INTRODUCTION TO PROJECT ONE (A)

• To study and investigate the use of the drawings as a means of communication

• To research on the types and function of drawings, stages and examples of drawings of a quantity surveyor used to communicate ideas and presentations.

Page 3: Itd project one (a) 4 m

WHAT IS A QUANTITY SURVEYOR?

A Quantity Surveyor is an expert in the art of costing a building at all its stages.

Page 4: Itd project one (a) 4 m

ROLES OF A QUANTITY SURVEYOR

• Estimate materials, time and labour costs.• Preparing, negotiating and analysing costs for tenders and contracts.

Page 5: Itd project one (a) 4 m

QUANTITY SURVEYING WORK PROCESS

Page 6: Itd project one (a) 4 m

1. FEASIBILITYAND

ESTIMATING

Page 7: Itd project one (a) 4 m

2. DESIGN

Page 8: Itd project one (a) 4 m

3. CONTRACT MANAGEMENT

Page 9: Itd project one (a) 4 m

4. CONSTRUCTION

Page 10: Itd project one (a) 4 m

QUANTITY SURVEYING DRAWINGS

Page 11: Itd project one (a) 4 m

BILLS OF QUANTITIES

• Describes the quality and quantity of work to be carried out during the construction stage.

Page 12: Itd project one (a) 4 m

PURPOSE OF BQ

• Provides a basis for valuation of variations to the work

• Provides good basis for cost analysis• Can be used by contractors

Page 13: Itd project one (a) 4 m

FORMATS OF BQ

• Elemental Bills• Trade Bills• Annotated Bills• Operational Bills• Activity Bills

Page 14: Itd project one (a) 4 m

ELEMENTAL BILLS

Page 15: Itd project one (a) 4 m

TRADE BILLS

Page 16: Itd project one (a) 4 m

EXAMPLES OF BILLS OF QUANTITIES

Page 17: Itd project one (a) 4 m
Page 18: Itd project one (a) 4 m

STAGES OF BQ PREPARATION

TAKING OFFTAKING OFF

SQUARINGSQUARING

ABSTRACTINGABSTRACTING

BILLINGBILLING

BILLING DIRECTBILLING DIRECT

Page 19: Itd project one (a) 4 m

DEVELOPMENT OF THE STAGES

DRAWINGDRAWING DIMENSIONPAPER

DIMENSIONPAPER

BILLINGPAPER

BILLINGPAPER

BILL OF QUANTITIES

(BQ)

BILL OF QUANTITIES

(BQ)

TAKING OFFSQUARING

DIRECT BILLING

Page 20: Itd project one (a) 4 m

CONTENTS OF BILL OF QUANTITIES

BILL NR. 1BILL NR. 1 PRELIMINARIESPRELIMINARIES

BILL NR. 2BILL NR. 2 PREAMBLESPREAMBLES

BILL NR. 3BILL NR. 3 MEASURED WORKSMEASURED WORKS

BILL NR. 4BILL NR. 4 PROVISIONAL QUANTITIESPROVISIONAL QUANTITIES

BILL NR. 5BILL NR. 5 PRIME COST & PROVISIONAL SUMPRIME COST & PROVISIONAL SUM

BILL NR. 6BILL NR. 6 CONTINGENCY SUMCONTINGENCY SUM

BILL NR. 7BILL NR. 7 GENERAL SUMMARYGENERAL SUMMARY

Page 21: Itd project one (a) 4 m

Mono-pitched roofPitched roof details

BILL NR. 3BILL NR. 3 MEASURED WORKSMEASURED WORKS

(a). Carcass – I.Foundations II.Frame III.External & Internal WallsIV.Partitions V.FloorsVI.Roofs

Page 22: Itd project one (a) 4 m

Example of an internal finishes schedule

(b). Finishing(c). External works (d). Spot items

Example of a door drawing

Page 23: Itd project one (a) 4 m

CONCLUSION• A quantity surveyor plays an

important role in the construction industry.

Page 24: Itd project one (a) 4 m

REFERENCES• Quantity Surveyor's Pocket Book (Second

Edition) by Duncan Cartlidge, published by Routledge Taylor & Francis Group, 2013

• Construction Quantity Surveying: A Practical Guide for the Contractor’s QS by Donald Towey, published by Wiley-Blackwell, 2012

• http://www.idealplanningdesign.co.uk/services/quantity-surveying

• http://www.nziqs.co.nz/about/whatis.html