January - ORMASormas.org/Application//uploadDocuments/Tender/Tender_20171213... · SISIR SARAS 2018...

9
January Tentative Design for SISIR SARAS 2018

Transcript of January - ORMASormas.org/Application//uploadDocuments/Tender/Tender_20171213... · SISIR SARAS 2018...

January

Tentative Design for SISIR SARAS 2018

•Specification: Bamboo Structure, Wooden Botton Frame,Artistic 3D Structured Design•Working Material:- Plaster of paris(pop),Bamboo & Thermcole•Pillar in Thermocole cut-out•Top Logo with Lighting with 3D Text• Design will be made over the Proper Structure

Entry Gate

•Working Materials:-POP,Bamboo structure,Ply Structure

Fabrication ,Thermocole & Colour

•Top Logos with 3D Text

• Design will be made over the Proper Structure

Co-ordination Cell

•Working Materials:-POP,Bamboo structure,Ply Structure

fabrication,Thermocool & Colour

•25 yrs Logo & Sisir Saras in Thermocool 3D Text Cut- out(5 nos)

• Design will be made over the Proper Structure

Stage

•Working Materials:-POP,Bamboo structure,Ply Structurefabrication, Thermocool & Colour• Design will be made over the Proper Structure

Demo Stall

Saras Facia

Ground Layout

Security: Layout

• There will be a committee to supervise, monitor &approve the work.

• The Committee will consist of Designer, Visualizer ,Artist, Design Consultant, Official etc…

• There should be minimum of flex work and more ofactual art objects & artworks