ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

6
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012

Transcript of ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

Page 1: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

ITU-R WP 5DUpdate

Orlett W. Pearson, Report to TR-45.5

August 2012

Page 2: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

2 ITU-R WP 5D Update | August 2012

ITU-R Working Party 5D Update

ITU-R WP5D

• Revisions of IMT Specifications (M.1457 Rev 11 and M.2012 Rev 1)

TIA did not send the complete package for the update and would have to send as an input contribution into the next meeting

Missing sections of M.1457 has to be incorporated back into document

• Progressed work to support Agenda Items 1.1 and 1.2, these agenda items supports additional spectrum for IMT.

• New SWG were established for future developments of IMT systems (IMT.2020 FUTURE, Report ITU R M.[IMT.ARCH])

• Public Protection Disaster Relief (PPDR). An LS was sent to External Organizations requesting input into the 03 October 2012 meeting, if not, would accept input into the 30 January 2012 meeting.

Page 3: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

3 | M2M Update | August 2012

ITU-R WP 5D Update – M.1457

• MAJOR CONCERN

TIA did not submit the entire package

Recommendation M.1457-11 was extended to the October 2012 meeting.

Complete package from TIA was not received.

Some sections were not included in the published document.

External Organizations will have opportunity to review and provide input documents into the next meeting.

SDO complaints (ATIS and ARIB) about the workload resulting from the simultaneous revisions in the future of ITU-R M.1457 and ITU-R M.2012.

Suggested to delay the deadline for the revision of ITU-R M.1457-11 from end 2013 to mid-2014 or end-2014 to reduce this workload.

The approval will coincide with the SG5 meeting

Page 4: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

4 | ITU-R WP 5D Update | August 2012

ITU-R WP 5D Update – New Agenda Items

• WP 5D created a new work plan to coincide with the newly created Joint Task Group created at WRC. The JTC will cover two Agenda items: Item 1.1 and 1.2.

Agenda item 1.1 “to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International Mobile Telecommunications (IMT) and related regulatory provisions, to facilitate the development of terrestrial mobile broadband applications, in accordance with Resolution 233 [COM6/8] (WRC‑12)”; and

Agenda item 1.2 “to examine the results of ITU‑R studies, in accordance with Resolution 232 [COM5/10] (WRC‑12), on the use of the frequency band 694-790 MHz by the mobile, except aeronautical mobile, service in Region 1 and take the appropriate measures.

Page 5: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

5 | ITU-R WP 5D Update | August 2012

ITU-R WP 5D – IMT VISION (2020+)

• WP 5D adopted a new structure at this meeting to coincide with Agenda 1.1 and 1.2. The new structure will consider the future of IMT, called Future IMT VISION (2020+). Concepts will be developed inside ITU and will consider

–Market trends and user demands

– Technology trends

– Spectrum requirements

WP 5D also expound upon

– Question ITU-R 229-3/5

– Res. ITU-R 233 (WRC-12)

– Resolutions ITU-R 56/57

– Rec. ITU-R M.1645

Page 6: ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.

6 | ITU-R WP 5D Update | August 2012

ITU-R WP 5D – IMT.VISION (2020+) Documents

• Based on the new structure and the Agenda 1.1 and 1.2 and to coincide with the Future IMT Vision (2020+). The following documents will be developed:

– [IMT.2020 TRAFFIC]

– [IMT.FUTURE TECH TRENDS]

– [MT.2020.ESTIMATE]

– [[IMT.2020.INPUT]

• WP 5D will continue to receive contributions from External Organizations, Academia and Research Centers.