ITS Omar Ppt

download ITS Omar Ppt

of 60

Transcript of ITS Omar Ppt

  • 8/10/2019 ITS Omar Ppt

    1/60

    INTERNATIONAL SEMINAR ON INTELLIGENT TRANSPORT SYSTEMS

    (ITS) IN ROAD NETWORK OPERATIONS

    The Legend Hotel, Kuala Lumpur, Malaysia, 14-16 August

    MANAGING THE KUALA LUMPUR ROAD NETWORK WITHTHE INTEGRATED TRANSPORT INFORMATION SYSTEM

    Ir Mahfix bin Omar,Director, Urban Transportation Department,

    Kuala Lumpur City Hall

  • 8/10/2019 ITS Omar Ppt

    2/60

    Description of the Kuala Lumpur

    Road Network

    Background of the Integrated

    Transport Information System

    Current Opertions at the Transport

    Management Centre (TMC)

    Future Challenges

    MANAGING THE KUALA LUMPUR ROAD NETWORK WITH THE

    INTEGRATED TRANSPORT INFORMATION SYSTEM

  • 8/10/2019 ITS Omar Ppt

    3/60

    Challenges in Managing the Road Network System in Kuala

    Lumpur

    Increase in the vehicle population, especially single

    occupancy vehicles

    Limited capacity of junctions to cater for incerease in

    traffic volumes

    Increase in overall aggressiveness of driver behaviour

    Resource constraints in managing, controlling and

    enforcing traffic flows in the city.

  • 8/10/2019 ITS Omar Ppt

    4/60

    Daily Traffic Flow Situation on KL Road Network (2005)

    On a daily basis:

    1.305 million vehiclescross the MRRI

    2.125 million vehicles

    cross the MRRII70% vehicle trips crossingMRRI (42,600 vehicles) andMRRII (86,500 vehicles) during

    AM peak hour are SOV.

    65% crossing MRRI (39,100vehicles) and MRRII (84,500

    vehicles) during PM peak hourare SOV.

    Total Volume Entering CPA

    =1,260,000 pcu/day

  • 8/10/2019 ITS Omar Ppt

    5/60

    Problems / Issues in Traffic Management

    Congestion Problems During peak hours

    Situations during flash floods, partial road closures,events

    Blockages during road construction, illegal kerbsideparking

    Abuse of Dedicated Bus Lanes Bus drivers Private vehicles

    Other related problems motorcyclists

    pedestrians

  • 8/10/2019 ITS Omar Ppt

    6/60

    Kuala Lumpurs Strategy for Sustainable Management of

    Road Transport System

    New concept based on Integrated Transportation DemandManagement

    Strategy is focused on following key areas:

    Increase usage of public transport system

    Accelerate management and operations of existing transportinfrastructures

    Optimise usage of transport facilities and infrastructure in themost effective way possible

  • 8/10/2019 ITS Omar Ppt

    7/60

    Integrated Transportation Demand Management Programme

    Prepare facilities to encourage greater use of public

    transport

    Carry out various traffic management schemes to

    smoother traffic flow and operations of bus and taxis in

    the city

    Apply Intelligent Transport System (ITS) to betterutilise the capacity of the overall road network system.

  • 8/10/2019 ITS Omar Ppt

    8/60

    Design-Build project is funded by Federal Governmentunder Rancangan Malaysia ke 8

    DBKL appointed as implementing agency

    Total cost of RM 365 million

    ITIS Project started in August 2002

    TMC Operations commenced March 2005

    Formal handing over commenced on 30 June 2005

    Background of the Integrated Transport

    Information System

  • 8/10/2019 ITS Omar Ppt

    9/60

    OVERVIEW OF SYSTEM

  • 8/10/2019 ITS Omar Ppt

    10/60

    45 Surveillance

    corridors

    Coverage

    I t t d T t I f ti S t

  • 8/10/2019 ITS Omar Ppt

    11/60

    Integrated Transport Information System

    KEY OBJECTIVES

    1. Monitor traffic situation

    2. Detect incidents3. Inform public

    4. Provide assistance

  • 8/10/2019 ITS Omar Ppt

    12/60

    Overview of the ITIS

    Advanced Traffic Management

    System (ATMS)

    Advanced Traveller

    Information System (ATIS)

  • 8/10/2019 ITS Omar Ppt

    13/60

    255

    728

    140

    1600

    89

  • 8/10/2019 ITS Omar Ppt

    14/60

    TRANSPORT MANAGEMENT CENTRE

  • 8/10/2019 ITS Omar Ppt

    15/60

    Shift Manager

    Supervisors

    Senior

    Controllers

    DBKL ATC

    Controllers

    Controllers

    Direktorat

    Supervisors

    Mon-Fri

    7AM - 4PM

    4PM 11PM

    Sat

    8AM - 2PM

    12PM - 6PM

    Sun

    10AM - 4PM

    PDRM

  • 8/10/2019 ITS Omar Ppt

    16/60

    (1st Floor) Call Centre

  • 8/10/2019 ITS Omar Ppt

    17/60

    (2nd Floor) Simulation / Joint Operations Centre

  • 8/10/2019 ITS Omar Ppt

    18/60

    Detect and Validate

    Monitor and

    RespondInform and Advise

    Engineering for

    Enhanced Safety

    and Traffic Flows

    OPERATIONS

  • 8/10/2019 ITS Omar Ppt

    19/60

    PLANS MAPS ALARMS

    VMS MAPS CCTVMAIN

    STYLISED

    Integrated Applications in ATMS Command Console

  • 8/10/2019 ITS Omar Ppt

    20/60

    Types of Incidents

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

    T f I id t

  • 8/10/2019 ITS Omar Ppt

    21/60

    Types of Incidents

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

    T f I id t

  • 8/10/2019 ITS Omar Ppt

    22/60

    Types of Incidents

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

    T f I id t

  • 8/10/2019 ITS Omar Ppt

    23/60

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

    Types of Incidents

    T f I id t

  • 8/10/2019 ITS Omar Ppt

    24/60

    Types of Incidents

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

  • 8/10/2019 ITS Omar Ppt

    25/60

    Types of Incidents

  • 8/10/2019 ITS Omar Ppt

    26/60

    Types of Incidents

    Stopped vehicles

    Road hazards

    Accidents

    Lane / road blockages

    Unusual congestion

    (Flash) Floods

    Faulty traffic lights

    Reporting Lines: Operations Field response

  • 8/10/2019 ITS Omar Ppt

    27/60

    p g p p

    Police / Directorate(Senior) Liaison

    Officer

    Police / Directorate(Senior) Liaison

    Officer

    Police / Directorate

    Officer

    Police / Directorate

    Officer

    TMC Operations ManagerTMC Operations Manager

    Shift ManagerShift Manager

    SupervisorsSupervisors

    Senior ControllersSenior Controllers

    ControllersControllers

    (Cooperative) Operating Framework

  • 8/10/2019 ITS Omar Ppt

    28/60

    ( ) g

    Controllers detect andmonitor incidents

    Controllers detect andmonitor incidents

    Supervisors validate

    incidents post VMS

    Supervisors validate

    incidents post VMS

    ATMS Operations ManagerATMS Operations Manager

    Police / Directorate takescontrol of field response as

    necessary

    Police / Directorate takescontrol of field response asnecessary

    Supervisors advise

    Police / DirectorateLiaison Officer or

    contacts Directorate

    Operations Room

    Police / Directorate

    Liaison / Operations

    Room advises TMC

    on response being

    taken

    TMC

    monitors field

    response

    being taken

    Shift ManagerShift Manager

  • 8/10/2019 ITS Omar Ppt

    29/60

    Building a Real Time Map of the Traffic Situation

    Congestion Map

  • 8/10/2019 ITS Omar Ppt

    30/60

    10 Dec 2005: 8.03AM

    Vehicle Detector(AID)

    Vehicle Detector mounted on

    street light

    Video image processing

    Congestion Map

  • 8/10/2019 ITS Omar Ppt

    31/60

    Wed 23 Aug 2005: 6.45PM

    Traffic Warning Alert

    Avoid Travelling

    in/out of KL

    R l Ti T ffi D t

  • 8/10/2019 ITS Omar Ppt

    32/60

    Real Time Traffic Data

  • 8/10/2019 ITS Omar Ppt

    33/60

    FLOW

    SPEED

    OCCUPANCY

    Profile of Traffic Flow at a Specific Location

  • 8/10/2019 ITS Omar Ppt

    34/60

  • 8/10/2019 ITS Omar Ppt

    35/60

    Flow Speed Density

    Relationships for One AID

    Location

    Detecting Disruptions in Network Flows

  • 8/10/2019 ITS Omar Ppt

    36/60

    Plot of Speed Profile from AID

    Free flow

    Interrupted flow

    Detecting Disruptions in Network Flows

  • 8/10/2019 ITS Omar Ppt

    37/60

  • 8/10/2019 ITS Omar Ppt

    38/60

    Speed

    Occupancy

  • 8/10/2019 ITS Omar Ppt

    39/60

    INFORMING THE PUBLIC

  • 8/10/2019 ITS Omar Ppt

    40/60

    Travel Time Messages on VMS

  • 8/10/2019 ITS Omar Ppt

    41/60

    Traffic Information on Website

  • 8/10/2019 ITS Omar Ppt

    42/60

    www.itis.com.my

    www.itis.com.my

  • 8/10/2019 ITS Omar Ppt

    43/60

    Improvements / Traffic Engineering / Planning

  • 8/10/2019 ITS Omar Ppt

    44/60

    Improvements / Traffic Engineering / Planning

    Identifying Traffic Congestion Hot-Spots

  • 8/10/2019 ITS Omar Ppt

    45/60

    HOT-SPOTS - MORNING

    Identifying Traffic Congestion Hot-Spots

  • 8/10/2019 ITS Omar Ppt

    46/60

    HOT-SPOTS - EVENING

    Installation of Flexi-poles to eliminate Q-jumping

  • 8/10/2019 ITS Omar Ppt

    47/60

    Identifying Accident Prone Locations

  • 8/10/2019 ITS Omar Ppt

    48/60

  • 8/10/2019 ITS Omar Ppt

    49/60

    EVENT MANAGEMENT

    ASEAN Summit

  • 8/10/2019 ITS Omar Ppt

    50/60

    ASEAN Summit

  • 8/10/2019 ITS Omar Ppt

    51/60

    ASEAN Summit

  • 8/10/2019 ITS Omar Ppt

    52/60

    ASEAN Summit

  • 8/10/2019 ITS Omar Ppt

    53/60

    ASEAN Summit

  • 8/10/2019 ITS Omar Ppt

    54/60

    Taxis parked

    day before as

    well

    National Day (Hari Kebangsaan)

  • 8/10/2019 ITS Omar Ppt

    55/60

    30 August 2005: 1:40PM

    KL Marathon

  • 8/10/2019 ITS Omar Ppt

    56/60

    KL Marathon

  • 8/10/2019 ITS Omar Ppt

    57/60

    ROAD MAP THE WAY FORWARD

  • 8/10/2019 ITS Omar Ppt

    58/60

    ROAD MAP THE WAY FORWARD

    Road Map for the Long Term Development of the TMC

  • 8/10/2019 ITS Omar Ppt

    59/60

    Inception Period /

    Develop Multi-Agency

    Working Platforms.

    Move to Commandand Control of Road

    Traffic / Develop field

    presence

    Move to Multi-ModalTransport Operations

    Develop into Regional

    Transport Centre

    Develop into National

    Transport Centre

    National Aspiration .. World class Transport Management Centre

    Thank You