Jackson Convention Complex Request for Proposals for...

26
Request for Proposals Digital Signage Replacement JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 1 of 26 Jackson Convention Complex Request for Proposals for Digital Signage Replacement And Expansion RFP #09-16DSRE Date Issued: October 7, 2016 Proposal Due Date: 4:00 p.m. CST, November 16, 2016

Transcript of Jackson Convention Complex Request for Proposals for...

Page 1: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 1 of 26

JacksonConventionComplexRequestforProposals

for

DigitalSignageReplacementAndExpansion

RFP#09-16DSRE

DateIssued: October7,2016

ProposalDueDate:4:00p.m.CST,November16,2016

Page 2: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 2 of 26

TableofContents

1. INTRODUCTION 31(A)RFPSCOPEANDPURPOSE 31(B)BACKGROUND 41(C)PROPOSALDUEDATE(S) 5

2. INSTRUCTIONS,INFORMATION,ANDFORMS 62(A)TIMELINE 62(B)CONTACTINFORMATION 72(C)LETTEROFINTENT 72(D)SITEVISIT/SURVEYS 72(E)QUESTIONSANDAMENDMENTS 82(F)NOTICES 82(G)RFPCOVERSHEET 112(H)NON-COLLUSIONCERTIFICATE 122(I)NORESPONSEFORM 13

3. PROJECTBACKGROUND,SCOPE,REQUIREMENTS,ANDEXPECTATIONS 143(A)PROJECTBACKGROUNDANDGENERALINFORMATION 143(B)REQUESTEDFEATURESOFDIGITALSIGNAGESOLUTION 143(C)SITESURVEYS 143(D)INSTALLATIONCONSIDERATIONS 153(E)INTEGRATIONANDIMPLEMENTATION 15

4. SUBMITTALREQUIREMENTS 174(A)TABLEOFCONTENTS 174(B)INTRODUCTION 174(C)RESPONDENTINFORMATION 174(D)CONTRACTORPROPOSAL 18

5. SELECTIONANDNOTIFICATION 205(A)RFPEVALUATIONCRITERION 205(B)NOTIFICATIONOFAWARD 206. RFPRESPONSESUBMITTALCHECKLIST 21

APPENDIXA 22FACILITYDIAGRAMSSHOWINGEXISTINGANDPROPOSEDNEWSIGNAGE 22FIRSTFLOORPLAN 23SECONDFLOORPLAN 24FIRSTFLOOR–OPERATIONSAREA 25THIRDFLOOR–WEST 25THIRDFLOOR–WEST-THEATRE 26

Page 3: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 3 of 26

1. INTRODUCTION1(A)RFPScopeandPurposeSMG(“Operator”),asoperatoroftheJacksonConventionComplex(“JCC”)isseekingproposalsfromqualifiedandexperiencedfirms(“Contractor”)withdemonstratedexpertiseindigitalsignagetechnologyinterestedinreplacingandaddingcomponentstothedigitalsignagenetworkthroughoutthefacility.Thegoaloftheprojectistoremovealloldcomponentsofthecurrentdigitalsignagesystemanddesign/installasinglesystemthatwillallowforcentralizedmanagementandcontrolofthedisplays/playerswhileprovidingend-userswiththeabilitytoaddcontentfordisplaysintheirrespectiveassignedareas.InadditiontothoroughlyreadingandunderstandingallelementsoftheRFPdocument,theOperatorexpectseachproposingContractortoperformasite-walk(seesections2a“Timeline”,2d“SiteVisit/Surveys”and3c“SiteSurveys”fortimelineandschedulinginformation)andindependentsurvey,whichwilldeterminetheoveralldesignandbillofmaterialsfortheirrespectiveresponse.ItisimportantthatContractorsrespondingtothisRFParemindfulthatportionsofthisRFPmaynotadequatelyaddressvariousfundamentaltechnicalormechanicalfunctionalities.Anyomissioninthisareaisunintentionalandisnotintendedtosuggestthatthosefundamentalitemsareunimportant.Tothecontrary,ContractorsrespondingtothisRFPshouldmakeapointtoillustrateandassuretheOperatorthatallfundamentaltechnicalfunctionalitieswillbepartoftheContractor’simplementationofthedigitalsignageequipment.InratingresponsestothisRFP,theOperatorwillconsiderhowwelleachContractorisabletotakethecontentsoftheRFP,askrelevantquestions,extractcriticalinformation,addressthevarioustechnicalissuesandclearlycommunicateitsplantoinstallandimplementaqualitydigitalsignagesystemthatmeetsorexceedstheOperator’sstandardsandexpectationsforthefacility.

Page 4: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 4 of 26

1(B)BackgroundJacksonConventionComplex:Openedin2009,theJacksonConventionComplex(“JCC”)features330,000squarefeetofflexibleexhibit,ballroomandmeetingspaceandislocatedintheheartofdowntownJackson…Mississippi’scapitalcityandtheheartofSouthernhospitality.Ithostsawiderangeofeventsincludingconventions,tradeshows,corporatemeetings,banquets,weddings,receptions,concerts,sportingevents,consumershows,politicalevents,communitygatheringsandreligiousservices.Throughitsfirstfiveyearsofoperation(FY09–FY13),theJCChashosted1,499eventsdaysandover685,000guests,generatinganestimated$125Millionineconomicimpact.Inadditiontoofferingfirst-rateamenities,stateofthearttechnologies,resortqualityserviceandin-housecatering,theComplexisaLEED®CertifiedbuildingasestablishedbytheU.S.GreenBuildingCouncil(USGBC).TheJacksonConventionComplexisownedbytheCapitalCityConventionCenterCommissionandmanagedbySMG.Formoreinformation,visitwww.jacksonconventioncomplex.com.CapitalCityConventionCenterCommission:TheCapitalCityConventionCenterCommission(“Commission”)wasformedin2005tooverseeallmattersrelatedtotheconstructionandoperationoftheJacksonConventionComplexandiscomprisedofanine-memberboardofcommissioners.TheCommissioncontractswithSMGforthemanagementoftheJCC.SMG:In2008,theCommissioncontractedwithSMG(“Operator”)tomanagetheJacksonConventionComplex,includingtheauthoritytonegotiateandcontractforgoodsandservicesnecessaryforthesuccessfulmanagementandoperationofthefacility.In2013theCommissionextendedSMG’scontractthrough2016withrenewaloptionsthrough2022.InMay2016,theCommissiongrantedSMGitsfirstrenewalofthenewcontracteffectiveuntil2019.Since1977,SMGhasprovidedmanagementservicestoover220publicassemblyfacilitiesincludingarenas,stadiums,theatresandperformingartscenters,equestrianfacilities,convention,congressandexhibitioncenters,sciencecentersandavarietyofothervenues.Acrosstheglobe,SMGmanagesmorethan12millionsquarefeet(1.1millionsquaremeters)ofexhibitionspaceandover1.5millionarenaandtheatreseats.Astherecognizedglobalindustryleader,SMGprovidesvenuemanagement,sales,marketing,eventbookingandprogramming,constructionanddesignconsulting,andpre-openingservicesforsuchlandmarkfacilitiesastheLouisianaMercedesBenzSuperdomeandSmoothieKingCenter,Houston'sNRGPark,McCormickPlace&SoliderFieldinChicagoandtheMosconeConventionCenterinSanFrancisco.SMGalsooffersfoodandbeverageoperationsthroughaninhousecatering

Page 5: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 5 of 26

company,Savor...,currentlyservicingmorethan100accountsworldwide.Foradditionalcompanyinformation,visitwww.smgworld.com.EqualBusinessOpportunityProgram:SMG,inkeepingwiththeCityofJackson’sEqualBusinessOpportunityPlan,iscommittedtotheprincipleofnon-discriminationinpubliccontracting.ItisthepolicyofSMGtopromotefullandequalbusinessopportunityforallfirmsdoingbusinesswithSMGandtheJacksonConventionComplex.

1(C)ProposalDueDate(s)ResponsessubmittedinresponsetothisRFPmustbesubmittedtotheaddressbelowby4:00p.m.CentralStandardTimeonWednesday,November16,2016.Proposalswillnotbeacceptedafterthedeadlineforanyreason.J.BrianSwindoll,DirectorofOperationsJacksonConventionComplex/SMG105EastPascagoulaStreetJackson,MS39201Telephone:601.960.2321ext:1039Fax:601.960.2584Email:bswindoll@jacksonconventioncomplex.comFormatsforsubmittalareasfollows.

§ One(1)originalhardcopy(8½”x11”,boundonthelongside)Thiscopyshouldbeplainlymarked“Original”.

§ Two(2)additionalhardcopies(8½”x11”,boundonthelongside)Thesecopiesshouldbeplainlymarked“Copy”.

§ One(1)electroniccopy(viaUSBdrive)–TheRFPshouldbecombinedintoonecohesivePDFdocumentthatelectronicallymirrorsthehardcopies.

Page 6: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 6 of 26

2. INSTRUCTIONS,INFORMATION,ANDFORMS

2(A)Timeline

Day/Date DescriptionFriday,October07,2016 RFPissuedate.Friday,October21,2016 LetterofIntentduefromallContractorswhointendtorespondtotheRFP.Failureto

submitaLetterofIntentmayresultinaContractor’sdisqualification.Monday,October24,2016 WeekofsitevisitsbyContractors(Seesection2bforcontactinformationtoschedule

walkthroughs).Walkthrough'savailablethroughFriday,November1,2016.Sitevisitsarescheduledin3-hourblocks.

Wednesday,November02,2016 LastDaytosubmitwrittenquestionsfromproposingContractorsFriday,November04,2016 Writtenanswerstoallquestionsposedduringsitevisitsandviawrittensubmissionswillbe

distributedbyemailby5pmtoallapplicants.Wednesday,November16,2016 RFPresponsesdueby4:00pmCST.Thursday,November17,2016 Applicants’responseswillbeanalyzedandscoredbytheevaluationteam.Monday,November21,2016 AdecisionismadeastowhichContractorswillbefinalists,orasingleContractorwillbe

chosentoenterintonegotiationswith.AllapplicantswillbenotifiedoftheOperator’sdecision.

Tuesday,November22,2016 FinalistContractorpresentationsattheJacksonConventionComplex.(Optional/Ifneeded)

Friday,November25,2016 OperatorselectionofInstaller/Integrator.(IfnotselectedPreviously)EarlytoMidDecember Prjoectanticipatedstartdate.Ifmoretimeisneededthanwhatisallotedhere,please

notateinproposal.StartandCompletiondatesareflexible.MidJanuary AnticipatedcompletiondateofInstallationandImplementation.Ifmoretimeisneeded

thanwhatisanticipatedhere,pleasenotateinproposal.

Page 7: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 7 of 26

2(B)ContactInformationTheofficialcontactperson(s)forthepurposeofthisRFPis…

PrimaryContact:BrianSwindoll,DirectorofOperationsJacksonConventionComplex/SMG105EastPascagoulaStreetJackson,MS39201Telephone:601.960.2321,ext.1039Fax:601.960.2584Email:[email protected]

AllcommunicationwiththeOperatorregardingthisRFPmustbedirectedtoMr.Swindollthroughemailortraditionalmail.

2(C)LetterofIntentInterestedContractorsshallsubmitaletterofintentbyFriday,October21,2016acknowledgingreceiptoftheRFPandinformingtheOperatoroftheirintenttorespondtotheRFP.Theletterofintentmaybesubmittedbymail,faxoremailtotheofficialcontactperson(s),above.Contractorsshouldalsoprovidethename,address,telephone&faxnumbers,andemailaddressoftheindividualwhocanaddressinquiriesrelatedtothisRFPandtheContractor’sproposal,andreceiveclarificationsoraddendafromtheOperator.

2(D)SiteVisit/SurveysContractorsarestronglyencouragedtoattendapre-proposalsitevisitbetweenMonday,October24,2016andTuesday,November1,2014attheJacksonConventionComplex.SpecificdaysandtimesmustbescheduledwiththeDirectorofOperations(Pleasenotethatdatesaresubjecttomodification;allpotentialrespondentswillbedulyadvisedofsuchchangeswithinanampletimeperiodtoadjustschedulesifsuchshouldoccur).ThepurposeofthesevisitswillbetoalloweachContractoropportunitytowalkthebuildingandperformindividualsitesurveys,asneeded.EachContractorwillbealloweda3-hourformalwalkthroughwithfacilitypersonnel,andadditionaltimeasneededandastheeventschedulewarrants,tocompletesurveys.Pleasenote,eventschedulewilldictatewhatareasareopenlyaccessiblebyContractors.

Page 8: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 8 of 26

2(E)QuestionsandAmendmentsQuestionsregardingthisRFPmaybeaskedatanytimepriorto,butnolaterthan,4:00pm,Wednesday,November2,2016.Allquestionsmustbesubmittedinwritingtotheofficialcontactperson,withtheexceptionoftheopportunityforallpotentialContractorstoaskquestionsin-personduringthepre-proposalsitevisits.WrittenresponsestoallquestionswillbesenttoallpotentialContractorswhoproperlysubmittedaLetterofIntent.

Additionally,anyamendmenttothisRFPwillbesenttoallpotentialContractorswhoproperlysubmittedaLetterofIntent

Otherthanduringthepre-proposalsitevisits,theOperatorwillnotrespondtooralrequests.

2(F)Notices

1. ThisRFPhasbeencompiledingoodfaith.TheinformationcontainedwithinisselectiveandsubjecttotheOperator’supdating,expansion,revisionandamendment.

2. TheOperatorreservestherighttochangeanyaspectof, terminate,ordelaythisRFP,theRFPprocess and/or theprogramoutlinedwithin this RFP at any time, andnoticeshallbegiveninatimelymannerthereafter.

3. RecipientsofthisRFPareadvisedthatnothingstatedherein,oranypartthereof,oranycommunication during the evaluation and selection process, shall be construed asconstituting,offeringorawardingacontract,representationoragreementofanykindbetweentheOperatorandanyotherparty,saveforaformalwrittencontract,properlyexecutedbybothparties.

4. ResponsestothisRFPwillbecomethepropertyoftheOperator,andwillformthebasisof negotiations of an agreement between the Operator and the apparent successfulrespondent.

5. The Operator is not liable and will not be responsible for any costs incurred by anyContractor(s) for the preparation and delivery of the RFP responses, nor will theOperator be liable for any costs incurred prior to the execution of an agreement,includingbutnotlimitedto,presentationsbyRFPfinaliststotheOperator.

6. During the review of this document, please note the Operator’s emphasis on theexpectations,qualities,andrequirementsnecessarytobepositionedasanRFPfinalistandapparentsuccessfulContractor.

7. ItisimportantthatContractorsrespondingtothisRFParemindfulthatportionsofthisRFPmaynotadequatelyaddressvariousfundamentaltechnicalormechanicalfunctionalities.Anyomissioninthisareaisunintentionalandisnotintendedtosuggestthatthosefundamentalitemsareunimportant.Tothecontrary,ContractorsrespondingtothisRFPshouldmakeapointtoillustrateandassuretheOperatorthatallfundamentaltechnicalfunctionalitieswillbepartoftheContractor’simplementationoftheproposedequipmentand/orservices.

Page 9: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 9 of 26

8. The Operator reserves the right, at its sole discretion, to waiveminor administrativeirregularitiescontainedinanyproposal.

9. Asingle response to theRFPmaybedeemeda failureof completion,and in thebestinterestoftheOperator,theRFPmaybecancelled.

10. The Operator reserves the right to reject any or all proposals at any time withoutpenalty. The Operator reserves the right to refrain from contracting with anyContractor. The release of this RFP does not compel the Operator to enter into acontract. TheOperatormayelect toproceed furtherwith thisprojectby interviewingotherproposers,orproceedingwithanaward.

11. Contractorsmaywithdrawaproposal thathasbeen submitted at any timeup to theproposal closing date and time. To accomplish this, a written request signed by anauthorizedrepresentativeoftheContractormustbesubmittedtotheRFPContact.TheContractormaysubmitanotherproposalatanytimeuptotheproposalclosingdateandtime.

12. As a result of the selectionof a Contractor to supply products and/or services to theOperator, the Operator is neither endorsing nor suggesting that the Contractor'sservicesarethebestoronlysolution. TheContractoragreestomakenoreferencetotheOperator in any literature, promotionalmaterial, brochures, salespresentationorthelikewithouttheexpresswrittenconsentoftheOperator.

13. Any informationcontained in theproposal that isdeemedproprietarymustbeclearlydesignated. Marking the entire proposal as proprietary will be neither accepted norhonored.IfarequestismadetoviewaContractor’sproposal,theOperatorwillcomplyaccordingtotheOpenPublicRecordsAct.Ifanyinformationismarkedasproprietaryintheproposal,suchinformationwillnotbemadeavailableuntiltheaffectedContractorhas been given a reasonable opportunity to seek a court injunction against therequesteddisclosure.

14. All materials submitted in response to this request become the property of theOperator.Selectionorrejectionofaresponsedoesnotaffectthisright.

15. TheOperatorwillnotbeliableforanyerrorsinContractorproposals.Contractorswillnotbeallowedtoalterproposaldocumentsafterthedeadlineforproposalsubmission.The Operator reserves the right to make corrections or amendments due to errorsidentified inproposalsby theOperatoror the respondent. This typeof correctionoramendmentwill onlybe allowed for sucherrors as typing, transpositionor anyotherobvious error. Contractors are liable for all errors or omissions contained in theirproposals.

16. Abidbondisnotrequired.17. Aperformancebondisnotrequired.

18. All proposals and relatedmaterials shall become the property of the Operator upondelivery and shall be subject to public inspection at the conclusion of the selectionprocess.

Page 10: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 10 of 26

19. ThisRFPand the selectedContractor’s submittals, includingall provisions,warranties,commitments,andrepresentationssetforththerein,willbebindingupontheselectedContractor and, at the Operator’s option, may be incorporated into any OperatorcontractwiththeContractor.

20. TheOperatorshallnotbe liableunderanycircumstancesforanycost incurredbyanyContractor inthepreparation,revision,orpresentationofanyproposal inresponsetothisRFP.

21. WhenevaluatingaContractor’sproposal,thefollowingfactorswillbeconsidered...

a. Theability,capacityandskilloftheContractortoprovidetheinstallationand/orimplementationservicesrequired

b. Thecharacter,integrity,reputation,judgment,experienceandefficiencyoftheContractor

c. Thequalityofperformanceofpreviousservices,including,butnotlimitedto,theContractor’sfailuretoperformsatisfactorily

d. EvidenceofcollusionwithanyotherContractor,inwhichcasecolludingContractorsmayberestrictedfromsubmittingfurtherbidsonthesubjectprojectorfuturetenders

e. ThereisuncompletedworkwiththeOperatororothers,oranoutstandingdisputeonapreviousorcurrentcontractthatmighthinder,negativelyaffectorpreventproperexecutionofthecontractwiththeOperator

f. TheContractororarepresentativeoftheContractorhasbeenconvictedofacrimearisingfromapreviouspubliccontract

g. TheContractororarepresentativeoftheContractorhasbeenconvictedofacrimeofmoralturpitudeoranyfelony.ContractorsshallaffirmativelydisclosetotheOperatorallsuchconvictions,especiallyofmanagementpersonnelortheContractorasanentity,priortonoticeofawardorexecutionofacontract,whichevercomesfirst.Suchdisclosureshallnotautomaticallybegroundsforterminationfordefaultsubsequenttoawardorexecutionofthecontract.However,failuretomakesuchaffirmdisclosureshallbegrounds,intheOperator’ssoleoptionanddiscretion,forterminationfordefaultsubsequenttoawardorexecutionofthecontract

h. TheOperatorconcludesthattheContractorwillbeunable,financiallyorotherwise,toperformthework

i. AtthetimeofRFPopening,theContractorisnotauthorizedtodobusinessinthestateofMississippiorotherwiselacksanecessarylicense,registrationorpermit

j. AccesstotheContractorisdifficultwithinOperator’snormalbusinesshours

Page 11: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 11 of 26

2(G)RFPCoverSheet

JACKSONCONVENTIONCOMPLEXRFP#09-16DSRE

DigitalSignageReplacementRFPCOVERSHEET

YesNoHasyourbusinessentityoperatedatleastfive(5)yearswithoutinterruption?

ccHasanownerormanagingagentofyourbusinessentitybeenconvictedofacrimewithinthepastten(10)years?

cc

Ifselected,doyouagreetoexecuteastandardservicescontract?(ifno,thisdoesnotnecessarilyeliminateyourContractorfromconsideration,thoughthisinformationmaybeusedintheevaluationprocess):

ccIfno,describedifferences: Hasyourcompanybeeninbankruptcy,reorganizationorreceivershipinthelastfive(5)years?

cc

Hasyourcompanybeendisqualifiedbyanypublicagencyfromparticipationinpubliccontracts?

cc

IsyourcompanylicensedtodobusinessintheStateofMississippi?

cc

Theundersignedherebyacceptsthetermsandconditionsassetforthherein.Theundersignedherebyacceptsthetermsandconditionsassetforthherein. ThispagemustbesignedandThispagemustbesignedanddatedbytheContractororarepresentativelegallyauthorizedtobindtheContractor.datedbytheContractororarepresentativelegallyauthorizedtobindtheContractor.

FULLLEGALNAMEOFCOMPANY TYPEOFBUSINESS

oCorporationoPartnership(general)oPartnership(limited)

oSoleProprietorshipoLimitedLiabilityCompany

ADDRESS

CITY/STATE/ZIP

EMAILADDRESS

PHONE FAX NAME TITLE SIGNATURE__________________________________

Page 12: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 12 of 26

2(H)Non-CollusionCertificate

JACKSONCONVENTIONCOMPLEXRFP#09-16DSRE

DigitalSignageReplacementNON-COLLUSIONCERTIFICATE

NON-COLLUSIONCERTIFICATION

Icertifythatthisresponseismadewithoutpriorunderstanding,agreement,orconnectionwithanycorporation,Contractor,orpersonsubmittinganofferforthisRequestforProposals,andisinallrespectsfairandwithoutcollusionorfraud.

ThebelowsignedContractorhasnotdivulgedtonordiscussedorcomparedhis/herresponsewithotherContractorsandhasnotcolludedwithanyotherContractororanyotherpartiestothisRFPwhatsoever.CompanyName: MailingAddress: City-State-Zip: Date: AuthorizedSignature: (Written)AuthorizedSignature: (typed/printed)Title:

Page 13: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 13 of 26

2(I)NoResponseForm

JACKSONCONVENTIONCOMPLEXRFP#09-16DSRE

DigitalSignageReplacementNoResponseForm

DearProspectiveContractor:IfyoudecidenottosubmitaresponsetothisRFP,wewouldverymuchappreciateyourcompletingandreturningthisformforourrecords.Reasonfornotsubmittingaresponseinresponsetothissolicitation:

FULLLEGALNAMEOFCOMPANY

ADDRESS

CITY/STATE/ZIP

EMAILADDRESS:

PHONE FAX NAME(PLEASEPRINT) TITLE

SIGNED DATE Thankyouforyourassistance.Pleasemail,faxoremailthisdocumentto:

JacksonConventionComplexAttn:BrianSwindoll,DirectorofOperations

105E.PascagoulaStJackson,MS39201Fax:(601)960-2584

[email protected]

Page 14: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 14 of 26

3. PROJECTBACKGROUND,SCOPE,REQUIREMENTS,ANDEXPECTATIONS

3(A)ProjectBackgroundandGeneralInformationTheJCCisseekingaqualifiedfirmwithpreviousexperienceindevelopmentandimplementationofadigitalsignagesolution.Thepurposeoftheprojectistoimplementdigitalsignsinvariouspre-functionareas,back-of-houseareas,andateachmeetingroomentrancethroughoutthebuilding.Accordingly,thesystemshouldbecapableofdisplayingarangeofdigitalmediaincludingannouncements,scheduledeventsandroomcards,customerandpartnermarketingmaterials,videos,messages,andemergencynotifications.Solutionproposedshouldberobust,flexibleandscalable.

3(B)RequestedFeaturesofDigitalSignageSolutionTheJCC’sprimaryneedsforaqualitydigitalsignagesystemareinmarketing/promotion,facilitiesmanagement,andemergency/facilityannouncements.

• Marketing/Promotion–Mayincludefacilitysponsoradvertisements,eventadvertisement,andevent-relatedmaterialsfromcustomers.

• FacilitiesManagement–Mayincludekiosks,stationaryandmobilewayfinding,meetingroomandvenueschedules(withpotentialintegrationintoeventmanagementsystem),etc.

• Emergency/FacilityAnnouncements–Includeemergencyalertsdeliveredinrealtime,andfacilitymanagementannouncements.

Contractorssubmittingaproposalarepreferredtohaveexperienceworkingwithotherconventioncentersand/orpublicfacilities.Proposersshouldbeawarethatthereisanexistingproductinplaceinhalfofthefacilitybuthasreacheditsendoflifeandwillrequireremovalduringthenewsysteminstallation.Allequipmentremovedduringthisprocessremainsthepropertyofthefacilityandshouldnotbediscardedorotherwiseremovedfromthepremises.Operatorwilldesignateacentrallocationforreceivingandinventoryingremovedhardware.AdiagramisincludedinAppendixAtoshowcurrentandproposednewdigitalsignagelocationsthroughoutthefacility.

3(C)SiteSurveysTobettermanagethisprojectandunderstandtheoverallrequirementssetforthintheRFP,theOperatorrequestsallrespondentstocompleteawalkthroughandindependentsitesurveyofthefacility.Sitesurveysmaybescheduledintwo-hour(3-hour)windowsbyemailingthe

Page 15: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 15 of 26

PrimaryContact(seesection2b“ContactInformation”)andproposingaspecificdate/time(seesection2a“Timeline”)tocompletethisrequirement.AppointmentswillnotbeconfirmeduntiltheOperatorhasreceivedanofficialLetterofIntenttobidfromtheProposer.

3(D)InstallationConsiderations

Thefollowinglistrepresentspertinentinstallationinformationthatshouldbeconsideredbyallrespondentswhendraftingproposals:

1. TheprojectincludestheremovalofoldmonitorsandplayerPC’sandinstallationofthenewequipment.

2. Contractorsshouldnotethatelectricalandnetworkinginfrastructuresarealreadyinplaceinmostofthesignagelocations.Ifcontractoriswillingandabletoprovideelectricalandnetworkingcablingservicestonewproposedsignagelocationsinthefacility,thoseinterestsorintentionsshouldbenotedintheproposal.Thisworkmaybesubcontractedouttoothers,ormaybecompletedbytheContractordirectly.PleasenotethattheJacksonConventionComplexiscommittedtofollowingandexceedingtheCityofJackson’sminorityandwomanownedenterprise(MBE/WBE)guidelinesforallfacilityprojects.IfContractorrespondingtothisRFPisnotalreadyaMBE/WBEcontractor,theOperatorpreferstheuseofaMBE/WBEtocompletethenetworkingand/orelectricalcablingcomponentofthisRFP.

3. Therearefive(5)free-standingsignsinthefacilitythatrequireenclosures.The

Operatorisopentoanewdesignfortheenclosures,aswellasenclosuresfortheroomsigns.Theseitems,ifaddedtotheproposal,shouldbepricedseparatelytoshowadditionalexpense,outsideoftheactualsystemreplacement.

4. DuetothenatureoftheJacksonConventionComplex’sbusiness,itmaybenecessarytocompletesomeoftheinstallationworkafterhoursandonweekends.TheOperatorwilldiscusstheseneedsandmakearrangementsastheeventscheduledictatesclosertotheinstallationwindow.

5. ThedigitalsignagenetworkisalreadysegmentedonaseparateVLANinthefacility’snetworkinfrastructure.InstallednetworkcomponentsofthenewsystemmustadheretotheprovidedIPschemebytheOperator.

3(E)IntegrationandImplementationAfterinstallation,Contractorwillberequiredtoensureallequipmentisfunctioningandoperatingatacceptablelevelsandcapabilities.Toensureasolidimplementationandmanagementofthenewsystem,Contractorwillbeaskedtoprovidethefollowing:

• Aspartoftheimplementationprocess,OperatorwillrequiretheawardedContractortoensureallequipmentisfunctioningwithoutincident.

Page 16: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 16 of 26

• Aspartoftheimplementationofthesystem,Contractorshouldbeavailableforampletrainingonthesystemandassistwithinitialsetup.TheOperatorwilldeterminedetailsatthetimeofsetupandimplementationofthesystem.

• TheOperatorrequestsassistancewithstart-upgraphicdesignoptionsandscreentemplates,providinganinitialturn-keysystemthatcanbeimmediatelydeployed.Thisstart-updesignworkshouldbeincludedintheContractor’sproposalpricing.Aspartofthisstartup,theOperatorwouldliketoautomaticallydisplayeventsinproperlocationsfromoureventreservationsystem.AlthoughthefacilityisinRFPprocesstochangeitscurrentreservationsystem,theOperatoranticipatesamajorsolution(i.e.eventbooking.com,Ungerboeck,etc)capableofthisfeature.

• Contractorshallprovidewrittendocumentationofthesystem,itscapabilities,andanyintricaciesthatmaybeneededforproperoperationandongoingmaintenance,aswellasdetailsoftheinstallationsuchasnetworkaddressesofallcomponentsinstalled,andinformationforreplacingpartsorrequestingserviceforthesystem.

• Contractorshouldprovidesystemsupportandanysystemadjustmentsasneededfornolessthan180daysaftercompletionofsystemimplementationatnoadditionalfeetotheOperator.Thissupportmaybeprovidedviaremoteaccessorthroughon-sitesupport.

Page 17: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 17 of 26

4. SUBMITTALREQUIREMENTSTheproposershallcompleteandsubmitone(1)originalhardcopy,two(2)additionalhardcopies,andone(1)electroniccopyofitsproposalviaUSBthumbdrive(Pleaseseesection1(C)forspecificformattingrequirements).Theproposershallsignalloriginalsubmissions.Unsignedsubmissionswillberejected.Submissionstransmittedbyfaxwillnotbeacceptedorreviewed.AchecklisttoassistrespondentshasbeenprovidedinSection6.

4(A)TableofContents(Section4(A)MaximumScore–2pts)Proposersmustincludeatableofcontents,whichlistssectionsandsubsectionswithpagenumbersthatfollowtheorganizationandsequenceoftheirsubmission.

4(B)Introduction(Section4(B)MaximumScore-12pts)Theintroductionshouldincludethefollowingitems:

§ AfullyexecutedRFPcoversheet.SeeSection2(G);(2pts)§ TheidentityoftheproposingContractorandanypartnersorconsultantsincludedas

partoftheresponse.(2pts)

§ ThenamesofindividualsinvolvedinthepreparationoftheRFPresponsealongwiththeirrelationshiptotheproposingContractor.(2pts)

§ AstatementconfirmingthattherespondenthassoleandcompleteresponsibilityforprovidingtheservicesasdefinedintheRFPandanyaddendaissuedtothisRFP.(2pts)

§ Astatementsignedbyarepresentativeauthorizedtolegallybindtherespondent,whichshallincludeanidentificationoftherespondentasacorporationorotherlegalentity.(2pts)

§ Afullyexecutednon-collusioncertification.SeeSection2(H).(2pts)

4(C)RespondentInformation(Section4(C)MaximumScore-28pts)Theproposalshallincludethefollowinginformation:

1. Organization(3pts):DatadescribingtheproposingContractor’scurrentorganization,ownership,legalentitydesignation(corporation,LLC,etc…),address,numberofyearsinbusiness,sizeofbusiness,andservicesoffered.

Page 18: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 18 of 26

2. RelevantExperience(15pts):DescribetheContractor’soverallqualificationstofulfilltherequirementsofthisRFP,includingexperienceindesigning,installing,andservicinglargecommercial-gradedigitalsignagedeployments.

IdentifyallpersonnelwhowillworkonthisprojectandprovidetheirqualificationsandexperiencerelatedtotheRFP’srequestedservices. ProvidealistingofcomparablesystemsthattheContractorhasdesignedand/oradministeredwithinthelastfive(5)years.IfthereareotherSMGfacilitieswithintheContractor’sresume,thoseshouldbeincludedhere.(Thisrequirementmayalsobefulfilledaspartofthe“references”sectionbelow,aslongasthesystemsreferencedarecomparabletoscopeofthisRFP.)

3. References(10pts):Includefive(5)referencesthathavecontractedwiththerespondentasitrelatestotheRFP’srequestedservices.Providethefollowingforeachreference:name,title,nameoforganization,addressandtelephonenumber,emailaddress,websiteaddress,aswellasabriefdescriptionoftheservicesprovided.

4(D)ContractorProposal(Section4(D)MaximumScore–58pts)TheproposalshallincludethefollowingminimuminformationabouttheContractor’sdesigninstallationandimplementationprocess.

1. SiteSurveyOverviewandExplanation(5pts):

Contractorwilldescribefindingsinthesitesurveyandanypotentialitemsofinterestthatwerefoundasaresultofthesitevisit.Also,anexplanationtohowtheremovaloftheoldsystemandanticipatedinstallationprocesswillunfoldshouldbeexplainedinthisarea.

2. Contractor’spreferredManufacturer(3pts):

DescribetheContractor’schosenequipmentmanufacturerandadetailedexplanationofthebenefitsoftheirequipmentoverpossiblecompetitors.Manufacturerliteratureisencouragedinthissection.

3. TechnicalSubmittal(20pts):

a. HardwareSpecifications:Provideacompletelistingofequipmentandsuppliesproposedtocompletetheproject–includemanufacturer/modelinformation,quantities,andadescriptionoftheitems.(4pts)

b. ConfigurationInformation:Pleaseprovideadescriptionhowtheproposedsystemoperates.Thissectionshouldaddressuserinterface,thefeaturesofthesystemavailableandhowtheyfulfilltherequestedusesofthesystemasoutlinedinSection3(B),acceptedmediaformats,maintenanceinformation,aswellas

Page 19: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 19 of 26

configurationbackupoptions.Also,futureexpansionandupgradabilityshouldbediscussedinthisarea.Screenshotsareencouraged.(10pts)

c. Timeline:Anticipatedtimelineofprogressionthroughthedigitalsignagesysteminstallation,implementation,andtraining.AplanofactiontoremoveandsalvageolddigitalsignagesystemtoOperatorasdescribedinsection3(B),aswellascomponentsofsection3(E)shouldbediscussedhere.Iftheproposedwindowoftimeallottedinsection2(a)isnotadequate,thisshouldbeaddressedhere.(4pts)

d. OperatorResponsibilities–Contractorshouldincludeacomprehensivelistofrequestsand/orrequirementsoftheOperatortocompletethisproject.(2pts)

4. Pricing(30pts):

Contractorshouldpresentdetailedanditemizedpricingproposalsthatoutlineageneralunderstandingofdifferentelementsinvolvedinthepricingstructure.Thissectionshouldincludedetailsofanticipatedparts,labor,andancillaryexpensestheContractorforeseesincurringduringthesysteminstallationandimplementationprocess.

Additionally,contractorshouldprovidepricinginformationforongoingserviceagreementsbasedon3-yearand5-yearcontractoptions.Contractpricingshouldbeseparatefrominstallationpricingandclearlydefinedforbudgetingreasons.ContractorshouldincludeacopyoftheproposedserviceagreementforreviewbytheOperator.

5. Sponsorship/CommercialRightsMarketingOpportunity:

TheJacksonConventionComplexhasanamingrightsandadvertisingprograminplacetooffsetsomeofthecostsassociatedwiththisproject.Contractorsarewelcometoarticulateanypotentialsponsorshipand/ortradeopportunitiesinlieuofcashforthisserviceandshouldoutlinethatinterestinthisarea.

6. Other:

ThissectionisopenforContractorstooutlineanypertinentinformationnotalreadycoveredintheRFPresponse.IfContractorintendstouseanMBE/WBEparticipantasnotedinsection3(D)(1),thoseintentionsshouldbenotedhere.

Page 20: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 20 of 26

5. SELECTIONANDNOTIFICATIONProposalswillbeevaluatedbasedprimarilyontheevaluationcriteriadescribedbelow.Theapproachandproceduresarethose,whichareapplicabletoacompetitivenegotiatedprocurement,wherebyproposalsarefirstevaluatedtodeterminewhichproposalsarewithinacompetitiverange.TheOperatorreservestherighttorejectanyproposalfrompotentialContractorsthatarenotfullyqualifiedtoperformtherequiredservices.DiscussionsandnegotiationsmaythenbecarriedoutwithpotentialContractorswithinthecompetitiverange,afterwhichBestandFinalOffers("BAFO")mayberequested.

OperatorreservestherighttoselectaproposalforanawardwithoutanydiscussionsornegotiationsorarequestforanyBAFO.SubjecttoOperator'srighttorejectanyorallproposals,thepotentialContractorwhoseproposalisfoundtobemostadvantageoustotheJCCwillbeselected.

5(A)RFPEvaluationCriterionAnevaluationteamcomposedoftheGeneralManager,theDirectorofOperationsand/orotherpartiesattheOperator’sdiscretion,willevaluatetheRFPresponsesreceivedfromeachContractor.TheOperatorreservestherightto,butshallnotbeobligatedto,requirepotentialContractorstoparticipateinapresentationtotheevaluationteamofitemscontainedintheRFPresponseandanyotheritemsdeemedappropriatebytheOperator.

Contractorselectionwillbebasedprimarilyonthefollowingsetofcriteriaandscoring.

SELECTIONSCORESHEETCriterion: AvailablePoints:

TableofContents–Section4(A)IntroductionofContractor-Section4(B)RespondentInformation–Section4(C)Contractor’sProposal–Section4(D)

2122858

100total

5(B)NotificationofAwardTheOperatorintendstocontactallContractorsattheconclusionoftheRFPprocesstoleteachContractorknowtheoutcomeofthebiddingprocess.Notificationwillbesentviaemailtotheindividual(s)listedintheContractor’sLetterofIntent

Page 21: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 21 of 26

6. RFPRESPONSESUBMITTALCHECKLIST

EachContractorshallsubmitaresponseinthefollowingformat:

1. EachContractorshallcreateone(1)originalresponse(labeled“original”)withoriginalsignatureandtwo(2)identicalcopies(foratotalofthree(3)hardcopyresponses),andone(1)electroniccopy.Formatsforsubmittalareasfollows.

§ One(1)originalhardcopy(8½”x11”,boundonthelongside)Thiscopyshouldbeplainlymarked“Original”.

§ Two(2)additionalhardcopies(8½”x11”,boundonthelongside)Thesecopiesshouldbeplainlymarked“Copy”.

§ One(1)electroniccopy(viaUSBdrive)–TheRFPshouldbecombinedintoonecohesivePDFdocumentthatelectronicallymirrorsthehardcopies.

2. Theoriginalandeachofthetwo(2)identicalcopiesshallbesenttotheofficialcontact

personattheaddressshowninSection2(B),onorbeforetheduedateshowninSection1(C).TheelectroniccopyshouldbeincludedonaUSBthumbdrive.

3. Theoriginalandeachofthethree(3)copiesshallbeorganizedasdescribedinSection4:TableofContentsIntroductionRespondentInformationContractor’sProposal

ThischecklistisintendedmerelyasanaidtotheContractorinprovidingaresponsetothisRFP.TheContractorretainsthesoleresponsibilityforaccuracyandcompletenessoftheresponse.

Page 22: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 22 of 26

APPENDIXA

FacilityDiagramsShowingExistingandProposedNewSignage

Page 23: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 23 of 26

FirstFloorPlan

Page 24: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 24 of 26

SecondFloorPlan

Page 25: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 25 of 26

FirstFloor–OperationsArea

ThirdFloor–West

Page 26: Jackson Convention Complex Request for Proposals for ...jacksonconventioncomplex.com/...09-16DSRE-Digital-Signage-Replac… · digital signage system that meets or exceeds the Operator’s

Request for Proposals Digital Signage Replacement

JCC RFP #09-16DSRE Digital Signage Replacement Revised 10.6.16 / JBS Page 26 of 26

ThirdFloor–West-Theatre