Item 204 – Portland Cement Stabilized Road Mix
-
Upload
jomar-paul-romero -
Category
Documents
-
view
250 -
download
6
Transcript of Item 204 – Portland Cement Stabilized Road Mix
![Page 1: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/1.jpg)
Item 204 – Portland Cement Stabilized Road Mix Base Course
![Page 2: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/2.jpg)
204.1 Description
• Foundation for surface source
- soil-aggregate
- Portland Cement
- Water
• In proper proportions
![Page 3: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/3.jpg)
204.2 Materials Requirements
• Soil Aggregate
-conforms to Subsection 203.2.1
• Portland Cement
- conforms to Item 700
• Water
- conforms to Item 714
![Page 4: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/4.jpg)
204.2 Materials Requirements
• Proportioning
- amount of cement added to soil-aggregate is from 6 – 10 mass percent of dry soil.
- exact percentage shall be fixed by the Engineer based on preliminary tests and trial mixes.
• Strength Requirements
- conforms to Subsection 203.2.5
![Page 5: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/5.jpg)
204.3 Construction Requirements
• prescribed under Subsections 203.3.1 through 203.3.10.
• in all cases, “lime” shall be deleted and replaced with “Portland Cement”
![Page 6: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/6.jpg)
204.4 Method of Measurement
• PC Stabilized Road Mix Base Course
- in cubic meter
• Quantity to be paid shall be the design volume
• No allowance shall be given for mat’ls placed outside the design limit
• Trial sections shall be included
![Page 7: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/7.jpg)
204.5 Basis of Payment
• Paid for at the Contract Unit Price for PC Stabilized Road Mix Base Course
• Full furnishing, all labor, equipment, tools and incidentals are included.
![Page 8: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/8.jpg)
Item 205 – Asphalt Stabilized Road Mix Base Course
![Page 9: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/9.jpg)
205.1 Description
• Foundation for Surface Course
- soil-aggregate
- asphaltic material
![Page 10: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/10.jpg)
205.2 Material Requirements
• Soil-aggregates
- conforms to Item 703, Gradation A or B shall be used
• Asphaltic Material
- Anionic or Cationic Emulsified Asphalt, conforms to Item 702
![Page 11: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/11.jpg)
205.2 Material Requirements
• Proportioning
- 4 – 7 mass percent of the dry soil-aggregate.
- exact percentage shall be fixed by the Engineer
• Strength Requirements
- conforms to Subsection 203.2.5
![Page 12: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/12.jpg)
205.3 Construction Requirements
• Prescribed under Subsections 306.3.1 through 306.3.7
• In all cases, the word “aggregate” shall be deleted and replaced by “Soil-aggregate”
• Trial sections shall conform to Subsection 200.3.4
• Allowable tolerance shall be in accordance with Subsection 201.3.5
![Page 13: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/13.jpg)
205.4 Method of Measurement
• Asphalt Stabilized Road Mix Base Course
- in cubic meters
• No allowance to be given for mat’ls placed outside the design limits
• Trial sections are included in the quantity
![Page 14: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/14.jpg)
205.5 Basis of Payment
• Paid for at the Contract Unit Price for Asphalt Stabilized Road Mix Based Course
• Full furnishing, all labor, equipment, tools and incidentals are included.
![Page 15: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/15.jpg)
Item 206 – Portland Cement Treated Plant Mix Base Course
![Page 16: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/16.jpg)
206.1 Description
• Foundation for surface source
- soil-aggregate
- Portland Cement
- Water
mixed by a travel plant or in a central plant
• In proper proportions
![Page 17: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/17.jpg)
206.2 Materials Requirements
• Same as 204.2.1 to 204.2.5
![Page 18: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/18.jpg)
206.3 Construction Requirements
• Weather Limitations
- PC shall not be applied during windy, rainy, or impending bad weather.
• Travel Plant Method
- new soil aggregate shall be pulverized until 80 mass percent can pass through No.4 sieve
- Mat’ls retained on 50 mm sieve shall be removed
![Page 19: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/19.jpg)
206.3 Construction Requirements
• Travel Plant Method
- subgrade/subbase shall support all equip required in the construction of the base course
- soil-aggregate to be treated be placed in a uniform windrow
- specified quantity of PC shall be applied uniformly
![Page 20: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/20.jpg)
206.3 Construction Requirements
• Travel Plant Method
- mixing shall be accomplished by means of a mixer
- maximum of 2 hrs shall be permitted for wet mixing, laydown, and finishing
• Central Plant Method
- soil-aggregate shall be proportioned and mixed with cement and water in a central mixing plant.
![Page 21: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/21.jpg)
206.3 Construction Requirements
• Spreading, Compacting and Finishing
- mixture shall be spread on a prepared and moistened subgrade/subbase
-no more than 60 mins shall elapse between start of mixing and start of compaction
- after spreading, compaction then finishing
![Page 22: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/22.jpg)
206.3 Construction Requirements
• Protection, Curing and Maintenance
- completed cement shall be cured with a bituminous curing seal
• Trial Section
- same as 203.3.8
• Tolerances
- same as 203.3.9
• Traffic
- same as 203.3.10
![Page 23: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/23.jpg)
206.4 Method of Measurement
• PC Treated Plant Mix Base Course
- in cubic meter
• Quantity to be paid shall be the design volume
• No allowance shall be given for mat’ls placed outside the design limit
• Trial sections shall be included
![Page 24: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/24.jpg)
206.5 Basis of Payment
• Paid for at the Contract Unit Price for PC Treated Plant Mix Base Course
• Full furnishing, all labor, equipment, tools and incidentals are included.
![Page 25: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/25.jpg)
Item 207 – Aggregate Stockpile
![Page 26: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/26.jpg)
207.1 Description
• Furnishing and placing aggregate in stockpiles
![Page 27: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/27.jpg)
207.2 Materials Requirements
• Conform to all requirements of specified Item Number
• Test for acceptance at the source
![Page 28: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/28.jpg)
207.3 Construction Requirements
• shall be graded, shaped and compacted to a uniform cross section
• In accordance with Clause 65 and 67
![Page 29: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/29.jpg)
207.4 Method of Measurement
• Aggregate Stockpile
- in cubic meter
![Page 30: Item 204 – Portland Cement Stabilized Road Mix](https://reader035.fdocuments.in/reader035/viewer/2022081716/5517b62b49795933228b4c95/html5/thumbnails/30.jpg)
207.5 Basis of Payment
• Paid for at the Contract Unit Price for Aggregate Stackpile