COMPLETED ESINET 9-1-1 CALLS

• December: 1057• January: 3470• February: 6685• Total: 11,212

Page 3: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

NG9-1-1 ESINET STATUS

LSR

LNG LSRG

ESInetMPLS IP Network

(Serves PSAPs & Data Centers)

Englewood

Miami

Edina

Fargo

Bismarck

LSR

LNG LSRG

ECMC

ECMC

Page 4: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

WHAT’S REALLY HAPPENING?

LSRCarrier Trunks

LNG LSRG IPSR

Legacy

Route

NG911 RouteESInet

PSAP

PSAP

Colo

Page 5: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

WHAT’S HAPPENING ON THE FINANCE SIDE?

• Previously• JPA would fund wireless & VoIP 9-1-1• PSAP would fund landline 9-1-1

• After the ESInet connection is made for a PSAP• JPA funds all 9-1-1 delivery (LL, VoIP, WRLS)

• Important!!!!!• Make sure to clean up your LEC billing after ESInet is

deployed.• Particularly those PSAPs with 9-1-1 trunks coming from

the tandem in non-CenturyLink exchanges.

Page 6: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

WHAT’S HAPPENING IN 2015?

• MSAG Development• Develop MSAGs where they do not exist• Update MSAGs are not conformant with USPS addressing

• New Interconnection Options for Local Exchange Carriers.• Need to move LEC to PSAP direct trunks to common

aggregation points (Analog and IP)

• Text to 9-1-1 Deployment

Page 7: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

MSAG WORK

Page 8: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

MSAG WORK

• 26 Counties need an MSAG• 3 Counties need a new MSAG• 23 Counties need MSAG updated / reviewed• As new MSAGs are developed, direct trunking

from LECs to PSAPs can be eliminated• Project will run through 2015-2016

Page 9: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

NEW CARRIER INTERCONNECTION OPTIONS

• Next Generation Aggregation Points (NGAPs)• Deployed in the State of Washington & Utah• NGAPs replace the Legacy Selective Router for Analog

traffic• LSRs are becoming a real maintenance issue

• Parts & Technical Support

• NGAPs MAY also serve as ND’s IP aggregation points• Primary & Backup available to Carrier Soft Switches

• Legacy Network Gateways• Existing LNGs MAY also be used

Page 10: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

NEW CARRIER INTERCONNECTION OPTION A

LSRCarrier Trunks

LNG LSRG IPSR

Legacy

Route

NG911 RouteESInet

NGAPBIS

Carrier Trunks

(Analog)

NGAPFAR

Carrier Trunks

(IP)

Page 11: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

NEW CARRIER INTERCONNECTION OPTION B

LSRCarrier Trunks

LNG LSRG IPSR

Legacy

Route

NG911 RouteESInet

NGAP

Carrier Trunks

(Analog)

Carrier Trunks

(IP)

Page 12: JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)

TEXT TO 9-1-1

• Need Memorandum of Understanding finalized• PSAPs: Please sign if you haven’t already.

• NDACo still working with CenturyLink, Intrado on a suitable ESInet connection strategy for RRRDC & GF• RRRDC/GF is CenturyLink’s first multi-node direct IP

deployment on Viper• Being on the leading edge is delaying the process a bit

• NDACo working with CenturyLink on Text-to-911 amendment to NG9-1-1 agreement.• Legal stuff and one-time configuration expenses for PSAPs• PSAPs will still be responsible for purchasing their own CPE

upgrades