ITS Sketch Plans

38
presented to Wisconsin Department of Transportation presented by Brian Scott SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07 ITS Sketch Plans Corridor Sketch Plan Methodology – Update

description

ITS Sketch Plans. Corridor Sketch Plan Methodology – Update. presented to Wisconsin Department of Transportation presented by Brian Scott SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07. Agenda. Schedule/Progress Management Update – John Corbin - PowerPoint PPT Presentation

Transcript of ITS Sketch Plans

Page 1: ITS Sketch Plans

presented to

Wisconsin Department of Transportation

presented by

Brian Scott

SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07

ITS Sketch PlansCorridor Sketch Plan Methodology – Update

Page 2: ITS Sketch Plans

2

Agenda

Schedule/Progress

Management Update – John Corbin

Presentation – Sketch Planning Update - SRF, EK, SEH

• Threshold Updates

• Deployment Density – Spectrum Update

• Corridor Examples− Beltline

− Fox Valley

− Capital

Long Range Plan Input - Chris Hedden

Next Steps

Page 3: ITS Sketch Plans
Page 4: ITS Sketch Plans

Management Update

Page 5: ITS Sketch Plans

Sketch Planning Update

Page 6: ITS Sketch Plans

Thresholds Update

Page 7: ITS Sketch Plans

7

Threshold Adjustment

Original Adjusted

Page 8: ITS Sketch Plans

8

Process

Raw Data Threshold Map

Develop Raw Data Corridor Map

Smooth Segments

Analyze Smoothed Segments

Apply Operations Oriented Recommendations (Mileposts)

Next Steps

• Meeting with Regions – Operations Chiefs and Planning Chiefs

• Produce final maps and recommendations for all corridors

Page 9: ITS Sketch Plans

Deployment Density Update

Page 10: ITS Sketch Plans

10

Deployment Density – Urban Interstate/Expy

Page 11: ITS Sketch Plans

11

Deployment Density – Rural Interstate/Expy

Page 12: ITS Sketch Plans

12

Deployment Density – Urban and Rural Other

Page 13: ITS Sketch Plans

13

Beltline Corridor – Raw Threshold Data

Page 14: ITS Sketch Plans

14

Beltline Corridor – Smoothed Data

Page 15: ITS Sketch Plans

15

Beltline - Mileposts

Page 16: ITS Sketch Plans

16

Fox Valley Corridor – Raw Data

Page 17: ITS Sketch Plans

17

Fox Valley Corridor – Raw Data

Page 18: ITS Sketch Plans

18

Fox Valley Corridor

Page 19: ITS Sketch Plans

19

Fox Valley Corridor

Page 20: ITS Sketch Plans

20

Fox Valley – Milepost Adjustment Data

Page 21: ITS Sketch Plans

21

Fox Valley Corridor – Revised Mileposts

Page 22: ITS Sketch Plans

22

Fox Valley Corridor – Revised Mileposts

Page 23: ITS Sketch Plans

23

Fox Valley Corridor

Insert SEH Methodology

Page 24: ITS Sketch Plans

24

Fox Valley Corridor – DMS

Page 25: ITS Sketch Plans

25

Capitol Corridor

Page 26: ITS Sketch Plans

26

Capitol Corridor - Signals

Page 27: ITS Sketch Plans

27

Statewide – Additional Information Layers

• RWIS

• Fiber optic cable• State Patrol microwave network• State Patrol MDN

Page 28: ITS Sketch Plans

Connection 2030 Input

Page 29: ITS Sketch Plans

29

Input into Connections 2030 LRP

Submitted draft data set 7/23/07

• Only red and orange links

• Table Text Suggested

Sketch Planning data set Version 3.0 submitted

• Contains updated thresholds

Page 30: ITS Sketch Plans
Page 31: ITS Sketch Plans
Page 32: ITS Sketch Plans
Page 33: ITS Sketch Plans

Mid-Term (5-10 Years)

US 29 Operations deployments recommended south of Fond du Lac MPA to milepost xxx.

x X x

Operations

Implement Operations technologies as recommended by WisDOT Operations Sketch Plan

x x x

Page 34: ITS Sketch Plans

Next Steps

Page 35: ITS Sketch Plans

35

Statewide Map – Signals

Page 36: ITS Sketch Plans

36

Next Steps (Short Term)

Complete SW and NE Region Maps

• Obtain consensus from WisDOT Regions & BHO

Complete SE Region Maps

Complete NW and NC Regions

Data collection – existing systems & infrastructure

Page 37: ITS Sketch Plans

37

Next Steps (Mid – Term)

Technology Scan

Validate results in Regional workshops SE, NW, NC)

Page 38: ITS Sketch Plans

38

Next Steps (Finalize)

Develop Infrastructure & Operations Plan

Aggregate Plans (Freeways, Arterials, ATIS)

Prioritize Corridors

Integrate into existing WisDOT planning processes