Issuance of Building Permit - Simple Transaction
Transcript of Issuance of Building Permit - Simple Transaction
![Page 1: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/1.jpg)
Issuance of Building Permit - Simple Transaction
BRIEF DESCRIPTION
Any person, firm, or corporation, including any department, office, bureau, agency of instrumentality of the government intending to construct, alter, repair, move, convert or demolish any building or structure, or cause the same to be done, shall obtain a building permit from the Building Official for whichever of such work is proposed to be undertaken for the building or structure, before any such work is started.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Building Permit that shall not exceed 1500 square meters in floor area; - Single dwelling residential - not more than (3)-storeys,
- Commercial Building - not more than (2)-storeys,
- Warehouse not storing hazardous substance,
- Renovation within a mall with Issued Building Permit
WHAT ARE THE REQUIREMENTS
1. Unified Application Form for Building Permit
2. Filled-up Application Form for Locational Clearance 3. In case the applicant is the registered owner of the lot;
- Two (2) Certified true copy of TCT (Transfer Certificate of
Title), on file with the Registry of Deeds,
- Two (2) Copies Tax Declaration
- Two (2) Copies Current Real Property Tax Receipt In case the applicant is not the registered owner of the lot,
in addition to the above, any of the following;
- Two (2) Copies of Duly Notarized Lease Contract
- Two (2) Copies Deed of Absolute Sale - Two (2) Copies Contract to Sell
4. Four (4) Complete sets of Plans/Drawings and Specifications Signed and Sealed by duly licensed and registered
Professional/s:
- Four (4) Sets of Approved Location Plans/Survey Plans (signed and sealed by Geodetic Engr.) - Four (4) Sets of Site Development Plan (signed and sealed by Architect or Civil Engr.) - Four (4) Sets of Architectural Plan & Specifications (signed and sealed by Architect or Civil Engr.)
- Four (4) Sets of Structural Plan & Specifications (signed and sealed by Civil/Structural Engr.)
- Two (2) Sets of Structural Computation/Analysis (signed and sealed by Civil/Structural Engr.)
- Four (4) Sets of Sanitary/Plumbing Plan & Specifications (signed and sealed by Sanitary Engr.)
- Four (4) Sets of Electrical Plan & Specifications (signed and sealed by Prof. Electrical Engr.) - Four (4) Sets of Mechanical Plan & Specifications (signed and sealed by Prof. Mechanical Engr.)
- Four (4) Sets of Electronics Plan & Specifications (signed and sealed by Prof. ECE)
Note: (All pages must be originally signed and sealed) 5. Four (4) Sets of Notarized Estimate value of the building/structure to be erected/Bill of Materials as declared by the owner
6. Specifications (Signed and Sealed by duly licensed and registered Professional/s) 7. Photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
8. Others if Applicable:
-Construction Safety and Health Program (DOLE)
-Soil Test (for 3-storey or more)
-Affidavit of Undertaking
-Other Clearances
FEES
Based on the Building Code/System Generated
FORMS
- Unified Application Form - Electronics Permit Form
- Building Permit Form - Sign Permit Form
- Electrical Permit Form - Fencing Permit Form
- Sanitary/Plumbing Permit Form - Excavation and Ground Preparation Form
- Mechanical Permit Form - Locational Clearance
NOTE: Forms required depending upon the type of application
![Page 2: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/2.jpg)
DURATION
3 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 30 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 1 hour Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 30 min Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
C. Plans Evaluation 1 hour Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
D. Site Inspection 2 hours Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 30 min Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 15 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
4 hours
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 15 min Engr. Myles H. Funtila
I. Archiving 30 min Cerecio D. Conversion
J. Tarpaulin Printing 10 min Cerecio D. Conversion
4 Claiming of Building Permit * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 3: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/3.jpg)
Issuance of Building Permit - Complex Transaction
BRIEF DESCRIPTION
Any person, firm, or corporation, including any department, office, bureau, agency of instrumentality of the government intending to construct, alter, repair, move, convert or demolish any building or structure, or cause the same to be done, shall obtain a building permit from the Building Official for whichever of such work is proposed to be undertaken for the building or structure, before any such work is started.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Building Permit not mentioned in Simple and Highly Technical Transaction
WHAT ARE THE REQUIREMENTS
1. Unified Application Form for Building Permit
2. Filled-up Application Form for Locational Clearance
3. In case the applicant is the registered owner of the lot; - Two (2) Certified true copy of TCT (Transfer Certificate of
Title), on file with the Registry of Deeds,
- Two (2) Copies Tax Declaration
- Two (2) Copies Current Real Property Tax Receipt
In case the applicant is not the registered owner of the lot, in addition to the above, any of the following;
- Two (2) Copies of Duly Notarized Lease Contract
- Two (2) Copies Deed of Absolute Sale
- Two (2) Copies Contract to Sell
4. Four (4) Complete sets of Plans/Drawings and Specifications Signed and Sealed by duly licensed and registered Professional/s:
- Four (4) Sets of Approved Location Plans/Survey Plans (signed and sealed by Geodetic Engr.)
- Four (4) Sets of Site Development Plan (signed and sealed by Architect or Civil Engr.)
- Four (4) Sets of Architectural Plan & Specifications (signed and sealed by Architect or Civil Engr.) - Four (4) Sets of Structural Plan & Specifications (signed and sealed by Civil/Structural Engr.)
- Two (2) Sets of Structural Computation/Analysis (signed and sealed by Civil/Structural Engr.)
- Four (4) Sets of Sanitary/Plumbing Plan & Specifications (signed and sealed by Sanitary Engr.)
- Four (4) Sets of Electrical Plan & Specifications (signed and sealed by Prof. Electrical Engr.
- Four (4) Sets of Mechanical Plan & Specifications (signed and sealed by Prof. Mechanical Engr.) - Four (4) Sets of Electronics Plan & Specifications (signed and sealed by Prof. ECE)
Note: (All pages must be originally signed and sealed) 5. Four (4) Sets of Notarized Estimate value of the building/structure to be erected/Bill of Materials as declared by the owner
6. Specifications (Signed and Sealed by duly licensed and registered Professional/s)
7. Photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
8. Others if Applicable:
-Construction Safety and Health Program (DOLE)
-Soil Test (for 3-storey or more)
-Affidavit of Undertaking
-Other Clearances
FEES
Based on the Building Code/System Generated
FORMS
- Unified Application Form - Electronics Permit Form
- Building Permit Form - Sign Permit Form
- Electrical Permit Form - Fencing Permit Form
- Sanitary/Plumbing Permit Form - Excavation and Ground Preparation Form
- Mechanical Permit Form - Locational Clearance
NOTE: Forms required depending upon the type of application
![Page 4: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/4.jpg)
DURATION
7 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 1 hour Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 2 hours Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 1 hour Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
C. Plans Evaluation 1 hour Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
D. Site Inspection 4 hour Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 1 hour Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 15 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
6 hours
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 30 min Engr. Myles H. Funtila
I. Archiving 1 hour Cerecio D. Conversion
J. Tarpaulin Printing 10 min Cerecio D. Conversion
4 Claiming of Building Permit * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 5: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/5.jpg)
Issuance of Building Permit - Highly Technical Transaction
BRIEF DESCRIPTION
Any person, firm, or corporation, including any department, office, bureau, agency of instrumentality of the government intending to construct, alter, repair, move, convert or demolish any building or structure, or cause the same to be done, shall obtain a building permit from the Building Official for whichever of such work is proposed to be undertaken for the building or structure, before any such work is started.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for other Applications requiring Sangguniang Panlungsod Resolution and Clearances from other agencies.
WHAT ARE THE REQUIREMENTS
1. Unified Application Form for Building Permit
2. Filled-up Application Form for Locational Clearance 3. In case the applicant is the registered owner of the lot;
- Two (2) Certified true copy of TCT (Transfer Certificate of
Title), on file with the Registry of Deeds,
- Two (2) Copies Tax Declaration
- Two (2) Copies Current Real Property Tax Receipt In case the applicant is not the registered owner of the lot,
in addition to the above, any of the following;
- Two (2) Copies of Duly Notarized Lease Contract
- Two (2) Copies Deed of Absolute Sale - Two (2) Copies Contract to Sell
4. Four (4) Complete sets of Plans/Drawings and Specifications Signed and Sealed by duly licensed and registered
Professional/s:
- Four (4) Sets of Approved Location Plans/Survey Plans (signed and sealed by Geodetic Engr.)
- Four (4) Sets of Site Development Plan (signed and sealed by Architect or Civil Engr.) - Four (4) Sets of Architectural Plan & Specifications (signed and sealed by Architect or Civil Engr.)
- Four (4) Sets of Structural Plan & Specifications (signed and sealed by Civil/Structural Engr.)
- Two (2) Sets of Structural Computation/Analysis (signed and sealed by Civil/Structural Engr.)
- Four (4) Sets of Sanitary/Plumbing Plan & Specifications (signed and sealed by Sanitary Engr.)
- Four (4) Sets of Electrical Plan & Specifications (signed and sealed by Prof. Electrical Engr.) - Four (4) Sets of Mechanical Plan & Specifications (signed and sealed by Prof. Mechanical Engr.)
- Four (4) Sets of Electronics Plan & Specifications (signed and sealed by Prof. ECE)
Note: (All pages must be originally signed and sealed) 5. Four (4) Sets of Notarized Estimate value of the building/structure to be erected/Bill of Materials as declared by the owner
6. Specifications (Signed and Sealed by duly licensed and registered Professional/s) 7. Photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
8. Others if Applicable:
-Construction Safety and Health Program (DOLE)
-Soil Test (for 3-storey or more)
-Affidavit of Undertaking
-Other Clearances
FEES
Based on the Building Code/System Generated
FORMS
- Unified Application Form - Electronics Permit Form
- Building Permit Form - Sign Permit Form
- Electrical Permit Form - Fencing Permit Form
- Sanitary/Plumbing Permit Form - Excavation and Ground Preparation Form
- Mechanical Permit Form - Locational Clearance
NOTE: Forms required depending upon the type of application
![Page 6: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/6.jpg)
DURATION
20 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 6 hours Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 1 day Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 3 hours Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
C. Plans Evaluation 5 days Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
D. Site Inspection 1 day Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 3 hours Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 15 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
1 day
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 45 min Engr. Myles H. Funtila
I. Archiving 1 hour & 30 min Cerecio D. Conversion
J. Tarpaulin Printing 10 min Cerecio D. Conversion
4 Claiming of Building Permit * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 7: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/7.jpg)
![Page 8: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/8.jpg)
Issuance of Certificate of Occupancy -Simple Transaction
BRIEF DESCRIPTION
It must be secured after the completion of construction. An Occupancy Permit is required before any building or structure is used or occupied. It is also required if there is any change in existing use or occupancy classification of a building, structure or any portion thereof.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Occupancy Permit that shall not exceed 1500 square meters in floor area; - Single dwelling residential - not more than (3)-storeys,
- Commercial Building - not more than (2)-storeys,
- Warehouse not storing hazardous substance,
- Renovation within a mall with Issued Building Permit
WHAT ARE THE REQUIREMENT
1. Filled-up Unified Application Form for Certificate of Occupancy
2. Five (5) copies of duly notarized Certificate of Completion using the
form in Annex H, signed by the owner/applicant and signed and
sealed by the duly licensed Architect or Civil Engineer in-charge of
construction, and one copy of the construction logbook. If the
construction was undertaken through a contract, the Certificate of
Completion shall be signed by the contractor/Authorized Managing Officer
3. Three (3) sets As-Built Plan (Architectural, Structural, Electrical, Sanitary/Plumbing, Mechanical, Electronics, Sign Permit) *signed
and sealed by professionals
4. One (1) photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
5. Photograph of the completed structure showing front, sides and rear areas
6. Others * Photocopy of Permits (Building/Electrical/Sanitary/Plumbing/Mechanical, Electronics, Sign Permit) *all pages back to back
* Copy of Approved Plan
FEES
Based on the Building Code/System Generated
FORMS
Unified Application Form for Certificate of Occupancy Certificate of Completion
DURATION
3 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 30 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 1 hour Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 30 min Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
![Page 9: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/9.jpg)
C. Plans Evaluation 30 min Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
D. Site Inspection 2 hours Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 30 min Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 15 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
2 hours
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 15 min Engr. Myles H. Funtila
I. Archiving 15 min Cerecio D. Conversion
4 Claiming of Certificate of Occupancy * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 10: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/10.jpg)
Issuance of Certificate of Occupancy - Complex Transaction
BRIEF DESCRIPTION
It must be secured after the completion of construction. An Occupancy Permit is required before any building or structure is used or occupied. It is also required if there is any change in existing use or occupancy classification of a building, structure or any portion thereof.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Occupancy Permit not mentioned in Simple and Highly Technical Transaction
WHAT ARE THE REQUIREMENTS
1. Filled-up Unified Application Form for Certificate of Occupancy
2. Five (5) copies of duly notarized Certificate of Completion using the
form in Annex H, signed by the owner/applicant and signed and
sealed by the duly licensed Architect or Civil Engineer in-charge of
construction, and one copy of the construction logbook. If the
construction was undertaken through a contract, the Certificate of
Completion shall be signed by the contractor/Authorized Managing
Officer
3. Three (3) sets As-Built Plan (Architectural, Structural, Electrical,
Sanitary, Plumbing, Mechanical, Electronics, Sign Permit) *signed and
sealed by professionals
4. One (1) photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
5. Photograph of the completed structure showing front, sides and rear areas
6. Yellow Card issued by Electrical Service Provider
7. Others * Photocopy of Permits (Building/Electrical/Sanitary/Plumbing/Mechanical, Electronics, Sign Permit) *all pages back to back
* Copy of Approved Plan
FEES
Based on the Building Code/System Generated
FORMS
Unified Application Form for Certificate of Occupancy Certificate of Completion
DURATION
7 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 1 hour and 30 min
Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 2 hours Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 1 hour and 30 min
Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
![Page 11: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/11.jpg)
C. Plans Evaluation 1 hour and 30 min
Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
D. Site Inspection 4 hours Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 1 hour Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 30 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
2 hours and 30 min
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 30 min Engr. Myles H. Funtila
I. Archiving 30 min Cerecio D. Conversion
4 Claiming of Certificate of Occupancy * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 12: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/12.jpg)
Issuance of Certificate of Occupancy -Highly Technical Transaction
BRIEF DESCRIPTION
It must be secured after the completion of construction. An Occupancy Permit is required before any building or structure is used or occupied. It is also required if there is any change in existing use or occupancy classification of a building, structure or any portion thereof.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for other Applications requiring Sangguniang Panlungsod Resolution and Clearances from other agencies.
WHAT ARE THE REQUIREMENTS
1. Filled-up Unified Application Form for Certificate of Occupancy
2. Five (5) copies of duly notarized Certificate of Completion using the
form in Annex H, signed by the owner/applicant and signed and
sealed by the duly licensed Architect or Civil Engineer in-charge of
construction, and one copy of the construction logbook. If the
construction was undertaken through a contract, the Certificate of
Completion shall be signed by the contractor/Authorized Managing
Officer
3. Three (3) sets As-Built Plan (Architectural, Structural, Electrical,
Sanitary, Plumbing, Mechanical, Electronics and Sign Permit) *signed
and sealed by professionals
4. One (1) photocopy of the Valid Licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation
Commission identification card)
5. Photograph of the completed structure showing front, sides and rear areas
6. Others * Photocopy of Permits (Building/Electrical/Sanitary/Plumbing/Mechanical, Electronics and Sign Permit) *all pages back to back
* Copy of Approved Plan
FEES
Based on the Building Code/System Generated
FORMS
Unified Application Form for Certificate of Occupancy Certificate of Completion
DURATION
20 Days (with Zoning/Locational Clearance; Fire Safety Evaluation Clearance (FSEC) or Fire Safety Inspection Certificate (FSIC))
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 4 hours Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 1 day Josefina V. Beato Ruth R. Tanchico
B. Encoding and Evaluation thru BPAS 4 hours Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
C. Plans Evaluation
6 hours
Engr. Myles H. Funtila Allan G. Banaticla Melody B. Lijauco
Camille M. Alhambra Edwin P. Patron Jay-Arr V. Batitis
![Page 13: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/13.jpg)
D. Site Inspection 1 day Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
Omar P. Babasanta Niño Gover M. Mosqueda
Nelson T. Nuñez Ronald C. Ira
E. Preparation of Inspection Report 4 hours Rodelito S. Tardeo Kent Louie M. Almontero Christian Jay O. Bautista
F. Assessment and Preparation of Order Payment 45 min Engr. Myles H. Funtila Allan G. Banaticla
Camille M. Alhambra Edwin P. Patron
Melody B. Lijauco Jay-Arr V. Batitis
2 Issuance of Order Payment
15 min Josefina V. Beato Ruth R. Tanchico
3 Payment of Fees/Submission of Official Receipt
15 min Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
G. Documentation
4 hours
Josefina V. Beato Filomeno A. Carvajal Jr.
Mike Anthony C. Barrera Ruth R. Tanchico
Jasmin A. Bartolome
H. Approval 1 hour Engr. Myles H. Funtila
I. Archiving 1 hour Cerecio D. Conversion
4 Claiming of Certificate of Occupancy * The Applicant will submit Claim Stub
15 min Josefina V. Beato Ruth R. Tanchico
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 14: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/14.jpg)
Issuance of Certificate of Final Electrical Inspection - Simple Transaction
BRIEF DESCRIPTION
This document is required before putting up new, additional or alteration of electrical installations.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Meralco Service Connection for buildings/structures with issued Building Permit and Occupancy Permit that shall not exceed 1500 square meters in floor area; - Single dwelling residential - not more than (3)-storeys,
- Commercial Building - not more than (2)-storeys,
- Warehouse not storing hazardous substance,
- Renovation within a mall with Issued Building Permit
WHAT ARE THE REQUIREMENTS
A. With Issued Building and Occupancy Permit
- One (1) copy of Occupancy Permit and Electrical Permit
- Approved Application from Meralco (via Email)
B. With No Building and Occupancy Permit
1. In case the applicant is the registered owner of the lot;
Transfer Certificate of Title (TCT) - Certified True Copy from RD (updated)
Tax Declaration (Land)
Real Estate Tax Receipt
In case the applicant is not the registered owner of the lot (Additional Requirements whichever is applicable) Deed of Sale/Contract to Sell/Lease Contract
Undertaking/Extra Judicial Settlement Others: Specify ___________________
2. Barangay Clearance 3. Photocopy of Valid ID 4. Old Meralco Bill 5. Locational Clearance 6. Electrical and Schedule of Loads (signed and sealed by Professional Electrical Engineer)
* Floor Plan
* Picture of House/Building
FEES
Based on the Building Code/System Generated
FORMS
Permit for Temporary Service Connection
DURATION
3 Days (with Complete Requirements)
STEPS IN AVAILING THE SERVICE (For Feasible Applicants Notified via Text Message)
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 30 minutes Leonilo L. Maaghop Benjie C. Candelaria
Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Plans Evaluation 1 hour Allan G. Banaticla Rodelito S. Tardeo
Christian Jay O. Bautista
![Page 15: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/15.jpg)
B. Site Inspection 2 hours Rodelito S. Tardeo Christian Jay O. Bautista
Omar P. Babasanta Antonino G. Tan Nelson T. Nuñez
Ronald C. Ira
C. Assessment and Preparation of Order Payment 15 min Josefina V. Beato Ruth R. Tanchico
Leonilo L. Maaghop Benjie C. Candelaria
2 Receipt of Order Payments
15 min Leonilo L. Maaghop Benjie C. Candelaria
3 Payment of Fees/Submission of Official Receipt - Issuance of CFEI No.
15 min Leonilo L. Maaghop Benjie C. Candelaria
BACK ROOM OPERATION
D. Archiving 15 min Elvira B. Corral
4 Transmittal of E-Copy of CFEI to Meralco 1 hour Benjie C. Candelaria Josefina V. Beato
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 16: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/16.jpg)
Issuance of Certificate of Final Electrical Inspection - Complex Transaction
BRIEF DESCRIPTION
This document is required before putting up new, additional or alteration of electrical installations.
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Meralco Service Connection for buildings/structures with issued Building Permit and Occupancy Permit not mentioned in Simple Transaction
WHAT ARE THE REQUIREMENTS
A. With Issued Building and Occupancy Permit
- One (1) copy of Occupancy Permit and Electrical Permit
- Approved Application from Meralco (via Email)
B. With No Building and Occupancy Permit
1. In case the applicant is the registered owner of the
lot;
Transfer Certificate of Title (TCT) - Certified True Copy
from RD (updated)
Tax Declaration (Land)
Real Estate Tax Receipt
In case the applicant is not the registered owner of the lot (Additional Requirements whichever is applicable) Deed of Sale/Contract to Sell/Lease Contract
Undertaking/Extra Judicial Settlement
Others: Specify ___________________
2. Barangay Clearance 3. Photocopy of Valid ID 4. Old Meralco Bill 5. Locational Clearance 6. Electrical and Schedule of Loads (signed and sealed by Professional Electrical Engineer)
* Floor Plan
* Picture of House/Building
FEES
Based on the Building Code/System Generated
FORMS
Permit for Temporary Service Connection
DURATION
7 Days (with Complete Requirements)
STEPS IN AVAILING THE SERVICE (For Feasible Applicants Notified via Text Message)
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and checking of all requirements 30 minutes Leonilo L. Maaghop Benjie C. Candelaria
Josefina V. Beato Ruth R. Tanchico
BACK ROOM OPERATION
A. Document Verification 2 hours Leonilo L. Maaghop Benjie C. Candelaria
Josefina V. Beato Ruth R. Tanchico
B. Plans Evaluation 2 hours Allan G. Banaticla Rodelito S. Tardeo
Christian Jay O. Bautista
![Page 17: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/17.jpg)
C. Site Inspection 4 hours Rodelito S. Tardeo Christian Jay O. Bautista
Omar P. Babasanta Antonino G. Tan Nelson T. Nuñez
Ronald C. Ira
D. Assessment and Preparation of Order Payment 15 min Josefina V. Beato Ruth R. Tanchico
Leonilo L. Maaghop Benjie C. Candelaria
2 Receipt of Order Payments
15 min Leonilo L. Maaghop Benjie C. Candelaria
3 Payment of Fees/Submission of Official Receipt - Issuance of CFEI No.
15 min Leonilo L. Maaghop Benjie C. Candelaria
BACK ROOM OPERATION
E. Archiving 15 min Elvira B. Corral
4 Transmittal of E-Copy of CFEI to Meralco 1 hour Benjie C. Candelaria Josefina V. Beato
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official
![Page 18: Issuance of Building Permit - Simple Transaction](https://reader033.fdocuments.in/reader033/viewer/2022061607/62a011b4ffd51e75696844c5/html5/thumbnails/18.jpg)
Issuance of OBO Clearance for Business Permits – Simple Transaction
BRIEF DESCRIPTION
This document is issued to compliant Business Establishment
DEPARTMENT/OFFICE CONCERNED
OFFICE OF THE BUILDING OFFICIAL (OBO)
SCHEDULE OF AVAILABILITY OF SERVICE
Monday – Friday 8:00AM - 5:00PM (No Noon Break)
WHO MAY AVAIL OF THE SERVICE
Those who are applying for Annual Inspection Certificate for Business Establishment with issued Building Permit and Occupancy Permit that shall not exceed 1500 square meters in floor area; - Single dwelling residential - not more than (3)-storeys,
- Commercial Building - not more than (2)-storeys,
- Warehouse not storing hazardous substance,
- Renovation within a mall with Issued Building Permit
WHAT ARE THE REQUIREMENTS
1. Certificate of Occupancy
2. As-Built Plan
3. Contract for Lease (For New Business)
4. Transfer Certificate of Title/Tax Declaration (For New
Business)
FEES
Based on the Building Code/System Generated
FORMS
N/A
DURATION
3 Days (with Complete Requirements)
STEPS IN AVAILING THE SERVICE
STEP PROCEDURE DURATION PERSON IN CHARGE
1 Submission and verification of all requirements 10 minutes Omnafe I. Repato Kazle B. Almodovar
Rino T. Alimagno Angelo M. Raflores
Bheejay Francis C. Mendoza
2 Assessment of Fees 10 minutes Omnafe I. Repato Kazle B. Almodovar
Rino T. Alimagno
FEEDBACK MECHANISM
Client may use Comments and Suggestion Box provided at the Office of the Building Official (OBO)
CONTACT DETAILS
Land Line - (049) 530-0015 local 3501 Globe - 0926-369-7691, 0906-771-3625 Smart - 0961-421-9727
ENGR. MYLES H. FUNTILA ARLENE B. ARCILLAS City Government Department Head I City Mayor Office of the Building Official