBER: JE17KK EXECUTIVE SUMMARY
JE17KK POST MISSION PRODUCT
VP-8
DATE: 17 JAN 2010
MISSION NUMBER: JE17KK
EXECUTIVE SUMMARY(UNCLAS) On 17 JAN 2010, one P-3C (AIP) flew a Humanitarian Assistance Disaster Relief (HADR) Mission from NAS Jacksonville over Port-au-Prince, Haiti returning to NAS Jacksonville. During the mission, Electro-Optical and Infrared (EO/IR) imaging equipment was used to capture images of earthquake damage.
CPRW 11 Intel: IS3 Lind CPRW 11 Analyst
Overwater
UNCLASSIFIED
Individual Imagery Slides
UNCLASSIFIED
Product contact: IS3 Michael LindCPRW 11 Analyst
DSN: 942-2179 EXT 155/156/730 SIPR: [email protected]