What is the role of ITS in the emerging public/private partnership transportation

market in Georgia?

20100624 ITS Georgia Monso_Julia V1.1.ppt

ITS Deployment & Operations in P3 Agreements

Page 2: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

Agenda

ACS-Dragados

ITS within the MLSP

P3: Advantages

I-595 Corridor Roadway Improvement Project

I-595 ITS Requirements

I-595 ITS Architecture

P3: Main Characteristics

Project Delivery Options

Page 3: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

ACS-Dragados

Page 4: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

Project Delivery Options

Several Project Delivery options are currently available:

Design-Build (DB): Design and Build are tendered together based on a preliminary design

Design-Bid-Build (DBB): Predominant highway delivery method, where Build is tendered based on a complete design.

Design-Build-Finance (DBF): the responsibility for completing design and construction is transferred to the private sector contractor, who is also responsible for raising private financing to fund construction.

Design-Build-Finance-Operate-Maintain (DBFOM): a private concessionaire is responsible for completing design and construction, raising private finance to fund construction of the project assets, and retaining long-term responsibility for operating and maintaining the facility. Payment deductions are applied for poor performance of the asset during the concession period.

Page 5: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

P3: Main characteristics

A Public Private Partnership (P3) defines a long-term performance based contract between public agency and a private partner to deliver public infrastructure.

Several of the key elements inherent to this approach are as follows:

Long-term contract between public and private sectorIt changes the risk profile of the public sectorAccelerates infrastructure projects deemed impractical under traditional fundingWell developed international toolPrivate sector provides design, construction, financing and operations of a Public Infrastructure

Page 6: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

P3: Advantages

It provides some significant advantages over other approaches

Value for money over project life cycle Optimum Risk Transfer Increases public liquidity, attract international investment and

decreases reliance on traditional funding Level of Operations and Maintenance Service Improves accountability Allows public focus on core functions Introduces Innovation and efficiency

Page 7: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

Schedule and Cost certainty is one of the most significant advantages, as the lenders would have their own due diligence process in place in order to ensure that construction milestones are certified and payments made on schedule by the Project Sponsors.

0%10%20%30%40%50%60%70%80%90%

100%

HMT PPP Research NAO PPP Research Non-PPP Experience

On Time or early Late

P3: Advantages

United Kingdom Treasury and National Audit Office compared the delivering performance of DBB and DBFOM project delivery options used in theirprograms

Source: United Kingdom HM Treasury, “PFI: Meeting the Investment Challenge,” July 2003

Page 8: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

ITS within the MLSP

Georgia Department of Transportation’s (GDOT’s) Managed Lane System Plan (MLSP) that began in January 2007 sets an impressive plan for bringing Managed Lanes to Atlanta.The MLSP is the first comprehensive system-wide evaluation of urban area Managed Lanes performed in the United States.The Managed Lanes system for metro Atlanta has the potential to be bigger and bolder than any other Managed Lanes system in the country.Operating Managed Lanes in a urban environment highlights not only the importance of the ITS function but it especially underlines the necessity to integrate the different ITS applications

Page 9: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

ITS within the MLSP

The scope of both Public and the Private partners when delivering, integrating, operating and maintaining the ITS system can be very diverse, but it needs to be aligned to the risk profile of each of the parties.The risk profile is defined as the effect of uncertainty on being able to meet the obligations of each of the parties.The risk profile should be based on the following assumptions:

o No party shall be required to assume a risk which is directly or indirectly related to the performance of the other party

o Risk should be borne by the party best placed to manage that risk

o Private Capital will focus on ensuring that the split of risks between Government and the Private sector are fair and equitable

Page 10: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

ITS within the MLSP

TMCVMS CCTV LCS PWZ

TMCVMS CCTV LCS PWZ

COMMSHUB

Multiple options can be considered, but the Concession Agreement needs to establish clear and concrete requirements

Device control and permissions?

Mandatory or optional?

Location criteria?

Integration Requirements?Service Level Agreements?Alignment to CA?

Public Agency

Private Partner

Page 11: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 Corridor Roadway Improvement Project

The project takes place in central Broward County, Florida and consists of the reconstruction, addition of auxiliary lanes and resurfacing of the I-595 mainline, and a new reversible Managed Lanes system in the I-595 median.

The project limits extend for 10.5 miles, and have a design and construction cost of approximately $1.2 billion.

The project improvements will be implemented as part of a public private partnership (P3) with I-595 Express, LLC, who was awarded the contract to serve as the Concessionaire to design, build, finance, operate and maintain (DBFOM) the project for a 35 year term

Page 12: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 Corridor Roadway Improvement Project

Page 13: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 Corridor Roadway Improvement Project

Major improvements are proposed for the mainline interchanges to eliminate friction in the outer lanes caused by merge, diverge and weaving segments along the mainline.  This will be accomplished by providing auxiliary lanes, continuous collector-distributor roadways, and braided ramps

Page 14: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Requirements

The Concessionaire shall assume the responsibilities of all of the existing ITS operations on I-595 corridor within the Project Limits from the date of NTP-2

The ITS operations shall include, but not be limited to, the Concessionaire’s I-595 TMC operations located at the SMART SunGuide TMC, the Road Ranger Service Patrols, the Severe Incident Response Vehicles (SIRV) and the Broward County Freeway Traffic Incident Management (TIM) Team.

Page 15: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Requirements

When it is no longer feasible to operate the existing I-595 ITS infrastructure due to the impacts from the Design Work and Construction Work, the Concessionaire shall deploy a portable work zone and wireless communication based Interim Traffic Management System (ITMS) during the construction.

Page 16: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Requirements

Page 17: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Requirements

Page 18: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Architecture

Page 19: ITS Georgia | June 24 2010 What is the role of ITS in the emerging public/private partnership transportation market in Georgia? 20100624 ITS Georgia Monso_Julia.

ITS Georgia | June 24 2010

I-595 ITS Architecture