ITP - Concrete Works.pdf

download ITP - Concrete Works.pdf

of 2

description

itp

Transcript of ITP - Concrete Works.pdf

  • 5/24/2018 ITP - Concrete Works.pdf

    1/2

    1 2 3 4

    1

    1.1 R R R R/S

    1.2 R R R R/S

    1.3 W R R R/S

    2

    2.1 Standards&

    Specifications S S S S

    2.2 S S S S

    2.3 S S S S

    2.4 W W W S/R

    2.5 R R R R

    2.6 W W W S

    2.7 W W W S/R

    2.8 W W S S/R

    3

    3.1 ApprovedDrawings

    R R R R

    3.2 Approved

    Drawings H W S S

    3.3 Approved

    Drawings H W S S/R

    S.No

    1.ConstructionContractor

    2.MainContractor

    3.ThirdPartyInspetion

    Sphinx ConstructionofIlmeniteSmelterPlant,JazanEconomicCity,KSA

    Inspection&TestPlanforConcreteWorks

    NasserS.AlHajriCorp

    Outotec

    TheNationalTitaniumDioxideCompanyLtd.(Cristal)

    H=HoldPoint

    R=RecordReview

    4.Client/Owner

    W=WitnessPoint

    I=Inspection

    ChecktheSlumptestonetestpertruck.

    Ensurenowaterisaddedtoconcreteonsite.

    Drawingsare

    approved

    and

    at

    correct

    revision.

    Reinforcement is to the correct size, shape, bent to the correct radius and is clean of

    looserustandmillscale.

    MaterialApproval

    S=Surveillance

    FormworkandReinforcementInspected.

    Vibrationcarriedoutcorrectlyasrequirement.

    MethodStatement

    Submittals

    ReinforcementSteelSupplier,ConcreteSupplierandConcreteMixDesignetc.

    Testing

    EnsureConcreteplacementrestrictionsregardingtemperature,conditionsandtime.

    Pre PourInspection

    InspectionsAcceptabilityCriteria

    FrequencyifApplicable

    Description

    Ensure Laboratory Technicians are on site with the correct instrument for Sampling

    andTesting.

    Ensurelocation

    is

    accessible

    for

    Concrete

    Placement

    and

    Pumps.

    Ensure the 7 days and 28 days Cubes test reach the compressive strength

    requirement.

    Permeabilitytestaretobecarriedoutwithinitialsurfaceabsorbilitytestsofconcrete.

    NasserS.AlHajriCorp ITP002Rev.0

  • 5/24/2018 ITP - Concrete Works.pdf

    2/2

    1 2 3 4S.No

    1.ConstructionContractor

    2.MainContractor

    3.ThirdPartyInspetion

    Sphinx ConstructionofIlmeniteSmelterPlant,JazanEconomicCity,KSA

    Inspection&TestPlanforConcreteWorks

    NasserS.AlHajriCorp

    Outotec

    TheNationalTitaniumDioxideCompanyLtd.(Cristal)

    H=HoldPoint

    R=RecordReview

    4.Client/Owner

    W=WitnessPoint

    I=Inspection

    S=Surveillance

    InspectionsAcceptabilityCriteria

    FrequencyifApplicable

    Description

    3.4 Approved

    Drawings H W S R

    3.5 Approved

    Drawings H W S S

    3.6 Approved

    Drawings H W S S

    3.7 Approved

    Drawings H W S S

    3.8

    Approved

    Drawings W S S R/S

    3.9 Approved

    Drawings H W S R/S

    3.1 Approved

    Drawings H W S R/S

    4

    4.1

    AsPer

    Standard&

    Specification

    S S R R/S

    4.20 S S R R/S

    4.30 W I/W R R/SEnsureConcreteRepairpriortocoverup.

    Ensurecuringofconcretefor aminimumperiodof7days.

    Coordinatesanddatumarecorrect.

    Formworkisdimensionallycorrectandinaccordancewithapprovedconstruction

    drawings.

    EnsureExpansionjointsandConstructionjointsareformedcorrectlywhererequired.

    Post PourActivities

    Reinforcementconcretecovermeetstheminimumrequirementofapproved

    drawingsand

    specification.

    Ensurewaterstopperareinstalled(ifrequired)atconstructionjoints.

    Formworkshallberemovedafter24hours,providedconcretehardenedsufficiently.

    Ensure the Reinforcement is installed as per approved design drawings, tied correctly

    andsupportedbyapprovedspacers/supports.

    Ensure all insert plates shall be of the material and size as shown on the drawings and

    standards.

    NasserS.AlHajriCorp ITP002Rev.0