IT Office Relocation Planning

8
IT Office Relocation Planning Prio Planning Item Complete By Status Done Date Completed 1 Need help? Learn how to use this template. - 2 3 IT Department Moving Plan 31.12.2014 - 4 Planning and Mapping (3 Months Prior) 02.10.2014 2 of 27 5 Create teams ans assign responsibilities for all aspects of the move 02.10.2014 26.06.2014 6 Ensure all areas of expertise are covered 02.10.2014 29.03.2014 7 Contact service providers for all the utilities needed well in advance 02.10.2014 8 Make plans for business interruptions. 02.10.2014 9 Identify key internal resources from other departments 02.10.2014 29.03.2014 10 Make sure all property is protected from damage, loss or theft during the relocation process. 02.10.2014 11 Determine what warranties or maintenance protection options exist for each item in your inventory and any recertification requirements necessary after equipment and systems are reinstalled at new location. Extra insurance items may be purchased for those not already covered. 02.10.2014 12 Schedule the move. Obtain quotes from moving companies and evaluate if an efficient relocation expert is necessary. 02.10.2014 13 Plan every detail. Obtain a blueprint of the complete office layout — including the locations of desks and printer stands — to optimize power outlets and communications ports. 02.10.2014 14 Develop a checklist of changes. Log any changes required once servers, user systems and network equipment are in place at the new location. 02.10.2014 15 Seek specialists as appropriate. Be willing to obtain outside help in areas such as network wiring, server setup, project management and infrastructure design. 02.10.2014 16 If you employ a relocation specialist, negotiate and sign a statement of work that will detail the entire process. 02.10.2014 17 Plan your new network configuration. This should include wired, fiber-optic and wireless components, as well as any upgrades you intend to include. 02.10.2014 18 Determine which equipment and applications/workstations should be up and running first. Prioritize move items. 02.10.2014 19 Coordinate elevators and shipping docks with building management 02.10.2014 20 Request a detailed copy of the floor plan that includes proposed furniture orientation 02.10.2014 21 Review final space plans, including electrical and furniture placement 02.10.2014 22 If modular furniture is being used, run the network cabling before the furniture is installed 02.10.2014 23 Determine PC and printer locations in the new space 02.10.2014 24 Determine the location of fax machines in the new space 02.10.2014 Page 1 of 8 Exported on 13 martie 2015 10:50:22 IST

description

IT Office Relocation Planning

Transcript of IT Office Relocation Planning

  • IT Office Relocation Planning

    Prio Planning Item Complete By Status Done DateCompleted1 Need help? Learn how to use this template. -2

    3 IT Department Moving Plan 31.12.2014 -4 Planning and Mapping (3 Months Prior) 02.10.2014 2 of 27

    5 Create teams ans assign responsibilities for all aspects of the move 02.10.2014 26.06.2014

    6 Ensure all areas of expertise are covered 02.10.2014 29.03.2014

    7 Contact service providers for all the utilities needed well in advance 02.10.2014

    8 Make plans for business interruptions. 02.10.2014

    9 Identify key internal resources from other departments 02.10.2014 29.03.2014

    10 Make sure all property is protected from damage, loss or theft during the relocation process. 02.10.2014

    11Determine what warranties or maintenance protection options exist for each item in your inventory and anyrecertification requirements necessary after equipment and systems are reinstalled at new location. Extrainsurance items may be purchased for those not already covered.

    02.10.2014

    12 Schedule the move. Obtain quotes from moving companies and evaluate if an efficient relocation expert isnecessary.02.10.2014

    13 Plan every detail. Obtain a blueprint of the complete office layout including the locations of desks andprinter stands to optimize power outlets and communications ports.02.10.2014

    14 Develop a checklist of changes. Log any changes required once servers, user systems and networkequipment are in place at the new location.02.10.2014

    15 Seek specialists as appropriate. Be willing to obtain outside help in areas such as network wiring, serversetup, project management and infrastructure design.02.10.2014

    16 If you employ a relocation specialist, negotiate and sign a statement of work that will detail the entireprocess.02.10.2014

    17 Plan your new network configuration. This should include wired, fiber-optic and wireless components, aswell as any upgrades you intend to include.02.10.2014

    18 Determine which equipment and applications/workstations should be up and running first. Prioritize moveitems.02.10.2014

    19 Coordinate elevators and shipping docks with building management 02.10.2014

    20 Request a detailed copy of the floor plan that includes proposed furniture orientation 02.10.2014

    21 Review final space plans, including electrical and furniture placement 02.10.2014

    22 If modular furniture is being used, run the network cabling before the furniture is installed 02.10.2014

    23 Determine PC and printer locations in the new space 02.10.2014

    24 Determine the location of fax machines in the new space 02.10.2014

    Page 1 of 8Exported on 13 martie 2015 10:50:22 IST

  • Responsible Party Notes

    United Movers

    Ken L

    John G

    Ken L

    Ken L

    United Movers

    Ken L

    Ken L

    Ken L

    Ken L

    Ken L

    Page 2 of 8Exported on 13 martie 2015 10:50:22 IST

  • Prio Planning Item Complete By Status Done DateCompleted25 Identify personal printers on the floor plan 02.10.2014

    26 Identify analog lines on the floor plan 02.10.2014

    27 Determine jack locations (on the furniture plan) for voice and data 02.10.2014

    28 Obtain floor plan approval 02.10.2014

    29 Obtain bids for working 02.10.2014

    30 Check to see if the doorways, access hallways, ramps and the elevator doors are wide enough for movingequipment to fit through02.10.2014

    31 Conduct thorough walkthru inspection of new facility 02.10.2014

    32 Equipment (2 Months Prior) 01.11.2014 0 of 8

    33 Inventory existing equipment and hardware: 01.11.2014

    34 Computers 01.11.2014

    35 Monitors 01.11.2014

    36 Printers 01.11.2014

    37 Modems 01.11.2014

    38 Servers 01.11.2014

    39 Surge protectors 01.11.2014

    40 Fax machines 01.11.2014

    41 Data cables 01.11.2014

    42 Network switches 01.11.2014

    43 Copiers 01.11.2014

    44 Assess the need for any new equipment required 01.11.2014

    45 Arrange for new Security/Video surveillance system 01.11.2014

    46 Plan for lead time required in ordering new equipment items 01.11.2014

    47 Devise plan for properly disposing of or donating old equipment 01.11.2014

    48 Ensure all redundant IT equipment is disposed of correctly 01.11.2014

    49 Review service calls for last year and identify likely-to-fail parts and order additional to be prepared 01.11.2014

    50 Have a physical backup for all servers (transport separately) 01.11.2014

    51 Labeling (1 Month Prior) 01.12.2014 0 of 7

    Page 3 of 8Exported on 13 martie 2015 10:50:22 IST

  • Responsible Party Notes

    Page 4 of 8Exported on 13 martie 2015 10:50:22 IST

  • Prio Planning Item Complete By Status Done DateCompleted

    52 Before you move a single cable, develop a detailed inventory of all hardware and software including serialnumbers and approximate weights and values of each item.01.12.2014

    53 Prepare for worst-case scenarios. Document your backup procedures, label all wiring and machines, andhave tools to disassemble and assemble equipment.01.12.2014

    54 Make sure all lines are labeled with "A" for analog, "V" for digital phone lines and "D" for network lines 01.12.2014

    55 Verify all wiring has permanent labels on both ends with room, plate and jack numbers. 01.12.2014

    56 Post a set of floor plans next to the patch panels with all room numbers and wall plate locations clearlyidentified01.12.2014

    57 Label computers, boxes, binders, switches, keyboards, mice and other equipment with destination info(room numbers/locations)01.12.2014

    58 Confirm 30 days ahead of time with all vendors 01.12.2014

    59 Wiring Items (2 Weeks Prior) 17.12.2014 0 of 13

    60 Schedule wiring according to the construction timeline for newly-built or renovated space 17.12.2014

    61 Identify the telephone and data cabling close/room within the space 17.12.2014

    62 Detail server room requirements 17.12.2014

    63 Research new power needs and look for opportunities to improve performance. 17.12.2014

    64 Confirm proper shelving or racks for server and network equipment 17.12.2014

    65 Confirm room dimensions of server room 17.12.2014

    66 Verify electrical requirements of server room 17.12.2014

    67 Verify proper ventilation system 17.12.2014

    68 Verify separate climate control 17.12.2014

    69 Test all network and phone drops 17.12.2014

    70 Test all power outlets using a tester as well as by plugging something in 17.12.2014

    71 Map the locations of the desks and use a mapping tool to estimate cable sizes 17.12.2014

    72 Plan for extra wiring drops. 17.12.2014

    73 Verify all backup batteries for phone switches and servers are installed according to schedule 17.12.2014

    74 If using an 800 phone number, confirm plans with vendor for cutover date and time. 17.12.2014

    75 Test new telephone line several days before the move 17.12.2014

    76 Review programming/routing on voicemail system for required changes. 17.12.2014

    77 Disconnect all leased lines, such as T1s at old location 17.12.2014

    78 If company web address is hosted internally, verify if change to DNS resolution is required. 17.12.2014

    Page 5 of 8Exported on 13 martie 2015 10:50:22 IST

  • Responsible Party Notes

    Page 6 of 8Exported on 13 martie 2015 10:50:22 IST

  • Prio Planning Item Complete By Status Done DateCompleted79 Meetings and Special Communications (1 Week Prior) 24.12.2014 0 of 19

    80 Conduct security system and telephone system training if new ones are to be implemented 24.12.2014

    81 Distribute new access cards to staff 24.12.2014

    82 Identify key contacts and new locations 24.12.2014

    83 Create a list of contact names, phone numbers, cell phone numbers, email addresses, etc to distribute toresponsible parties. Include property management contacts, local phone company, website master, etc.24.12.2014

    84 Arrange for local staff contact to be onsite for deliveries and needed vendor access to the space prior toopening.24.12.2014

    85 Establish and inventory every telephone number to be moved 24.12.2014

    86 Schedule a meeting with local phone vendor 24.12.2014

    87 Schedule disconnects or additions of phone lines 24.12.2014

    88 Transfer any ISDN lines 24.12.2014

    89 Schedule phone activation time for new office location 24.12.2014

    90 Have a team meeting to confirm roles and responsibilities 24.12.2014

    91 Update all pertinent information with your company's backup alarm system, office security stems, etc 24.12.2014

    92 Remind users to backup their own files as necessary 24.12.2014

    93 If any reconfig is necessary at the new site, script all steps and test before the move 24.12.2014

    94 Script the shutdown steps of all equipment 24.12.2014

    95Know the details of your service contracts. If a move will take you out of a service area, immediately getyour contracts and documentation out and review them carefully. If possible, schedule an office move intandem with contract end dates.

    24.12.2014

    96 Perform complete backup of network 24.12.2014

    97 Perform complete backup of telephone system 24.12.2014

    98 Test new office phones, computers, printers, security cameras, Internet connection and all electrical devicesthe day prior to staff returning to work24.12.2014

    Page 7 of 8Exported on 13 martie 2015 10:50:22 IST

  • Responsible Party Notes

    Page 8 of 8Exported on 13 martie 2015 10:50:22 IST