James River Crossing Profile - nao.usace.army.mil · dominion ground clearance is controlled by 5ma...
Transcript of James River Crossing Profile - nao.usace.army.mil · dominion ground clearance is controlled by 5ma...
PLS-CADD DRAWING
40
+0
0
50
+0
0
60
+0
0
70
+0
0
80
+0
0
-20
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
-20
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
PI
-2°0
6'3
6"
PI
-0°0
2'3
2"
PI
13
°16
'57
"
14
'39
"
58
2-7
15
.20
5A
15
5F
T 5
82
-7-1
0.P
OL
ST
A=
46
+1
9.9
6H
T=
15
7.0
0 E
LE
=3
1.1
2H
T A
DJU
ST
=2.0
0G
ALV
12
-F
NE
W:
1 1
5.2
05
A
58
2-8
15
.20
5A
15
5F
T 5
82
-7-1
0.P
OL
ST
A=
52
+6
0.2
9H
T=
15
7.0
0 E
LE
=3
4.4
1H
T A
DJU
ST
=2.0
0G
ALV
12
-F
NE
W:
1 1
5.2
05
A
58
2-9
15
.20
5A
15
5F
T 5
82
-7-1
0.P
OL
ST
A=
58
+9
9.8
2H
T=
15
7.0
0 E
LE
=3
0.3
1H
T A
DJU
ST
=2.0
0G
ALV
12
-F
NE
W:
1 1
5.2
05
A
58
2-1
0 1
5.2
05
A 1
55
FT
58
2-7
-10
.PO
LS
TA
=6
6+
58
.62
HT
=1
57
.00
EL
E=
25
.72
HT
AD
JUS
T=
2.0
0G
ALV
12
-F
NE
W:
1 1
5.2
05
A
58
2-1
1 1
5.2
10
17
0F
T 5
82
-11
.PO
LS
TA
=7
3+
53
.30
HT
=1
72
.00
EL
E=
22
.28
HT
AD
JUS
T=
2.0
0F
UT
UR
E-1
1G
ALV
12
-F
NE
W:
1 1
5.2
10
2 9
6.5
00
FU
TU
RE
/11
535
-5.P
OL
ST
A=
77
+8
3.7
8H
T=
18
0.0
0 E
LE
=1
9.4
3H
T A
DJU
ST
=2
0.0
0
NE
W:
1 1
53
51
28
6
58
2/1
2 5
VD
EA
20
20
.TO
WS
TA
=8
4+
42
.62
HT
=1
38
.00
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
DE
A 20
20
20
20
20
NE
W:
1 1
5.7
16
837.45
640.33 639.53758.79
694.69 1089.32
582-7 582-8 582-9582-10
582-11
FUTURE/11582/12
582/13
PI
58
+99
.82
-2°0
6'3
6"
PI
66
+58
.62
-0°0
2'3
2"
PI73+
53.3
013°1
6'5
7"
PI84+42.62
-71°14'39"4
0+
00
50
+0
0
60
+0
0
70
+0
0
80+
00
90+00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
45
0 DEG F INITIAL
60 DEG F INITIAL
235 DEG F FINAL
582 LINE STRUNG ON NORTH SIDE OF DC STRUCTURES
582-3 -582-11 794 DNO 9809 3509
7750582-3 -582-11 793
DNO 9809
35127750
582-3 -582-11 793
1351ACSR 45/7 "DIPPER"
786414500
582-11 -582/12 1070
DNO 9809
36418500
582-11 -582/12 1115
DNO 9809
35758500
582-11 -582/12 1089
1351ACSR 45/7 "DIPPER"
757114500
582/12 -582/15 979
DNO 9809
38278500
582/12 -582/15 955
DNO 9809
38788500
582/12 -582/15 966
1351ACSR 45/7 "DIPPER"
769014500
DNO 9809
0582017/9/2015PAGE 2/16
582-7 - 582/12
162
1-582-1-
01-5
82-0
1
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
MHW = 1.01`
RIVER BOTTOM
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/11
Structure 582/12
Structure 582/10
Structure 582/9
Structure 582/8
Structure 582/7
Vertical Scale 1.1 = MHW
James River Bank
James River Crossing Profile
PLS-CADD DRAWING
90
+0
0
10
0+
00
11
0+
00
12
0+
00
13
0+
00
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
58
2/1
3 5
VH
T0
02
0.T
OW
ST
A=
94
+0
9.4
8H
T=
13
4.2
9 E
LE
=0
.00
HT
AD
JUS
T=
18
.00
GS
TL
12
-F5V
HT 20
20
20
20
NE
W:
1 1
5.7
12
58
2/1
4 5
VH
T0
02
0.T
OW
ST
A=
10
3+
75
.34
HT
=1
34
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 20
20
20
20
NE
W:
1 1
5.7
12
58
2/1
5 5
VH
A0
03
0.T
OW
ST
A=
11
3+
43
.20
HT
=1
28
.00
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HA 30
30
30
30
NE
W:
1 1
5.7
15
58
2/1
6 5
VH
T0
02
0.T
OW
ST
A=
11
9+
74
.98
HT
=1
34
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 20
20
20
20
NE
W:
1 1
5.7
12
58
2/1
7 5
VH
T0
02
0.T
OW
ST
A=
13
0+
24
.68
HT
=1
34
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 20
20
20
20
NE
W:
1 1
5.7
12
966.86965.86 967.86 631.78 1049.70
582/13 582/14 582/15
582/16
582/17
90
+0
0
10
0+
00
11
0+
00
120+
00
130+
00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
46
582/12 -582/15 979 DNO 9809 3827
8500582/12 -582/15 955 DNO 9809 3878
8500
582/12 -582/15 966 1351
ACSR 45/7 "DIPPER"7690
14500
582/15 -582/20 1113 DNO 9809
35798500
582/15 -582/20 1124 DNO 9809
35608500
582/15 -582/20 1118 1351
ACSR 45/7 "DIPPER"7523
14500
0582017/9/2015PAGE 3/16
582/13 - 582/17
163
1-582-1-
01-5
82-0
1
60 DEG F INITIAL
0 DEG F INITIAL
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
MHW = 1.01`
4/1/144/1/14
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
235 DEG F FINAL
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/13
Structure 582/14
Structure 582/15
Structure 582/16
Structure 582/17
James River Crossing Profile
PLS-CADD DRAWING
13
0+
00
14
0+
00
15
0+
00
16
0+
00
17
0+
00
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
58
2/1
7 5
VH
T0
02
0.T
OW
ST
A=
13
0+
24
.68
HT
=1
34
.29
EL
E=
0.0
0H
T A
DJU
ST
=18
.00
GS
TL
12
-F5V
HT 20
20
20
20
NE
W:
1 1
5.7
12
58
2/1
8 5
VH
T2
02
5.T
OW
ST
A=
14
2+
34
.38
HT
=1
59
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 20
25
25
25
25
NE
W:
1 1
5.7
12
58
2/1
9 5
VH
T2
02
5.T
OW
ST
A=
15
4+
84
.29
HT
=1
59
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 20
25
25
25
25
NE
W:
1 1
5.7
12
58
2/2
0 5
VD
EA
20
20
.TO
WS
TA
=1
67
+0
5.6
0H
T=
13
8.0
0 E
LE
=0
.00
HT
AD
JUS
T=
18
.00
GS
TL
12
-F5V
DE
A 20
20
20
20
20
NE
W:
1 1
5.7
16
58
2/2
1 X
58
B_
50
0K
V+
30
+2
3+
23
+2
3+
23
_R
2.T
OW
ST
A=
17
7+
49
.75
HT
=2
97
.06
EL
E=
0.0
0H
T A
DJU
ST
=1
8.5
0G
ST
L1
2-F
SA
E R
IVE
R C
RO
SS
ING 30
23
23
23
23
NE
W
1209.70 1249.91 1221.31
1044.15
582/17 582/18 582/19582/20
582/21
71 0
170+00
180+00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
47
582/15 -582/20 1113 DNO 9809 3579
8500582/15 -582/20 1124 DNO 9809 3560
8500
582/15 -582/20 1118 1351
ACSR 45/7 "DIPPER"7523
14500
582/20 -582/29 1586 DNO 9809
34029000
582/20 -582/29 1586 DNO 9809
34029000
582/20 -582/29 1586 1351
ACSR 45/7 "DIPPER"7184
14500
0582017/9/2015PAGE 4/16
582/17 - 582/21
164
1-582-1-
01-5
82-0
1
60 DEG F INITIAL
0 DEG F INITIAL
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
MHW = 1.01`
4/1/144/1/14
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
235 DEG F FINAL
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/17
Structure 582/18
Structure 582/19
Structure 582/20
Structure 582/21
James River Crossing Profile
PLS-CADD DRAWING
18
0+
00
19
0+
00
20
0+
00
21
0+
00
22
0+
00
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
58
2/2
1 X
58
B_
50
0K
V+
30
+2
3+
23
+2
3+
23
_R
2.T
OW
ST
A=
17
7+
49
.75
HT
=2
97
.06
EL
E=
0.0
0H
T A
DJU
ST
=1
8.5
0G
ST
L1
2-F
SA
E R
IVE
R C
RO
SS
ING 30
23
23
23
23
NE
W:
1 1
-58
2-1
-31
58
2/2
2 X
58
B_
50
0K
V+
30
+2
3+
23
+2
3+
23
_R
2.T
OW
ST
A=
19
1+
78
.03
HT
=2
97
.06
EL
E=
0.0
0H
T A
DJU
ST
=1
8.5
0G
ST
L1
2-F
SA
E R
IVE
R C
RO
SS
ING 30
23
23
23
23
NE
W:
1 1
-58
2-1
-31
2 4
4.2
12
A
58
2/2
3 5
VH
T4
03
5.T
OW
ST
A=
21
2+
31
.13
HT
=1
89
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 40
35
35
35
35
NE
W:
1 1
5.7
12
1428.28 2053.10
1667.64
188.8
582/21 582/22 582/2318
0+
00
19
0+
00
20
0+
00
21
0+
00
22
0+
00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
48
582/20 -582/29 1586 DNO 9809 3402
9000582/20 -582/29 1586 DNO 9809 3402
9000
582/20 -582/29 1586 1351
ACSR 45/7 "DIPPER"7184
14500
0582017/9/2015PAGE 5/16
582/21 - 582/23
165
1-582-1-
01-5
82-0
1
60 DEG F INITIAL
0 DEG F INITIAL
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
CHANNEL CROSSING
MHW = 1.01`
4/1/144/1/14
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
235 DEG F FINAL
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/21
Structure 582/22
Structure 582/23
Secondary Channel Crossing Minimum Vertical Clearance above MHW = 188 ft
James River Crossing Profile
PLS-CADD DRAWING
22
0+
00
23
0+
00
24
0+
00
25
0+
00
26
0+
00
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
58
2/2
4 5
VH
T4
03
5.T
OW
ST
A=
22
8+
98
.77
HT
=1
89
.29
EL
E=
0.0
0H
T A
DJU
ST
=18
.00
GS
TL
12
-F5V
HT 40
35
35
35
35
NE
W:
1 1
5.7
12
58
2/2
5 X
58
B_
50
0K
V+
00
+3
3+
33
+3
3+
33
_R
2.T
OW
ST
A=
24
6+
17
.41
HT
=2
77
.06
EL
E=
0.0
0H
T A
DJU
ST
=1
8.5
0G
ST
L1
2-F
SA
E R
IVE
R C
RO
SS
ING 33
33
33
33
NE
W:
1 1
-58
2-1
-31
58
2/2
6 X
58
B_
50
0K
V+
00
+3
3+
33
+3
3+
33
_R
2.T
OW
ST
A=
25
6+
45
.13
HT
=2
77
.06
EL
E=
0.0
0H
T A
DJU
ST
=1
8.5
0G
ST
L1
2-F
SA
E R
IVE
R C
RO
SS
ING 33
33
33
33
NE
W:
1 1
-58
2-1
-31
1667.64
1718.64 1027.72 1833.05
202.1
582/24 582/25 582/2622
0+
00
23
0+
00
24
0+
00
25
0+
00
26
0+
00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
49
582/20 -582/29 1586 DNO 9809 3402
9000582/20 -582/29 1586 DNO 9809 3402
9000
582/20 -582/29 1586 1351
ACSR 45/7 "DIPPER"7184
14500
0582017/9/2015PAGE 6/16
582/24 - 582/26
166
1-582-1-
01-5
82-0
1
60 DEG F INITIAL
0 DEG F INITIAL
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
CHANNEL CROSSING
MHW = 1.01`
4/1/144/1/14
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
235 DEG F FINAL
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/24
Structure 582/25
Structure 582/26
Federal Channel Crossing Minimum Vertical Clearance above MHW = 201 ft
James River Crossing Profile
PLS-CADD DRAWING
27
0+
00
28
0+
00
29
0+
00
30
0+
00
31
0+
00
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
1°1
6'3
6"
7°2
5'1
1"
58
2/2
7 5
VH
T4
02
5.T
OW
ST
A=
27
4+
78
.19
HT
=1
79
.29
EL
E=
0.0
0H
T A
DJU
ST
=18
.00
GS
TL
12
-F5V
HT 40
25
25
25
25
NE
W:
1 1
5.7
12
58
2/2
8 5
VH
T4
02
5.T
OW
ST
A=
28
6+
67
.06
HT
=1
79
.29
EL
E=
0.0
0H
T A
DJU
ST
=1
8.0
0G
ST
L1
2-F
5V
HT 40
25
25
25
25
NE
W:
1 1
5.7
12
58
2/2
9 1
5-2
25
A 1
05
FT
.PO
LS
TA
=2
99
+2
5.5
4H
T=
10
7.0
0 E
LE
=2
4.0
0H
T A
DJU
ST
=2.0
0G
ST
L1
2-F
NE
W:
1 1
5.2
25
A2
96
.50
0
58
2/3
0 1
5-2
01
_1
30
ST
K4
22
18
96
2 &
89
89
.PO
LS
TA
=3
06
+4
1.4
6H
T=
13
2.0
0 E
LE
=2
5.1
5H
T A
DJU
ST
=2.0
0G
ST
L1
2-F
NE
W:
1 1
5.2
01
1 1
27
0.0
01
12
70
.10
2 9
6.5
00
58
2/3
1 1
5-2
25
A 1
05
FT
.PO
LS
TA
=3
12
+8
9.7
4H
T=
10
7.0
0 E
LE
=2
5.0
8H
T A
DJU
ST
=2.0
0G
ST
L1
2-F
NE
W
1833.05
1188.87 1258.48
715.92 648.28
JAM
ES
RIV
ER
CO
RP
OR
AT
ION
BA
SF
N/F
ED
GE
OF
RIV
ER
582/27 582/28 582/29
582/30
582/31
PI3
12+89
.74
47°2
5'11
"
147.3
ORIGINAL CENTERLINE - RELOCATED
BY COORDINATION WITH PROPERTY OWNER
LINE 582 CENTERLINE
27
0+
00
28
0+
00
29
0+
00
300+00
310+00
DRAWN
CHECKED
INSPECTED
APPROVED
NAME DATE SHEET NO.SCALE
OF
CAD NO.
DRAWING NO.
PROJECT NO. B/M NO.W.O. NO.
$D
GN
SP
EC
$
$S
YT
IME
$
FIL
E N
O.
REVISIONS
CH
EC
KE
D
AP
PR
OV
ED
DE
SC
RIP
TIO
N
NO
.D
AT
EB
Y
(N.E.S.C.)
SPECIFICATIONS
DESIGN
N.E.S.C. CLEARANCES RULING SPAN
ICE °F WATER GROUND ROAD RAILROAD CONDUCTOR
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
INSTALLEDSIZE
STRINGINGTENSION 60°F
MAXIMUMTENSION
SHIELD WIRE
ELECTRONIC
DATA
LOADING
WIND
4 LBS.
SEE TABLE SEE TABLE SEE TABLESEE TABLE SEE TABLE SEE TABLE SEE TABLE PLS CADD
'X' - C = NUMBER OF CONDUCTOR DAMPERS
'X' - S = NUMBER OF STATIC DAMPERS
EROSION & SEDIMENTATION NOTES:
ACCORDANCE WITH THE COMPANY'S GENERAL CONSTRUCTION PROVISIONSAND GENERAL EROSION AND SEDIMENTATION CONTROL PLAN.
2. EROSION & SEDIMENTATION MEASURES TAKEN AT EACH STRUCTURESHALL BE SPECIFIED BY THE PROJECT COORDINATOR AND IMPLEMENTEDPRIOR TO EARTH DISTURBING ACTIVITIES.
1. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN
3. AT A MINIMUM, AREAS MARKED ON THE PLAN AND PROFILE DRAWING
EARTH DISTURBING ACTIVITIES OCCUR UPSTREAM OF THESE AREAS.BY SHALL BE PROTECTED AGAINST EROSION WHEN ANY
2007 EDITION
1/2'' 0°
KV TRANSMISSION LINE
29.9 FT 27.9 FT 27.9 FT 35.9 FT
DOMINION GROUND CLEARANCE IS CONTROLLED BY 5MA ELECTROSTATIC INDUCTION TO LARGEST VEHICLE ON THE R/W UNDER THE 120 F. FINAL CURVE. THIS IS CONTROLLED BY WIRE SIZE, TOWER DATA, PHASING CONFIGURATION, ETC.
SPAN CONDUCTOR(FEET)
60°F INITIAL
MAXIMUM
TENSION (LBS)
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
RULING SPAN
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
1'' = 30' V
1'' = 200' H
MAXIMUM
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
MAXIMUM
MAXIMUM
60°F INITIAL
60°F INITIAL
MAXIMUM
MAXIMUM
60°F INITIAL
MAXIMUM
NAD 83/88 VA NORTH
KAKEK
2611
50
582/20 -582/29 1586 DNO 9809 3402
9000582/20 -582/29 1586 DNO 9809 3402
9000
582/20 -582/29 1586 1351
ACSR 45/7 "DIPPER"7184
14500
582/29 -582/31 839 DNO 9809
34317750
582/29 -582/31 850 DNO 9809
34087750
582/29 -582/31 844 1351
ACSR 45/7 "DIPPER"7847
14500
0582017/9/2015PAGE 7/16
582/27 - 582/31
167
1-582-1-
01-5
82-0
1
60 DEG F INITIAL
0 DEG F INITIAL
60` MIN WATER CLEARANCE ABOVE MHW AT ALL LOCATIONS U.N.O.180` WATER CLEARANCE AT CHANNELS
MHW = 1.01`
RIVER BOTTOM
4/1/144/1/14
K:\WORK\TRANS\05\058201\058201.XYZ
99-2245
500 582SURRY - SKIFFES CREEK
235 DEG F FINAL
VERT. SCALE
HORIZ. SCALE
30.0 FT.
200.0 FT.
Structure 582/27
Structure 582/28
Structure 582/29
Structure 582/30
Structure 582/31
James River Bank
James River Crossing Profile