IZMIT BAY BRIDGE BRIDGES EUROPE 1 Kent J. Fuglsang COWI

Transcript of IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE ›...

Page 1: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

IZMIT BAY BRIDGE

BRIDGES EUROPE1

Kent J. Fuglsang

COWI

Page 2: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Agenda

1 APRIL 2014

DANSK BRODAG2

IZMIT BAY BRIDGE

› Introduction to the project› General layout› Seismic› Substructure Design/Construction

› Tower foundations› South Anchor Block› North Anchor Block

Page 3: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

5 MARCH 2013

DANSK BRODAG3

GeneralIZMIT BAY BRIDGE

› Bridge site location approx. 50 kilometers East of Istanbul

› First phase of major infra-structure project in Turkey. New highway from Gebze to Izmir.

› BOT project, approx. $11 billion const. const

1 APRIL 2014

Page 4: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Invitation to Tender May 2010 – Design & Build

› Tender conditions – Suspension bridge- Main span 1550 – 1700m- Total length 3km

› Tender submission September 2010› Three bidding contractor groups –

Japan(IHI), China, Korea, › IHI announced preferred bidder Jan 2011› Contract negotiations Jan–Sep 2011› Bridge construction cost approx. $1.2 billion› Detailed design start Sep 2011› Preparatory Site Works started Sep 2012› Permanent Site Works started Jan 2013› Bridge completion early 2016

1 APRIL 2014

DANSK BRODAG4

Project dates summaryIZMIT BAY BRIDGE

Page 5: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Concrete Anchor Blocks and Tower Foundations› Tower Foundations at approx. 40 m water depth› Navigational clearance profile 64x1000m› South Piers supported on South Anchor Block (Integrated structure) › Steel towers 250m high

General layout

1 APRIL 2014

DANSK BETONDAG5

IZMIT BAY BRIDGE

Page 6: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Orthotropic steel deck – dehumidified› 3 traffic lanes each direction› 14mm deck plate and 60mm surfacing

General arrangement - Bridge deck

1 APRIL 2014

DANSK BRODAG6

IZMIT BAY BRIDGE

Page 7: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Steel towers / low weight / increased flexibility / fast construction

› Seismic load combinations and normal ULS combinations are more or less equal in governing the tower design

› Constructed by prefabricated elements – 22 blocks

› Horizontal joints by combined welding and bolting

General arrangement - Towers

1 APRIL 2014

DANSK BRODAG7

IZMIT BAY BRIDGE

Page 8: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower erection

1 APRIL 2014

DANSK BRODAG8

IZMIT BAY BRIDGE

Panel erectionBlock no. 12-22Tower crane, 40t

Block erectionBlock no. 1-11Floating crane, 300t

Bolt friction connection in stiffeners

Page 9: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Sag-to-span-ratio 1:9 › Prefabricated strands› 110 strands each with 127 nos. 5.91 mm diameter wires, 1760 MPa› 781 mm diameter

General arrangement – Main Cables

1 APRIL 2014

DANSK BRODAG9

IZMIT BAY BRIDGE

Page 10: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Progression of 20th Century EQs along the NAF

› 1999 EQsSurface Ruptures Map

› Gölcük 1999 EQ– 7.5 magnitude

› Izmit Site

High Seismic Activity

1 APRIL 2014

DANSK BRODAG10

IZMIT BAY BRIDGE

Page 11: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Reinforced soil with steel inclusion piles (~200 nos. ø2m dia.)

› Gravel bed (3m thick) allowing caisson to slide during earthquake

› Pre-fabricated caisson (54x68x15m)

› Composite steel/concrete shafts (16m dia., t = 1.2m) with high robustness against ship impact

› Solid plinths with anchor bolts for fixing of the steel tower

General arrangement - Tower foundations

1 APRIL 2014

DANSK BRODAG11

IZMIT BAY BRIDGE

Page 12: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Dry dock stage – Part of the caisson structure is constructed in a purpose built dry dock with a limited depth of approximately 7.5 m.

Construction stages- Tower foundations – Dry dock

1 APRIL 2014

DANSK BRODAG12

IZMIT BAY BRIDGE

Page 13: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – Dry dock

1 APRIL 2014

DANSK BRODAG13

IZMIT BAY BRIDGE

Page 14: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – Dry dock

1 APRIL 2014

DANSK BRODAG14

IZMIT BAY BRIDGE

Page 15: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Wet dock stage - The caisson is towed out of dry dock and the remaining part of the caisson as well as the steel shafts are completed in a wet dock in floating condition at an intermediate site with a minimum water depth of 15 m. The prefabricated steel shaft is lifted by cranes and placed on temporary support.

Construction stages- Tower foundations – Wet dock

1 APRIL 2014

DANSK BRODAG15

IZMIT BAY BRIDGE

Page 16: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Dry Dock – Tower Foundations

1 APRIL 2014

DANSK BRODAG16

IZMIT BAY BRIDGE

Page 17: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction

1 APRIL 2014

DANSK BRODAG17

IZMIT BAY BRIDGE

Page 18: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – End September 2013

1 APRIL 2014

DANSK BRODAG18

IZMIT BAY BRIDGE

Page 19: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction

1 APRIL 2014

DANSK BRODAG19

IZMIT BAY BRIDGE

Page 20: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – Steel shaft installation

1 APRIL 2014

DANSK BRODAG20

IZMIT BAY BRIDGE

Page 21: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – Pile installation

1 APRIL 2014

DANSK BRODAG21

IZMIT BAY BRIDGE

Page 22: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tower foundation construction – Gravel bed placing

1 APRIL 2014

DANSK BRODAG22

IZMIT BAY BRIDGE

Page 23: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Immersion of the tower foundation by ballasting - Tower foundation is lowered into its final position by filling the caisson cells with ballast water.

› It is noted that in order to maintain floating stability of the caisson in the stage where the main body gets immersed the caisson is tilted about 10 degrees.

› The infill concrete in the shafts from level -21 m to -1 m is cast after the structure has been immersed.

Construction stages- Tower foundations - Immersion

1 APRIL 2014

DANSK BRODAG23

IZMIT BAY BRIDGE

Page 24: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Wet Dock – Tower Foundations

1 APRIL 2014

DANSK BRODAG24

IZMIT BAY BRIDGE

Page 25: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Wet Dock – South Tower Foundation

1 APRIL 2014

DANSK BRODAG25

IZMIT BAY BRIDGE

Page 26: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Tow out – North Tower Foundation

1 APRIL 2014

DANSK BRODAG26

IZMIT BAY BRIDGE

Page 27: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Immersion – North Tower Foundation

1 APRIL 2014

DANSK BRODAG27

IZMIT BAY BRIDGE

Page 28: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Immersion – North Tower Foundation

1 APRIL 2014

DANSK BRODAG28

IZMIT BAY BRIDGE

Page 29: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Final position – North Tower Foundation

1 APRIL 2014

DANSK BRODAG29

IZMIT BAY BRIDGE

Page 30: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Gravity based solution founded on dense sand› Foundation massif 124x58x16m› Guitar shape to provide additional stability of excavation

General arrangement – South Anchor Block

1 APRIL 2014

DANSK BRODAG30

IZMIT BAY BRIDGE

Page 31: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

South Anchor Block Excavation

1 APRIL 2014

DANSK BRODAG31

IZMIT BAY BRIDGE

Design circular part- Uniform water-pressures and soil-pressures- Hoop structure, i.e. all panels in tangential compression- No vertical distribution of forces in D-wall panels- Compression transferred to junctions- Reinforcement in D-wall panels 75 kg/m3

Page 32: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

South Anchor Block – D-wall panel reinforcement

1 APRIL 2014

DANSK BRODAG32

IZMIT BAY BRIDGE

Page 33: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Technical details for guitar shaped excavation; › Diaphragm wall (all); thickness 1.0m, top level +1.5m, toe level -32.0m, length 33.5m › Excavation level -15.0m, Platform level +1.5m, depth 16.5m› Watertightness at base of the excavation achieved by 10m thick clay layer, underlaid by

sand› Construction time for D-wall and excavation: 6month

1 APRIL 2014

DANSK BRODAG33

South Anchor Block ExcavationIZMIT BAY BRIDGE

Page 34: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

South Anchor Block Excavation

1 APRIL 2014

DANSK BRODAG34

IZMIT BAY BRIDGE

Page 35: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

South Anchor Block Construction

1 APRIL 2014

DANSK BRODAG35

IZMIT BAY BRIDGE

Page 36: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Progress– South Anchor Block

1 APRIL 2014

DANSK BRODAG36

IZMIT BAY BRIDGE

Page 37: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

General arrangement – South Anchor Block

1 APRIL 2014

DANSK BRODAG37

IZMIT BAY BRIDGE

Page 38: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

› Typical gravity based structure deeply embedded in rock - Foundation massif 50x66x22m

General arrangement – North Anchor Block

1 APRIL 2014

DANSK BRODAG38

IZMIT BAY BRIDGE

Page 39: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

North Anchor Block construction

1 APRIL 2014

DANSK BRODAG39

IZMIT BAY BRIDGE

Page 40: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Progress– North Anchor Block

1 APRIL 2014

DANSK BRODAG40

IZMIT BAY BRIDGE

Page 41: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Summary of Main Quantities

1 APRIL 2014

DANSK BRODAG41

IZMIT BAY BRIDGE

Structure Material Unit Quantity

Anchor blocks Concrete m3 130000

Tower foundations Concrete m3 45000

Steel inclusions Steel ton 16000

Towers Steel ton 17000

Main cable Steel ton 18000

Bridge deck Steel ton 33000

Page 42: IZMIT BAY BRIDGE - Brodag IZMIT.pdf · Agenda 1 APRIL 2014 2 DANSK BRODAG IZMIT BAY BRIDGE › Introduction to the project › General layout › Seismic › Substructure Design/Construction

Questions?

19 SEPTEMBER 2013

DANSK BRODAG42

IZMIT BAY BRIDGE COWI