J. Colón's Worksample (Summer 2016)
-
Upload
joseph-a-colon -
Category
Design
-
view
54 -
download
3
Transcript of J. Colón's Worksample (Summer 2016)
-
Studio Projects Professional Projects
Design Projects
Condensed Resum & Contact
-
1'-0"Section Detaiet l
b
j
i
f
k
aa
e
cccc
dd
hh
gg
Studio Projects
-
Joseph A. Coln | Professor Rafael Gmez-Moriana | CIEE Architecture + Design | Fall 2014
The ordinary building is the type of edifi ce cities are
mostly made up of. In Barcelona, as in most large European
cities, these kinds of buildings typically contain a vertical
programmatic distribution of housing above ground-level
commercial spaces (sometimes there is offi ce space in-
between the commercial space and the housing), and parking
in the basement and is usually designed in the regional
vernacular style of the period.
The project thus sought to design a contemporary
edifi ce in a historic setting. The proposal does so by rotating
to give residents a dynamic way to live, exposed to light,
views, and greenery at every eff ective opportunity.
Another benefi t the unique rotation yields is an
innovative method of determining units for a mixed-income
building population.
An Ordinary Building in Barcelonas Eixample
-
Joseph A. Coln | Professor Rafael Gmez-Moriana | CIEE Architecture + Design | Fall 2014
-
Joseph A. Coln | Professor Scott Bernhard | Thesis Design Studio | Fall 2015 - Spring 2016
My thesis project, entitled Fostering Heterogeneity, yy
started by focusing on how income inequality is a global
phenomenon that sees people of diff erent incomes living
further apart enabled by automobile-driven suburbanization.
By focusing in the United States of America, this wealth
stratifi cation had to be understood in context of an abhorrent
racialized history. Even with interventions in underprivileged
communities such as public housing, wealth inequality
and residential segregation have persisted. 1128 Spring
Gardens refocuses mixed-income housing by hyperlocalizing
unit organization while engaging communal spaces in
emphasizial manner. The hopes is that the project can be
a prototype in de-emphasizing the nature of homogeneity
present in low-density living and spur further remediation of
socioeconomic segregation.
1128 Spring Gardens
-
Joseph A. Coln | Professor Scott Bernhard | Thesis Design Studio | Fall 2015 - Spring 2016
-
Orienting roofs to southern sky maximizes effi ciency of solar panels that helps off set energy costs for (most fi nancially stressed) residents
Integrating rainwater collection systems from roofs can serve water usage needs such as for the gardens, pools, and laundry facilities that helps off set utility costs for (most fi nancially stressed) residents
Maximizes unit effi ciency by providing residences with organizational hierarchy without sacrifi cing communal space quality
Increases interaction between assorted communal spaces while maintaining physical separation
Variety of programming distributed throughout project achieves access for all residents to all spaces
Encourages self-segregation of diff erent occupants not by race or class, but by interest-motivated factors = demographic distinguishers demographic distinguishers
Culturally relevantCulturally relevant spaces should be included; i.e. spaces that are desirable to a wide range of people, despite race, class, religion, etc. and contextually applicable (Research indicates that sports fanaticism has these characteristics with Philadelphias strong sports culture, thus having a sports bar is suitable) = demographic integratordemographic integrator
Instead of stratifying wealth vertically, integrating unit wealths horizontally (per fl oor) alleviates socioeconomic segregation typical in other schemes
Establishes an organizational scheme that is responsive to mixed-income projects economic realities
Units targeted towards high-income families; households earning between above 150% of AMI
Joseph A. Coln | Professor Scott Bernhard | Thesis Design Studio | Fall 2015 - Spring 2016
Instead of double loaded corridors, having circulation corridors that open to large (outdoor) space allows
further penetration of light and ventilation Having the circulation core as a datum where user
paths can be incidentally determined by occupants creates opportunities for passive interaction
Units and residents are visually connected across multiple levels
IBy having structure independent of supporting walls with a grid of reinforced structural columns, diff erent
sized units can be accommodated in the same structural bay
Off setting exteriors of units from faade creates ample outdoor space for each unit
Allows further penetration of natural light and ventilation into units
Extends health and economic benefi ts of all outdoor space to all occupants
Unit-level control of respective light, ventilation, and visibility preferences
Dynamism of faade obscures unit sizes (and thus wealth of occupants there-within)
Communal Spaces have interiorly situated louvers to retain direct user control
Units alloted for low-income families using a tax subsidy; households earning no more than 50% of
AMI(Area Median Income)
Units alloted for essential workers where it is diffi cult to secure housing in reasonable proximity to work;
earning between 50% and 80% of AMI
Units rented or owned by people who pay market rent. No subsidy is alloted; households usually earning
between 80% and 150% of AMI
-
Joseph A. Coln | Professor Scott Bernhard | Thesis Design Studio | Fall 2015 - Spring 2016
ROOFTOP CABANAROOFTOP CABANA
SERVICE KITCHENSERVICE KITCHEN
GYMNASIUMGYMNASIUM
ENTERTAINMENT PARLOR | EXCLUSIVE LOUNGE ENTERTAINMENT PARLOR | EXCLUSIVE LOUNGE
COMMUNAL DINING | ART STUDIOCOMMUNAL DINING | ART STUDIO
CENTRAL GREEN PARKCENTRAL GREEN PARK
-
(N) WOOD BALUSTRADE
IN CORRESPONDING BAYS (x4 TOTAL)SIZE APPROXIMATELY 2'-10" WIDE x 7'-512" HIGH.VERIFY IN FIELD.
(N) STUCCO CHAIN WALL
MOVE STAIRWAY TO CREATESIDE ENTRY
EXTEND IRON RAILING
EXPANDED PORCH AND STUCCOCHAIN WALL (EACH SIDE)
(E) COLUMNS TO REMAIN(E) COLUMNS TO REMAIN
(N) METAL FRAMED GLASS STOREFRONT
3'-6
"3'
-6"
Drawn By: J. Coln
Issued For: Date:
REVIEW
2014.08.04
3/16" = 1'-0"BPROPOSED FRONT ELEVATION
REINFORCE LOCK W/ (N) DEADBOLT ON EXISTING DOOR
(N) HIGH IMPACT GLASS STOREFRONT WINDOW W/ TRANSOM
(E) DOOR TO REMAIN. REPLACEHARDWARE TO IMPROVE SECURITY
REMOVE (E) PLYWOOD
REMOVE (E) SIGN
REMOVE (E) SECURITY BARS AT DOORS AND WINDOWS, TYP.
REMOVE (E) PLYWOOD AT TRANSOM
INSTALL (N) SIGN ON (E) CANOPY
ADD (N) LIGHTING FIXTURE FOR RESIDENTIAL ENTRY
ADD (N) LIGHTING FIXTURES (x2 TOTAL)
EXISTING FRONT ELEVATION
REPAINT ENTIRE BUILDING
INSTALL (N) OPEN WEAVE SECURITY SHUTTERS
Professional Projects
-
3'-6
"3'
-6"
8'-1112" 8'-7" 8'-1112"
11'-0
"
10'-412" 13'-012" 12'-3
12"
13'-1
03 4"
14'-9
3 4"13
'-53 4"
1/8" = 1'-0"A
(N) 2'-10 34" x 4'-7 14" (VERIFY DIMENSIONS)
WOOD DOUBLE HUNG WINDOWS(x6 TOTAL (3 ON EACH FAADE))
INSTALL (N) LIGHT FIXTURES AT ENTRY(x2 TOTAL)
INSTALL SUSPENDED SIGNS
LINE OF BALCONY OVERHANG
INSTALL WALL MOUNTED DOUBLE DIRECTION LIGHTING(x4 TOTAL (2 ON EACH FAADE))
(N) TRADITIONAL GLASS AND WOOD STOREFRONT
OPTIONAL SIGN BAND
(N) AMBIENT NEON LIGHTING(x6 TOTAL (3 ON EACH FAADE))
(N) IRON BALCONY TO WRAP CORNER
EXTEND ROUGH OPENING AT WINDOWHEAD TO MATCH ADJACENT WINDOWS
REPAINT STUCCO
(FRONT VIEW)OPTION #1PROPOSED ELEVATION
3'-6
"3'
-6"
14'-1
114
'-1133 44
""
8'-8144" 11'-1"11 1 10'-11"10 11
7'-134" 7'-112" 7'-1
12"
6'-1
13 4"
OPTIONAL DOUBLE DOOR ENTRANCE
1/8" = 1'-0"A
(N) 2'-10 34" x 4'-7 14" (VERIFY DIMENSIONS)
WOOD DOUBLE HUNG WINDOWS(x6 TOTAL (3 ON EACH FAADE))
INSTALL SUSPENDED SIGNS
LINE OF BALCONY OVERHANG
(N) TRADITIONAL GLASS AND WOOD STOREFRONT
OPTIONAL SIGN BAND
(N) AMBIENT NEON LIGHTING(x6 TOTAL (3 ON EACH FAADE))
(N) IRON BALCONY TO WRAP CORNER
EXTEND ROUGH OPENING AT WINDOWHEAD TO MATCH ADJACENT WINDOWS
PROPOSED ELEVATION OPTION #1 (SIDE VIEW)
INSTALL WALL MOUNTED DOUBLE DIRECTION LIGHTING(x4 TOTAL (2 ON EACH FAADE))
REPAINT STUCCO
3/32" = 1'-0" A
3/32" = 1'-0"B
Mar
tin L
uthe
r Kin
g
Thal
ia S
t.
Era
to S
t.
Oretha Castle Haley Boulevard
1/100" = 1'-0" BLOCATION PLAN
1/8" = 1'-0" (APPROX.)A1332 Oretha Castle Haley
PATCH & REPAIR CRACKSIN (E) STUCCO
RELOCATE DOWNSPOUTTO SIDE OF BUILDING &PATCH/REPAIR (E) STUCCO
REMOVE (E) SIGN
EXISTING FRONT ELEVATION
1/8" = 1'-0" (APPROX.)A
PATCH & REPAIR CRACKSIN (E) STUCCO
REMOVE (E) UNUSED ELECTRICAL CONDUITS
ADD SCUPPER,ASSESS CONDITION OF DOWNSPOUT,AND REPAIR AS REQ'D.
Joseph A. Coln | Beth Jacobs + Melissa Lee | Tulane City Center | Summer 2014
As a Tulane City Center Public Interest Design Fellow, I had
the privilege of being assigned to faade reNEW. faade
reNEW is a project that incentivizes business and property
owners to revitalize their storefront faades in four targeted
corridors in the city via a reimbursable grant program.
Tulane City Center worked with NORA (the New
Orleans Redevelopment Authority) led by Melissa Lee
and CLIO Associates, vis--vis founder Beth Jacobs, as we
provided design assistance to the business owners in order to
strengthen their applications.
By researching historical documentation,
examining existing urban context, and meeting with the
owners, we were able to present designs that restored the
integrity of buildings (of varying conditions), provided much
needed face-lifts (via project proposals), and
met the desires of the owners.
faade reNEW
-
11'-9
"
3'-6
"
15'-312" 7'-434" 15'-3
12"
(N) DOUBLE HUNG WINDOWSIN CORRESPONDING BAYS (x4 TOTAL)SIZE APPROXIMATELY 2'-10" WIDE x 9'-1014" HIGH.VERIFY IN FIELD.
(N) WOOD BALUSTRADE
(N) STUCCO CHAIN WALL
3/16" = 1'-0"A
3/16" = 1'-0"BEXISTING PLAN
7'-434"
6'-0
"5'
-9"
Joseph A. Coln | Beth Jacobs + Melissa Lee | Tulane City Center | Summer 2014
-
DISTRICTING
Design Projects
-
DISTRICTING
Gateway to the City
District
Arts & Culture
Districts
Low Density Residential
High Density Residential
Mixed-UseZones
ShoppingDistricts
Central Business
District
Joseph A. Coln | Professor Grover Mouton | Urban Studies Elective: Design Urbanism | Spring 2015
In this interpretative design seminar in partnership
with TRUDC (Tulane Regional Urban Design Center), we
designed an urban plan for the Chinese city of Jintang.
Though Jintang is a small town located an hour
Northwest of Chengdu, projections indicate it will see rapid
growth and is in need of a comprehensive urban design
strategy. Orienting the plan to three universities, the old city,
and the coalescing rivers was fundamental to design success.
Thus, my proposal seeks to distribute amenities
and zones in a diverse eff ective way such as having the urban
wetlands oriented on the north and south ends of the design
to remediate water pollution and provide public green space,
while the zones seek to provide eff ective density for optimal
mass transit usage. Recreational and educational amenities
are situated in correspondence with city services to yield an
optimal quality of life for all Jintang residents.
Jintang Urban Plan
-
HIGHLIGHTED STREET GRIDPrimary Roads & Thoroughfares (~30m wide)
Secondary Avenues (~15m wide)
Tertiary Roads (~7m wide)
Pedestrian Pathways (~7m wide)
Pedestrian Waterfronts (~7m wide)
Two New Bridges
NON-ROAD NETWORKS
Midtown LoopLine that connects Recreation Island, the universities, and North Park, along with other culture and shopping hubs.
Historic Jintang LoopLine that connects Old Jintang and New Jintang
Uptown LoopLine that services the primarily residential parkside district
Parkside Line One of two lines that service the North-South axis of the city A non-road based light rail line that acts as its own street, open-ing the ground level to pedestrian, retail, and commuter traffic
Riverside Line One of two lines that service the North-South axis of the cityA primarily commuter rail.
Street-Based Light Rail
Independent Light Rail
Urban Canal
Northern Wetland that serves to clean and filter water as ittravels through the urban canal (and further downriver)
Park that acts as commodity for all of JintangHosts amentities such as concert stands, hiking, green lawns, sports fields, etc.
Green zones that meet the rivers edge in natural, minimally developed designsdeveloped designs.
Public Parks that act as points of centrality or destinationthroughout New Jintangs many districts and introduce nature in urban contexts
Southern Wetland that serves as flood retention, filtration system,and public park amenity
FILTRAFILTRAILTRALTRATION WTION WTION WTION WON WON WWWWN WWWWWWO WWETLANDETLANDETLANDETLANDTLANLALALALANNDETLANETLANDTLANDLANDETLANLAETLANDNDE D
CITY-SCITY-ITCITY-SCITY-SCITY-SCITY-SCALE PCALE PCALE PCALE PCALE PAALE PARKARKARKAARKK
RIVERIVRIVERFRIVERFRIVERIV RFVERFFRIV RONONTRONT GRONTT GNTR RREREEREENSEENSEENSEREENSEENSEENSREEEN
NEIGHBORHOODOODOODOODODDDDODDDDOODOODODDD PARKSPARPARKSPARKSP RPARKSPARKSPARKSAPARKSPARKSPARKSPARKSPARKSPARKSPARKSPARKSPA SSPPARKSP
URBAURBANURBAUUUUURBANURBURBRBURBANRBAN RBAN RBARBANRBANURRBANRRURBBANUURBRBARURB WWWEWEWEWETLANWETLANWETLANETLANWETLANETLETLETLETLANWETLANWETLETLANW TWETLANWEEWETWETLANNWETLANNNANDDDDDDDD
NATURAL ZONES
Joseph A. Coln | Professor Grover Mouton | Urban Studies Elective: Design Urbanism | Spring 2015
-
COMMERCIAL DISTRICTS
CENTRAL BUSINESS DISTRICTDistrict that is home to the largest offices and businessesUsed as a signal at the sourthern end of the
city to establish a skyline, distinct and
marketable for Jintang
SHOPPING DISTRICTSDistricts that encourage the healthy habit of
(sustainable) consumerism
Hosts storefronts, malls, whole shopping avenues and related offices and services
Max. Height: 50m (150) Min. Height: No less than 3 floors
Setbacks: Min = 0m (0) Max = 3.25m (10)Parking: 25% of occupancy, 75% of
workers must be On-Site or in
neighborhood
Open Space: 15% of SiteGreen Spaces: 10% of Site (at or
above grade)
Typology: Large building footprints with sufficient relief for pedestrian occupancy and parking (as necessary)
Max. Height: 150m (500 ~ 50 floors) Min. Height: No less than 10 floors
(Vertical) Setbacks: after 80m (200)Parking: 80% of occupancy, must be
On-Site
Open Space: 10% of SiteGreen Spaces: 10% of Site (at or
above grade)
Typology: Massive structures that have more vertical direction; site conditions allow for orientation towards urban wetland
MIXED-USE DISTRICTS
MIXED-USE ZONESZoning that incorporates residential,
commercial, office, and community
programming
Seeks to create neighborhood scale & zones
of transition between zones by both the
scale of developments and the makeup of the
respective zones
Max. Height: 35m (120) Min. Height: No less than 4 floors
Setbacks: Min = 1.5m (15)
Parking: 75% of occupancy must be
On-Site or in neighborhood
Open Space: 25% of Site (30% if O.S.s are located Interiorly)Green Spaces: 35% of Site (at or
above grade)
Zone Specific: MUDs adjacent to residential districts must be 20% community spaces MUDs adjacent to shopping districts
must be 45% office
and 40% residential
MUDs adjacent to office zones must be at least 25% residential 30% community, and 20% retail spacesTypology: Dense pattern of buildings
that follow the rythyms and
symmetry of adjacent
districs, are transitional
heights and create open
spaces within its respective
organization
CULTURAL DISTRICTS
GATEWAY TO THE CITY DISTRICTDistrict that serves to be transition from old
Jintang and New Jintang
Houses visitors center, city and regional museums;Other landmarking elements
ARTS & CULTURE DISTRICTS Districts that serve as cultural spirit of
Jintang
Hosts theaters, nightclubs, museums, dance schools, demonstration resturants, art galleries, and other institutional build-
Max. Height: 50m (150) Min. Height: No less than 3 floors
Setbacks: NoneParking: 50% of occupancy, 50% of
workers must be On-Site or in
neighborhood
Open Space: 20% of SiteGreen Spaces: 25% of Site (at or
above grade)
Typology: Monumental building footprints (in either vertical or horizontal directions)with sufficient orientation to views, parks, and water
Max. Height: 30m (100 ~ 10 floors) Min. Height: No less than 4 floors
Setbacks: Max = 1.5m (5)Parking: 50% of occupancy must be
within neighborhood scale
Open Space: 15% of Site (20% if O.S.s are located interiorlyGreen Spaces: 15% of Site (at or
above grade)
Typology: Structures that are similar to in footprint to Old Jintang or that are existing structures
RESIDENTIAL DISTRICTS
HIGH DENSITY RESIDENTIAL Zoning for high-intensity residential
High rise condos and apartmentsPrimarily for commuters within the city,
transit riders, and citizens who yearn for a
denser style of living
LOW DENSITY RESIDENTIALZoning for less intense residential
Walkable streetscapes and multi-family
dwellings will be common
Primarily for family, vacation, retirement & second homes
Max. Height: 15m (50) Min. Height: No less than 3 floors
Setbacks: Min = 4.5m (15)Parking: 85% of occupancy must be
On-Site
Open Space: 30% of SiteGreen Spaces: 35% of Site (at or
above grade)
Typology: Attached dwellings with \ ring-like orientation to create inner courtyards, front yards and maximum views outside of the block
Max. Height: 90m (300 ~ 30 floors) Min. Height: No less than 6floors
Setbacks: Max = 6m (20) Min = 1.5m (5)Parking: 75% of occupancy must be
On-Site
Open Space: 15% of Site Green Spaces: 25% of Site (at or
above grade)
Typology: Thick footprints that are vertically directioned and oriented around courtyards and towards views
Joseph A. Coln | Professor Grover Mouton | Urban Studies Elective: Design Urbanism | Spring 2015
-
Tulane University. New Orleans, LA Masters of Architecture Minors in Economics and Urban Studies
Tulane O ce of Undergraduate Admissions, New Orleans, LA Student Worker
Tulane O ce of Study Abroad, New Orleans, LA Front O ce Coordinator
Tulane City Center, New Orleans, LA Public Interest Design Intern
Vector Marketing Corporation Advanced Sales Representative
Barcelona, Spain CIEE Archicture + Design
Guatemala City | Petn, Guatemala Chi Alpha Global Expedition Team
Copn, Honduras The House Missions Team
PHONNE: 562-822-1418
EMAILL: [email protected] LINKEEDIN: www.linkedin.com/in/JoAnCo
Solicittudes en espaol son bienvenidos.
Condensed Resum Contact
-
Height: No less than 4 floorsNo leo lo
acks: Max = 1.5m (5)x = 1Max = =ng: 50% of occupancy must be occung:ng: 50% o cucc
within neighborhood scaleghborghbobhbo
Space: 15% of Site (20% ifS 5% of: 15% e (2te ( O.S.s are located O tedated interiorlyi
n Spaces: 15% of Site (at or n S 15%s: 15
above grade)ve veove
ogy: Structures that are similar o ureStruruct to in footprint to Oldin ffofoot
intang or that are existing JintJinta isor tntaang tingstitures structucturureres
1/8" = 1'-0"
PATCH & REPAIN (E) STUCC
RELOCATE DOWNSPOUTO SIDE OF BUILDINGPATCH/REPAIR (E) S
EXISTIN0"
PAICCO
UTG &
ST
IN-0"
PACC
UTG
ST
TIN