Issue in Setting Up 660 MW

26
By Ujjawal Kumar.

Transcript of Issue in Setting Up 660 MW

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 1/26

By

Ujjawal Kumar.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 2/26

Statutory

Techno Economic

Financial

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 3/26

Necessity of the plant

Site LocationTechnology

Managerial Capability

Past Experience

Letter of Consent to SEB

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 4/26

NOC from

State Govt.

State Electricity Board

State Pollution Board

Fuel Comfort Level

Water Clearance from State

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 5/26

From CEA after submitting feasibility reportalong with minimum required statutoryclearances

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 6/26

Publication

Schemes to be published in the official Gazette/local news papers as the generating company may

consider necessary along with a notice for at leasttwo months and modification if any consequent topublic representation.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 7/26

Water Availability

From Irrigation department

If necessary from state, central/ watercommission.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 8/26

Pollution Clearance Water and Air

State pollution board/ Central ministry of Environment& Forest

Environment Impact Assessment

Environment Management Program

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 9/26

Environment & Forest Clearance

State Govt./ Min of E&F

Civil Aviation Clearance for Chimney Height

National Airport Authority

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 10/26

Rehabilitation & Resettlement of DisplacedFamilies by Land acquisition

Min of E&F / State Govt.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 11/26

Land Availability - State Govt.

Fuel Linkage - Dept of Coal, Dept of petroleum &

Natural Gas

Financing - CEA, Dept of Power, Dept of Economic Affairs, Financial Institutions.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 12/26

Transportation of Fuel

Dept of Coal, Min of Petroleum & Natural Gas,Min of Railways, Shipping & Surface Transport.

Risk Involved

Sharing of risk

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 13/26

General Contents

Need of the Project

Site Features

Fuel Linkage & Transportation to sitePlant Layout & Civil aspects

Main plant equipment & systems

Instrumentation & Control systems

Fuel handling systems

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 14/26

Waste handling systems

Electrical systems

Environmental aspectsProject Scheduling & Implementation

Project Cost estimates

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 15/26

Such technology is already existing

Capacity of operating plants

Performance of operating plantsRisk involved in adopting the technology

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 16/26

Availability in long runQuality of fuelExpected variation in quality

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 17/26

Dept, Extent of DeptEquity, Extent of EquityAnalyse Cost of EquityAnalyse Cost of DeptFinalise Dept Equity RatioMeans of Dept

Means of Equity

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 18/26

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 19/26

Operating Conditions forDeemed GenerationNon generationCapacity/Availability Declarations on bar/ on generatorRevised declarationsPayment termsGuaranteed Dispatches

*

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 20/26

Security Mechanism Letter of CreditEscrow facilityCounter guarantee. State/Central

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 21/26

O&M costWorking CapitalDepreciationTaxes & reimbursements

Tax holiday

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 22/26

Gestation Period

EPC

PackageAdvantages & disadvantages

*

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 23/26

Necessity of team to review & follow up of project progress to reduce delays.

Delays results in increased project costthrough increased interest during construction.

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 24/26

DepartmentalThrough ContractAdvantages & Disadvantages

RecruitmentTraining

*

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 25/26

7/31/2019 Issue in Setting Up 660 MW

http://slidepdf.com/reader/full/issue-in-setting-up-660-mw 26/26

*