JAM_RESUME

8
Jose A. Mora, Jr. Brgy. Cogon, Baybay City, Leyte E-mail add: [email protected] Mobile No.: +639369561923 CAREER SUMMARY Commissioning and start-up of refurbished 3 x 41 MW steam turbine generator, auxiliary equipment and balance of plant facilities of Tongonan Geothermal Power Plant with Siemens SPPA T3000 Profibus PA DCS control systems and GE multilin numerical relay; Two years of experience as Rig Electrician on Onshore Cyber Rig. Passed the upgrading examinations for Professional Electrical Engineer (PEE). Commissioning and start-up of newly refurbished 2 x 55 MW steam turbine generator, auxiliary equipment and balance of plant facilities of BACMAN geothermal power plant with Yokogawa Field Bus DCS control system and Basler Numerical Relay; Fourteen years in the operation / maintenance of 3 x 77.5MW geothermal power plant. Four years in the installation and commissioning of electrical system and process instrumentation and control for the Fluid Collection and Disposal System of 3x77.5 MWe and 4x30 MWe Geothermal Power Plants. One and a half years in the Electric Utility Distribution Line. Attended twelve days seminar on Design Practices in Industrial Electrical Systems conducted by the Centre for Studies in Electrical Engineering Practices and Standards (4 modules). Attended thirteen days seminar on protective relaying.

Transcript of JAM_RESUME

Page 1: JAM_RESUME

Jose A. Mora, Jr. Brgy. Cogon, Baybay City, Leyte E-mail add: [email protected] Mobile No.: +639369561923 CAREER SUMMARY Commissioning and start-up of refurbished 3 x 41 MW steam turbine generator,

auxiliary equipment and balance of plant facilities of Tongonan Geothermal Power Plant with Siemens SPPA T3000 Profibus PA DCS control systems and GE multilin numerical relay; Two years of experience as Rig Electrician on Onshore Cyber Rig. Passed the upgrading examinations for Professional Electrical Engineer (PEE).

Commissioning and start-up of newly refurbished 2 x 55 MW steam turbine generator, auxiliary equipment and balance of plant facilities of BACMAN geothermal power plant with Yokogawa Field Bus DCS control system and Basler Numerical Relay; Fourteen years in the operation / maintenance of 3 x 77.5MW geothermal power plant.

Four years in the installation and commissioning of electrical system and process

instrumentation and control for the Fluid Collection and Disposal System of 3x77.5 MWe and 4x30 MWe Geothermal Power Plants.

One and a half years in the Electric Utility Distribution Line. Attended twelve days seminar on Design Practices in Industrial Electrical Systems

conducted by the Centre for Studies in Electrical Engineering Practices and Standards (4 modules).

Attended thirteen days seminar on protective relaying.

Page 2: JAM_RESUME

CORE COMPETENCIES Power systems study, short circuit calculation and protective relay coordination study

of steam turbine generator power plant; Proficient in determining protection relay settings for Turbo Generator, Generator Step-up Transformer, Line protection, Medium and Low voltage motors; Knowledgeable to evaluate the different integrity test of power transformer and synchronous generator unit, MV/LV motor, Switchgears and MV/LV circuit breakers; Project implementation/installation, testing and commissioning of steam turbine generator power plant and its balance of plant facilities; Operation of Steam-Turbine Generator power plant with DCS control systems.

PROFESSIONAL REGULATION COMMISSION Professional Electrical Engineer Date Passed: November 13, 2012 PRC ID No.: 003476

Registered Electrical Engineer Date Passed: August 3, 1992 PRC ID No.: 0014884 EDUCATION College University of Eastern Philippines Catarman, N. Samar 1985 – 1986 BS Mechanical Engineering Divine Word University Tacloban City, Leyte 1986 – 1988 BS Electrical Engineering

Cebu Central Colleges (now University of Cebu) Cebu City 1988 – 1991 BS Electrical Engineering Graduated

Page 3: JAM_RESUME

WORK EXPERIENCE Company : Energy Development Corp. Position : Commissioning Engineer Period : October 31, 2016 – Present Project : Commissioning of 3 x 41 MWe Geothermal Power Plant Duties and Responsibilities Evaluates site acceptance test of Oil- Immerse Power Transformer, Synchronous

Generator, OIP high voltage transformer bushing, MV/LV Motors, MV/LV switchgears and Circuit Breakers, Protection Relays;

Lead and organize on site Execution Team/Contractors Commissioning Team of

electrical equipment and balance of plant facilities; Review / Witness functional performance testing for all pre-commissioned systems.

Lead the execution of functional performance testing per systems e.g., Transformer and

generator protections, synchronizing sytems and analyze systems performance using testing instruments;

Inspect and ensure all construction activities are completed prior to taking up the system for commissioning;

Ensure that all safety and precautionary requirements and procedures are followed during the commissioning. Regularly contact discipline engineers and supervisors for solving problems related to project execution work safely;

Attend and participate in post construction meeting. Company : National Drilling Company, UAE Position : Chief Rig Electrician Period : February 16, 2014 – July 3, 2016 Project : Operation/Maintenance of 3000hp Onshore Cyber Rig Duties and Responsibilities Maintain properly to ensure optimum operation of Power Generation Units, PLC’s,

Profibus DP system, VFD’s, MCC’s, associated motors and instrumentation in the rig;

Audit spare material to ensure availability of material during scheduled maintenance and exigency.

Initiate recommendation/update to the Rig Manager pertaining the status of rig electrical and instrumentation equipments.

Page 4: JAM_RESUME

Troubleshooting and repair of malfunctioned rig electrical equipments;

Ensure that all equipment is properly used and maintained by the rig operating personnel and when applicable, train crews in the proper handling of electrical equipment;

Manage and oversee the utilization of electrical equipment;

Conduct installation, functional testing of Top Drive, Drawworks, Mud Pumps, Iron Roughneck, VFD, Intercom, Camera, Rig Sense, both prior to use and in particular after rigging-up operations;

Company : Energy Development Corp. Position : Power Plant Operations Engineer Period : December 16, 1999 – February 12, 2014 Project : Operation/Maintenance of 3 x 77.5 MWe Geothermal Power Plant Duties and Responsibilities

Responsible for the operation and maintenance of protective relays, transformers,

generators, 230 kV switchyard equipments, 13.8/4.16/0.48 kV switchgears and motors; Carries out pre-commissioning, commissioning, start-up, and stop of 2x55MWe Bacman

Geothermal Power Plant;

Review / audit the fault current analysis and protection relay settings to verify the integrity of protection relays coordination settings;

Participates in the root cause failure analysis of the electrical /instrumentation equipments and make recommendations to mitigate and even eradicate the recurrence of the problem;

Provides technical evaluation on electrical/instrumentation equipments to ensure the

reliability and enhance the electrical systems operational efficiency; Leads a team of electrical technician during the turnaround activities of the power plant

and 230 kV switchyard;

Participates in the preparation of electrical specifications and scope of works for both upgrading and turnaround projects;

Identifies, proposes and evaluates testing and preventive measures to ensure the optimum operating condition of the electrical systems;

Evaluates test results of oil- immerse power transformer, OIP high voltage transformer bushing, electrical motors, switchgears and protection relays;

Monitors the progress of electrical system upgrade/enhancement projects and provide recommendations to meet the project schedules and cost.

Page 5: JAM_RESUME

Company : PNOC - Energy Development Corp. Position : Electrical/Instrumentation Field Engineer Period : June 5, 1995 – June 30, 1999 Project : Fluid Collection and Disposal System for 3 x 77.5 and 4x 30

MWe Geothermal Power Plant Duties and Responsibilities Conduct inspection on the installations done by the contractor to see to it that it complies

with the approved plans and specifications, conform with applicable industrial practice and standards;

Coordinate with the vendors and contractors in the testing and commissioning of

transformers, switchgears, as well as process instruments and controllers (PLC/DCS) of steam collection and reinjection system of geothermal power plant;

Write correspondence to the contractor and other discipline within the company;

Attend technical coordination meeting with the contractor to discuss project program of

works and updates of the project; Review the proposed and as-built drawing of electrical systems and various

instrumentation drawing (i.e. P&ID, Logic and loop wiring diagrams); Prepare information/data needed by the higher management regarding the updates of the

project; Coordinate with other discipline concerning field installation to rid out conflict in the

implementation;

Punch listing of units in accordance to design during pre-commissioning period; Prepare material take-off for electrical and instrumentation system project;

Evaluate the one month look ahead work plan schedule submitted by the contractor.

Company : Northern Samar Electric Cooperative Position : Staff Engineer Period : June 23, 1994 to May 31, 1995 Project : O/M Utility Distribution Line Duties and Responsibilities Supervise the installation of 13.2 kV wood – pole distribution lines.

Responsible in the preparation of needed materials based on the construction plan.

Page 6: JAM_RESUME

Submit monthly accomplishment reports and other reports that are needed by the management.

Conduct ocular inspection on the wiring installations in the commercial and residential

establishments and make approval and disapproval based on the standard practices.

Company : Visayan Electric Company Position : Cadet Engineer Period : September 24, 1993 to March 23, 1994 Project : Distribution Transformer and Distribution Line Sizing Duties and Responsibilities Transformer load monitoring to prevent it from overloading and transformer burns;

Secondary line distribution designing to provide customer’s required voltage and to solve

low voltage problem; Secondary line distribution designing to reduce line losses.

SEMINARS AND TRAININGS ATTENDED 1. May 13 – 14, 2016 General Guidelines for the Design of Outdoor Medium

Voltage Transformer Substation for Electrical Supply of Commercial/Institutional Building and Industrial Plants

2. March 18-19, 2016 Electrical Power System Design for High Rise Building Institute of Integrated Electrical Engineers #41 Monte de Fiedad St., Cubao, Quezon City

3. February 8 -12, 2015 SIMATIC S7 Service Training 1 Siemens - UAE

4. November 3 – 28, 2014 Industrial Instrumentation and Calibration

Metrologyx Training & Assessment Center (Industrial instrumentation & automation training systems)

Mandaue City, Philippines www.metrologyx.com

5. February 18 – 20, 2014 Basic Offshore Safety Induction Emergency Training

Emirates Technical & Safety Development Center Abu Dhabi, UAE

Page 7: JAM_RESUME

6. November 5-8, 2013 NFPA 70 (National Electrical Code) Cebu City, Philippines

7. September 30 – October 4, 2013 Infrared Thermographic Testing -Level I Philippine Nuclear Research Institute NDT laboratory and Training Center

Diliman, Quezon City, Philippines 8. March 13-15, 2013 Safety Refresher Training

EDC Safety Management Department

9. March 5-7, 2012 NFPA 70E Standard for Electrical Safety in the Workplace, 2012 Edition

10. July 27-28, 2011 Safework Permitting Refresher Training

EDC Safety Management Department

11. November 22-26, 2010 Protective Relaying Course Delta Power Engineering & Consulting

12. October 28-30, 2009 Design Practices in Industrial Electrical Systems

(Module 4: Industrial Substations and Protection Systems ) CESEEPS International Association, Inc. 13. November 19-21, 2008 Design Practices in Industrial Electrical Systems

(Module 1. Low Voltage Systems and Applications in Industries)

CESEEPS International Association, Inc. 14. November 26-28, 2008 Design Practices in Industrial Electrical Systems

(Module 2. Medium Voltage Systems and Applications in Industries)

CESEEPS International Association, Inc. 15. September 6-8, 2006 Design Practices in Industrial Electrical Systems (Module 3 Fault Calculations & Applications in Industries ) CESEEPS International Association, Inc. 16. March 09-11, 2004 Basics and Use of Project Management Software Energy Development Corporation EDC Computer Training Room 17. February 7-11, 2000 Principles of Protective Relaying, Control and Monitoring Seminar, ABB

Page 8: JAM_RESUME

18. January 7-9, 1997 Rotork Training on: IQ Electrical Actuators, Pakscan Master station, Pakscan Two Wire Control System ROTORK CONTROL (Singapore) PTE LTD 19. July 24-26, 1996 Control Valve Operation and Maintenance TRIGON Mgt & Industrial Corporation AFFILIATION Life Member, Institute of Integrated Electrical Engineers of the Philippines. CHARACTER REFERENCE 1. Edino Q. Inot 2. RONALD R. BERNARDO

Consultant Commissioning Engineer Energy Development Corporation Energy Development Corporation

Ormoc Heights subd., Ormoc City Tongonan, Ormoc City, Phils Mobile No. 09175787910 Mobile No. 09232743822

The undersigned certifies that the foregoing information is true and correct. Jose A. Mora Jr.