IT Project Details

download IT Project Details

of 77

Transcript of IT Project Details

  • 8/17/2019 IT Project Details

    1/77

    ................................................

    ................................................

    ................................................

    ................................................

    RFP for Supply, Installation & Commissioning of  various IT hardware & Installation of Campus Wide Area etwor!ing & Providing Internet "andwidth &

    #peration and $aintenan%e servi%es in various AP$Cson "ehalf of har!hand State Agri%ultural $ar!eting

    'oard, har!hand(

    …………………………………………………..

    Pre-bid meeting :xx.0.2016 on 1500hours

    Last Date of Submission

    of Bid :

    xx.0.2016 till 1500

    hours

    Last Date of Submission of Bid Processing Fees & EMD:xx.0.2016 till 1500 hours

    Date of Opening of Bid : xx.0.2016 at 1700 hours

    Bid Processing Fee: Rs. 5,000

  • 8/17/2019 IT Project Details

    2/77

     Te!ar"and State #gricu$tura$ Mar"eting Board%ereinafter referred to as 'tetenderer()% intends toin*ite o+ers troug E-tendering route for Suppl, !nstallation" #o$$issioning o% &arious !' hard(are "!nstallation o% #)*+ #a$pus )ide *rea +et(or-ing " Pro&iding !nternet/and(idth " pro&iding operation and aintenance ser&ices in 1 +os o% *P#s on /ehal% o% har-handState *gricultural ar-eting Board,across te

     har-handState, 'ender +o. 3333333333.

    4ligi/ilit #riteria %or the /idder:

    , Bidder sou$d be .T S/stem .ntegrator% .ncorporated in !ar"and and sou$d be inexistence for at $east 0 /ears as on 1st Marc 234, attac cop/ of 5erti6cate of .ncorporation)

    2, Bidder must a*e an a*erage turno*er of 7s, 1 5rores or more in te $ast tree/ears, attac copies of audited ba$ance seet),

    1, Bidder sou$d a*e $oca$ presence in at $east tree to8ns of !ar"and in te form of 'Ser*ice O9ce( across !ar"and,

    , Te bidder sou$d a*e executed at $east one order 8ort 7s, 5r in te $ast 1/ears,

    4, Te bidder must be a $icensed .SP in te state of !ar"and for at $east 4 /ears,

    0, Bidder must ensure tat te 8arrant/ support & ser*ice sou$d be a*ai$ab$e up tode$i*er/ $ocations to pro*ide repairing cum rep$acement ser*ices of fau$t/e;uipments 8itin < rs,

    =, Bidder sou$d attac #utori>ation certi6cate from te OEMs ;uoted e;uipment) topro*e tat te/ are autori>ed dea$ers ? ser*ice pro*iders 8o can ensure re$iab$eafter sa$es support,

    edsignator/ of te compan/ needs to be submitted in tis regard,

    2,Te bidder or an/ of its a9$iates sou$d not be in*o$*ed in pro*iding consu$tanc/ser*ices for te preparation or imp$ementation of tis proect,

    +ote:

    1. Bidders 8o 8is to participate in tis bid 8i$$ a*e to register on ttps:CCCCC,,Furter bidders 8o 8is to participate in on$ine bids 8i$$ a*e toprocure Digita$ 5erti6cate as per .nformation Tecno$og/ #ct 2333 using 8icte/ can sign teir e$ectronic bids, Bidders can procure te same from n) codeso$utions ,% or an/ oter agenc/ $icensed b/ 5ontro$$er of 5ertif/ing #utorit/%

    https://gil.nprocure.com/https://gil.nprocure.com/https://gil.nprocure.com/https://gil.nprocure.com/

  • 8/17/2019 IT Project Details

    3/77

    o*t, of .ndia, Bidders 8o a$read/ a*e a *a$id Digita$ 5erti6cate need notprocure a ne8 Digita$ 5erti6cate,

  • 8/17/2019 IT Project Details

    4/77

    'he 'er$s and #onditions are as %ollo(s:

     Te $ast date of submission of bid on te 8ebsitehttps:........................... .co$  is =33 rs xx.0.2015.+o phsical /ids(ill /e accepted under nor$al circu$stances, o8e*er% te tendererreser*es te rigt toas" te bidders to submit te bid and?or an/ oterdocuments in p/sica$ form,

    2  Te bid is non-transferab$e,

    1 Bidders are re;uired to mention Ma"e and Mode$ of te products ;uoted,

     Te bidder 8i$$ a*e to supp$/% insta$$ and pro*ide training for ard8are% soft8areand peripera$s% pro*ide internet band8idt and carr/ out L#G cab$ing at *arious#PM5s $ocated a$$ across !ar"and,

    4  Te bidder 8i$$ ;uote for te fo$$o8ing:

    i, Supp$/ insta$$ation and commissioning of te $isted ard8are,

    ii, Supp$/ insta$$ation and commissioning and maintenance of .nternetband8idt, Primar/ Lin" Mbps :) H Secondar/ Lin" 2 Mbps :) forte fu$$ 6*e /ear period,

    iii,  Training and ando$ding of #PM5s for te 6rst six monts,i*, Supp$/ of manpo8er to support te ser*ices on-site for 4 /ears,

    0 .n case te ;uoted .tem is not a*ai$ab$e in te mar"et% te bidder 8i$$ a*e tosupp$/ iger Iersion of tat same at te ;uoted price in te same 8it priorappro*a$ of te tenderer,

    =  Te Bidder sa$$ bear a$$ te costs associated 8it te preparation andsubmission of its bid% and te tenderer in no case 8i$$ be responsib$e or $iab$e for

    tese costs% regard$ess of conduct or outcome of bidding process,

    <  Te bidder as to up$oad te comp$iance $etter on its $etter ead du$/ signed b/te autori>ed signature and oter supporting documents as as"ed for in te bidin scanned format, Fai$ing to submit te same or non-comp$iance from an/ bidterms and conditions% e$igibi$it/ criteria or tecnica$ speci6cations ma/ resu$t inreection of te bid,

    @  Te Bidder as to examine a$$ instructions% forms% terms% conditions andspeci6cations in te bidding documents, Fai$ure to furnis a$$ information re;uiredb/ te bidding documents or submission of a bid not substantia$$/ responsi*e tote biding documents in e*er/ respect 8i$$ be at te BidderJs ris" and ma/ resu$t

    in reection of its bid,3 #mendment of Bidding Documents 5orrigendum)

    #t an/ time prior to te dead$ine for submission of bids% te tenderer ma/% foran/ reason% 8eter its o8n initiati*e or in response to te c$ari6cation re;uestb/ a prospecti*e bidder% modif/ te bidding documents,

     Te corrigendum 8i$$ be pub$ised on te 8ebsiteCCCCCC,, .n order to a$$o8 prospecti*e bidders reasonab$e time to ta"e into consideration

    te amendments 8i$e preparing teir bids te tenderer% at its discretion% ma/extend te dead$ine for te submission of bids,

    Bid 5urrenc/  Prices sa$$ be ;uoted in .ndian 7upees on$/,

    2  Te Bidder 8i$$ a*e to submit te +on8re%unda/le Bid Processing Fees o% Rs. 5,0008 and 4arnestone 9eposit 4..9. o% 2 o% the 'ender;alue in the %or$ o% Ban- 9ra%tBan-

  • 8/17/2019 IT Project Details

    5/77

    #o$$issioning o% &arious !' hard(are " !nstallation o% #)*+ #a$pus)ide *rea +et(or-ing in *P#s " Pro&iding !nternet /and(idth "pro&iding operation and aintenance ser&ices in &arious *P#s on/ehal% o% har-hand State *gricultural ar-eting Board, Ranchi acrossthe har-hand State.>

    • Bid processing fees must be in te form of Demand Draft in te name of 

    'xxxxxxxxxxxxxxxxxxxxxxx,( pa/ab$e at CCCCCCCCCCCC, a$ong 8itte co*ering $etter,

    • EMD as mentioned abo*e% sa$$ be submitted in te form of Demand Draft ?Rin te form of an unconditiona$ Ban" uarantee 8ic sou$d be *a$id up to*a$idit/ of bid H @3 da/s) of #$$ Gationa$i>ed Ban" inc$uding te pub$ic sectorban" or Pri*ate Sector Ban"s or 5ommercia$ Ban"s or 5o-Operati*e Ban"s and7ura$ Ban"s as per te ,7, no,CCCCCCCCCCCCCCCCCCCCC,issued b/ Finance Department orfurter instruction issued b/ Finance department time to time in te name of 'xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx( pa/ab$e at ,,,,,,,,,,,,,,,,,,,,,,, as perprescribed format gi*en at CCCCCCCCCCCCCC,,) and must be

    submitted a$ong 8it te co*ering $etter,

    • P$ease a9x te stamp of /our compan/ on te o*er$eaf of demand draft,2 .n case of non-receipt of Bid Processing fees and EMD as mentioned abo*e 8itin

    prescribed time te bid 8i$$ be reected b/ te tenderer as non-responsi*e,

    1 Ansuccessfu$ ? Dis;ua$i6ed bidderJs E,M,D, 8i$$ be returned as prompt$/ aspossib$e but not $ater tan 4 da/s after te expiration of te period of bid*a$idit/ O7 upon te successfu$ Bidder signing te 5ontract% and furnising tePerformance Ban" uarantee K 3 of te tota$ order *a$ue as prescribed b/ tetenderer% 8ice*er is ear$ier,

    .n exceptiona$ circumstances% te tenderer ma/ so$icit te BidderJs consent to anextension of te period of *a$idit/, Te re;uest and te responses tereto sa$$be made in 8riting, # Bidder ma/ refuse te re;uest 8itout forfeiting its E,M,D,# Bidder granting te re;uest 8i$$ not be permitted to modif/ its bid,

    15  Te Successfu$ bidder as to submit Performance Ban" uarantee K 3 of tota$order *a$ue 8itin 4 da/s from te date of issue of Purcase order %or theduration o% 66 $onths from #$$ Gationa$i>ed Ban" inc$uding te pub$ic sectorban" or Pri*ate Sector Ban"s or 5ommercia$ Ban"s or 5o-Operati*e Ban"s and7ura$ Ban"s as per te ,7, no, CCCCCCCCCCC

    0 Successfu$ bidders 8i$$ a*e to sign te contract upon recei*ing te PurcaseOrder 8it te purcasers) 8itin 4 8or"ing da/s from te date of PurcaseOrder,

    =  Te successfu$ BidderJs E,M,D, 8i$$ be returned upon te Bidder signing te5ontract% and furnising te Performance Ban" uarantee K 3 of te tota$order *a$ue and o+er of inspection of te ordered materia$ or after comp$etion of bid *a$idit/ 8ice*er is $ater,

    <  Te E,M,D, ma/ be forfeited:

    a) if a Bidder 8itdra8s its bid during te period of bid *a$idit/,

    b) .n case of a successfu$ Bidder% if te Bidder fai$s:

    i) To sign te contract as mentioned abo*e or

    ii) To furnis performance ban" guarantee as mentioned abo*e or

    iii) .f te bidder is found to be in*o$*ed in fraudu$ent practices,@  Termination for Defau$t:

    @, Te Purcaser ma/% 8itout preudice to an/ oter remed/ for breac of contract% b/ 8ritten notice of defau$t sent to te Bidder% terminate te5ontract in 8o$e or part:

    a) if te bidder fai$s to de$i*er an/ or a$$ of te oods 8itin 0 (or-ing das in1 *P#s from te date of purcase order% or 8itin an/ extensiontereofgranted b/ te Purcaser or

  • 8/17/2019 IT Project Details

    6/77

    b) if te Bidder fai$s to perform an/ oter ob$igations) under te5ontract?Purcase order,

    c) .f te Bidder% in te udgment of te Purcaser as engaged in corrupt orfraudu$ent practices in competing for or in executing te 5ontract,

    For te purpose of tis c$ause:

    '5orrupt practice( means te o+ering% gi*ing% recei*ing or so$iciting of an/ting of *a$ue of inuence te action of a pub$ic o9cia$ in te procurementprocess or in contract execution,

    'fraudu$ent practice : a misrepresentation of facts in order to inuence aprocurement process or te execution of a contract to te detriment of tepurcaser% and inc$udes co$$usi*e practice among Bidders prior to or after bidsubmission) designed to estab$is bid prices at arti6cia$ non-competiti*e $e*e$sand to depri*e te purcaser of te bene6ts of free and open competitionN(

    @,2 .n te e*ent te Purcaser terminates te 5ontract in 8o$e or in part%pursuant to 5$ause @, abo*e% te Purcaser ma/ procure% upon suc termsand in suc manner% as it deems appropriate% oods or Ser*ices simi$ar totose unde$i*ered% and te Bidder sa$$ be $iab$e to te Purcaser for an/excess costs for suc simi$ar oods or Ser*ices, o8e*er% te Bidder sa$$

    continue te performance of te 5ontract to te extent not terminated,

    23 Price sa$$ be inc$usi*e of a$$ freigt% for8arding% transit insurance and insta$$ationcarges,

    2 Prices sa$$ be inc$usi*e of Excise Duties, Te prices sa$$ strict$/ be submitted inte gi*en format, uoted prices sa$$ be inc$usi*e of a$$ taxes except 5,S,T, ? I#T ?Ser*ice Tax, Te tax components $i"e 5,S,T, ? I#T ? Ser*ice Tax as app$icab$e sa$$be mentioned separate$/ in te respecti*e co$umns,

    22 Late Bids  Te bidder 8i$$ not be ab$e to submit te bid after 6na$ submissiondate and time,

    21 Modi6cation and itdra8a$ of Bids

    21, Go bids 8i$$ be a$$o8ed to be modi6ed subse;uent to te 6na$ submission of bids,

    21,2 Go bid 8i$$ be a$$o8ed to 8itdra8n in te inter*a$ bet8een te dead$ine forsubmission of bids and te expir/ of te bid *a$idit/, itdra8a$ of a bid duringtis inter*a$ 8i$$ resu$t in te forfeiture of bidderJs E,M,D,

    2 Bids 8i$$ be opened 8it te bu/erJs pri*ate digita$ "e/ in te presence of BidderJs representati*es% 8o coose to attend, Te BidderJs representati*es8o are present sa$$ sign a register ? attendance seet e*idencing teirattendance, Te representati*e 8i$$ be e$d responsib$e for a$$ commitments

    made on bea$f of te bidder and tat 8i$$ be considered *a$id for a$$ furterdea$ings re$ated to tis tender process, .n te absence of te bidders)% tetender committee ma/ coose to open te bids as per te prescribed scedu$e,

    24 Te BidderJs names% Bid modi6cations or 8itdra8a$s% discounts and tepresence or absence of re$e*ant E,M,D, and suc oter detai$s as CCCCCCC,o9cers) at teir discretion% ma/ consider appropriate% 8i$$ be announced at teopening,

    26 4&aluation o% the Bids: #fter te c$osing time of submission% tender committee8i$$ *erif/ tesubmission of Bid Processing Fees and EMD as per bid terms andconditions, Te e$igibi$it/ criteria e*a$uation 8i$$ be carried out of te responsi*e

    bids, Te tecnica$ bids of te bidders 8o are comp$/ing 8it a$$ te e$igibi$it/criteria 8i$$ be opened and e*a$uated next, Te 6nancia$ bid of te tecnica$$/;ua$i6ed bidders 8i$$ be opened and 6nancia$$/ L bidder 8i$$ be decided from tesum tota$ of prices for a$$ $ine items 8itout tax 8it 5 ears (arrant and tenca$$ed for furter negotiations if re;uired, Te 6na$i>ed unit rates of tee;uipments sa$$ remain *a$id for a period of /ear from te date of a8ard of contract, Te order 8i$$ be p$aced to successfu$ L bidder at te 6na$i>ed unitrates,

  • 8/17/2019 IT Project Details

    7/77

    27  Te bidder 8i$$ a*e to o+er te inspection in te manner as decided b/ tetenderer before de$i*ering to te respecti*e sites or at customer sites, Te cost of te same as to be borne b/ te supp$ier, #n/ de*iation found in tespeci6cation of te produced goods or de$i*ered goods after inspection from tetender speci6cations 8i$$ $ead to te cance$$ation of te order% forfeiture of EMD?PB and proibition in te participation in te future purcase of o*ernment of ,,,,,,,,,,,,,,,,,te tenderer 8i$$ not be responsib$e for an/ time de$a/8ic ma/ arise due to an/ de*iation from te bid tecnica$ speci6cation foundat te time of inspection and te bidder as to de$i*er and insta$$ te ordered

    goods 8itin prescribed time $imit, #t te time of inspection% bidder is re;uired toproduce OEMJs con6rmation on OEMJs Letter ead 8it Sr, Gos, of E;uipment andSoft8are supp$ied for bac" to bac" 8arrant/ support as per tender terms andconditions,

    2@ 9eli&er and !nstallation:

     Te successfu$ bidder 8i$$ a*e to de$i*er% insta$$ and commissioning teard8are% L#G cab$ing and imp$ement .nternet Band8idt in @ #PM5s 8itin @38or"ing da/s from te date of con6rm purcase order ? a8ard of contract,

     Te successfu$ bidder as to carr/ out site sur*e/ as per te scematic net8or"diagram gi*en in bid document and submit te cange if an/) in Get8or"diagram% Scematic Diagram and 7outing diagram and obtain te appro*a$ fromte respecti*e #PM5s 8itin te imp$ementation time,

    2 Bids shall /e &alid %or the period o% 1 ear %ro$ the date o% price /idopening. * /id &alid %or shorter period shall /e reAected as non8responsi&e. !% reuired, the tenderer $a extend the /id &alidit %or%urtherperiod %ro$ the date o% expir o% /id &alidit in consultation (iththe success%ul /idder.

    0 Bidders are re;uired to ;uote a$$ items inc$uding optiona$ add-ons as 8e$$,.ncomp$ete bids 8i$$ be treated as non-responsi*e and 8i$$ be reected,

    1  Te 6na$i>ed unit rates of te e;uipments sa$$ remain *a$id for a period of /earfrom te date of a8ard of contract, Based on te appro*a$ & a*ai$abi$it/ fundsorder for te additiona$ #PM5s sa$$ be p$aced to te successfu$ bidder &successfu$ bidder is bound to supp$/ & insta$$ & commissioning of .T ard8are &.nsta$$ation of 5#G 5ampus ide #rea Get8or"ing) & pro*ide .nternetband8idt & pro*iding Operation and Maintenance ser*ices at te 6na$i>ed unitrates,

    2 )arrant:

    11, )arrant: 5ompreensi*e onsite 8arrant/ for 4 /ears from te date of 

    insta$$ation of supp$iedard8are% L#G cab$ing & .nternet band8idt a$ong 8itte net8or"ing e;uipments,

    11,2 Maintenance ser*ice

    11,2, Free maintenance ser*ices sa$$ be pro*ided b/ te Bidder during theperiod o% (arrant.

    11,2,2 .n case bidder% is not pro*iding satisfactor/ support & doing un8arrantedde$a/ in pro*iding 8arrant/ support% o*t, o9ces reser*es rigt to repairte e;uipment at ris" & cost of te bidder,

    11,2,1 Te Bidder?S/stem .ntegrator 8i$$ be re;uired to co-ordinate 8it soft8are*endor and?or do $iaisoning 8it oter ser*ice pro*iders to acie*e te

    end-to-end connecti*it/, Tis a$so inc$udes OS con6guration 8it respect toL#G?#G tecno$ogies imp$ementation,

    For =ard(are, C*+ #a/ling and +et(or-:

    a, Go ad*ance pa/ment 8i$$ be made,

    b, @3 pa/ment after successfu$ inspection% de$i*er/ and insta$$ation of teordered goods, Te inspection 8i$$ be done as decided b/ te tenderer,

  • 8/17/2019 IT Project Details

    8/77

    c, 7emaining 3 pa/ment 8i$$ be made after 1 monts of comp$etion of successfu$ insta$$ation% and comp$etion of te usersJ operationa$ training of te ordered goods to te purcaserJs sta+,

    For #onnecti&it Ser&ices:

    a, Go ad*ance pa/ment 8i$$ be made,

    b, 33 pa/ment of one time carges of insta$$ation and commissioning of connecti*it/ at *arious $ocations as speci6ed 8i$$ be paid after successfu$commissioning of $in",

    c, .nternet Band8idt carges 8i$$ be paid ;uarter$/ after comp$etion of eac;uarter for 4 /ears, First ;uarter 8i$$ start after date of successfu$ comp$etionof insta$$ation and commissioning of connecti*it/,

    For ?peration and anage$ent Ser&ices / pro&iding anpo(er %or 5ears:

    a, Go ad*ance pa/ment 8i$$ be made,

     b. Manpo8er carges 8i$$ be paid ;uarter$/ after comp$etion of eac ;uarter forte fu$$ period of 6*e /ears, First ;uarter 8i$$ start after date of successfu$comp$etion of insta$$ation of ard8are% L#G 5ab$ing and Get8or" andcommissioning of connecti*it/,

    14  Te tenderer reser*es te rigt to cange an/ bid condition of an/ item e*enafter in*iting te bids% 8it ? 8itout prior noti6cation,

    10  Te tendererJs 7igt to accept an/ Bid and to reect an/ or a$$ Bids te tendererreser*e te rigt to accept or reect an/ bid% and to annu$ te bidding processand reect a$$ bids at an/ time prior to a8arding te 5ontracts% 8itout tereb/incurring an/ $iabi$it/ to te a+ected Bidder or bidders or an/ ob$igation to informte a+ected Bidder or bidders of te grounds for suc decision,

    37  Te tendered ;uantities are estimated based on te receipt of te re;uirementfrom *P#s on/ehal% o% 33333. State *gricultural ar-eting Board,

    333333., #t present department isp$anning to execute te proect at @numbers of #PM5s across te State 8itin te time $imit speci6ed in tis 7FP,7emaining #PM5s 8i$$ be executed subect to appro*a$ of funds, Based on teappro*a$ & a*ai$abi$it/ funds order for te additiona$ #PM5s sa$$ be p$aced to tesuccessfu$ bidder & successfu$ bidder is bound to supp$/ & insta$$ &commissioning of .T ard8are & .nsta$$ation of 5#G 5ampus ide #reaGet8or"ing) & pro*ide .nternet band8idt & pro*iding Operation andMaintenance ser*ices at te 6na$i>ed unit rates,

    1< #$$ correction?addition?de$etion sa$$ re;uire autori>ed countersign,

    39 Ci$itation o% ;endorDs Cia/ilit: IendorJs cumu$ati*e $iabi$it/ for its

    ob$igations under te contractsa$$ not exceed te contract *a$ue and te *endorsa$$ not be $iab$e for incidenta$% conse;uentia$% or indirect damages inc$uding$oss of pro6t or sa*ing,

    3 Force Maeure Sa$$ mean and be $imited to te fo$$o8ing:

    a) ar ? osti$ities

    b) 7iot or 5i*i$ commotion

    c) Eart;ua"e% ood% tempest% $igtening or oter natura$ p/sica$ disaster,

    d) 7estrictions imposed b/ te o*ernment or oter statutor/ bodies 8icpre*ents or de$a/s te execution of te order b/ te B.DDE7,

     Te B.DDE7 sa$$ ad*ise te tenderer b/ a registered $etter du$/ certi6ed b/ te$oca$ statutor/ autorities% te beginning and end of te abo*e causes of de$a/8itin se*en =) da/s of te occurrence and cessation of suc Force Maeure5onditions, .n te e*ent of de$a/ $asting o*er t8o monts% if arising out of causesof Force Maeure% te tenderer reser*es te rigt to cance$ te order,

  • 8/17/2019 IT Project Details

    9/77

    5omp$etion period ma/ be extended to circumstances re$ating to Force Maeureb/ te tenderer, Bidder sa$$ not c$aim an/ furter extension for comp$etion of 8or", Te tenderer sa$$ not be $iab$e to pa/ extra costs under an/ conditions,

     Te B.DDE7 sa$$ categorica$$/ specif/ te extent of Force Maeure conditionspre*a$ent in teir 8or"s at te time of submitting teir bid and 8eter te samea*e been ta"en in to consideration or not in teir ;uotations, .n te e*ent of an/Force Maeure cause% te B.DDE7 sa$$ not be $iab$e for de$a/s in performing teirob$igations under tis order and te de$i*er/ dates can be extended to teB.DDE7 8itout being subect to price reduction for de$a/ed de$i*ered% as stated

    e$se8ere,

    .t 8i$$ be prerogati*e of te tenderer to ta"e te decision on force maorconditions and te tenderer decision 8i$$ be binding to te bidder,

    Bidders can see" 8ritten c$ari6cations at least 5 das /e%ore the date o% pre8/id  to CCCCCCCCCCCCCCCCCCCCCCCCCC, te tenderer 8i$$c$arif/ and issue amendments if an/, Go furter c$ari6cation 8at so e*er 8i$$ beentertained,

     Te bid sou$d be submitted on te 8ebsite on or before 433 ours% 20.01.2016.

     Te Tecnica$ Bids 8i$$ be opened on xx.0.2016 at 17:00 =ours atxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxin te presence of te committeemembers and representati*es of te bidders% 8oa*e submitted *a$id bids, On$/ onerepresentati*e from eac bidder 8i$$ be a$$o8ed to attend te tender opening, Terepresentati*e 8i$$ be e$d responsib$e for a$$ commitments made on bea$f of tebidder and tat 8i$$ be considered *a$id for a$$ furter dea$ings re$ated to tis tenderprocess,

    P$ease address a$$ ;ueries and correspondence to

    3333333333333333333333333333333333333333333333333333333333333.

  • 8/17/2019 IT Project Details

    10/77

    Brie% o% the ProAect

    Department of 5ooperation% o*ernment of ,,,,,,,,,, troug open tender as a$read/se$ected ser*ice pro*ider to pro*ide compreensi*e e-mar"et p$atform to *ariousagricu$ture mar"et commodities across te state,

     Troug tis e$ectronic p$atform traders?farmers can on$ine auction?se$$ teir produce intransparent manner & te/ 8i$$ a*e better access of mar"et & rates% 8ic it aims toimpro*e transparenc/ and e9cienc/ in mar"ets for agricu$tura$ produce in te state in

    order to e$p producer-se$$ers farmers) to secure te best price for teir produce% andintends to acie*e tis troug increased competition amongst bu/ers% a transparentauction process% rationa$i>ation of mar"et practices and oter measures,

     To impro*e tis e-mar"et p$atform in *arious #gricu$tura$ Produce Mar"eting 5ommittees#PM5s) across te State% ,,,,,,,,,,State #gricu$tura$ Mar"eting Board Ander teDepartment of 5ooperation) intend to in*ite bids for se$ection of s/stem integrator forSupp$/% .nsta$$ation & 5ommissioning of *arious .T ard8are% .nsta$$ation of 5#Gcampus ide #rea Get8or"ing) in #PM5 & Pro*iding .nternet band8idt & pro*idingoperation and Maintenance ser*ices for 4 /ear,

    #cross te ,,,,,,,,,,State% depending upon te *o$ume and si>e of transaction and$ed%te #PM5s a*e been categori>ed in 1 t/pes i,e, T/pe #% T/pe B & T/pe 5, Tere;uirement sa$$ *ar/ depending upon te categories of #PM5 & te same is p$aced at*nnexure *.

    #t present% in Pase- department is p$anning to execute te proect at 3 nos, of #PM5s based on te appro*ed funds a*ai$ab$e, .n Pase-2% department sa$$ executete said proect in remaining #PM5s% based on te appro*a$ of funds recei*ed fromo*ernment of .ndia% subect to *a$idit/ of 6na$i>ed unit rates under tis proect,

     Te successfu$ bidder as to carr/ out te site sur*e/ as per te scematic net8or"diagram gi*en in bid document and submit te cange if an/) in Get8or" diagram%

    Scematic Diagram and 7outing diagram and obtain te appro*a$ from te respecti*e#PM5s,

    Scope o% )or- 

    #s te purpose of tis proect is to pro*ide B to B ser*ices Business to BusinessSer*ices) suc as auction of teir produces on$ine% te uptime of supp$ied e;uipmentsand internet band8idt is ig$/ critica$, ence it as been en*isage to a*e a*ai$abi$it/of te ser*ices a$$ te time, Te successfu$ bidder 8i$$ a*e to supp$/% insta$$ation &commissioning of ard8are inc$uding Des"tops% Printers% Laptops% Tab$ets% Mobi$e

    Printers)% .nternet Band8idt% 5ampus ide #rea Get8or"ing% ire$ess Get8or"ing andpro*ide Operation & Maintenance Ser*ices for te entire proect for te period of 4/ears,

     Te #PM5 8ise re;uirements: .nternet band8idt from t8o .SP% One ire$ess 5ontro$$er%One 2 Port La/er 2 S8itc for #dmin B$oc"% T8o < Port S8itc% Des"tops% Printers,5ategor/ 8ise re;uirement detai$ is gi*en as per *nnexure B.

    'he Broad scope o% (or- is as %ollo(s: Scope o% )or- related to suppl and installation o% !' =ard(are: Scope o% )or- related to !nternet Band(idth #onnecti&it Part: Scope o% )or- related to C*+ +et(or- and )ireless +et(or-ing Part: Scope o% )or- related to ?peration and anage$ent Ser&ices /

    pro&iding anpo(er:

    S! shall /e responsi/le %or the %ollo(ing scope o% ser&ices and shall /ethe Single Point o% responsi/ilit %or the end userclient oEcials:

  • 8/17/2019 IT Project Details

    11/77

    Scope o% )or- related to suppl and installation o% !' =ard(are:

    • Supp$/% insta$$% operate% maintain and pro*ide 8arrant/ and re$atedsupport ser*ices inc$uding #M5 for ard8are and upgrade?update fors/stem soft8are% as detai$ed out in BoM% inc$uding re$ated soft8are% OSetc for a period of 4 /ears from te date of insta$$ation for a$$ supp$ieditems at respecti*e #PM5s,

    • 5osts must inc$ude cost of de$i*er/ at designated $ocations at #PM5s%transit and$ing and insurance% custom duties etc as ma/ be app$icab$e,

     Taxes sa$$ be so8n separate$/ as in 6nancia$ bid and sou$d inc$ude a$$app$icab$e taxes as on date of bidding and sa$$ be paid as per actua$,Iariations in rates and structure% introduction of ne8 $e*ies sa$$ bepa/ab$e separate$/,

    • S/stem .ntegrator sa$$ be responsib$e for insta$$ation of te Des"top%Printer% APS at #PM5s as per te re;uirement speci6ed in tis 7FP,

    • S/stem .ntegrator sa$$ be responsib$e for insta$$ation & maintenance of Operating S/stem & #nti*irus insta$$ation in Des"top & Laptop as & 8enre;uired at eac #PM5s,

    • S/stem .ntegrator sa$$ be responsib$e for integration of Des"tops%Printers% APS & net8or"ing e;uipments at eac #PM5s,

    • #s te said app$ication is .nternet based% S. sa$$ be responsib$e fora*ai$abi$it/ of .nternet Band8idt in a$$ te insta$$ed Des"tops,

    • S/stem .ntegrator sa$$ pro*ides onsite 8arrant/ support for 6*e /earsfrom date of insta$$ation for a$$ te supp$ied items,

    Scope o% )or- related to !nternet Band(idth #onnecti&it Part:

    #separate#greement 8i$$ be signed 8it te successfu$ bidder, Te same8i$$ be signed initia$$/ for a period of 4 /ears 8ic ma/ be extended onmutua$ terms, #s bidder 8i$$ be responsib$e for smoot functioning of teentire net8or" connecti*it/% a*ai$abi$it/ of su9cient ;uantities of a$$ tecritica$ components 8i$$ be ta"en care of b/ te bidder to maintain teguaranteed uptime,

    #t present connecti*it/ re;uirement is for @ #PM5 $ocations across te !ar"and State as per *nnexure * 8ic ma/ furter increased to

    co*er remaining #PM5s subect to appro*a$ of fund inte period of /ear,

    Bidder as to o+er .nternet Band8idt : 7a8% Dedicated & Ansared)from t8o di+erent .SPs for redundanc/) so tat in case of nona*ai$abi$it/ of internet band8idt from one .SP% te #PM5 sou$d get teinternet band8idt from oter .SP% tus #PM5 sou$d get te internetband8idt a$$ te time,

     Te successfu$ bidder as to integrate te internet band8idt from t8odi+erent .SP 8it te supp$ied net8or"ing e;uipments at eac #PM5

    suc tat% in case of non a*ai$abi$it/ of internet band8idt from one .SP%tere 8i$$ be internet band8idt a*ai$ab$e from oter .SP,

  • 8/17/2019 IT Project Details

    12/77

    'he $ini$u$ reuire$ent o% !nternet Band(idth, to /e supplied

    / /idder at auction hall " auction shed area at *P#s is as$entioned /elo(:

    Bidder sa$$ pro*ide rea$ .P address for exc$usi*e use b/ #PM5s $ocationsacross state,

    *P#!nternet Band(idth!PS 1

    !nternetBand(idth !SP 2 'otal Band(idth

     T/pe 5 Mbps : 7a8) 2 Mbps : 7a8) 0 Mbps

    • Bidders are re;uested to ta"e into consideration a$$ te e;uipmentJs re;uired for

    pro*iding connecti*it/ 8i$e ;uoting for te tender, Band8idt 8i$$ be terminating

    on te #G port of Fire8a$$ ? Securit/ app$iance i,e, 3?33?333BaseT port,

    Department 8i$$ not pa/ an/ additiona$ carges for te 7outer% Modem or Fiber to

    Eternet con*ert for te same,

    .nternet Band8idt from bot .SP con6gured sou$d be in suc a 8a/ tat user canab$e to use bot .nternet Band8idt and in case on fai$ure of one .SP $ine% second

    .SP $ine 8i$$ ta"e o*er te entire $oad, Bidders sa$$ pro*ide .nternet band8idt

    5onnecti*it/ 8it $ast mi$e connecti*it/ on eiter Optica$ Fiber or 7F or 5opper 8it

    te Aptime 5ommitment% ua$it/ of Ser*ices & Pena$ties as stated in SL# of te

    7FP,

    •  Te BidderJs .SP Get8or" uptime sou$d be at $east @@,4% and Pac"et $oss sou$d

    be $ess tan , Ap time guarantee must be @@ fai$ing 8ic a pena$t/ 8i$$ be

    app$icab$e,

    • Bidder sou$d ta"e care of te 2x=x104 da/s connecti*it/ at a$$ te #PM5 $ocation8itout an/ do8ntime,

    •  Te Band8idt sa$$ be supp$ied strict$/ in accordance 8it te speci6cations and

    conditions stated in te SL#,

    •  Te Bidder 8i$$ be responsib$e to pro*ide te Band8idt at a$$ te $ocations at te

    agreed price o*er te period of Fi*e /ear, Te 8or"s are to be comp$eted on

    turn"e/ basis, Te Bidder sa$$ be responsib$e for imp$ementation of te 8or" as

    de6ned, Band8idt price can be re*ie8ed e*er/ /ear & in case of rate droppedN

    te band8idt rates can be negotiated & mutua$$/ decided,

    Scope o% )or- related to C*+ +et(or- and )ireless +et(or-ing Part:

    • Supp$/% .nsta$$ation% 5ommissioning and 5on6guration of te Get8or" S8itces?Securit/ #pp$iance Fire8a$$)% ire$ess 5ontro$$er% #ccess Point etc, and associatede;uipment as per te re;uirement,

    • Supp$/% .nsta$$ation% 5ommissioning and 5on6guration of te cab$ing componentsand associated e;uipment as per te so$ution,

    • Supp$/% .nsta$$ation% 5ommissioning and 5on6guration of te Get8or" ire$ess5ontro$$er ? #ccess Points and associated e;uipment as per te so$ution, Supp$/and .nsta$$ ire$ess Get8or" Management s/stem to manage te entire campus.nfrastructure troug ire$ess contro$$er,

  • 8/17/2019 IT Project Details

    13/77

    • L#G ? ire$ess Test connecti*it/ end to end and commission te s/stemN for properconnecti*it/ as a part of ua$it/ #ssurance?ua$it/ 5ec",

    •  Test a$$ redundancies and resi$iencies as per te so$ution as a part of #? 5procedures and submit a detai$ed documentation of te insta$$ed andcommissioned s/stem,

    • Supp$/ and .nsta$$ of ire$ess Management S/stem in area of #dmin b$oc"% #uction

    area and eiging bridge so tat Get8or" can be manage entire campusinfrastructure centra$$/,

    • Before carr/ing out te cab$ing 8or"% a $a/out diagram sa$$ be prepared &6na$i>ed 8it respecti*e #PM5s,?Departments,

    •  Te successfu$ bidder 8i$$ a*e to con6gure te Get8or" S8itc% ire$ess 5ontro$$er%#ccess Point ? Securit/ #pp$iance Fire8a$$)% cab$ing components and associatede;uipment in existing Get8or",

    •  Te successfu$ bidder 8i$$ a*e to supp$/ te DPE pipes comp$/ing 8it .S. standards,

    • Successfu$ bidder sou$d ensure tat te ;uoted product must be seam$ess$/ integrate8it a$$ te e;uipments dep$o/ on net8or",

    • Successfu$ bidder is re;uired to con6gure .nternet Distribution .nternet faci$it/) in a$$extended nodes 8it a$$ ser*ices,

    • Ser*ices on .nternet sou$d be seam$ess$/ a*ai$ab$e on entire #PM5 net8or", Successfu$bidder is re;uired to con6gure te ;uoted product & 8i$$ re;uire coordinating 8itexisting *endors) of #PM5 if re;uired,

    •  Te ;uantit/ of #ccess Points ma/ *ar/ based on te re;uirements and if re;uiredS/stem .ntegrator sa$$ supp$/ additiona$ ire$ess #ccess Point at ;uoted rate in tebid,

    • .f re;uired% necessar/ e$ectri6cation for te insta$$ation ? integration of supp$ied goods8i$$ be carried out b/ successfu$ bidder,

    • For 7outer% Fire8a$$% ire$ess 5ontro$$erN bidder is re;uired to re;uired to c$ear$/ specif/in teir tecnica$ bid% 8eter bidder is proposing a so$ution 8it sing$e de*ice meetingfunctiona$it/ of 7outer% Fire8a$$% ire$ess 5ontro$$er or bidder is proposing separate

    de*ices for 7outer% Fire8a$$% ire$ess 5ontro$$er,

    Scope o% )or- related to ?peration and anage$ent Ser&ices / pro&idinganpo(er:

    • ?peration " aintenance Ser&ice / anpo(er 4ngineer at Site %or First ear o% #ontract:Bidder is re;uired to dep$o/ minimum one Fu$$ time Ser*ice ? Get8or" Engineer at eac#PM5s during a$$ 8or"ing da/s during 6rst /ear of contract, Te dep$o/ed resources%

     Troub$esooting% O&M of a$$ te insta$$ed components at #PM5s,

    S"i$$ed Ser*ice ? Get8or" Engineer sou$d a*ing minimum ;ua$i6cations of 9iplo$a4#!'#4!'! 1 ear o% rele&ant experience ?R an graduate (ith rele&ant=ard(are " So%t(are diplo$a certiGcation (ith 2 ears o% rele&ant experience.  Temanpo8er is re;uired to be dep$o/ed for te fu$$ 4 /ears of te contract,

  • 8/17/2019 IT Project Details

    14/77

    Follo(ing considerations shall /e -ept in $ind, to arri&e at the ca$pus architectureo% the respecti&e *P#.

    =ighHa&aila/ilit:.t is re;uired because of mission critica$ s/stems running on te campus net8or", .f an/ acti*e$in" going do8n for an/ reason sou$d a*e preferab$/ no impact or minima$ impact on tenet8or" performance,

     Te net8or" $e*e$ redundanc/ sou$d be automatic and no manua$ inter*ention sou$d bere;uired for s8itco*er of te $in"s,

    odularit:.t is a "e/ re;uirement in te sense tat incrementa$ additions sou$d be possib$e at teard8are and soft8are $e*e$s as e*o$*ing needs ustif/ expansion,

    Scala/ilit and 4xpanda/ilit:

    Sca$abi$it/ and Expandabi$it/ are te stated re;uirements of te proposed campus net8or" atrespecti*e #PM5 site $ocation, Te so$ution sou$d be Sca$ab$e and Expandab$e% if re;uired%sou$d be eas/ 8it minima$ canges in te net8or",

    Flexi/ilit:

    F$exibi$it/ and ease of adding ne8 ser*ices or features Data% Ioice% Iideo% ire$ess etc,)re;uired due to te d/namic operating en*ironment,

     Te proposed so$ution sou$d a$so be exib$e enoug to support current standards andforeseen upcoming standards

    IoS:

    ua$it/ of Ser*ice is re;uired in te proposed net8or" as *arious user groups and *ariousapp$ications 8i$$ be running on te net8or", #$$ te net8or" components being proposed

    sou$d support tra9c po$icies and oS

    Relia/ilit:

    ig re$iabi$it/ of te entire product constituting te core of te campus net8or" and otersub s/stems is crucia$, Te product sou$d a*e te se$f ea$ing 8it fast con*ergence futurein case of an/ fai$ure, Te e;uipments proposed sou$d a*e ig MTBF and 8it pro*ere$iabi$it/,

    Redundanc:

    P/sica$ redundanc/ is re;uired at 6ber $e*e$, Tis sou$d be acie*ed using redundant runsof 6ber on redundant pats, .f primar/ 6ber gates cut or damaged for an/ reason% it sou$d

    a*e preferab$/ no impact or minimum impact on te o*era$$ operation s/stem, Get8or" $e*e$redundanc/ is re;uired at te connecti*it/ $e*e$,

    Do8n times must be minimi>ed b/ te rigt coice of components% rigt design and pro*isionof ade;uate redundanc/,

    Securit:

    Securit/ is one of te "e/ re;uirements of proposed campus net8or" as di+erent user groupsare using tis common infrastructure 8it *er/ sensiti*e app$ications, So pro*ision of ade;uate securit/ to be pro*ided on te net8or" bet8een di+erent user groups,

    anage$ent:

    5omp$ete *isibi$it/ and contro$ of   te net8or"% as 8e$$ as te pro*ision of being ab$e toexcange data 8it te management p$atforms or oter sub s/stems is crucia$ to  teproposed campus net8or",Si$plicit:

  • 8/17/2019 IT Project Details

    15/77

     Te proposed net8or" design sou$d be simp$e 8it minimum *ariet/ of   components andfrom a sing$e manufacture, Tis a$so imp$ies simp$e to understand% imp$ement and maintainte entire s/stem,

     Te bidder sou$d furnis a brief 8rite up bac"ed up 8it ade;uate data% exp$aining isa*ai$ab$e capacit/ and experience bot tecnica$ and commercia$% for te insta$$ation andsupp$/ of te re;uired s/stems and e;uipments 8itin speci6ed time of comp$etion aftermeeting a$$ teir current commitments,

     Te successfu$ bidder 8i$$ a*e to carr/ out te site sur*e/ as per scematic net8or" diagramannexed in bid document and submit te cange if an/) in Get8or" diagram% ScematicDiagram and 7outing diagram andobtain te appro*a$ for te same from te #PM5, Tesuccessfu$ bidder 8i$$ a*e to pro*ide disp$a/ board 8it a$$ detai$s of tags 8it a$$ tag nodes%Get8or" Diagram% Scematic Diagram and 7outing Diagram,

  • 8/17/2019 IT Project Details

    16/77

    Ser&ices

    , .nsta$$ation and Termination% documentation and Site certi6cation for .ndoor?OutdoorFiber 5ab$ing,

    2, Optic 5ab$e $a/ing 8it route sur*e/ and documentation 8it fo$$o8ing:

    2, Outside bui$ding $a/ing of 6ber in DPE?. Pipe on 8a$$ or underground 8itproper c$amping and Securing,

    2,2 S5 connector termination on Fiber Optic cab$e,2,1 Supp$/ and insta$$ation of bu+er tubing "it,

    2, 5ab$e pu$$ing pit made of reinforced concrete and bric" 8a$$s 8it remo*ab$eco*ers% if re;uired,

    2,4 Fiber optics cab$e route mar"er% if an/,

    2,0 Performance testing of $aid Fiber Optic cab$e for continuit/% $engt and db $oss asper F.#?T.#-44-03,

    2,= Document for FO test procedures and Documentation of te resu$ts,

    1, DPE ducts 12mm OD for 6ber#rmored6ber pu$$ing 8i$$ be $aid in ground 2,4 feetdeep and feet 8ide trenc, 5ab$e to be $aid o*er inc sand bed and co*ered soi$

    o*er tat 8ere e*er road crossing is tere or cab$e is coming out of ground andoutside bui$ding, Tis 8or" 8i$$ be di*ided in te o8ing subdi*isions, #t te endtere sou$d be no 6ber cab$e open$/ *isib$e,

    , .n-bui$ding $a/ing of ATP 5#T 0 cab$e 8it cab$e route sur*e/ and detai$ed cab$e routediagram% termination of cab$e 8it $abe$s and mar"ing as per appro*ed $abe$ing p$anand documentation,

    4, Supp$/ and 6xing of .S. mar"ed PI5 5onduit of si>es ,4( si>e for ATP 5ab$e, itsecure enc$osing of cab$e so tat it 8i$$ not be *isib$e from and at an/ point, QTJs andQBendJ re;uired to be insta$$ed 8ere e*er re;uired,

    0, .nsta$$ation and termination of ATP cab$es on Patc Pane$ 8it 8ire Manager and on

    .nformation out$et% crimping of 7!4 connector Performance testing of te $aid ATPcab$e for 5anne$ Lin" as per E.#?T.# TSB-0= standard or iger in particu$ar 8iremap Sort% open% transpose% re*erse% sp$it)% GERT% PSGERT% FERT% PSFERT% #5T%PS#57% 7eturn $oss% $engt% propagation de$a/% de$a/ s"e8% Site certi6cation forperformance 8arrant/ of 23 /ears troug OEM% Get8or" #udit,

    =, 23 ears 8arrant/ on parts and performance on insta$$ed net8or"s for copper as 8e$$as 6ber, Site registration re;uires 8it OEM for $ogica$ and passi*e net8or", Tis a$soinc$udes fo$$o8ing steps:

    =, Te 6rst step in certi6cation is site registration,

    =,2 Te net8or" design% 8ic inc$udes $ogica$ acti*e net8or" and passi*e net8or"%as to be appro*ed, Tis procedure is initiated b/ 6$$ing up a registration form b/

    te insta$$er,=,1 # uni;ue number is attaced to tis registration,

    =, Te site as to be designed% insta$$ed and tested b/ .nsta$$ers,

    =,4 Te fo$$o8ing documentations are re;uired,

    =,4, Logica$ diagram%

    =,4,2 7outing diagram%

    =,4,1 Scematic Diagram

    =,4, Test 7eport for eac point,

  • 8/17/2019 IT Project Details

    17/77

     Training to users ? membersJ of te Purcaser for at $east 1 to 4 da/s on tecomponents of structured cab$ing% L#G% #G% Securit/% basic troub$e sooting andmaintenance, Sa$$ pro*ide a$$ reference manua$s% boo"$ets and oter materia$sre;uired for training) at PurcaserJs site,

    # minimum of 1 Tree) personne$ to be trained per #PM5, Training 8i$$ be re;uiredon$/ for te #PM5 site $ocation 8ere Leased Line% 5#G and ire$ess 8i$$ beimp$emented,

    Ser&ice Ce&el *gree$ent SC*

    Pro*ide 8arrant/?onsite maintenance for .T infrastructure tat sa$$ be supp$ied andinsta$$ed under tis procurement trougout te period of contract,

    Ensure tat a$$ tese e;uipments integrate and function as per te re;uirements andmeet SL#s set out in tis document,

    Free maintenance ser*ices sa$$ be pro*ided b/ te Bidder during the period o%(arrant.

     Te maximum response time for maintenance comp$aint from an/ of te destinationsspeci6ed in te Scedu$e of 7e;uirements ? Purcase orders) i,e, time re;uired forbidders maintenance engineer to report at te insta$$ation after a re;uest ca$$ ?te$epone or $etter is 8ritten) sa$$ not exceed 2 rs,

    Maintenance and repair of te structured cab$ing during te 8arrant/ period inc$udingsupp$/ of a$$ spares, Tis sa$$ not re$ie*e te supp$ier of an/ 8arrant/ ob$igations undertis contract,

    Spare Parts: Supp$ier sa$$ carr/ su9cient in*entories to assure ex-stoc" supp$/ of consumab$es and spares,Oter spare parts and components sa$$ be supp$ied as

    prompt$/ as possib$e but in an/ case 8itin six monts of p$acement of order, Supp$iersa$$ ensure te a*ai$abi$it/ of after sa$es ser*ice for a period of at $east six /earsinc$uding te 8arrant/ period,

    )arrant:

    !n partial $odiGcation o% the pro&isions, the (arrant period shall /e 5 ears%ro$ date o% acceptance o%

  • 8/17/2019 IT Project Details

    18/77

     Te )arrant sou$d be compreensi*e onsite 8arrant/ (ith 5 ears and 8i$$ co*erte cost of a$$ te spare parts re;uired for rep$acement?repair te campus area 8ideL#G, Te )arrant ma/ be on regu$ar basis to ensure te minimum do8ntime of tes/stem, .n oter 8ords )arrant sou$d assure @

  • 8/17/2019 IT Project Details

    19/77

    =ard(are !nstallation: Te Supp$ier 8i$$ be responsib$efor a$$ unpac"ing% assemb$ies%8iring% insta$$ations%cab$ing bet8een ard8are units and connecting to po8er supp$ies,

     Te Supp$ier 8i$$ test a$$ ard8are operations and accomp$is a$$ adustments necessar/for   successfu$ and continuous operation of  te ard8are at a$$ insta$$ation sites, Tesupp$ier as to submit Dai$/ 7eport of materia$ used to #PM5 site $ocation,

    S/stem .ntegrator sa$$ be responsib$e for coordination for te smoot function of tisProect 8it stac" o$ders $i"e i,e, GeML% G5DER% 7especti*e #PM5s & o*ernmentDepartment etc,)

    Penalties %or dela in deli&er " i$ple$entation:

    a, .f te bidder fai$s to comp$ete te entire proect 8itin 4 8or"ing da/s in 3#PM5s & =4 8or"ing da/s in 13 #PM5s from te issue of te con6rmedpurcase order% ten a sum e;ui*a$ent to a$f percent 3,4 ) of te tota$contract *a$ue sa$$ be deducted from te pa/ment for eac ca$endar 8ee" of de$a/ or part tereof,

    b, Te amount of pena$ties for de$a/ in insta$$ation sa$$ be subect to a maximum

    $imit of 3 of te tota$ contract *a$ue,

    a, De$a/ in excess of 23 8ee"s from te date of con6rmed purcase order 8i$$ besu9cient to cause for termination of te contract, .n tat case te PerformanceBan" uarantee of te bidder 8i$$ be forfeited,

    b, .n case% te se$ected bidder does not supp$/ te ordered items for an/ reason%te bidder 8i$$ be $iab$e to pa/ te di+erence amount to te purcaser% o*erand abo*e te performance guarantee% 8ic indenter department as to pa/to te next or oter se$ected bidder for purpose of te said items,

    ?perational )arrant period Penalties:

    a, During 8arrant/ period% if te comp$aint is not reso$*ed 8itin < rs tepena$t/ of 7s, 133 per da/ for 5omputer% Laptop% Get8or"ing S8itces 8i$$ be$e*ied and te pena$t/ of 7s, 233 per da/ for Tab$ets% Printers% Monitors% #ccessPoints L#G cab$ing components and oter peripera$s te 8i$$ be $e*ied,o8e*er% if te comp$aints not reso$*ed 8itin = da/s ten from

  • 8/17/2019 IT Project Details

    20/77

    Penalt related to !nternet Band(idth #onnecti&it:

    For purposes of pena$t/ ca$cu$ation% eac site sa$$ be treated separate$/, .n case of SL#breaced on more tan one parameter% cumu$ati*e pena$t/ sou$d be ca$cu$ated

     Te Ser*ice Pro*ider sa$$ be responsib$e for maintaining te desired performance and

    a*ai$abi$it/ of te s/stem?ser*ices, Operationa$ pena$t/ 8i$$ be imposed for eac QourJde$a/ or part tere of de$a/% unti$ actua$ a*ai$abi$it/ of agreed .nternet Band8idt, .f teSer*ice Pro*ider fai$s to pro*ide ser*ices as speci6ed abo*e% te fo$$o8ing pena$t/ 8i$$be imposed

    .f uarter$/ Ser*ice uptime is

    ) @@,33 orbetter : GO Pena$t/2) Less tan@@,33 : Ap Time

    During 8or"ing da/s from 3@:33 #M to 34:33 PM% 7s,3%333?-per our on

    do8ntime be/ond agreed ;uarter$/ do8n time,During 34:33 PM to 3@:33 #M% 7s,4%333?- per our ondo8ntime be/ond

    agreed ;uarter$/ do8n time,

    Exc$usions ? conditions for 8ic Do8ntime 8i$$ not be considered as Do8ntime:) Do8ntime due to Qp$anned outageJ for 8ic prior intimation as been gi*en,2) Te uptime or Do8ntime ca$cu$ation 8i$$ not inc$ude an/ do8n time re$ated to an/

    media & its e;uipments% 8ic are not pro*ided ? insta$$ed b/ te S/stem.ntegrator,

    1) Te do8ntime caused due to prob$ems re$ated to non a*ai$abi$it/ of po8er at#PM5% due to s8itced o+ ? fai$ure of po8er and? or po8er uctuations% ard8arefai$ure due to abo*e,

    ) Do8ntime due to Gon bro8sing?s$o8 bro8sing of an/ due to ebsitesJ o8nprob$em?an/ oter prob$em% ser*er?*irus prob$em in te net8or" etc,

    Penalt related to ?peration and anage$ent Ser&ices / pro&idinganpo(er:

    Manpo8er to be dep$o/ed to support .T .nfrastructure at eac #PM5 $ocation asmentioned in bid document, Minimum one fu$$ time during O9ce rs,) s"i$$ed Ser*ice ?

    Get8or" Engineer to be dep$o/ed at eac #PM5 $ocation during 6rst /ear of contract8ic ma/ be extended for furter period during contract period of 4 /ears,

    .n case te s"i$$ed engineer is absent for an/ reason% ten te successfu$ bidder as toarrange te rep$acement in co-ordination 8it te respecti*e #PM5, .f for an/ reasonte said manpo8er is found to be absent 8itout prior permission at te $ocation% tena pena$t/ of 7s, 233? per absent da/ 8i$$ be $e*ied 8ic 8ou$d be deducted from te;uarter$/ pa/ment, o8e*er One) 5asua$ Lea*e 5L) per mont is a$$o8ed 8it priorpermission of te concern #PM5,

  • 8/17/2019 IT Project Details

    21/77

    Special 'er$s and #onditions

    K*L 'esting and #ertiGcation:

    1. !nspection and 'ests prior to ship$ent o%

  • 8/17/2019 IT Project Details

    22/77

    KBL 'esting and #ertiGcation:

    1. #*' 86 #a/ling 'esting:

    , 33 percent of te ori>onta$ and riser 8iring pairs sa$$ be tested for opens%sorts% po$arit/ re*ersa$s and sp$it pairs,

    ,2 ori>onta$ 8iring pairs sa$$ be tested from te information out$et to tete$ecommunication c$oset,

    ,1 Te 5#T -0 cab$ing s/stems sa$$ be tested to certif/ conformance 8it te

    #GS.? T.#?E.#-S0ed up to 33 M>,

    2. ?ptical Fi/er #a/ling 'esting:

    2, #$$ 6ber testing sa$$ be performed on a$$ 6bers in te comp$eted end-to-end s/stem

    2,2 Tere sa$$ be no sp$ices un$ess c$ear$/ de6ned, Testing sa$$ consist of a

    bi- directiona$ end to end b/ using eiter OTD7 or Fiber 5ab$e Tester,2,1 Te s/stem $oss measurement sa$$ be pro*ided at

  • 8/17/2019 IT Project Details

    23/77

    , For the Sste$ and ?ther So%t(are the %ollo(ing (ill appl:  Te Supp$iersa$$ pro*ide comp$ete and$ega$ documentation of ard8are% a$$ subs/stems%operating s/stems% compi$er% s/stem soft8are and te oter soft8are, Te Supp$iersa$$ a$so pro*ide $icensed soft8are for a$$ soft8are products% 8eter de*e$oped b/tem or ac;uired from oters, Te supp$ier sa$$ a$so indemnif/ te purcaseragainst an/ $e*ies?pena$ties on account of an/ defau$t in tis regard,

    5. *cceptance #ertiGcates:

    4, On successfu$ comp$etion of acceptabi$it/ test% receipt of de$i*erab$es etc, and

    after te purcaser is satis6ed 8it te 8or"ing of te s/stem% te acceptancecerti6cate signed b/ te supp$ier and te representati*e of te purcaser 8i$$ beissued, Te date on 8ic suc certi6cate is signed sa$$ be deemed to be tedate of successfu$ commissioning of te s/stems,

    4,2 #t $east One ee"Js training sa$$ be conducted on te dates mutua$$/ agreedupon and 8itin t8o monts from te date of acceptance of supp$/ at tePurcaserJs site,

    6. 9eli&er and 9ocu$ents:

    0, Apon de$i*er/ of te oods% te supp$ier sa$$ notif/ te purcaser and teinsurance compan/ b/ cab$e?te$ex?fax te fu$$ detai$s of te sipment inc$uding

    contract number% rai$8a/ receipt number and date% description of goods%;uantit/% name of te consignee etc, Te supp$ier sa$$ mai$% te fo$$o8ingdocuments to te purcaser 8it a cop/ to te insurance compan/:

    0,, 31 5opies of te Supp$ier in*oice so8ing contract number% goodsdescription% ;uantit/% unit Price% tota$ amount

    0,,2 7ai$8a/ receipt? ac"no8$edgment of receipt of goods from teconsignee s)N

    0,,1 31 5opies of pac"ing $ist identif/ing te contents of eac pac"age0,, .nsurance 5erti6cate0,,4 ManufacturerJs?Supp$ierJs 8arrant/ certi6cate,0,,0 .nspection 5erti6cate issued b/ te nominated inspection agenc/% and te

    Supp$ierJs factor/ inspection reportN and0,,= 5erti6cate of Origin

    0,2 Te abo*e documents sa$$ be recei*ed b/ te Purcaser before arri*a$ of teoods except 8ere te oods a*e been de$i*ered direct$/ to te 5onsignee8it a$$ documents) and% if not recei*ed% te Supp$ier 8i$$ be responsib$e for an/conse;uent expenses

    =, !nsurance: For de$i*er/ of goods at site% te insurance sa$$ be obtained b/ teSupp$ier in an amounte;ua$ to 3 of te *a$ue,

    @. !ncidental Ser&ices:

  • 8/17/2019 IT Project Details

    24/77

    ation of teparameters of te parameters of te La/er 2 Edge 5assis based S8itc,

    ation of teparameters of te Fire8a$$ and oter securit/ products as per de6nedpo$iciesN

  • 8/17/2019 IT Project Details

    25/77

  • 8/17/2019 IT Project Details

    26/77

  • 8/17/2019 IT Project Details

    27/77

    S4#'!?+ !

    Bid Processing Fees and 4arnest one 9eposit 9etails:

    Sr.!te$

    *$ount !nRs.

    +a$e o% theBan- 

    9e$and 9ra%t+o.

    +o. and Branch

    1 Bid Processing Fees

    24arnest one 9eposit

    4..9.

    4C!

    For$ +o. 41: Bidder should /e !' #o$pan Sste$ !ntegrator,registered!ncorporated in !ndia and should /e in existence %or at least G&e

    ears as on 1st

      arch 2015, (ho $ust ha&e supplied and success%ullinstalled ite$s si$ilar to the tpe speciGed in the schedule o% reuire$entsto an o% the reputed organiMations in the countr. 'he cop o% #ertiGcate o% !ncorporation shall /e su/$itted. 'he cop o% #ertiGcate o% !ncorporation

    shall /e su/$itted:#op o% #ertiGcate

    o% 

    Sr. +o.+a$e o%?rganiMation *ddress

    #ertiGcation9ate !ncorporation

    uploadedN

    +ote:Please Gll this %or$ and upload the cop o% #ertiGcate o% !ncorporation.

    For$ +o. 42: Bidder $ust ha&e a&erage turno&er o% Rs. 25 #rore or $ore ineach o% the three ears. #opies o% audited accounts o% last three Gnancialears $ust /e attached (ith the /id:

    Financial ear 'urno&er Rs. !n #rore*udited *ccounts uploadedNes+o

    201281

    20181J

    201J815

  • 8/17/2019 IT Project Details

    28/77

    For$ no. 4J: )arrant support " repairing cu$ replace$ent ser&ice up todeli&er locations

    Sr. +o. *ddress#ontactPerson

    #ontactnos.

    'pe o% supportingdocu$entuploaded

    21

    +ote: ou $a $ention $ore details / adding $ultiple ro(s

    For$ +o. 45: 4xperience 9etails #usto$er Re%erences:

    +a$e o%  #ontact9atePerio

    d

    4xperience o% executiono% ten

    'pe o% Sste$ !ntegration

    proAect o% Sr. the #ontact

    telephone o% 

    Supporting

    &alue o% Rs. 50 Cac each

    +o.?rganiMat

    i Person no. "i$ple$ent

    at 9ocu$entincluding suppl o% !'

    =ard(are,

    on *ddress ion *ttachedC*+ )*+ #a/ling (or- etc

    1

    2

    .

    +ote:Please Gll this %or$ and upload the supporting docu$ents %or eachcusto$er re%erence in scanned %or$at. Failing the sa$e $a lead tothe reAection o% the /id. ou $a add the custo$er re%erences /adding $ultiple ro(s (hich $a /e added / O+B4R ?F R?)S '?*99>.

    For$ no. 46: *uthoriMation Cetters:

    Sr. a-e and*uthoriMation

    !te$+a$e o%?4

    Cetter*ttachedN

    +o. odeles+o

    Des"top

    2 Laser Printer

    1 Layer 2 Swithc – 24 port manageable

    L2 S8itc

    4  Networ !ac"

    03( or iger Professiona$ Disp$a/Monitor

    = ire$ess Products

    < ATM #pp$iance

    @ 1 VI# on$ine APS

    3 033 I# Line .nteracti*e APS

    Passi*e 5omponents Fiber and5opper 8it

    #ccessories)For$ +o. 47: Bidder should ha&e 15 s-illed engineers (ith $ini$u$ 2 ears

    4xperience. !n%or$ation, educational ualiGcations, and experiencedetails along (ith the proAects the ha&e handled should /e pro&ided(ith the /id

    Sr. +a$e o% 9ate o% 

    4ngineerDs 4ducation 4xperience!n&ol&ed in

  • 8/17/2019 IT Project Details

    29/77

     oiningthe

    proAect+a$e

    +o. 4ngineer#ontact9etails IualiGcation 9etails

    ?rganiMation o% proAect

    1

    2

    J

    5

    6

    7

    @

    +ote:Please Gll this %or$. ou $a add the engineerDs details / adding$ultiple ro(s (hich $a /e added / O+B4R ?F R?)S '? *99>.

    For$ no. 4@: !S? 001:200@ #ertiGcation %or anu%acturing:

    a-e +a$e !S?!S?

    Sr.#ertiGca

    tion!te$ and o% 

    #ertiGcation

    +o.ploade

    dNodel ?4 &alid up to

    es+o

    -La/er 2 S8itc - 2 Port La/er 2 ManagedS8itc

    2La/er 2S8itc - < Port La/er 2 ManagedS8itc

    1 Mini B.5 333LR transcei*er port

    ATM #pp$iance

    4 ire$ess #ccess 5ontro$$er

    0 ire$ess #ccess Point

    = Port PoE .nector

    < Des"top

    @ Sur*ei$$ance S/stem

    -3 Printer

    -- 3( or iger Professiona$ Disp$a/ Monitor

    -2 1 VI# on$ine APS

    -1 033 I# Line .nteracti*e APS

    - 2 A 7ac"

    -4 @ A 7ac"

    -0 5at-0 ATP 5ab$e - 134 Meters Box

    -= 5at-0 ATP Pr, Patc 5ord - Meter

    -< 5at-0 ATP Pr, Patc 5ord - 2 Meter

    -@

    5at 0 ATP Surface Sing$e Sutter out$et8it .?O

    Modu$e and bac" box

    23 5at 0 ATP Suttered Patc Pane$ 2 Port-

  • 8/17/2019 IT Project Details

    30/77

    Loaded

    8it cab$e Manager

    2- Sing$e Mode Fiber 5ab$e

    22 Fiber SM-S5 5oup$ers and Pigtai$ x

    21Fiber Patc 5ord S5-L5 T/pe @?24 Sing$eModeFiber

    22 port 7M L.A - L.A Loaded 8it adapter p$ate&8it Sing$e Mode #dapters)

    +ote:Please Gll this %or$ and upload the supporting docu$ents in scanned%or$at.

  • 8/17/2019 IT Project Details

    31/77

    S4#'!?+!!

    For$ +o. '1: a-e " odel Cist:

    SupportingSr.+o. !te$

    a-e andodel

    9ocu$entattachedN

    Fes+o

    1La/er 2 S8itc - 2 Port La/er 2 ManagedS8itc

    2La/er 2 S8itc - < Port La/er 2 ManagedS8itc

    Mini B.5 333LR transcei*er port

    J ATM #pp$iance

    5 ire$ess #ccess 5ontro$$er

    6 ire$ess #ccess Point

    7 Port PoE .nector for ire$ess #ccess Points

    @ Des"top 8it

  • 8/17/2019 IT Project Details

    32/77

    26 Sing$e Mode Fiber 5ab$e

    27 Fiber SM-S5 5oup$ers and Pigtai$ x

    2@Fiber Patc 5ord S5-L5 T/pe @?24 Sing$eMode Fiber

    2

    2 port 7M L.A - L.A Loaded 8it adapterp$ate &

    8it Sing$e Mode #dapters)

    0 12 MM .S. mar" DPE Pipe for Fiber 5ab$e#s per #ctua$ t/ 7e;uired at Site) .n Mtr,)

    1

    24mm 5$ass B categor/ .S. mar" . Pipe #sper #ctua$

    t/ 7e;uired at Site) .n Mtr,)

    Gote:

    1. Please )rite +.*. i% the a-e " odel is not a&aila/le.

    Ser&ice as per *ctual

    !te$ +o. 1 to 1@ Ser&ice as per *ctual It.

    atched

    9e&iation

    Sr. !te$ It. +ot

    +o.Re$ar

    -satched

    !% an

    1 La/ing of 0 5ore Sing$e Mode Fiber 5ab$e

    2 La/ing of DPE pipe

    3 La/ing of . Pipe - 24mm

    4 Fixing of L.As

    5 Fiber Pigtai$s Sp$icing

    6 Fiber 5ore Testing 5arges

    7 Soft Soi$ Digging & 7e6$$ing

    # ard Soi$ ? 7oc" digging &7e6$$ing

    9 #spa$t 5utting - 755 5utting

    1$ Anderground Boring

    11 Pa*er B$oc" 7emo*ing and 7einsta$$ation

    12 Fixing of 7oute Mar"er

    13 La/ing of PI5 5onduits ? cap on casing - ,4X14 La/ing of ATP 5ab$e

    15 Feru$ing % Labe$ing

    16  Termination of .nformation Out$et

    17  Termination of 2 Port !ac" Pane$

    1# 7ac" .nsta$$ation 8it Patc cord 7outing

  • 8/17/2019 IT Project Details

    33/77

    Per%or$a o% #o$pliance letter*uthenticit o% !n%or$ationPro&ided

    ?n +on Audicial Sta$p paper o% Rs 1008 dul attested / the First classagistrate +otar Pu/lic

    Date:

    'o,9ed to gi*e te underta"ing onbea$f of YYGame of te bidderZZ,

    e 8is to inform /ou tat 8e a*e read and understood te tecnica$ speci6cationand tota$ re;uirement of te abo*e mentioned bid submitted b/ us on 23,3,230,

    e ereb/ con6rm tat a$$ our ;uoted items meet or exceed te re;uirement and areabso$ute$/ comp$iant 8it speci6cations mentioned in te bid document,

    e a$so exp$icit$/ understand tat a$$ ;uoted items meet tecnica$ speci6cation of tebid & tat suc tecnica$ speci6cation o*errides te brocures?standard $iterature if tesame contradicts or is absent in brocures,

    .n case of breac of an/ tender terms and conditions or de*iation from bid speci6cationoter tan a$read/ speci6ed as mentioned abo*e% te decision of Te Tenderer Tender5ommittee for dis;ua$i6cation 8i$$ be accepted b/ us,

     Te .nformation pro*ided in our submitted bid is correct, .n case an/ informationpro*ided b/ us are found to be fa$se or incorrect% /ou a*e rigt to reect our bid at an/stage inc$uding forfeiture of our EMD? PB?cance$ te a8ard of contract, .n tis e*ent%

     Te Tenderer reser*es te rigt to ta"e $ega$ action on us,

     Tan"ing /ou%

    Dated tis [[[[[[[[[ da/ of[[[[[[[[[[[[230

    Signature: [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ in te 5apacit/ of) :[[[[[[[[[[[[[[[[[[[[[[ Du$/ autori>ed to sign bid for and on bea$f of 

     [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ 

    +ote: 'his %or$ should /e signed / authoriMed signator o% /idder

  • 8/17/2019 IT Project Details

    34/77

    *nnexure*1

    For$at o% 4arnest one 9eposit in the %or$ o% Ban-

  • 8/17/2019 IT Project Details

    35/77

     Te Ban" sa$$ not be re$eased of its ob$igations under tese presents b/ an/ exerciseb/ te OGE7?PA75#E7 of its $iabi$it/ 8it reference to te matters aforesaid or an/of tem or b/ reason or an/ oter acts of omission or commission on te part of teOGE7?PA75#SE7 or an/ oter indu$gence so8n b/ te OGE7?PA75#SE7 or b/an/ oter matter or tings,

  • 8/17/2019 IT Project Details

    36/77

     Te Ban" a$so agree tat te OGE7?PA5#SE7 at its option sa$$ be entit$ed to enforcetis uarantee against te Ban" as a Principa$ Debtor% in te 6rst instance 8itoutproceeding against te SELLE7 and not 8itstanding an/ securit/ or oter guaranteetat te OGE7?PA75#SE7 ma/ a*e in re$ation to te SELLE7Js $iabi$ities,

    Dated at [[[[[[[[[[[[[[[ on tis [[[[[[[[[ da/ of [[[[[[[[[[[230,

     [[[[[[[[[[[[[[[[[[[[ 

    Signed and de$i*ered b/ [[[[[[[[[[[[[[[[[[[[[ 

    For & on Bea$f of 

    Game of te Ban" & Branc &

    .ts o9cia$ #ddress

    *ppro&ed Ban-: *ll +ationaliMed Ban- including the pu/lic sector /an- orPri&ate Sector Ban-s or #o$$ercial Ban-s or #o8?perati&e Ban-s and RuralBan-s operating in !ndia ha&ing /ranch at ....................... as per the

  • 8/17/2019 IT Project Details

    37/77

    P4RF?R* ?F +94R'*Q!+<

    nderta-ing o% *uthenticit %or +et(or- 4uip$ent Supplies

     Tis as reference to Des"tops being supp$ied?;uoted to /ou *ide /our tender en;uir/no, [[[[[[[[[[[ dated [[[[[[[[[[[[ 

    e ereb/ underta"e tat a$$ te components?parts?assemb$/?soft8are used in teSecurit/ #pp$iance?Get8or" E;uipments?Des"tops under te abo*e $i"e ard dis"%Monitors% Memor/% moterboard etc, sa$$ be origina$ ne8 5omponents?parts?assemb$/?soft8are from respecti*e OEMs of te products and tat norefurbised?dup$icate? second and components?parts? assemb$/ ? soft8are are beingused or sa$$ be used,

    .n respect of $icensed Soft8are% 8e underta"e tat te same sa$$ be supp$ied a$ong 8itte autori>ed $icense certi6cate 8i$$ our name?$ogo e,g, Product Ve/s on 5erti6cation of #utenticit/ in case of Microsoft indo8s Operating S/stem), #$so% tat it sa$$ besourced from te autori>ed source for use in .ndia e,g, #utori>ed Microsoft 5anne$ in

    case of Microsoft Operating S/stem),

    Sou$d /ou re;uire% 8e sa$$ produce certi6cate from our OEM supp$ier in support of abo*e underta"ing at te time of de$i*er/, .t 8i$$ be our responsibi$it/ to produce suc$etters from our OEM supp$ier\s 8itin a reasonab$e time,

    .n case 8e are found not comp$/ing 8it abo*e at te time of de$i*er/ or duringinsta$$ation% for te Get8or" E;uipments ? Securit/ #pp$iance Fire8a$$) a$read/ bi$$ed% 8eagree to ta"e bac" te e;uipment a$read/ supp$ied at our cost and return an/ amountpaid to us b/ /ou in tis regard and tat /ou 8i$$ a*e te rigt to forfeit our EMD ? Bfor tis tender,

    *uthoriMed Signator

    +a$e:

    9esignation:

    +ote:i 'he signing *uthorit should /e no lo(er than #o$pan Secretar o% 

    the ?4 o% S(itches, Securit *ppliance.ii 'he /idders are reuired to upload this underta-ing %ro$ the ?4s o% 

    the S(itches, Securit *ppliance %or the uoted options.

  • 8/17/2019 IT Project Details

    38/77

    Per%or$a o% #ontract8cu$84uip$entPer%or$ance Ban-

  • 8/17/2019 IT Project Details

    39/77

     Te Ban" a$so agree tat te OGE7?PA5#SE7 at its option sa$$ be entit$ed to enforcetis uarantee against te Ban" as a Principa$ Debtor% in te 6rst instance 8itoutproceeding against te SELLE7 and not 8itstanding an/ securit/ or oter guaranteetat te OGE7?PA75#SE7 ma/ a*e in re$ation to te SELLE7Js $iabi$ities,

    Got8itstanding an/ting contained erein abo*e our $iabi$it/ under tis uarantee isrestricted to 7s,

     [[[[[[[[[[[[[[[[[ 7upees [[[[[[[[[[[[[[[[[[[[[[[[[) and it sa$$ remain in force up toand inc$uding

     [[[[[[[[[[[[[[[[ and sa$$ be extended from time to time for suc period as ma/ bedesired b/ te SELLE7 on 8ose bea$f tis guarantee as been gi*en,

    Dated at [[[[[[[[[[[[[[[ on tis [[[[[[[[[ da/ of [[[[[[[[[[[230,

     [[[[[[[[[[[[[[[[[[[[[ 

    Signed and de$i*ered b/

     [[[[[[[[[[[[[[[[[[[[[ 

    For and on Bea$f of 

    Game of te Ban" and Branc and.ts o9cia$ #ddress

    List of appro*ed Ban"s*ll +ationaliMed Ban- including the pu/lic sector /an- or Pri&ate Sector Ban-sor #o$$ercial Ban-s or #o8?perati&e Ban-s and Rural Ban-s

    #?+'R*#' F?R

     T.S #7EEMEGT made on te [[[[[[[[[[ da/ of [[[[[[[[[[[[[[[[[[[[% 230 [[[[bet8een

     [[[[[[[[[[[[[[[[[[[[[[[ (Name of purchaser)  of [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ (Country ofPurchaser) ereinafter 'te Purcaser( of te one part and

     [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ 

    (Name of Supplier) of [[[[[[[[[[[[[[[[[[[[[[[[[[[   (City and Country of Supplier)ereinafter ca$$ed 'teSupp$ier( of te oter part:

    E7E#S te Purcaser is desirous tat certain oods and anci$$ar/ ser*ices *i>,% [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ (BriefDescription of Goods and Services) and as accepted a bid b/ te Supp$ier for tesupp$/ of tose goods andser*ices in te sum of  

     [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ (Contract Price in Wordsand i!ures)ereinafter ca$$ed 'te 5ontract Price in ords and Figures( ereinafter ca$$ed 'te5ontractPrice,(

    GO T.S #7EEMEGT .TGESSET #S FOLLOS:

    .n tis #greement 8ords and expressions sa$$ a*e te same meanings as arerespecti*e$/ assigned to tem in te 5onditions of 5ontract referred to,

    2 Te fo$$o8ing documents sa$$ be deemed to form and be read and construed aspart of tis #greement% *i>, :

    2, te Bid Form and te Price Scedu$e submitted b/ te BidderN

  • 8/17/2019 IT Project Details

    40/77

    2,2 terms and conditions of te bid

    2,1 te PurcaserJs Goti6cation of #8ard

    1 .n consideration of te pa/ments to be made b/ te Purcaser to te Supp$ier asereinafter mentioned% te Supp$ier ereb/ co*enants 8it te Purcaser topro*ide te goods and ser*ices and to remed/ defects terein in conformit/ in a$$respects 8it te pro*isions of te 5ontract,

    Te Purcaser ereb/ co*enants to pa/ te Supp$ier in consideration of tepro*ision of te goods and ser*ices and te remed/ing of defects terein% te

    5ontract Price or suc oter sum as ma/ become pa/ab$e under te pro*isions of te 5ontract at te times and in te manner prescribed b/ te 5ontract,

    4 Particu$ars of te goods and ser*ices 8ic sa$$ be supp$ied ? pro*ided b/ teSupp$ier are as en$isted in te enc$osed annexure :

     TOT#L I#LAE:

    DEL.IE7 S5EDALE:

    .G .TGESS 8ereof te parties ereto a*e caused tis #greement to be executed inaccordance 8it teir respecti*e $a8s te da/ and /ear 6rst abo*e 8ritten,

    Signed% Sea$ed and De$i*ered b/ te

    Said [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ For te Purcaser)

    in te presence of [[[[[[[[[[[[[[[[[[[[[[[[ 

    Signed% Sea$ed and De$i*ered b/ te

    said [[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[ For te Supp$ier)

    in te presence of [[[[[[[[[[[[[[[[[[[[[[[ 

    *nexure: *

    +a$e " #ontact +u$/er o% the 1 *P# Secretaries in har-handState.

    +o. 9!S'R!#'

    G#ME OF#gricu$tura$ producemar"et committee

    #hair$anDsna$e$o/ile

    nu$/er

    SecretarDsna$e $o/ile

    nu$/er#C*SS

      1 !anchi  

    2 %am"he&p'r   

    1(hanba&   !amgarh  

    4 (altongang  

    0 )a*aribagh  

    = +haiba"a  

    < Sahebgan,  

    @ -oaro  

    -3 arhwa  

    -- Lohar&aga  

    -2 'mla  

    -1 Sim&ega  - +ha'lia  

    -4 iri&ih  

    -0 /a'r   

    -= 0o&erma  

    -< (eoghar   

    https://en.wikipedia.org/wiki/Agricultural_produce_market_committeehttps://en.wikipedia.org/wiki/Agricultural_produce_market_committeehttps://en.wikipedia.org/wiki/Agricultural_produce_market_committeehttps://en.wikipedia.org/wiki/Agricultural_produce_market_committeehttps://en.wikipedia.org/wiki/Agricultural_produce_market_committeehttps://en.wikipedia.org/wiki/Agricultural_produce_market_committee

  • 8/17/2019 IT Project Details

    41/77

    -@ ('ma  

  • 8/17/2019 IT Project Details

    42/77

    *nnexure B*P# (ise Bill o% aterial

    +ote:'he Bill o% aterial and Iuantit $entioned in Bid docu$ent areesti$ated uantities. 'he success%ul /idder (ill ha&e to calculate andappro&e the changes, i% an, in the actual Bill o% aterial %ro$ *P#.

    Bo %or each *P#.Sr.+o. !'4

    It per*P 8

    'otal It %or1 *P#s

    .SP - Mbps .nternet connection : 7a8Dedicated & Ansared Band8idt) 8itre;uired de*ice i,e, 7outer% Modem as persite ? $ocation re;uirement,

    @

    2

    .SP -2 2 Mbps .nternet connection : 7a8Dedicated & Ansared Band8idt) 8itre;uired de*ice i,e, 7outer% Modem as persite ? $ocation re;uirement,

    @

    1 Des"top 3 @3

    Laser Printer 8it i-Fi connecti*it/ 1 4=

    4 3X or iger LED Monitor @

    0 2 Port La/er 2 S8itc @

    = < Port La/er 2 S8itc 1 4=

    < Mini B.5 333LR transcei*er port < 42

    @ ATM #pp$iance @

    3 1 VI# On$ine APS for 5entra$ Get8or" @

    033 I# Line .nteracti*e APS 1 4=

    2 ire$ess #ccess 5ontro$$er @1 ire$ess #ccess Point < 42

    Port PoE .nector for ire$ess #ccess Points =0

    4 Securit/ 5amera Fixed 0

    0 Securit/ 5amera PTW 2 1<

    = GI7 Ser*er @

    < ire$ess #utentication Ser*er @

    @ 2 A 7ac" @

    23 @ A 7ac" 1 4=

    2 5at-0 ATP 5ab$e - 134 Meters Box 4 @4

    22 5at-0 ATP Pr, Patc 5ord - Meter 1< =22

    21 5at-0 ATP Pr, Patc 5ord - 2 Meter 2= 41

    2 5at 0 ATP Surface Sing$e Sutter out$et 8it.?O Modu$e and bac" box

    2= 41

    24 5at 0 ATP Suttered Patc Pane$ 2 Port-Loaded 8it cab$e Manager

    =0

    20

    ,4 Si>e PI5 5ap on 5asing 8it #ccessoriesneed to be insta$$ed 8ere e*er re;uired, #sper #ctua$ t/ re;, at Site )

    33 =033

    2= ,4 Si>e PI5 Pipe 8it #ccessories need to beinsta$$ed 8ere e*er re;uired, #s per #ctua$t/7e; at Site )

    33 =033

    2< Sing$e Mode Fiber 5ab$e 33 =033

    2< Fiber SM-S5 5oup$ers and Pigtai$ x 0 1313 Fiber Patc 5ord S5-L5 T/pe @?24 Sing$e < 42

  • 8/17/2019 IT Project Details

    43/77

    Mode Fiber

    1 2 port 7M L.A - L.A Loaded 8it adapter p$ateand 8it Sing$e Mode #dapters)

    1 4=

    12 12 MM .S. mar" DPE Pipe for Fiber 5ab$e #sper #ctua$ t/ 7e;uired at Site) .n Mtr,)

    33 =033

    11 24mm 5$ass B categor/ .S. mar"s . Pipe #sper #ctua$ t/ 7e;uired at Site) .n Mtr,)

    43 @43

    17oute Mar"er to be insta$$ed on 6ber route8it minimum Distance of 43 mtrs,) < 42

    14 La/ing of 0 5ore Sing$e Mode Fiber 5ab$e 33 =033

    10 La/ing of DPE pipe 33 =033

    1= La/ing of . Pipe - 24mm 43 @43

    1< Fixing of L.As 1 4=

    1@ Fiber Pigtai$s Sp$icing 0 13

    3 Fiber 5ore Testing 5arges 2 40

    Soft Soi$ Digging and 7e6$$ing 233 1

  • 8/17/2019 IT Project Details

    44/77

    S4#'!?+ !!!

    For$ +o. F1: F!+*+#!*C B!9 F?R*'

    Sr.+o. !'4

    '?'*C It

    1*P#s

    nit Price(ith 5Frs.)arrant!n Rs.

    )ithout#.S.'.

    ;*'Ser&ice

    'ax

    'otal Price(ith 5Frs.

    )arrant !nRs. )ithout

    #.S.'. ;*' Ser&ice

    'ax

    Rate o% #.S.'. ;*'

    Ser&ice'ax

    * B # 9 4# 9 F Des"top @3

    2Laser Printer 8it i-Ficonnecti*it/

    4=

    1 3X or iger LED Monitor @

    2 Port La/er 2 S8itc @

    4 < Port La/er 2 S8itc 4=

    0Mini B.5 333LR transcei*erport

    42

    = ATM #pp$iance @

    <1 VI# On$ine APS for 5entra$Get8or"

    @

    @ 033 I# Line .nteracti*e APS 4=

    3 ire$ess #ccess 5ontro$$er @

    ire$ess #ccess Point 42

    2 Port PoE .nector forire$ess #ccess Points

    =0

    1 Securit/ 5amera Fixed Securit/ 5amera PTW 1<

    4 GI7 Ser*er @

    0ire$ess #utenticationSer*er

    @

    = 2 A 7ac" @

    < @ A 7ac" 4=

    @5at-0 ATP 5ab$e - 134 MetersBox

    @4

    235at-0 ATP Pr, Patc 5ord - Meter

    =22

    25at-0 ATP Pr, Patc 5ord - 2Meter

    41

    225at 0 ATP Surface Sing$eSutter out$et 8it .?OModu$e and bac" box

    41

    215at 0 ATP Suttered PatcPane$ 2 Port-Loaded 8itcab$e Manager

    =0

    2

    ,4 Si>e PI5 5ap on 5asing8it #ccessories need to beinsta$$ed 8ere e*er re;uired, #s per #ctua$ t/ re;, at

    Site )

    =033

    24

    ,4 Si>e PI5 Pipe 8it#ccessories need to beinsta$$ed 8ere e*er re;uired, #s per #ctua$ t/7e; at Site)

    =033

    20 Sing$e Mode Fiber 5ab$e =033

  • 8/17/2019 IT Project Details

    45/77

    2=Fiber SM-S5 5oup$ers andPigtai$ x

    13

    2<Fiber Patc 5ord S5-L5 T/pe@?24 Sing$e Mode Fiber

    42

    2<2 port 7M L.A - L.A Loaded8it adapter p$ate and 8itSing$e Mode #dapters)

    4=

    1312 MM .S. mar" DPE Pipe forFiber 5ab$e #s per #ctua$ t/7e;uired at Site) .n Mtr,)

    =033

    1 24mm 5$ass B categor/ .S.mar"s . Pipe #s per #ctua$t/ 7e;uired at Site) .n Mtr,)

    @43

    127oute Mar"er to be insta$$edon 6ber route 8it minimumDistance of 43 mtrs,)

    42

    11La/ing of 0 5ore Sing$e ModeFiber 5ab$e

    =033

    1 La/ing of DPE pipe =033

    14 La/ing of . Pipe - 24mm @43

    10 Fixing of L.As 4=

    1= Fiber Pigtai$s Sp$icing 13

    1< Fiber 5ore Testing 5arges 40  1@ Soft Soi$ Digging and 7e6$$ing 1

  • 8/17/2019 IT Project Details

    46/77

    0

    .SP- .nternet Band8idt5arges for Dedicated &Ansared Band8idt) Mbps.nternet connection :) 7a8for 4 /ears, uarter$/pa/ment)

    @

     

    02

    .SP-2 .nternet Band8idt5arges for Dedicated &Ansared Band8idt) Mbps.nternet connection :) 7a8

    for 4 /ears, uarter$/pa/ment)

    @

     

    01

    One time .nsta$$ation andcommissioning carges for.SP - 8it Dedicated &Ansared Band8idt) Mbps.nternet connection :)7a8,

    @

     

    0

    One time .nsta$$ation andcommissioning carges for.SP -2 8it Dedicated &Ansared Band8idt) 2 Mbps.nternet connection :)

    7a8,

    @

     +ote:1. Bidder shall uote unit rates %or all hard(are (ith 5 ears (arrant.2. C1 (ill /e the lo(est su$ total o% rates o% all line ite$s (ithout tax (ith

    (arrant.. 'he uantit $entioned a/o&e %or all line ite$s is pro&isional " %or e&aluation

    purpose onl. =o(e&er, at the ti$e o% the i$ple$entation and /illing, theactual consu$ption (ill /e ta-en into account.

    J. Success%ul ;endor (ill ha&e to supplpro&ide goods (ith an !n&oice %ro$ aplace located (ithin State o% har-hand.

    5. 'he success%ul /idder has to suppl " install an other reuired

    ite$speripherals accessories to carr out the (or- o% #a$pus (ide area

    +et(or- in the respecti&e *P#s.

    Cist o% 1 *P#s %or 4 ar-et proAect i$ple$entation in

    Grst phase.

    Sr. +o. +a$e o% *P#s

    1 !anchi

    2 %am"he&p'r 

    3 (hanba&

    4 !amgarh

    5 (altongang

    6 )a*aribagh

    7 +haiba"a

    # Sahebgan,

    9 -oaro

    1$ arhwa

    11 Lohar&aga

    12 'mla

    13 Sim&ega

    14 +ha'lia

  • 8/17/2019 IT Project Details

    47/77

    15 iri&ih

    16 /a'r 

    17 0o&erma

    1# (eoghar 

    19 ('ma

  • 8/17/2019 IT Project Details

    48/77

    For$ +o. '2: '4#=+!#*C !+! SP4#!F!#*'!?+S:

    *cti&e #o$ponents

    Caer 2 S(itch 8 2J Port Caer 2 anaged S(itch

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o.

    atched !% an

    2]3?33?333Base-T ports2]SFP S$ots 33?333M Base-R SFP)Sou$d support .nterface s8itcing capacit/ of42bpsSou$d support For8arding capacit/ of ,= Mbps

    .EEE

  • 8/17/2019 IT Project Details

    49/77

    Sou$d support .nterface s8itcing capacit/ of23bps

    Sou$d support For8arding capacit/ of ,

  • 8/17/2019 IT Project Details

    50/77

    S8itc Sou$d Supports

  • 8/17/2019 IT Project Details

    51/77

    c) .t sou$d support .P*0 routing protoco$% .P*0tunne$ing% .P*0.PSec IPGs% G#T0 and G#T 0 for 6re8a$$ and ATM for.P*0 tra9c,d) .t sou$d a$$o8 sing$e sign on for 8indo8 acti*edirector/%Go*e$$e director/ c$ient% termina$% ser*er% user access

  • 8/17/2019 IT Project Details

    52/77

    e) ATM Sou$d a*e L1 features of 7outing

    .P*0 read/ from Da/

    Fire(alla)Te minimum troug put of te 6re8a$$ sou$dbe 1, bps or more,

    b) .t sou$d support at $east 2 mi$$ion concurrent sessions,

    c) .t sou$d support at $east 333 ne8 session per second,!PS " !9S

    a) .t sou$d be .5S# or G.PS? e;ui*a$ent certi6ed

    b) .t sou$d support minimum trougput of 233 Mbps or more,

    c) .t sou$d a*e at $east 0333H signature .PS DB

    *nti&irus

    a) #I sou$d be certi6ed b/ .5S# Labsb) .t sou$d support fo$$o8ing protoco$si) TTP and TTPSii) SMTP and SMTPSiii) PoP1 andPoP1S i*) .M#P*) .nternet Manager #.M% aoo_%MSG%.5%S.MPLE) *i) GGTPc) #I trougput is minimum 14 Mbps of igerin Prox/-based mode

    )e/ and *pplication #ontrol Filteringa) .t sou$d support 243H Mi$$ion A7L Database8ic categori>ed in at $east =3H categories in 03H$anguages

    b) .t sou$d at $east a*e database of 1333H t/pe of app$ication,

    *d$inistration, onitoring and 9iagnostica) .t sou$d support management access o*erTTPS% SS% te$net conso$e protoco$ or externa$management de*ice

    ;P+a) Te proposed so$ution must support .PSec% SSL% PP2P & L2TPIPG

    b ) Fire8a$$ sou$d support at $east 33 SSL IPG c$ients from da/

    c) .PSec IPG trougput must be bps or mored ) Must support at $east 33 c$ient to site IPG inrouter?o9ce mode from da/

    e) IPG sou$d be .5S# certi6ed or e;ui*a$ent

    ;irtual #ontext;9?Ts;irtual Fire(alla) .t sou$d support at $east 4 Iirtua$ context from da/ 8itFu$$ATM feature in e*er/ sing$e IDOM

    Cogs " reportinga) it sou$d a*e option to integrate 8itexterna$ $og de*ice for passi*e $ogging & reportingpart

    b) it must a*e faci$it/ to for8ard $ogs to s/s$og ser*er

  • 8/17/2019 IT Project Details

    53/77

    - 1 of0@ -

  • 8/17/2019 IT Project Details

    54/77

    c ) 7ea$ time $ogging & dasboard $i"e top 3source?destination?user?.P?app$ication must be teiron 6re8a$$ on$/

    Fire8a$$ sou$d be .5S# $abs certi6ed or iger certi6ed,.f ire$ess 5ontro$$er is not a part of ATM-MatcSpeci6cation mentioned in ire$ess 5ontro$$er

    )ireless *ccess #ontroller8 #an also /e part o% '

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o.

    atched !% an

    ini$u$ : ]3?33?333Base-T igabit L#G ports]3?33?333Base-T igabit #G ports

     Tota$ te de*ice sou$d a*e 4 gigabit 7!4 ports %ifconsidered

    under ATM Ports of ATM need to be consideredSa$$ support EB Porta$ #utentication support% sa$$supportad*ertisement under ate8a/ operation modeSa$$ Support .EEE

  • 8/17/2019 IT Project Details

    55/77

     Te 5ontro$$er sa$$ support scan and add te #Pautomatica$$/ inte L#G net8or"

     Te contro$$er sa$$ support in bot L2 and L1 Get8or"for autodisco*er/, Sa$$ support 7ea$ Time Monitor and #na$/>eof #P

    < #ccess points Licenses must be Loaded b/ defau$t percontro$$er

    #b$e to Apgrade up to 0 #ccess points per contro$$er8itoutadding additiona$ 5ontro$$er or ard8are 5on6gure

    - 12 of0@ -

  • 8/17/2019 IT Project Details

    56/77

    Monitor and management of #ccess points and c$ients update of Soft8are% con6guration and SGMP managementfor te access points,MM ire$ess mu$timedia Extensioneb based Management% 5L.%S/s$og% Aser access *ia Te$net andSS $oginOperating Temperature of 3 deg, 5 3 deg, 5

    Storage Temperature of 24 deg, 5 03 deg, 5

    Operating umidit/ of 23 @3 non condensing

    )ireless *ccess Point

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o.

    atche

    d !% anSou$d ab$e to mount on 5ei$ing% po$e and 8a$$,#$$ mounting accessories must be inc$uded in pac"age^ 3?33 Mbps L#G Port 8it POESou$d be po8ered b/ .EEE

  • 8/17/2019 IT Project Details

    57/77

    Minimum < Iirtua$ #ccess point canne$sSS.D iding function#ccess point s8itc o*er function

    - 11 of0@ -

  • 8/17/2019 IT Project Details

    58/77

    .EEE

  • 8/17/2019 IT Project Details

    59/77

    treated andpo8der coated,APS sa$$ be free from 8or"mansip defects% sarpedges% nic"s%scratces% burs etc, #$$ fasteners sa$$ be 6xed proper$/,

     Tee;uipment sa$$ be comp$ete 8it a$$ parts and a$$ partssa$$ be

    functiona$

    Enc$osures sa$$ conform to protection re;uirement of.P2L to.S.:1@= Part )?@@1 rea9rmed @@

  • 8/17/2019 IT Project Details

    60/77

    Bpass S(itch

    Manua$ and Static b/-pass s8itc sa$$ be pro*ided formaintenance of APSAPS sa$$ supp$/ output po8er and carging currentat te same time

    S(itching 9e&ice

    S8itcing De*ice sa$$ be .BT

    S8itcing fre;uenc/ sa$$ be @ V> or abo*e

    APS sa$$ be pro*ided 8it seria$ communication port7S 212 for computer interface for data excange ofe$ectrica$ parameters of APS $i"e *o$tage% current%fre;uenc/% carging status% mode of operation etc,

    Rating

     Te rating speci6ed is a unit/ po8er factor

    !+P'

    Io$tage 7ange: 03I - 203I

    Fre;uenc/ 7ange: 43> H?- 3 >Pase: Sing$e Pase #5

    ?'P'

    Io$tage 7egu$ation: 213 I H?-2Percent 8it a$ternati*e settingfor223I H?- 2Percent)

    Output Fre;uenc/: 43 > H?- > Sing$e Pase .n in*ertermode)

    Io$tage 7egu$ation: From on $oad to fu$$ $oad Sou$d be 8itin H?-Percent in bot te cases% APS sa$$ a$so a*e faci$it/

    for operation in s/ncronous mode in 8ic outputfre;uenc/ sa$$ be same as tat of mains fre;uenc/

    armonic Distortion: 2 maximum on resisti*e $oad for 1 VI#

    4Ecienc

    #t rated Output *o$tage and Fre;uenc/.n*erter: @3 min,)

    O*era$$:

  • 8/17/2019 IT Project Details

    61/77

    .nput #5 Io$tage% Output #5 Io$tage% .?o Fre;uenc/% & O?pFre;uenc/% Batter/ Io$tage 8it LEDL5D disp$a/)

    Batter 9etail

  • 8/17/2019 IT Project Details

    62/77

    O*er Io$tage% sort circuit and o*er$oad at APS outputtermina$% no$oad sut do8n, 5o$d start

    Ander *o$tage at batter/ termina$% Batter/ o*er carge

    !ndicators and $eters

    Mains presence% APS mode% Batter/ $o8% o*er$oad

    Batter details

    Batter/ T/pe- Sea$ed Maintenance Free I7L#) Bui$t-in

    - 10 of0@ -

  • 8/17/2019 IT Project Details

    63/77

    Batter/ ma"e- Exide?uanta?5SB?Panasonic ?uasa?Same ma"e asOEM Batter/ Sr, Go on OEM Letter ead 8itarrant/ #ssurance of /ears)Minimum Batter/ #- 033 I# APS

  • 8/17/2019 IT Project Details

    64/77

    /ear updates5erti6cations : 7oS %AL %5E?F55 or e;ui*a$ent tirdpart/certi6cation from reputed #genc/% indo8s

  • 8/17/2019 IT Project Details

    65/77

    Moterboard 8it .ntegrated 5ipset 8it Processor or better

    B DD71 SD7#M 111 M> upgradeab$e to < B,

    433 B or iger S#T# DD 8it 433 7PM

    Screen: 1,1(?(?4,0( or iger LED B?L Disp$a/ 8it100]=0< reso$ution R#)

    .nte$ rapics Media #cce$erator D or better

    ired 5ommunication: .ntegrated 3?33?333 Mbpsigabit

    Eternetire$ess 5ommunication: .ntegrated ire$ess L#G

  • 8/17/2019 IT Project Details

    66/77

    atched !% an

    Diagona$ Screen Si>e : 3( or iger

    Pane$ T/pe : LED 3

    7eso$ution : -@23 x -3

  • 8/17/2019 IT Project Details

    67/77

    Brigtness : 143 nit or better

    5ontrast 7atio : 333: or iger

    7esponse Time : 3ms or better

    .nput & Output : P5 input D-sub)-% DM.-% 5omposite .n - or5omponent in -% #udio in & out% ASB% 7! 4Po8er cab$e% I# cab$e% #udio Iideo cab$eP$ease mention te $engt of te cab$es)

    Po8er Supp$/ : #5 33-23I% 43?03 >

    uic" Setup uide% arrant/ 5ard% #pp$ication 5D%7emote 5ontro$ 8it Batteries

    3( or iger Professiona$ Disp$a/ Monitor sou$d be certi6ed forEnerg/ Star 0,3% B.S% 5E% F55% AL

     Te on$ine rates a*ai$ab$e for *ariouscommodities sou$d be disp$a/ on te saidProfessiona$ Disp$a/ Monitor

     Te said Professiona$ Disp$a/ Monitor sa$$ besupp$ied 8it 8a$$ mount?oor stand & setup tesame as per te re;uirement of respecti*e #PM5

    o/ile )ireless 'her$al Printer

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o.

    atched !% an

    Print Speed:

  • 8/17/2019 IT Project Details

    68/77

    reso$ution or better% 8ic sou$d be c$ear$/ *isib$e inte da/ $igt

    a$so, 233

    .ntegrated 5amera for Poto & 7ecording

    #onnecti&it i-Fi% B$ue toot I

    Slots and Ports Micro ASB Supporting ASB 2,3)%eadpone andmicropone ac"% S.M card s$ot 8it *oice ca$$ing faci$it/

    ?perating Sste$ #ndroid Vit Vat or iger,- 1@ of0@ -

  • 8/17/2019 IT Project Details

    69/77

    +et(or- .nfra% 2 SM% 1 5DM#% LTE FDD

    Po(er Suppl 213I% 43 > #5 Supp$/, Suitab$e

    carger sa$$ besupp$ied, Bui$t-in recargeab$e

    Batter/ 5apacit/ minimum 1333 M# or iger%

    .nternet Bro8sing Time : #t $east 0 to < ours

    S! Support - Sing$e S.M% SM?P7S

    Canguage Support - indi & uarati $oca$ $anguage fonts insta$$ed

    )eight Got more tan 433gm inc$uding batter/

    Batter/ carger% data cab$e% ear pone% bag?pouc etc

     Te ;uoted Tab$et sou$d be estab$ised brand 8it B.S

    certi6cation, B.S 5erti6cate must be attaced for te

    ;uoted Tab$et,

    Suggested Ma"e : #pp$e% De$$% P% Leno*o% Samsung

    Rac-s

     J2 Rac- 

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o.

    atched !% an

    2A F$oor Standing rac" @( #dustab$e rai$s in tefront and rear%Front section 8it g$ass door and $oc"% Top and bottomcab$e entr/

    faci$it/% 033mm 8ide ]

  • 8/17/2019 IT Project Details

    70/77

    atched !% an

  • 8/17/2019 IT Project Details

    71/77

    Pair 1 : ite - reen

    Pair : ite - Bro8n

    Seat : Fire 7etardant PI5 5ompound F7PI5)

    #pprox, 5ab$e OD : 0,4 mm

    Operating En*ironment : .ndoor

    4lectrical SpeciGcation : at 550 =M

    Standards : T.# ? E.# 40< B,2-

    .mpedance : 33 H?- 4 om

    AL ? ETL Ieri6ed% ETL >ero bit error tested,

    8 #at86 'P JPr. Patch #ord 8 1 eter

    Sr.

    atched

    9e&iation

    !te$ It. +ot

    Re$ar- 

    s+o. atched !% an

    Sou$d conform or exceed te E.#?T.# 40< B standardsfor 5#T 0Factor/ mo$ded boots on 7! 4 p$ugs at bot ends5omp$iance 8it 5at 0 standards of .SO?.E5

  • 8/17/2019 IT Project Details

    72/77

    4% 5#T 4e

    and 5#T0

  • 8/17/2019 IT Project Details

    73/77

    S;uare in Si>e

    Designed for ease of use

    Anc$uttered interna$ design

    P5B based 5at 0 Ve/stone !ac"

    Spring 5ontact: 43u( go$d o*er 33u( nic"e$

    Sou$d Support T40

  • 8/17/2019 IT Project Details

    74/77

    atched

    9e&iation

    Sr. !te$ It. +ot

    +o.Re$ar

    -satched

    !% an

    0 core @?24 micron) sing$e mode Loose Tube e$$/6$$ed% Ani-tubedesign% 5ST #rmored optica$ Fiber cab$e 4033]

    Sing$e Mode Fiber to support 13 nm and 443 nm8a*e$engts%

    @?24 micron%

    Graded index, anti rodent, fiber Should be protected inside

     jelly filled loose tube armoring with acrylic coated goodquality steel. Should conform or exceed the EIA!IA "##,

    EIA!IA #$%, IS&' ((%)( and I*EA'$") standards for +iberand cable performance specifications. Attenuation -ot more

    than ).% d/0m at (() nm and ).1# d/0m at (##) nm.E**S armor followed by a jac0et of polyethylene. &2er the

    armor, water bloc0ing powder applied for water tight cable.Aramid yarn as peripheral strength member, Steel rods

    embedded in the outer jac0et.&peration ' )3* to 45)3*

    Fi/er S8S# #ouplers and Pigtail x

    atched

    9e&iation

    Sr. !te$ It. +ot

    +o.Re$ar

    -satched

    !% anSM-S5 Pigtai$5onnector T/pe:- S5-St/$e5onnector co$or-SM-B$ueLengt: ,4meter

     Tic"ness of pigtai$ cab$e sou$d be 3,@ mm nomina$,Ferru$es:- Pre-radiused 5eramic Ferru$es.nsertion Loss: 3,1dB7eturn Loss: ZU23dB 3Dup$ex S5 #daptor 8it Wirconia S$ee*eDust caps for protection

    5o$or: Sing$e mode-B$uePus pu$$ mecanism

    3,@mm Tigt bu+ered 6ber

    .nsertion $oss: Sing$e mode Y 3,4dB% Mu$timodeY3,2dB

    Fi/er Patch #ord S#8C# 'pe 125 Single ode Fi/er

    atched

    9e&iation

    Sr. !te$ It. +ot

    +o.

    Re$ar

    -satched!% an

    SM S5 ? L5 Fiber Patc 5ord% 1M% Dup$ex% @?24um5onnector T/pe:- S5-L55o$or-SM-e$$o8

    12Ferru$es:- Pre-radiused 5eramic Ferru$es.nsertion Loss: 3,1dB

  • 8/17/2019 IT Project Details

    75/77

    7eturn Loss: ZU23dB

    12 port R C! 8 C! Coaded (ith adapterplate " (ith Single ode *dapters

    atched

    9e&iation

    Sr. !te$ It. +ot

    +o.Re$ar

    -satched

    !% an

    Mode a*ai$abi$it/ 2 Port Fiber Patc Pane$23