JANUARY 30 2013
2
JANUARY 30 2013 Laurie Corcoran DEMAND RESOURCE STRATEGY ANALYST ISO NEW ENGLAND, INC. Update on Baseline/Outages Project
description
JANUARY 30 2013. Laurie Corcoran. DEMAND RESOURCE STRATEGY ANALYST ISO NEW ENGLAND, INC. Update on Baseline/Outages Project. Status of Baseline/Outages Project. ISO-NE is working to develop a solution for the transition period that addresses baseline accuracy during outages. - PowerPoint PPT Presentation
Transcript of JANUARY 30 2013
JANUARY 30 2013
Laurie CorcoranDEMAND RESOURCE STRATEGY ANALYST
ISO NEW ENGLAND, INC.
Update on Baseline/Outages Project
Status of Baseline/Outages Project
• ISO-NE is working to develop a solution for the transition period that addresses baseline accuracy during outages.
• Implementing a solution for the transition period is difficult :– IT support is very limited– Must account for multiple assets behind the same meter which may
be interacting with one another
• Under full-integration the requirement for an asset to be measured at the Retail Delivery Point solves the most difficult issue.
2