i.t.t.presentation Feb.11

79
Sheet 1 I.T.T. I.T.T. SpA SpA INTRODUCTION INTRODUCTION REFORMERS VERTICAL CYLINDRICAL HEATERS BOX HEATERS

Transcript of i.t.t.presentation Feb.11

Page 1: i.t.t.presentation Feb.11

Sheet 1I.T.T.I.T.T. SpASpAINTRODUCTIONINTRODUCTION

REFORMERS

VERTICAL CYLINDRICAL

HEATERS

BOX HEATERS

Page 2: i.t.t.presentation Feb.11

Sheet 2I.T.T.I.T.T. SpASpAORGANIZATION CHARTORGANIZATION CHART

SECRETARY &GENERAL SERVICES

(QAM)QUALITY

MANAGERRappresentante della Direzione

(GM) DIRECTOR

& GENERAL MANAGER

(PM)PROJECT

MANAGEMENET

(CSM)ERECTION COMMISSIO

NING & START UP

(QCM)QUALITY

CONTROL &

EXPEDITING

SHOPMANUFACTURING

(PDM)PROCUEREME

NT & SHIPPING

(PEM)PROCESS

ENGINEERING

(TDM)DESIGN & ENGINEERI

NG

(SDM)SALES

DIRECTOR SECRETARY

(ADM)FINANCING ADMINISTRATION

& HUMAN RESOURCES DIRECTOR

(PRE)PRESIDENT

(CM)

Secretary & Accounting

Approved Manuafcturers

Calculation/ Specification

U.T. Secretary)

Drawings & Material Requisition

Engineering Office

External Engineering Offices

Page 3: i.t.t.presentation Feb.11

Sheet 3I.T.T.I.T.T. SpASpA

F.I.M. & EQUIPMENT SHOP CRITICAL ACTIVITIES

- STEELWORK FABRICATION & SUPPLY- LADDERS, PLATFORMS & GRATINGS & SUPPLY- STACK, DUCTS FABRICATION- WHS COIL FABRICATION- WHS LINING INSTALLATION- WHS MODULARIZATION- STACK / DUCTS LINING INSTALLATION- INLET DISTRIBUTOR FABRICATION- COLD COLLECTOR FABRICATION- HAIRPINS BENDING- STACK LINING APPLICATION - FG DUCTS LINING APPLICATION- DAMPERS FABRICATION & SUPPLY- DOORS FABRICATION & SUPPLY- MISCELLANEA SUPPLY AND FABRICATION

- SITE SURVEY OF FOUNDATION- ERECTION OF RADIANT SECTION- RADIANT SECTION LINING APPLICATION- ERECTION OF WHS MODULES- ERECTION OF DUCT SECTIONS- ERECTION OF STACK SECTIONS- ERECTION OF PLATFORMS & LADDERS- PRESSURE PARTS FIELD WELDING- WELDING OF CATALYST TUBES- FIELD WELDING OF INTERC. PIPING- WELDING OF INLET HAIRPINS- INSTALLATION OF BURNERS- WELDING OF EXTERNAL PIPING- INSTALLATION OF MOTORS / FANS- MISCELLANEA INSTALLATION- INSTRUMENTATION INSTALLATION

- DETAILED ENGINEERING- MECHANICAL DESIGN- Structural calculations- Pressure part calculations- CONSTRUCTION DRAWINGS- W.P.S. (Welding procedure Specification)- Q.A.P. (Quality Assurance Plan)- I.T.P. (Inspection Test plan)- P.P.P. (Project Procurement Plan)- ERECTION PROCEDURES- SCHEDULING- CHECK OF WELDING QUALIFICATION- PROCEDURE FOR ERECTION & INSTALLATION- 100 % SUPERVISION ON CRITICAL ACTIVITIES- Fit Up- Intermediate check of Steel Structure- All lining work- Welder qualification for site completion and installation- Coils welding

I.T.T. SpA MANAGEMENT & SUPERVISION

CATALYST TUBES& SPRING

TUBE & FITTINGFOR PRESSURE PARTS

LOOSE MATERIALFOR INLET DISTRIBUTORS

TUBES FOR HAIRPINS& FINNED TUBES

BURNERS

FANS &MOTORS

CASTINGS

INSTRUMENTS& OTHER

EQUIPMENTS

LINING MATERIAL

SITE ACTIVITIES

EXECUTION PLANEXECUTION PLAN

Page 4: i.t.t.presentation Feb.11

Sheet 4I.T.T.I.T.T. SpASpA

I.T.T. SpA is a leading Italian Company who specialise in the design, manufacture and installation of reformers and fired heaters for global oil, gas and petrochemical industries.

Understanding of process technology is a key factor in our ability to provide the best fired heaters for the job and to provide units designed to maximise efficiency and to minimise emissions. There is no fired heater challenge we cannot meet, whether for new installations, replacements, revamps or retrofit.

We have the experience since 1954 and present day structure to handle both single heater projects as well as larger and more complex multiple heater projects and reformers.

I.T.T. was formed as an independent Company to develop new business in international markets, following reorganisation and splitting of Kirchner Italia business in 1997. We operate from our offices in Milan, Delhi and Seoul as well as through our workshop and worldwide network of Agents and Representatives.

I.T.T. has its own thermal and mechanical design capability for Fired Heaters and our own in-house software resulting from fifty years of experience and reliable know-how. We are as well approved constructor of Reformers and Heaters designed by other parties (HALDOR TOPSØE, UOP, etc.).

COMPANY PROFILECOMPANY PROFILE

Page 5: i.t.t.presentation Feb.11

Sheet 5I.T.T.I.T.T. SpASpAQUALITY POLICY and QUALITY ASSURANCEQUALITY POLICY and QUALITY ASSURANCE

QUALITY POLICY (ISO 9001:2008 International Standard)

I.T.T. SpA has established his quality policy based on understanding of process technology, providing best and reliable design, best quality, on time delivery and

competitive price.The company is totally committed to this policy and follow this strategy:

- Keep and improve the design reliability based on proven know-how since 1954 and feed back data;

- Implement quality products with competitive prices and on-time deliveries in accordance with Codes and Standards;

- Follow Client specifications and requirements;- Establish a training program to improve potential capability and performance

of personnel;- Establish the Company strategic annual objectives, targets and review of

management activities.All personnel share understanding and responsibilities aimed at the enhancement of their performance and achievement of Company’s policy.

QUALITY ASSURANCEThe Quality Control for design, fabrication and erection assure that every project is performed in strict accordance with all Codes and Standards as well as Customers specifications and ISO 9001:2008A. Piccioni

I.T.T. SpA Managing Director

Page 6: i.t.t.presentation Feb.11

Sheet 6I.T.T.I.T.T. SpASpAPRODUCTS & SERVICESPRODUCTS & SERVICES

DETAILED ENGINEERING, PROCUREMENT, SHOP FABRICATION AND ERECTION OF REFORMER PACKAGE FOR HYDROGEN UNITS, METHANOL AND AMMONIA PLANTS (based on Licensors Basic design HALDOR TOPSØE A/S, KBR, ETC..).BASIC AND DETAILED ENGINEERING OF FIRED HEATERS WITH I.T.T. OWN DESIGN:

Crude Oil Heaters / Charge Heaters / Vacuum Heaters / Coker Heaters / Hydrocracker Heaters/ Hydrotreater Heaters / Platforming Heaters / Preheaters / Hot Oil Heaters / Dowtherm Heaters/ Reboilers / Start-up Heaters / Regeneration Furnaces / Visbreaking Heaters / Ethylene Cracking Heaters / Ethane Cracking Heaters / Naphtha Cracking Heaters

AIR PREHEATING SYSTEMSSTEAM GENERATION SYSTEMSWASTE HEAT BOILERS (WHB) AND WASTE HEAT RECOVERY SECTIONS (WHS)DESIGN AND ENGINEERING SERVICES, PROCUREMENT, EXPEDITING, SUPERVISION FOR FIELD ERECTION, DRY OUT. COMMISSIONING AND START UP.ENERGY CONSERVATION FEASIBILITY STUDIES.PROCESS DESIGN PACKAGE AND REVAMPING OF EXISTING HEATERS.CONSULTING AND TRAINING COURSES.SITE ERECTION.POST SALE ASSISTANCE.

Page 7: i.t.t.presentation Feb.11

Sheet 7I.T.T.I.T.T. SpASpAREFORMERSREFORMERS

Page 8: i.t.t.presentation Feb.11

Sheet 8I.T.T.I.T.T. SpASpAREFORMERSREFORMERS

Page 9: i.t.t.presentation Feb.11

Sheet 9I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

TABLE OF CONTENTS

1 Company Experience 32 Design and Engineering 5a. Process Design & Thermal Design 5b. Fluid Dynamics Design 6c. Mechanical Design 8d. Structural Engineering 9e. Piping Engineering 10f. Flexibility Piping Engineering 123 Prefabrication Grade 13

Page 10: i.t.t.presentation Feb.11

Sheet 10I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

1. Company ExperienceITT is the leading “Independent” Syngas Reforming Engineer in the worldwide market.

Based on their over 50 years and over 50 furnaces experience, ITT have been able to design, engineer, supply and start-up Steam Reforming packages for all Syngas application including:

- Hydrogen- Ammonia- Methanol- Hy-Co Syngas

Keeping an ideal condition of independence from any specific Basic Process Licensor, ITT has developed a wide knowledge of the specifications and details of construction as typical of all such Licensors and has at present an unequalled record of designed Steam Reforming Furnaces within units licensed by:

- Haldor Topsoe- Technip- Kellogg Brown & Root- Ammonia and Methanol Casale- Davy Process

Also, the composite origin of our key personell, coming from very senior positions and several differentiated experiences in other companies for the last 35 years, makes ITT very comfortable in dealing with such design issues as implemented in Syngaz Reforming technology by:

- KTI- Uhde- Lurgi- Linde (Selas)- Petrobras CENPES- Foster Wheeler

Experience as gained from these wide references allows ITT to design their Steam Reformers in any current state of the art technique including:

- Top firing- Side firing - Short hot stiff pigtail outlets- Short cold stiff pigtail outlets- Long hot flexible pigtail outlets- Premix PSA/Make Up Gas firing- Separate gun PSA/Make Up Gas firing- Hot headers- Cold headers- Ground mounted lined transferlines- Penthouse mounted lined and jacketed transferlines

A comprehensive list of all 50 years of references of ITT is attached hereto together with a more detailed list including the major technical data of all Steam Reformers design and supplied by ITT in the last 15 years. Also, a set of pictures of Steam Reformers package form around the world is attached.

Besides all the technical consideration above explained it is worthy to note that ITT performance limited to the very last 5 years is as follows:

-26 Steam Reforming Units designed and supplied / being supplied to 5 different Process Licenses

-5776 Catalyst Tubes purchased

-Large single train Steam Reforming unit up to 384 tubes.

-Largest single train firing in Steam Reforming package in excess of 500 MW, inclusive of auxiliary tunnel firing, convection crossover firing and external steam superheating. The simplified 3-D model of this package is shown here below:

Page 11: i.t.t.presentation Feb.11

Sheet 11I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

2. Design and Engineering

a. Process Design & Thermal Design

Process reaction design and thermal design are done by using ITT proprietary softwares, fully validated in all the many years of experience of ITT in the field of Syngas Steam Reforming. Catalyst data as given by the Licensor are checked with specialized Catalyst companies such as Johnson Mattey, Suedchemie, Topsoe or others before being imputed into ITT proprietary process and thermal design softwares.

b. Fluid Dynamics Design

A great deal of attention is given in ITT Reformer Design is paid to the Fluid Dynamics issues. This usually involves CFD analysis by using “FLUENT”software. Namely, the flue gas flow in the radiant tunnels of Top Fired Reformers is always simulated and optimized. A few examples of tunnel design procedure are given below:

- 3-D modeling for mesh preparation

Page 12: i.t.t.presentation Feb.11

Sheet 12I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

- Tunnel openings modeling

c. Mechanical Design

Critical parts of the Reformer Package are designed to the most updated and sophisticated design tools. Namely, critical intermediate tube sheets in the case of high biridgewalltemperature design of horizontal tubes convection sections, are always designed by using FEM (Finite Elements Method). A sample of FEM output is given below.

Page 13: i.t.t.presentation Feb.11

Sheet 13I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

e. Piping Engineering

Piping engineering will be executed within a 3-D environment, namely PDS. ITT is available to produce an interface to Client at the agreed battery limits based on a PDS model. If so desired, also PDMS model may be considered. Some examples of PDS 3-D modeling of a Top Fired Steam Reformer by ITT for a Hydrogen Unit are given below:

TEKLA Model: Cross Sectional View, Top Fired Reformer

d. Structural Engineering

Structural engineering is executed within a 3-D environment, namely TEKLA. The use of TEKLA software will result in a nearly non existent risk of design mismatching as well in the automatic production of shop fabrication cutting spools sketches and panel assembly sketches which in turn will allow an extremely low rate of possible site reworks. ITT will be pleased to give more detailed in formation on this issue at request.

TEKLA Model: Cross Sectional View, Side Fired Reformer

Fuel Gas Distribution

Page 14: i.t.t.presentation Feb.11

Sheet 14I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

Penthouse Piping Lay Out

Risers/Downcomers Arrangement

f. Flexibility Piping Engineering

3-D model as generated in PDS or PDMS environment are also the basis for the flexibility analysis typically incorporating the whole process piping for the Mixed Feed crossover outlet at convection section up to Process Gas Boiler in Hydrogen service of Secondary Reformer or Post Reformer in Ammonia and Methanol service

Page 15: i.t.t.presentation Feb.11

Sheet 15I.T.T.I.T.T. SpASpAThe The ““INDIPENDENTINDIPENDENT”” SyngasSyngas EngineersEngineers

3. Prefabrication Grade

ITT is in the position of providing any level of prefabrication up to full size, fully dressed Ro-Ro modules as shown below.

4. Attachments

Attachment 1: Company PresentationAttachment 2: Reference Lists

Reformers Reference ListReformers PhotosTechnical Data List

Attachment 3: Project Management DocumentsTypical Project Quality PlanOrganization Chart

Page 16: i.t.t.presentation Feb.11

Sheet 16I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Tjeldbergodden

Norway

Licensor:Haldor Topsøe

Client:Statoil A/S

Fluor Daniel

I.T.T. ref.:B-2971

Hydrogenproduction: 2400

MTPD

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 17: i.t.t.presentation Feb.11

Sheet 17I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Tjeldbergodden

Norway

Licensor:Haldor Topsøe

Client:Statoil A/S

Fluor Daniel

I.T.T. ref.:B-2971

Hydrogenproduction: 2400 MTPD

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 18: i.t.t.presentation Feb.11

Sheet 18I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Tjeldbergodden

Norway

Licensor:Haldor Topsøe

Client:Statoil A/S

Fluor Daniel

I.T.T. ref.:B-2971

Hydrogenproduction: 2400

MTPD

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 19: i.t.t.presentation Feb.11

Sheet 19I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Yochon-Korea

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-3441

Hydrogenproduction:11200 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 20: i.t.t.presentation Feb.11

Sheet 20I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Yochon-Korea

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-3441

Hydrogenproduction:11200 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 21: i.t.t.presentation Feb.11

Sheet 21I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Hpcl

Mumbai ref. India

Licensor:Haldor Topsøe

A/S

Client:Hyundai-Korea

I.T.T. ref.:B-3480

Hydrogenproduction:21000 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 22: i.t.t.presentation Feb.11

Sheet 22I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Hpcl

Mumbai ref. India

Licensor:Haldor Topsøe

A/S

Client:Hyundai-Korea

I.T.T. ref.:B-3480

Hydrogenproduction:21000 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 23: i.t.t.presentation Feb.11

Sheet 23I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Hpcl

Mumbai ref. India

Licensor:Haldor Topsøe

A/S

Client:Hyundai-Korea

I.T.T. ref.:B-3480

Hydrogenproduction:21000 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 24: i.t.t.presentation Feb.11

Sheet 24I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Iocl Barauni India

Licensor:Haldor Topsøe

Client:Haldor Topsøe

I.T.T. ref.:B-98037

Hydrogenproduction:38500 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 25: i.t.t.presentation Feb.11

Sheet 25I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Iocl Barauni India

Licensor:Haldor Topsøe

Client:Haldor Topsøe

I.T.T. ref.:B-98037

Hydrogenproduction:38500 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 26: i.t.t.presentation Feb.11

Sheet 26I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Iocl Barauni India

Licensor:Haldor Topsøe

Client:Haldor Topsøe

I.T.T. ref.:B-98037

Hydrogenproduction:38500 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 27: i.t.t.presentation Feb.11

Sheet 27I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

YochonKorea

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-00027

Hydrogenproduction:48300 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 28: i.t.t.presentation Feb.11

Sheet 28I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

YochonKorea

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-00027

Hydrogenproduction:48300 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 29: i.t.t.presentation Feb.11

Sheet 29I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Capro

CorporationUlsan – Korea

Licensor:Haldor Topsøe

Client:Hyundai

Engineering Co, Ltd

I.T.T. ref.:B-02015

Hydrogenproduction:42000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 30: i.t.t.presentation Feb.11

Sheet 30I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Esso NormandiaP. Jerome France

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-02096

Hydrogenproduction:47000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 31: i.t.t.presentation Feb.11

Sheet 31I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Esso NormandiaP. Jerome France

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-02096

Hydrogenproduction:47000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 32: i.t.t.presentation Feb.11

Sheet 32I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Esso NormandiaP. Jerome France

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-02096

Hydrogenproduction:47000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 33: i.t.t.presentation Feb.11

Sheet 33I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Caojing Hyco1China

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-02106

Hydrogenproduction:55800 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 34: i.t.t.presentation Feb.11

Sheet 34I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Caojing Hyco1China

Licensor:Haldor Topsøe

Client:Samsung

Engineering Co, Ltd

I.T.T. ref.:B-02106

Hydrogenproduction:55800 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 35: i.t.t.presentation Feb.11

Sheet 35I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air LiquidePriolo - Italy

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-03147

Hydrogenproduction:27000 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 36: i.t.t.presentation Feb.11

Sheet 36I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Lavera - France

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-04153

Hydrogenproduction:25000 Nm3/h

REFORMER SINGLE CELLREFORMER SINGLE CELL

Page 37: i.t.t.presentation Feb.11

Sheet 37I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Jupiter - Belgium

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-05270

Hydrogenproduction:

100000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 38: i.t.t.presentation Feb.11

Sheet 38I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Air Liquide

Jupiter - Belgium

Licensor:Haldor Topsøe

Client:Air Liquide

France

I.T.T. ref.:B-05270

Hydrogenproduction:

100000 Nm3/h

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 39: i.t.t.presentation Feb.11

Sheet 39I.T.T.I.T.T. SpASpA

REFORMER Photos

Location:Korea

Licensor:Haldor Topsøe

Client:SK / Daelim

Korea

I.T.T. ref.:B-06023

Hydrogenproduction:

110 MMSCFD

REFORMER DOUBLE CELLREFORMER DOUBLE CELL

Page 40: i.t.t.presentation Feb.11

Sheet 40I.T.T.I.T.T. SpASpAREFERENCES LIST OF REFORMER REFERENCES LIST OF REFORMER fromfrom 1998 up 1998 up toto 20102010

ENGRO Plant - Daharki PakistanH. TOPSØER2007Primary Reformer F-201SAIPEM - PORTUGAL

Petrochina Tarim Oilfield Co. Korla, Xinjiang - ChinaH. TOPSØER2007Primary Reformer H-201CHINA PETROLEUM MATERIAL & EQUIPMENT (Group) CORPORATION

Cepsa / Spain 10000 Nm3/h HTCR H2 PlantH. TOPSØER2007HTCR Skids and EquipmentHALDOR TOPSOE A/S DENMARK

HYCO 3 Plant - SPAL Site of Estarreja, PortugalH. TOPSØER2007Steam Reformer Package & Waste Heat BoilerAIR LIQUIDE, FRANCE

FFC Plant-III BMR Project Mirpur Mathelo, PakistanH. TOPSØER2007WHS RevampingFAUJI FERTILIZER Co., Ltd. PAKISTAN

SK Corporation No. 2 FCC Project - KoreaH. TOPSØER2006Hydrogen RefomerSK CORPORATION - KOREA

Ally Jupiter 2 Plant - BASF Site, Antwerpen BelgiumH. TOPSØER2006Steam Reformer Package & Waste Heat BoilerAIR LIQUIDE, FRANCE

Air Liquide Hydrogen Plant Priolo (Italy)H. TOPSØER2004No. 1 Steam Reformer Package & Waste Heat BoilerAIR LIQUIDE, FRANCE

Air Liquide - Caojing Hyco 1 ProjectH. TOPSØER2003Tubular Reformer PackageSAMSUNG ENGINEERING CO., LTD. KOREA

Sohar Fertilizer Project - OmanH. TOPSØER2005Steam Reformer Package & Waste Heat BoilerMITSUBISHI HEAVY INDUSTRIES JAPAN

Air Liquide Hydrogen Plant Lavera (France)H. TOPSØER2005Steam Reformer Package & Waste Heat BoilerAIR LIQUIDE, FRANCE

ENI Taranto Refinery - ItalyH. TOPSØER2006Steam Reformer Package & Waste Heat BoilerENI S.p.A. - RAFFINERIA DI TARANTO

Air Liquide, Yochon KoreaH. TOPSØER2001Reformer Package H-101SAMSUNG ENGINEERING CO., LTD. KOREA

Bayer PC, Thailand Proj.H. TOPSØER2000Tubular Reformer & W.H.B. PackageTESSAG EDELEANU GmbH GERMANY

IOCL, Barauni-IndiaH. TOPSØER1999Reformer PackageHALDOR TOPSOE A/S DENMARK

Capro Corporation Ulsan, KoreaH. TOPSØER2002Reformer PackageHYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Lube Oil Plant, Alexandria EgyptH. TOPSØER1999Reformer Heater BA-551FOSTER WHEELER FRANCE

Esso Normandie, Port Jerome, FranceH. TOPSØER2002N. 1 Steam Reformer Package & WHBAIR LIQUIDE, FRANCE

HPCL Mumbai Refinery, IndiaH. TOPSØER1998Reformer PackageHYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Air Liquide - Yochon, KoreaH. TOPSØER1998Reformer Package H-111SAMSUNG ENGINEERING CO., LTD. KOREA

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

Page 41: i.t.t.presentation Feb.11

Sheet 41I.T.T.I.T.T. SpASpAREFERENCES LIST OF REFORMER REFERENCES LIST OF REFORMER fromfrom 1998 up 1998 up toto 20102010

SOXAL Plant, Jurong Island SingaporeH. TOPSØER2008Steam Reformer Package & Waste Heat BoilerAIR LIQUIDE, FRANCE

QATAR FERTILISER Co. (SAQ) Mesaieed Industrial CityH. TOPSØER2008No. 2 Reformers PackagesSNAMPROGETTI - ITALY

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

Shazand Arak Refinery - IranTECHNIPR2007No. 2 Reformers Package (Train A & Train B)CONSORTIUM of SAZEH-ODCC-SEI, CHINA

Alberto Pasqualinin REFAP / BrasilH. TOPSØER2010Primary ReformerUTC - Brazil

PETROVIETNAM - CaMauH. TOPSØER2009Primary ReformerWUHUAN ENGINEERING Co., Ltd. - China

REPSOL Cartagena - SpainH. TOPSØER2009Lining Material Supply and DesignTECNICAS REUNIDAS - SPAIN

CBC - 2500 MTPD Methanol Plant in Dongfang City, HainanDAVY PROCESS

TECHN.

R2009Convection Section ModulesCHINA BLUE CHEMICAL Ltd. - CHINA

Tehran Refinery Products, Upgrading Project - IranTECHNIPR2008Primary ReformerEHSAN JOINT VENTURE - IRAN

Kaveh Methanol, Dayer, IranCASALER2010Primary ReformerKAVEH METHANOL / PIDEC

Raffineria SANNAZZARO, ItalyH. TOPSØER2010Primary ReformerENI S.p.A. - Italy

Abu Dhabi Oil Refining Co. (TAKREER)H. TOPSØER2010Primary ReformerSK ENGINEERING & CONSTRUCTION-Korea

NFL, Nangal Fertilizer Co.KBRR2010Primary ReformerTECNIMONT S.p.A. - ITALY

AOFP Project - El-Djazairia El-Omania Lil Asmida SpA -Algeria

H. TOPSØER2008No. 2 Primary ReformersMITSUBISHI HEAVY INDUSTRIES JAPAN

REPSOL Cartagena - SpainH. TOPSØER2008Engineering Services and Supplies for Steam Reformers U-604 & U-605

TECNICAS REUNIDAS - SPAIN

MOL Hungarian Oil & Gas Co Danube Refinery -HungaryH. TOPSØER2008Primary ReformerACE - UNGHERIA

Page 42: i.t.t.presentation Feb.11

Sheet 42I.T.T.I.T.T. SpASpABOX & VERTICAL CYLINDRICAL HEATERSBOX & VERTICAL CYLINDRICAL HEATERS

Page 43: i.t.t.presentation Feb.11

Sheet 43I.T.T.I.T.T. SpASpABOX HEATERSBOX HEATERS

BOX Photos

Location:Al Jubail

Saudi Arabia

Client:Samsung

Engineering CO., LTD.

Korea

I.T.T. ref.:B-00047

Reactor ChargeHeater double cell/ double fired with

Vert. Tubes.

Page 44: i.t.t.presentation Feb.11

Sheet 44I.T.T.I.T.T. SpASpABOX HEATERSBOX HEATERS

BOX Photos

Location:Saras refinery

Sarroch(Cagliari) - Italy

Client:Parsons

U.K.

I.T.T. ref.:B-98059

Reactor ChargeHeater single cell

With Aph andHor. Tubes.

Page 45: i.t.t.presentation Feb.11

Sheet 45I.T.T.I.T.T. SpASpABOX HEATERSBOX HEATERS

BOX Photos

Location:AssiutEgipt

Client:Assiut Oil

Refining Co.through

Petromaint

I.T.T. ref.:B-98047

Crude Oil FiredHeater

Double cellwith Pumps /

Steam Drum and Hor. tubes

Page 46: i.t.t.presentation Feb.11

Sheet 46I.T.T.I.T.T. SpASpABOX HEATERSBOX HEATERS

BOX Photos

Location:Izmir

Turkey

Client:LG Engineering

CO., LTD. Korea

I.T.T. ref.:B-02054

Combined FeedHeater

single celldouble fired and

Vert. tubes

Page 47: i.t.t.presentation Feb.11

Sheet 47I.T.T.I.T.T. SpASpABOX HEATERSBOX HEATERS

BOX Photos

Location:Atofina plant

Daesan

Client:Samsung

Engineering CO., LTD.

Korea

I.T.T. ref.:B-04061

Reactor ChargeHeater with

harbor tubes

Page 48: i.t.t.presentation Feb.11

Sheet 48I.T.T.I.T.T. SpASpAREFERENCES LIST OF BOX HEATERS REFERENCES LIST OF BOX HEATERS fromfrom 1998 up 1998 up toto 20102010

NAFTEC SpA Arzew Refinery Rehabilitation & Adaptation Project - Alger

TECHNIP/I.T.T.

B2009Hot Oil Heater Crude Feed Heater (Revamping)HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

INA Rijeka - CroatiaI.T.T.B2009ReEngineering Study Vacuum Heater 323-H-001KG PROCESS INNOVATIONS s.r.o. CZECH REPUBLIC

NIOEC Bandar Abbas Refinery - IranI.T.T.B2009CCR PlatforminFIMCO FZE – U.A.E.

Lab Complex, Al Jubail, Saudi ArabiaUOPB2010Hot Oil Heater / Pacoi Charge HeaterGULF ARABI /UHDE India

Shazand Arak Refinery - IranI.T.T.B2007No. 1 Preheater & (1st, 2nd, 3rd InterheatersCONSORTIUM of SAZEH-ODCC-SEI, CHINA

HDS VII Plant - PKN Orlen S.A. Plock / PolandI.T.T.B2007Charge HeaterTECHNIP ITALY S.p.A.

N.P.C. - EgyptI.T.T.B2008Fired Heater with Auxiliaries & APH SystemPETROJET - EGYPT

SK Corporation No. 2 FCC Project - KoreaI.T.T.B2006No. 3 Residue Hydrodesulphurisation HeatersDAELIM INDUSTRIAL Co. Ltd. KOREA

ENI - Livorno Refinery (Italy)ENI / I.T.T.B2005Revamping of HeatersENI - LIVORNO

NPPC Al Jubail, Saudi ArabiaI.T.T.B2005Reactor Charge HeaterSAMSUNG ENGINEERING CO., LTD. KOREA

The Aromatics (Thailand) Public Co. Ltd. Map Ta Phut, Thailand

UOPB2005CCR Pplatforming - Charge HeaterSK ENGINEERING & CONSTRUCTION Co., Ltd. - Korea

Polimeri Europa – Sarroch Cagliari (Italy) B2003Feasibility Study (Design & Engineering)for Reforming Plant

POLIMERI EUROPA

Turkey Petrol Rafinerileri A.S. Izmir, TurkeyUOPB2002No. 1 Combined Feed HeaterLG ENGINEERING & CONSTRUCTION CORPORATION KOREA

National Industrialization Co.Al Jubail, S.ArabiaI.T.T.B2001Reactor Charge Heater 1-BA-1001SAMSUNG ENGINEERING CO., LTD. KOREA

Assiut Refinery - EgyptI.T.T.B1999Complete Package of Crude Oil Fired Heater ASSIUT OIL REFINING Co. through PETROMAINT - EGYPT

Polimeri Europa – Sarroch Cagliari (Italy) I.T.T.B2004Feasibility Study - Basic Design -Revamping of Reforming Heaters F4-F5-F6-F7.

POLIMERI EUROPA SpA San Donato Milanese (MI)

Suez Oil Processing Co. Suez, Egypt ALCOR C –I.T.T.

B2003Rehabilitation of Coker Heater 12 H-3EGYPTIAN MAINTENANCE COMPANY - EGYPT

Aromatic Expansion Project Atofina Plant Daesan, KoreaI.T.T.B2004A-BA 1501 Charge HeaterSAMSUNG ENGINEERING CO., LTD. KOREA

Kaveh Methanol, Dayer, IranCASALE/I.T.T.

B2010Steam SuperheaterKAVEH METHANOL/PIDEC

Saras S.p.A., Italy I.T.T.B1998Reactor Charge Heater H-S-201PARSONS - U.K.

HDO Daesan Refinery, South KoreaHYUNDAIB1998Design for modification & revamping of 2 crude heaters HDO Refinery - Steam/air Preheater

HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Corinth GreeceI.T.T.B1998Convection PackageMOTOR OIL HELLAS GREECE

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

Page 49: i.t.t.presentation Feb.11

Sheet 49I.T.T.I.T.T. SpASpAVERTICAL CYLINDRICAL HEATERSVERTICAL CYLINDRICAL HEATERS

VERTICAL CYLINDRICAL

HEATER Photos

Location:Kalundborg,

Denmark

Client:Statoil

Denmark

I.T.T. ref.:B-3352

Charge Heater

Page 50: i.t.t.presentation Feb.11

Sheet 50I.T.T.I.T.T. SpASpAVERTICAL CYLINDRICAL HEATERSVERTICAL CYLINDRICAL HEATERS

VERTICAL CYLINDRICAL

HEATER Photos

Location:Holborn Europa Raffinerie GmbH

Client:Tessag EdeleanuGmbH - Germany

I.T.T. ref.:B-02031

Finishing ReactorFeed Heater

Page 51: i.t.t.presentation Feb.11

Sheet 51I.T.T.I.T.T. SpASpAVERTICAL CYLINDRICAL HEATERSVERTICAL CYLINDRICAL HEATERS

VERTICAL CYLINDRICAL

HEATER Photos

Location:Segas, Egypt LNG

Project Damietta Port

Egypt

Client:Kellogg / Jcg /

TecnicasReunidas (KJT)

I.T.T. ref.:B-02078

Hot Oil Furnace

Page 52: i.t.t.presentation Feb.11

Sheet 52I.T.T.I.T.T. SpASpAVERTICAL CYLINDRICAL HEATERSVERTICAL CYLINDRICAL HEATERS

VERTICAL CYLINDRICAL

HEATER Photos

Location:GOK-3 Unit, Mol-

Hungary

Client:Uhde Edeleanu

GmbHGermany

I.T.T. ref.:B-03035_40

Fired Heaterwith Steam Drum

Page 53: i.t.t.presentation Feb.11

Sheet 53I.T.T.I.T.T. SpASpAVERTICAL CYLINDRICAL HEATERSVERTICAL CYLINDRICAL HEATERS

VERTICAL CYLINDRICAL

HEATER Photos

Location:Atofina plant

Daesan

Client:Samsung

Engineering CO., LTD.

Korea

I.T.T. ref.:B-04062

Naphtha SplitterReboiler

Page 54: i.t.t.presentation Feb.11

Sheet 54I.T.T.I.T.T. SpASpAREFERENCES LIST OF VERT. CYLINDRICAL HEATERS REFERENCES LIST OF VERT. CYLINDRICAL HEATERS fromfrom 1998 up 1998 up toto 20102010

ENI - Livorno Refinery (Italy)I.T.T.C2005Engineering and Supply of Combustion Air DuctsENI - LIVORNO

Aromatic Expansion ProjectAtofina Plant Daesan, KoreaI.T.T.C2004A-BA 101 Revamping of Column Reboiler HeaterA-BA 102 Revamping of Charge HeaterBA-106 Naphtha Splitter Reboiler

SAMSUNG ENGINEERING CO., LTD. KOREA

Suez Oil Processing Co. Suez, EgyptI.T.T.C2004Rehabilitation of Coker Heater 12H-1PETROJET - EGYPT

Shell and BP South African Petroleum Refineries SHELLC2004No. 1 Stabilizer Reboiler Heater (F-501)FLUOR DANIEL B.V.The Netherlands

MOL Danube Refinery, BEK-5 Unit HungaryI.T.T.C2004Hot Oil Heater 460-H-50OTF - IGN Petrotech Kft., Hungary

GOK-3 Unit, Mol-HungaryI.T.T.C2003No. 2 Fired Heaters (items H-401 & H-402) with related equipment

UHDE EDELEANU GmbH GERMANY

DSU Plant in SecundaI.T.T.C2002No. 1 Fired Heater 221HT-N01GRINAKER - LTA / SASOL SOUTH AFRICA

STATOIL A/S - Site RefineryKalundborg DenmarkI.T.T.C2003Charge Heater H-802STATOIL DENMARK

Segas, Egypt LNG Project Damietta Port - EgyptI.T.T.C2002Hot Oil Furnace 58-MB01KELLOGG / JCG / TECNICAS REUNIDAS (KJT)

E.M.C. - EgyptALCOR CC2002Rehabilitation of Coker Heater 12 H-2EGYPTIAN MAINTENANCE COMPANY - EGYPT

Holborn Europa Raffinerie GmbHI.T.T.C2002Finishing Reactor Feed Heater CHD-F-1001TESSAG EDELEANU GmbH GERMANY

AGIP Iran BV – Assaluyah Gas Plant . South Pars Dev. Ph. 4 & 5 – Onshore Facilities

I.T.T.C2002n. 4 Drivers Regeneration Furnaces, N. 2 Propane Regeneration Heaters n. 2 ButaneRegeneration Heaters, n. 2 EthaneRegeneration Heaters

HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Statoil Refinery, TjeldbergoddenI.T.T.C2000Replacement of Coil in Heater H-4801 STATOIL DENMARK

Sirte Oil Co. - LibyaI.T.T.C2000No. 3 Heating Medium HeatersHYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Lube Oil Plant – Alexandria - EgyptI.T.T.C1999Vertical Cylindrical Heater BA-552FOSETER WHEELER FRANCE

Kalundborg, DenmarkI.T.T.C1999Convection Section & Associated PartsSTATOIL DENMARK

FJFC Bin Qasim - KarachiI.T.T.C2001Natural Gas Fired Heater F-1003FFC - JORDAN FERTILIZER COMPANY LIMITED

MDH-Plant, DEA UK WesselingI.T.T.C2001Fired Heater RD-1501TESSAG EDELEANU GmbH GERMANY

Korea National Oil Corporation (KNOC)I.T.T.C2001Heating Medium Fired Heater 300-F-56001SAMSUNG ENGINEERING CO., LTD. KOREA

Bataan, PhilippinesI.T.T.C1998TCCU Feed Heater - Item No.600HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Kalundborg, DenmarkI.T.T.C1998Engineering Design-New Convection Bank in Heater H-4201

STATOIL DENMARK

Mina Al-Ahmadi KuwaitI.T.T.C1998H-33-351 Polishing Regen. Gas Heater for Acid Gas Removal Project

K N P C Sunkyong Eng. & Construction Co. KOREA

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS

Page 55: i.t.t.presentation Feb.11

Sheet 55I.T.T.I.T.T. SpASpAREFERENCES LIST OF VERT. CYLINDRICAL HEATERS REFERENCES LIST OF VERT. CYLINDRICAL HEATERS fromfrom 1998 up 1998 up toto 20102010

ENI - Livorno Refinery (Italy)ENIC2007n. 1 Fired Heater F101UNI1n. 1 Fired Heater F1 HSW

ENI - LIVORNO

Ecopetrol S.A. Barrancabermeja ComplexI.T.T.C2007n. 1 Reactor Heatern. 1 Splitter Reboilern. 1 HDS Reactor Effluent Heatern. 1Stabilizer Reboiler

ECOPETROL S.A. - COLUMBIA

The Aromatics (Thailand) Public Co Ltd Map Ta Phut Thailand

I.T.T.C2005n. 2 Feed Fractionation Unit – n. 2 HeavyNaphta Hydrotreating Unit – n. 2 Heavy NaphtaHydrotreating Unit

SK ENGINEERING & CONSTRUCTION-Korea

Petron Bataan Refinery PhilippinesI.T.T.C2007Revamping of Hot Oil HeaterDAELIM INDUSTRIAL Co., Ltd. KOREA

MOC Cracker ProjectMap Ta Phut Olefins Co.,Ltd. Thailand

I.T.T.C2007n,. 1 DP Reactor Feed Heatern. 1 Regeneration Heater

SAMSUNG ENGINEERING Co., Ltd.KOREA

Gasoil HDS Unit, Gdansk PolandI.T.T.C2007Reactor Feed HeaterProduct Stripper Reboiler

ABB Lummus Global GmbH GERMANY

Chinese Petroleum Corporation - TaiwanALCOR CC2007Engineering Services (Fired Heater F-8001)KCE - TAIWAN

Q-Chem II - Mesaieed, QatarI.T.T.C2006Fired HeatersTECNIMONT S.p.A. - ITALY

INA FCC Gasoline HDS Unit, Sisak Refinery - CroatiaI.T.T.C2007Hot Oil HeaterACE Kft. - HUNGARY

New Ethane Recovery Plant Project, KuwaitI.T.T.C2006Fired HeatersHYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Vietnam Oil & Gas Corporation (Petrovietnam) -Dung Quat Refinery Project, Vietnam

I.T.T.C2006Reactor Fired HeaterCONSORTIUM OF TECHNIP (FRANCE) JGC CORPORATION (JAPAN) & TECNICAS REUNIDAS (SPAIN)

ENI - Livorno Refinery (Italy)I.T.T.C2005Revamping of Reboiler Fired HeaterENI - LIVORNO

BP Gelsenkirchen - GermanyI.T.T.C2005Reboiler Fired HeaterUHDE EDELEANU GmbH GERMANY

Turkish Petroleum Refineries Corp. Izmir RefineryI.T.T.C2006Fired HeatersTUPRAS - TURKEY

Ruwais - Emirates of Abu DhabiGASCO Project 5229 - Ruwais 3rd NGL

I.T.T.C2006No. 2 Regeneration Gas HeatersSNAMPROGETTI - ITALY

Gasco Miximization of C2 & C3 ProjectI.T.T.C2006Deethanizer Fired Heater ReboilerDepropanizer Fired Heater ReboilerDebutanizer Fired Heater Reboiler

ENPPI - EGYPT

Sohar Fertilizer Project - OmanI.T.T.C2005Start-up HeaterMITSUBISHI HEAVY INDUSTRIES JAPAN

AGIP Iran BV – Assaluyah Gas Plant . South Pars Dev. Ph. 9 & 10 – Onshore Facilities

I.T.T.C2005n. 4 Drivers Regeneration Furnaces, N. 2 Propane Regeneration Heaters n. 2 ButaneRegeneration Heaters, n. 2 EthaneRegeneration Heaters

OIEC Group /LG E&C Construction

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS

Page 56: i.t.t.presentation Feb.11

Sheet 56I.T.T.I.T.T. SpASpA

NIOEC / POGC – IranSouth Pars Gas Field Devel. Phases 17 & 18

I.T.T.C2009Dryer Regenaration Gas Fired Heater (4 sets) Ethane Regeneration Heater (2 sets)

FIMCO FZE – U.A.E.

NIOEC Bandar Abbas Refinery - IranI.T.T.C2009No. 1 Reactor Feed Heater -No. 1 Stripper Reboilers - No. 1 Reactor Feed Heater -No. 1 Stripper Reboilers

FIMCO FZE – U.A.E.

ADFP Project – El-Djazairia El-Omania Lil AsmidaSpA - Algeria

I.T.T.C2009n. 2 Start-up HeatersMITSUBISHI HEAVY INDUSTRIES JAPAN

NIOEC Bandar Abbas Refinery - IranI.T.T.C2009No. 1 Reactor Heater -No. 1 LP Stripper Reboilers - No. 1 Stabilizer Reboiler

FIMCO FZE – U.A.E.

Tupras Izmir Refinery TurkeyI.T.T.C2009H-1302CONVECTION Bank with Spare PartsTUPRAS - TURKEY

Shazand Arak Refinery - IranI.T.T.C2007No. 1 Reactor Feed Heaters - No. 2 Stripper Reboilers - No. 1 Stabilizer Reboiler

CONSORTIUM of SAZEH-ODCC-SEI, CHINA

Shazand Arak Refinery - IranI.T.T.C2007No. 2 Reactor Heaters - No. 1 LP Stripper Reboiler Heater - No. 1 HDS HeaterNo. 1 Charge Heater

CONSORTIUM of SAZEH-ODCC-SEI, CHINA

HDS/HDA Lukoil Neftochim BourgasI.T.T.C2007HDS Charge HeaterUHDE EDELEANU GmbH GERMANY

ABADAN Preliminary Renovation Project Phase III Iran

I.T.T.C2009First Stage HDS HeaterSecond Stage HDS Heater

PETROCHEMICAL INDUSTRIES DESIGN & ENG. Co. (PIDEC) Iran

Ruwais Industrial Complex, Abu Dhabi, UAEUOPC2010Start-up HeaterSAMSUNG ENGINEERING CO., LTD. KOREA

Alberto Pasqualinin REFAP / BrazilUOPC2010HDS Charge HeaterUTC - Brazil

KNPC / LPG Train 4 at MAA Refinery Project Kuwait

UOPC2010Regeneration Gas Heater (2 Heaters)DAELIM INDUSTRIAL Co. Ltd. KOREA

Lube Oil Refinery - TehranI.T.T.C2009Revamping of HeatersBEHRAN OIL Co. - Iran

NAFTEC SpA -Arzev Refinery Rehabilitation & Adaptation Project - Algeria

TECHNIPI.T.T.

C20092° Splitter Reboiler HeaterCharge Heater

HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

QATAR FERTILISER Co. Mesaieed Industrial CityI.T.T.C2008No. 2 Start-Up HeatersSNAMPROGETTI - ITALY

Ma'aden Ammonia Project - Saudi ArabiaI.T.T.C2008Start-up HeaterUHDE EDELEANU GmbH GERMANY

LAB Complex, Al Jubail, Saudi ArabiaUOPC2010n. 1 Hot Oil Heater – n. 1 Pacol Charge HeaterGULF ARABI / UHDE India

CHO Power Plant – Morceux - FranceI.T.T.C2009Combustor BoilerCHO POWER / EUROPLASMA

4° NGL Train Project – Ruwais – Abu DhabiUOPC2010Regeneration Gas Heater (2 Heaters)PETROFAC – GS E&C JOINT VENTURE

POLIMERI EUROPA - PORTO MARGHERA (Italy)I.T.T.C2008Revamping of Economizers E135 - E136POLIMERI EUROPA - ITALY

ENGRO Plant - Daharki PakistanI.T.T.C2007Start-Up F-501SAIPEM - PORTUGAL

PlaceBasicDesign

TypeYear ofOrder

Heater ServiceCustomer / Contractor

REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS

Page 57: i.t.t.presentation Feb.11

Sheet 57I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM SOLIDWORKS SOFTWARESNAPSHOTS OBTAINED FROM SOLIDWORKS SOFTWARE

Page 58: i.t.t.presentation Feb.11

Sheet 58I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 59: i.t.t.presentation Feb.11

Sheet 59I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 60: i.t.t.presentation Feb.11

Sheet 60I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 61: i.t.t.presentation Feb.11

Sheet 61I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 62: i.t.t.presentation Feb.11

Sheet 62I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 63: i.t.t.presentation Feb.11

Sheet 63I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 64: i.t.t.presentation Feb.11

Sheet 64I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 65: i.t.t.presentation Feb.11

Sheet 65I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 66: i.t.t.presentation Feb.11

Sheet 66I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 67: i.t.t.presentation Feb.11

Sheet 67I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 68: i.t.t.presentation Feb.11

Sheet 68I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 69: i.t.t.presentation Feb.11

Sheet 69I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 70: i.t.t.presentation Feb.11

Sheet 70I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 71: i.t.t.presentation Feb.11

Sheet 71I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 72: i.t.t.presentation Feb.11

Sheet 72I.T.T.I.T.T. SpASpASNAPSHOTS OBTAINED FROM TEKLA SOFTWARESNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Page 73: i.t.t.presentation Feb.11

Sheet 73I.T.T.I.T.T. SpASpAPhotoPhoto

Page 74: i.t.t.presentation Feb.11

Sheet 74I.T.T.I.T.T. SpASpAPhotosPhotos

Page 75: i.t.t.presentation Feb.11

Sheet 75I.T.T.I.T.T. SpASpAI.T.T.I.T.T. Sponsor Sponsor ofof competitioncompetition Carrera Carrera CupCup 20102010

Page 76: i.t.t.presentation Feb.11

Sheet 76I.T.T.I.T.T. SpASpAI.T.T.I.T.T. Sponsor Sponsor ofof competitioncompetition Carrera Carrera CupCup 20102010

Page 77: i.t.t.presentation Feb.11

Sheet 77I.T.T.I.T.T. SpASpAI.T.T.I.T.T. Sponsor Sponsor ofof competitioncompetition Carrera Carrera CupCup 20102010

Page 78: i.t.t.presentation Feb.11

Sheet 78I.T.T.I.T.T. SpASpAI.T.T.I.T.T. Sponsor Sponsor ofof competitioncompetition Carrera Carrera CupCup 20102010

Page 79: i.t.t.presentation Feb.11

Sheet 79I.T.T.I.T.T. SpASpA

I.T.T. SpA - Head Office - Italy – Via Privata Vasto, 1/3 – 20129 Milano.(Tel. No. +39 02 29536032 / Fax. +39 0229536031) E-mail: [email protected] / Web link: www.ittki.it

I.T.T. Branch Office - Italy – Viale Bramante, 36 – 00054 Fiumicino Roma.(Tel. No. +39 06 657666224 / Fax. +39 06 657666235)

Office in the World:I.T.T. Korean Office - Korea – Address : Room 1207-2, ILSHIN B/D, 541, Dohwa-dong, Mapo-gu, Seoul, 121-701, Korea(Tel. No. +82 2 707 0006 / Fax. + 82 2 707 0069 )

S.T.T. Singapore Thermal Technology PTE LTD (STT) - 143 Cecil Street, #18-00 GB Building, Singapore 069542

I.T.T. Indian Office - India – Address : Indian Rep. Office of ITT SpA 707 , Madhuban 55,Nehru Place New Delhi - 110 019 (Tel. No.91 11 30882707 + / Fax. + 91 11 30882708 )

THANK YOU FOR YOUR TIMETHANK YOU FOR YOUR TIME