IT Applications in Operations by Sr Prof Tm
-
Upload
indian-railways-knowledge-portal -
Category
Documents
-
view
2.125 -
download
10
description
Transcript of IT Applications in Operations by Sr Prof Tm
![Page 1: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/1.jpg)
IT APPLICATIONS IN TRAIN OPERATIONS
BY:PRAVIN PARMARSr Professor(T.M.)
Apr 21, 2023 1
![Page 2: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/2.jpg)
Why IT applicationsGigantic DimensionsOperationsPayment Man power PlanningData captureData Mining Administration and Management
Apr 21, 2023 2
![Page 3: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/3.jpg)
Indian Railways Gigantic OperationsDAILY TRANSPORT OUTPUT
23 MILLION PASSENGERS 3 MILLION TONNES FREIGHT
LOADING 12,617 PASSENGER TRAINS RUN > 7000 FREIGHT TRAINS
3
![Page 4: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/4.jpg)
Assets of I R (2013-14)
65,436 route kilometers 63,870 Passenger Coaches 9,956 locomotives 2.44 lakh wagons 7172 block stations 13.07 lakh work force
4
![Page 5: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/5.jpg)
IT APPLICATIONS IN OPERATIONS1. FOIS (Freight Operations Information System)
2. ICMS (Integrated Coaching Management System)
3. COA (Control Office Application)
4. PMS (Parcel Management System)
5. SATSaNG (Software Aided Train Scheduling and
Network Governance)
6. CMS (Crew Management System)
7. RFID (Radio frequency Identification)
Apr 21, 2023 5
![Page 6: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/6.jpg)
Freight Operation Information System (FOIS) - Back ground
1051 Million Tonnes of Freight Loading in a year 2013-14
Freight trains bring two thirds of the Indian Railway revenues
The major commodities carried by Indian Railways are Coal, Iron Ore, Food grains, Iron & Steel, Cement, Petroleum products, Fertilizer and Containerized Traffic.
specialized wagons for different types of commodities.
Apr 21, 2023 6
![Page 7: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/7.jpg)
Freight Operation Information System (FOIS) - Back ground
Freight trains do not run to a fixed schedule thus making Freight Operations a highly Information Intensive activity.
Based on this information managers make Allocation Decisions continually to dynamically Optimize Utilization of resources like wagons, locomotives, crew and paths on the network.
Real time information allows good decision making and thus ensures high levels of mobility within the system.
This realisation has led to the development of Freight Operations Information System (FOIS).
Apr 21, 2023 7
![Page 8: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/8.jpg)
Freight Operation Information System (FOIS)• Freight Operations Information System
– Conceived in 1982– Led to formation and functioning of CRIS in
1987 – RMS pilot implementation started in 1999
on NR– TMS implementation started in 2006– E-payment –pilot project 2007
• Being extended to major customers in phases
– FOIS terminals being extended to customers
Apr 21, 2023 8
![Page 9: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/9.jpg)
FOIS - OBJECTIVE A Strategic Advantage to both IR and its
customers. The implementation of the system is envisaged to eventually achieve the following:-
1. Extension of the current business practice of bulk movement in train load formation to piecemeal traffic to increase the market share by clubbing and moving together similar type of stock of "Hub & Spoke" arrangement.
2. Global tracking of consignments in real time whether in rakes or in individual wagons. The insight and pipeline of consignments would be seamlessly available for timely planning and just in time inventory management.
Apr 21, 2023 9
![Page 10: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/10.jpg)
FOIS - OBJECTIVE3. Facilitate acceptance of customer's
orders, billing and cash accountal from identified nodal customer centers which, may not necessarily be the handling terminals. These facilities could even get extended to customer's premises and along with introduction of e-commerce benefit both by reducing the burden of logistics management.
Apr 21, 2023 10
![Page 11: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/11.jpg)
FOIS MODULESFOIS comprises two major subsystems :1. Phase I -Rake Management
System (RMS) for handling the operational aspects of IR.
2. Phase II -Terminal Management System (TMS) for handling the commercial aspects of IR.
Apr 21, 2023 11
![Page 12: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/12.jpg)
Rake Management System (RMS)RMS captures the following events in real time
• Customer indents
• Wagon supply - date and time
• Departure after loading
• Running particulars - arrival/departure at stations enroute with attachments/detachments if any
• Arrival at destination
• Handling and delivery at destinationApr 21, 2023 12
![Page 13: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/13.jpg)
RMS provides information on:
1. Train Operations2. Interchange & Forecast 3. Rake based consignment tracking4. Train in pipeline5. Wagon type wise stock holding6. Consist reporting on summary basis7. Terminal handling performance8. Loco holding, outage and power on
line.
Apr 21, 2023 13
![Page 14: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/14.jpg)
RMS – Query SetConference Set – Interchange, Forecast,
Loads on Run, Stream-wise Pipeline, Traffic Flow, Terminal Position, etc.
Managerial Set – Yesterday’s Interchange, Load in Pipeline, Stock, Demand, Rake, etc.
Operations Control – I/C, Stock, Rake, Loco, Trains, Demand, etc.
Statistical Report – I/C Summary, Load, Stock
Messages – Info. Sharing, instructions/feedback
Apr 21, 2023 15
![Page 15: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/15.jpg)
Terminal Management System (TMS)
Introduced as phase II of FOIS in 2006 Enables management of activities at freight
terminals Commercial activities– RR preparations; e-
payment Document generation—wagon consist, labels Data capture and report generation—DC,WC
etc Detention analysis Commodity and customer details capture Customer facilitation in tracking consignments
for large customersApr 21, 2023 16
![Page 16: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/16.jpg)
TMS provides information on: Customers – profile, concessions, etc Booking – arrival, demand register, haulage,
RR, etc Rake handling Piecemeal Outward – F/Notes Inward – delivery, on hand, etc Charges – local, remittance, WC, DC, Bill Transshipment Query Message
Apr 21, 2023 17
![Page 17: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/17.jpg)
E-Payment of Freight E-banking facility for payment of freight,
Year 1997 Tri-partite Agreement: Railways, Bank and
Consignee Originating point intimates electronically
(TMS) freight charges due (Paid) to Bank before printing RR/ORR (Invoice)
RR generated after receipt of successful transaction message from the Bank
Synchronous Transaction – reply within 150 sec
Apr 21, 2023 18
![Page 18: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/18.jpg)
FREIGHT OPERATIONS INFORMATION SYSTEM
FOIS Phase-II (TMS Expansion) Enabling non-device locations under the
nodal concept, more than 99.9% of RR’s are booked through TMS.
IREPG, E-Payment facility . Facility has now been extended to more than
635 customers. A total of Rs. 5550 crores (Rs. 179 crores per
day) of freight payment was done through E-payment during December, 2012 which is around 71.60 % of the total freight.
Apr 21, 2023 19
![Page 19: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/19.jpg)
FOIS-BENEFITS1. Convenience and Transparency to Customers2. Optimum Utilization of Resources3. Handling of Commercial and Operational aspects of Rail and Freight Movement4. Better Decision making tools5. Help for better logistics management.6. Position of Freight Trains in Computerized Territory, ETA/ETD at a station www.fois.indianrail.gov.in 7. Commodity wise flow for customers like Power Houses, Refineries, Fertilizers, Cement Plants, Steel Depots and public freight terminals . 20
![Page 20: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/20.jpg)
FOIS-BENEFITS8. Attachment/Detachment of Rolling Stock -
Wagons in yard, Locos in Shed 9. Detention -Loading/Unloading from
different regions/locations. 10.Freight Earnings, RRs, Invoices, Demurrage
charges, Wharfage charges and other Local Charges
11.Balance Sheet, Apportionment, E-payments, Empty Haulage etc.
12.Availability of data like NTKMs, GTKMs, WTR, Outage etc.
13.Comparative/ Trend analysis on different parameters.
14.Terminal Congestion Determination etc
21
![Page 21: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/21.jpg)
22
![Page 22: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/22.jpg)
23
TEST RESULT OF FNR ENQUIRY
![Page 23: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/23.jpg)
Integrated Coaching Management System (ICMS)
1. National Train Enquiry System (NTES)2. Punctuality Analysis and Monitoring (PAM)
3. Coaching Operations Information System (COIS)
4. Coach Maintenance Management (CMM) – Pilot phase
Apr 21, 2023 24
![Page 24: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/24.jpg)
ICMS – (Integrated Coaching Management System)
MODULES IN ICMS1.National Train Enquiry System (NTES):
Captures train running details from COA and provides real time information to passengers .Status: Implemented in 1999
2.Punctuality Module (PAM):For Post facto analysis of punctuality loss and its causes (not an on-line system), Captures train running at Originating/ Terminating and interchange points and the causes of detention. Data input predominantly at Divisional HQ level. Status: Implemented in 2003Apr 21, 2023 25
![Page 25: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/25.jpg)
ICMS – (Integrated Coaching Management System)
1.Coaching Operations
Information System (COIS): Captures events on Coaches, Rakes, Generates Reports for Management of Coaching Stock. Data input predominantly at Station/Coaching Yard level.
Status: Implemented in 2006
Apr 21, 2023 26
![Page 26: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/26.jpg)
ICMS – (Integrated Coaching Management System)
Coaching Maintenance Module: Coach Maintenance Management (CMM) Presently under Pilot phase –
Pilot project and is aimed at computerization of complete Mechanical & Electrical maintenance activities of coaching depots and closely integrated with COIS.
Status : Under pilot project being implemented at coaching depots of NDLS, BCT & LKO
Apr 21, 2023 27
![Page 27: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/27.jpg)
ICMS (Integrated Coaching Management System)
PAM:Feeding mostly at divisional level. Interchange owning division controls the data feeding for handing over or taking over, Zonal client does the responsibility fixing( deciding the trains “lost in punctuality”). Activities include:
1. Originating terminating, interchange timings.
2. Detention Reports.3. Cause wise logging4. Fixing Responsibility
Apr 21, 2023 28
![Page 28: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/28.jpg)
ICMS (Integrated Coaching Management System)
COIS:Unlike PAM - no concept of data “feeding” in COIS. Instead working on the system at station/yard level leads to generation of required data (and memos for the operator).This works as input for MIS. All station/yard activities from arrival to departure of rake are captured:
1. Yard stock entry2. Dispute Resolve3. Yard Position4. Sick Marking5. Rake formation6. Sick line Placement7. Sick line Operation8. Modify consistApr 21, 2023 29
![Page 29: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/29.jpg)
ICMS (Integrated Coaching Management System)
COIS 9. Shop Marking10. Movement Shop Placement11. Movement (Yard to yard)12. Remove fit available coaches13. Rake Examination14. Search Feedbacks15. Departure Reporting16. Send Feedbacks17. En route Attachments/Detachments18. Generate memo19. Arrival Reporting
Apr 21, 2023 30
![Page 30: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/30.jpg)
ICMSICMS-MIS-REPORTS
PAM : Reports for Management at Divisional Level, HQ level, Board level like:
1. Railway Punctuality Performance for a date for a Division2. Movement of Trains (Division wise) in a Zone3. Punctuality percentage of Mail/Express4. Cause wise/Gauge Wise breakup of Lost Trains between
dates5. Division wise analysis of Cause of Lost Trains on Date in a
Zone6. Railway Punctuality performance for a date in a Zone7. Cause wise breakup of Trains lost in a period8. Summary of Monitored trains daily Run and Lost9. Section wise/Cause wise analysis for all trains on a date10. Zone wise/Cause wise analysis for all trains on a date, etc
Apr 21, 2023 31
![Page 31: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/31.jpg)
ICMSCOIS: Reports for Management at Station Level,
Divisional Level, HQ, RB level like :1. Yard Stock Position (Line position)2. Vehicle Guidance3. Zonal Stock Balance sheet (type wise details of
Bare Requirement, allotment, running in service, ineffective etc)
4. Coaches on way from/to shop5. Foreign Railway Coaches6. Ineffective Coaches7. Coach History8. Rake Link Information Zonal/Divisional
Coaching Stock allotment/availability, etc.Apr 21, 2023 32
![Page 32: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/32.jpg)
CONTROL OFFICE APPLICATION (COA) Control Office Application (COA) is
comprehensive software for the automation of Control Charting at a railway divisional control office.
COA is intended to replace the tedious manual plotting of running trains on a chart.
The core functionality of the control charting with ergonomics is intended to provide the Traffic Controllers good look-and-feel and user-friendly work environment.Apr 21, 2023 33
![Page 33: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/33.jpg)
Control Office Application (COA) Pilot project completed in TVC Division -
February, 2006 Completed phase III in October 2009 in all 69
Divisions Integration with;
NTES – NOV.2009ICMS – NOV. 2009FOIS- AUG. 2009DATA LOGGER- NOV.2012
Apr 21, 2023 34
![Page 34: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/34.jpg)
CONTROL OFFICE APPLICATION (COA)
Functionalities of COA1. Train Ordering2. Maintain Train Information3. Manage Train Movement (Abnormal
Working, Stabling, Banker Movement)4. Report Unusual Occurrences.5. Management of Maintenance Blocks6. Caution Orders
Apr 21, 2023 35
![Page 35: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/35.jpg)
CONTROL OFFICE APPLICATION (COA)Functionalities of COA7. Plot Graph.8. Advance Plotting _ System / Manual9. Maintain referential data10.MIS Reports11.Yard Management Siding12.Miscellaneous Functions13.View Station Layout
Apr 21, 2023 36
![Page 36: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/36.jpg)
Control Office Application (COA)Benefits:1. 24*7 system for train running operation.
2. Automated Chart plotting in all divisional control offices of Indian Railways.
3. Forecasting tool for Advanced planning.
4. Reporting of unusual and abnormal events.
5. MIS for management to take informed decisions.
6. Online Real-time Train running information to public through NTES.
7. Train running information to ICMS for punctuality.
8. Integration with Data-logger for automated Train Movement Capture. Apr 21, 2023 37
![Page 37: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/37.jpg)
Parcel Management System• Pilot Project on Delhi - Howrah corridor• Project architecture – RDBMS-based software
on three-tiered network• Modules
Booking and Delivery ModulesLoading and Unloading modulesDemurrage and Wharfage calculationVP and lease BookingPrinting of Bar Code Labels on packages and scanning
On Line Status and trackingOver-carriage and Undercarriage position
Apr 21, 2023 38
![Page 38: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/38.jpg)
Parcel Management System 223 parcel offices
10 corridors1. NDLS-BCT2. NDLS-MAS3. CSTM-HWH4. CSTM-SBC-MAS5. HWH-MAS6. JAT-CAPE7. NDLS-HWH8. BSB-GHY-TSK9. DLI-ADI10. SRE-LKO-SPJApr 21, 2023 39
![Page 39: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/39.jpg)
Parcel Management SystemBenefits to Customers:
1. Track latest status of the parcel through internet and SMS2. Reduction in time required for weighment and booking
Benefits to Staff3. Automatic freight calculation based on latest rules4. Reduction in human errors.
Benefits to Railways 5. Loading generally according to priority thereby curtailing
malpractices and complaints6. Beneficial to Accounts for internal check7. Reduction in Claims8. Potential for revenue generation based on improvement in
service.Apr 21, 2023 40
![Page 40: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/40.jpg)
Crew Management System (CMS)
System to enableManagement of Crew activities
BookingMonitoring including performance evaluation Information updationMIS report generationDSS for planning
Rolled out in 2007352 lobbies covered48000 daily calls served through SMSBio Data of 123970 Crew in CMSBiometrics, abnormality reporting to be
coveredApr 21, 2023 41
![Page 41: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/41.jpg)
Analytics Crew Utilization Overtime / Mileage Pre Dept Detention Outstation Rest Crew Balancing Availability On
Railnet Others Call Serve by SMS Bio Metric sign on Touch Screen Sign On Inter Server
Messaging Bi-lingual Coaching, Shunter Employee Self Service Reduced / Paper work
Planning & Control Crew Scheduling.Scheduling PME.Training, L.R.Loco Handling
SOFWARE FUNCTIONALITY
SafetyScheduling Crew Rest
10 Hrs working compliance
Exposure to current circulars
Crew Quiz - QUICK
Grading of Drivers
LI monitoring
Group SMS for breakdowns
Global availability of Driver bio-data in case of accidents
Apr 21, 2023 42
![Page 42: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/42.jpg)
Bio – Metrics Sign ON / OFF
Easier to handle. Increased
Security and authentication.
Legally binding. Quickly
adaptable for crew booking points.
Apr 21, 2023 43
![Page 43: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/43.jpg)
CMS – Breath-analyser integrationBreath analyzer
integrated with CMS For safety reasons.
On getting positive CMS will not allow
Sign onIt will also send
SMS to concern BO
Apr 21, 2023 44
![Page 44: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/44.jpg)
SOFTWARE AIDED TRAIN SCHEDULING AND NETWORK GOVERNANCE (SATSaNG) For Train Scheduling – Proposed by Rly. Bd. In
2007 Data entry for infrastructure data enabled in 2012BENEFITS The application has features that will enable
creation of conflict free paths for train services and
conflict free allocation of resources. The acronym SATSaNG means the collective search for truth, in Sanskrit. Planners at the Zonal level can use this application to refine their solutions and find newer ones with greater ease.
Apr 21, 2023 45
![Page 45: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/45.jpg)
Radio Frequency Identification (RFID)
For Automatic Identification of Railway Wagons using RFID
Pilot project with Rs. 2 crore provisions from FOIS estimate in Talcher, Paradeep and Vishakhapatnam locations has been executed. Detailed estimate for roll out as per revised instruction of Railway Board has been sent to CAO/FOIS, NR for sanction.
PO for the Tender for AMC of RFID locations has been issued in April 2013
Apr 21, 2023 46
![Page 46: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/46.jpg)
Apr 21, 2023 47
RFID
RFID READER
![Page 47: IT Applications in Operations by Sr Prof Tm](https://reader031.fdocuments.in/reader031/viewer/2022013108/563dbb1d550346aa9aaa63ce/html5/thumbnails/47.jpg)
Thank You
Apr 21, 2023 48