J0444 OPERATION MANAGEMENT

25
J0444 OPERATION MANAGEMENT Desain Tata Letak Pert 14 Universitas Bina Nusantara

description

Pert 14. Desain Tata Letak. J0444 OPERATION MANAGEMENT. Universitas Bina Nusantara. Tujuan Strategi Tata Letak. Develop an economical layout which will meet the requirements of: product design and volume (product strategy) process equipment and capacity (process strategy) - PowerPoint PPT Presentation

Transcript of J0444 OPERATION MANAGEMENT

Page 1: J0444 OPERATION MANAGEMENT

J0444OPERATION MANAGEMENT

Desain Tata Letak

Pert

14

Universitas Bina Nusantara

Page 2: J0444 OPERATION MANAGEMENT

Tujuan Strategi Tata Letak

Develop an economical layout which will meet the requirements of:– product design and volume (product strategy)– process equipment and capacity (process

strategy)– quality of work life (human resource strategy)– building and site constraints (location strategy)

Page 3: J0444 OPERATION MANAGEMENT

Tipe – Tipe Tata Letak

• Fixed-position layout• Process-oriented layout

• Office layout• Retail layout

• Warehouse layout• Product-oriented layout

Page 4: J0444 OPERATION MANAGEMENT

What is Facility Layout

• Location or arrangement of everything within & around buildings

• Objectives are to maximize– Customer satisfaction – Utilization of space, equipment, & people– Efficient flow of information, material, & people– Employee morale & safety

Page 5: J0444 OPERATION MANAGEMENT

Desain Tata Letak harus Mempertimbangkan Objektivitas Berikut:

• Utilisasi ruang, peralatan dan orang yang lebih tinggi

• Aliran informasi yang lebih baik• Moral karyawan yang lebih baik• Interaksi dengan pelanggan yang

lebih baik• Fleksibelitas

Page 6: J0444 OPERATION MANAGEMENT

Tipe – Tipe Tata Letak

• Fixed-position layout “Tata Letak dengan Posis Tetap”– Memenuhi persyaratan tata letak untuk proyek yang

besar dan memakan tempat seperti proyek pembuatan kapal

• Process-oriented layout “Tata Letak berorientasi Proyek”– Berhubungan dengan produksi dengan volume

rendah dan bervariasi tinggi• Office layout “Tata Letak Kantor”

– Menempatakan para karyawan, peralatan mereka dan ruangan / kantor yang melancarkan aliran informasi

Page 7: J0444 OPERATION MANAGEMENT

• Retail/service layout “Tata Letak Ritel”– Menempatkan rak – rak dan memberi

tanggapan atas perilaku pelanggan• Warehouse layout “Tata Letak Gudang”

– Melihat kelebihan atau kekurangan antara ruangan dan sistem penanganan bahan

• Product-oriented layout “Tata Letak yang berorientasi pada Produk”– Mencari utilisasi karyawan dan mesin yang

paling baik dalam produksi yang kontinyu

Tipe – Tipe Tata Letak

Page 8: J0444 OPERATION MANAGEMENT

Layout StrategiesProject

(fixed-position)Job Shop(Process-oriented)

Office Retail Warehouse(storage)

Repetitive/Continuous

(product-oriented)

Examples

Pittsburgh Airport

Problem

Ingal Ship Building Corp.

Trump Plaza

Shouldice Hospital

Olive Garden

Allstate Insurance

Microsoft

Kroger’s Supermarket

Walgreens

Bloomingdales

Federal-Mogul’s Warehouse

The Gap’s distribution center

Sony’s TV Assembly Line

Dodge Caravans Minivans

Move material to the limited storage areas around the site

Manage varied material flow for each product

Locate workers requiring frequent contact close to each other

Expose customer to high-margin items

Balance low-cost storage with low-cost material handling

Equalize the task time at each workstation

Page 9: J0444 OPERATION MANAGEMENT

Contoh Layout Kantor

Page 10: J0444 OPERATION MANAGEMENT

Requirements of a Good Layout

an understanding of capacity and space requirements

selection of appropriate material handling equipment

decisions regarding environment and aesthetics

identification and understanding of the requirements for information flow

identification of the cost of moving between the various work areas

Page 11: J0444 OPERATION MANAGEMENT

Constraints on Layout Objectives

• Product design & volume• Process equipment & capacity• Quality of work life• Building and site

Page 12: J0444 OPERATION MANAGEMENT

Layout Strategies, Examples, and Criteria

Service/retail Drug store

Grocery store

Department store

Expose customer to high

margin items

Storage Distributor

Warehouse

Minimize storage and

handling costs

Product oriented TV assembly line Minimize line imbalance,

delay, and idle time

Layout strategy Example Criteria

Page 13: J0444 OPERATION MANAGEMENT

LayoutStrategy

MaterialFlow

Communication

WorkCell

Safety

MaterialAttributes

Warehousing

ServiceAreas

Areas of Concern in Layout Strategy

Page 14: J0444 OPERATION MANAGEMENT

Fixed-Position Layout

• Design is for stationary project • Workers and equipment come to site• Complicating factors

– Limited space at site– Changing material needs

Page 15: J0444 OPERATION MANAGEMENT

Office Layout

• Design positions people, equipment, & offices for maximum information flow

• Arranged by process or product– Example: Payroll dept. is by process

• Relationship chart used• Examples

– Insurance company– Software company

Page 16: J0444 OPERATION MANAGEMENT

Office Layout Floor Plan

AccountingAccounting

ManagerManager Brand XBrand X

FinanceFinanceFin. Acct.

Page 17: J0444 OPERATION MANAGEMENT

Retail/Service Layout

• Design maximizes product exposure to customers

• Decision variables– Store flow pattern– Allocation of (shelf) space to products

• Types– Grid design– Free-flow design

Video

Page 18: J0444 OPERATION MANAGEMENT

Retail /Service Layout -Grid Design

OfficeOffice CartsCarts Check-Check-outout

Grocery StoreGrocery StoreMeatBread

Milk

ProduceFrozen Foods

Page 19: J0444 OPERATION MANAGEMENT

A Good Service Layout (Servicescape) Considers

• Ambient conditions - background characteristics such as lighting, sound, smell, and temperature.

• Spatial layout and functionality - which involve customer circulation path planning

• Signs, Symbols, and Artifacts - characteristics of building design that carry social significance

Page 20: J0444 OPERATION MANAGEMENT

Warehouse Layout Floor Plan

ZonesZones

ConveyorConveyor

TruckTruck

Order PickerOrder Picker

Page 21: J0444 OPERATION MANAGEMENT

Product-Oriented Layout

• Facility organized around product• Design minimizes line imbalance

– Delay between work stations• Types: Fabrication line; assembly line

Page 22: J0444 OPERATION MANAGEMENT

Product-Oriented Requirements

• Standardized product• High production volume• Stable production quantities• Uniform quality of raw materials &

components

Page 23: J0444 OPERATION MANAGEMENT

Product-Oriented Layout Advantages

• Lower variable cost per unit• Lower material handling

costs• Lower work-in-process

inventories• Easier training &

supervision• Rapid throughput

Page 24: J0444 OPERATION MANAGEMENT

Product-Oriented Layout Disadvantages

• Higher capital investment– Special equipment

• Any work stoppage stops whole process

• Lack of flexibility– Volume– Product

Page 25: J0444 OPERATION MANAGEMENT

A B

E H

C

D

F G I10 Min.10 Min.

551111

1212

33 77 33

44

1111

Precedence Diagram Example