ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

14
ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Transcript of ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Page 1: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

ITK Car Rental Inc.

Team Members:

Billy Lim (Project Manager)

Jane Doe (System Analyst)

Etc.

Page 2: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Table of Contents

• Milestone 1 ………………………..…..…………………..... p. 1

– Project Charter ………..……………………………….….. p. x– Stakeholder Analysis ……………...……………………... p. x– Summary List of Essential Use Cases …………………. p. x– Use Cases and Preliminary User Interfaces

• Logon …………………………………………………... p. x• Etc.

– Work Breakdown Structure ………………………………. p. x– Project Schedule/Timeline ….……………………………. p. x– Project Risk and Feasibility ………………………………. p. x– Environment ………………….……………………………. p. x

• Milestone 2 …

Page 3: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Milestone 1

Page 4: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Project Charter

• Need

• Objective

• Benefits

• System Capabilities

Page 5: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Stakeholder Analysis

Page 6: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Summary List of Use Cases

1. Log onto the System2. Remember User Signon 3. Make Vehicle Reservation4. Release Vehicle 5. Return Vehicle6. Process Customer Feedback7. Customer wants to extend rental period8. …9. Log off the System Wrong format! Instead, say:

“Adjust Rental Period”This is the right format and it is more generic (allows one to extend or cut short (with penalty perhaps) a rental)

Involves setting a cookie

Page 7: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

1. Log onto the System

• Summary– …

• Actors

• Preconditions

• (“Sunny Day”) Descriptions

• (“Rainy Day”) Exceptions

• Postconditions

Page 8: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

User Interface for “Log onto the System”

ITK

Logon

Page 9: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

2. Remember User Signon

• Summary– …

• Actors

• Preconditions

• (“Sunny Day”) Descriptions

• (“Rainy Day”) Exceptions

• Postconditions

Page 10: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

User Interface for “Remember User Signon”

ITK

If checked,cookie is set on this machine.

Page 11: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Work Breakdown Structure

• Refer to Figure 3-10

Page 12: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Project Schedule/Timeline

• Tasks with timeline

Page 13: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Project Risk and Feasibility

• Address all the risk and feasibilities issues – Risk to project– Feasibilities

• Organizational and Cultural • Technological • Schedule• Resource• Economic

Page 14: ITK Car Rental Inc. Team Members: Billy Lim (Project Manager) Jane Doe (System Analyst) Etc.

Environment

• Tools

• Technologies