Presentation to Green Economy Expo 2010
Environmental Impact Assessment and Planning Legislation for Wind
Farms
![Page 2: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/2.jpg)
Agenda
• About IWCM
• Legislation
• Planning System
• Environment Impact Assessment
• Natura 2000 Sites / Appropriate Assessment
• 2010 Planning Bill
2
![Page 3: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/3.jpg)
About IWCM
• Irish Wind Energy Consultancy
• Planning, Advisory, Project Management and Engineering Services
• 10 Professional and 10 Support Staff
3
![Page 4: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/4.jpg)
Legislation
• European Community (Environmental Impact Assessment) Regulations, 1989 (SI No. 349 of 1989), amended in 1994 by (SI No. 93 of 1999)
• EU Environmental Impact Assessment (EIA) Directive 97/11/EEC
• The Planning and Development Regulations, 2001 (SI 600 of 2001), Schedule 5 Part 10. Section 3 (Energy Industry) (i) –
• Part 10 of the Planning and Development Act, 2000 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) under Section 176, that the application be accompanied by an Environmental Impact Assessment.
4
![Page 5: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/5.jpg)
Irish Planning System
• Local Authority
• An Bord Pleanala
• SID
• Judicial Review
5
![Page 6: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/6.jpg)
Typical Planning Timelines
• Lodgement
• Submission Period (5 weeks)
• Decision Due (8 weeks from lodgement)
• Further Information (6 months to respond)
• Notification of Decision (Grant / Refusal) (4 weeks)
• 1st/3rd party Appeal to An Bord Pleanala (18 weeks)
6
![Page 7: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/7.jpg)
Requirement for an Environmental Impact Statement
• An EIS is mandatory for any development with more than 5 turbines or having a total output greater than 5 MW.
• Sub-Threshold typically 1 to 2 turbines
• Auto-production
• Planning Authority can request EIA for any Development
7
![Page 8: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/8.jpg)
Environmental Impact Assessment
• Scope
• Non Technical Summary
• Environmental Impact Statement
• EPA and WF Planning Guidelines
8
![Page 9: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/9.jpg)
Existing Environment
• Human Beings
• Ecology
• Ornithology
• Soils and Water
• Air
• Landscape
• Material Assets
• Interaction of the Foregoing
9
![Page 10: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/10.jpg)
Proposed Development
• Alternatives
• Characteristics
• Existence
• Other Developments
10
![Page 11: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/11.jpg)
EIA Process
• Assessment of Impacts
– Significance
• Mitigation
– Avoid
– Reduce
– Compensate
• Interaction of the Foregoing
• Design of Project Informed by EIA Process
11
![Page 12: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/12.jpg)
Public Access to Information
• Structure
• Presentation
• Public Access
• Non-Technical Summary
• Requirement
12
![Page 13: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/13.jpg)
Appropriate Assessment
• Natura 2000
• AA required within 15 km from a Natura 2000 site
• Precautionary Principle
• NI Statement included with the EIS
13
![Page 14: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/14.jpg)
AA 4 Stages
14
![Page 15: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/15.jpg)
SAC and SPA’s in Ireland
15
![Page 16: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/16.jpg)
2010 Planning Bill
16
Moved to Committee Stage; May
• Enactment of the Bill expected
before Summer Recess
• Significant Input and Debate
• Defines Obligations for
Planning Bodies
• Statutory Guidelines for Wind
Farm Applications
![Page 17: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/17.jpg)
2009 Planning and Development Bill
• Requirement for Substantial Works Removed but
– Only One Extension Allowed
– Need for Consistent Interpretation Remains
– 8 Week Time Frame for Determination Diluted
• 10 Year Planning not Guaranteed for New Permissions
• Projects SID Threshold under Review
• Will Address EU Habitats and Birds Directives
17
![Page 18: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/18.jpg)
Conclusions
• Irish Planning Process
• EIA Process
• Obligations of the Habitats Directive
• Appropriate Assessment
• 2010 Planning Bill
18
![Page 19: Iwcm green_expo](https://reader034.fdocuments.in/reader034/viewer/2022051818/54bf3f6d4a79599a1e8b45f7/html5/thumbnails/19.jpg)